Subject : Order List for FLR.TILES AT 4TH, 5TH, 6TH & 7TH FLR. (NOT INCLUDED THE TILES FOR C.R. & WALL)
Date : 8/26/2019
Item
Description Sizes Qty Unit Remarks / Brand Reference Piture
No.
A.) Order List for FLR.TILES AT 4TH, 5TH, 6TH & 7TH FLR. (NOT INCLUDED THE TILES FOR C.R. & WALL)
Prepared By:
ROLAND GONZALES
Civil Engineer
Approved By:
Project : Proposed 11 Storey Mixed Use Building
Subject : Order List for FLR.TILES AT 4TH, 5TH, 6TH & 7TH FLR. (NOT INCLUDED THE TILES FOR C.R. & WALL)
Date : 8/26/2019
Item
Description Sizes Qty Unit Remarks / Brand Reference Piture
No.
Mr. Ding Shen Zhou
Project Manager
5000 GAL 1000 LIT 18927.06 18927.06 LITERS
264.172 GAL
Project : Proposed 11 Storey Mixed Use Building at Capitan Ambo St., Pasay City, Metro Manila
Subject : Order List for TILES (FLR. & WALL)
Flr. No. / Area 8TH, 9TH, 10TH & 11TH FLR. / BALCONY, BEDROOM, LIVING ROOM & C.R.
Order No. 2
Date : 12/5/2019
Item
Description Sizes Qty Unit Remarks / Brand Reference Piture
No.
A.) Order List for TILES AT 8TH, 9TH, 10TH & 11TH FLR. (BALCONY)
B.) Order List for TILES AT 8TH, 9TH, 10TH & 11TH FLR. (BEDROOM, LIVING ROOM)
C.) Order List for TILES AT 8TH, 9TH, 10TH & 11TH FLR. (C.R.)
Prepared By:
ROLAND GONZALES
Civil Engineer
Approved By:
Mr. Ding Shen Zhou
Project Manager
Project : Proposed 11 Storey Mixed Use Building
Subject : Order List for FLR.TILES AT 8TH, 9TH, 10TH & 11TH FLR.
Date : 12/5/2019
B.) Order List for FLR.TILES AT 4TH, 5TH, 6TH & 7TH FLR. (C.R.)
80 SQ.M. (FOR
3 TILES 300MM X 300MM 880 PCS
FLOOR)
C.) Order List for FLR.TILES AT 4TH, 5TH, 6TH & 7TH FLR. (BALCONY)
Prepared By:
ROLAND GONZALES
Civil Engineer
Approved By:
Mr. Ding Shen Zhou
Project Manager
Project : Proposed 11 Storey Mixed Use Building
Subject : Order List for FLR.TILES AT 4TH, 5TH, 6TH & 7TH FLR.
Date : 9/4/2019
B.) Order List for FLR.TILES AT 4TH, 5TH, 6TH & 7TH FLR. (C.R.)
80 SQ.M. (FOR
3 TILES 300MM X 300MM 880 PCS
FLOOR)
C.) Order List for FLR.TILES AT 4TH, 5TH, 6TH & 7TH FLR. (BALCONY)
Prepared By:
ROLAND GONZALES
Civil Engineer
Approved By:
Mr. Ding Shen Zhou
Project Manager