This document contains the results of the weekly and monthly checks of the diesel/hydraulic cranes on a rig. The checks found that most items on both cranes were operating properly, with a few exceptions: the port crane's boom hoist was not spooling correctly, cable replacements were needed for the whip and boom lines, and the starboard crane's auxiliary hoist oil needed changing. In addition, the port crane's boom wire showed some damage but no broken wires, while the starboard crane's boom wire had two broken wires at the 68 degree mark.
This document contains the results of the weekly and monthly checks of the diesel/hydraulic cranes on a rig. The checks found that most items on both cranes were operating properly, with a few exceptions: the port crane's boom hoist was not spooling correctly, cable replacements were needed for the whip and boom lines, and the starboard crane's auxiliary hoist oil needed changing. In addition, the port crane's boom wire showed some damage but no broken wires, while the starboard crane's boom wire had two broken wires at the 68 degree mark.
This document contains the results of the weekly and monthly checks of the diesel/hydraulic cranes on a rig. The checks found that most items on both cranes were operating properly, with a few exceptions: the port crane's boom hoist was not spooling correctly, cable replacements were needed for the whip and boom lines, and the starboard crane's auxiliary hoist oil needed changing. In addition, the port crane's boom wire showed some damage but no broken wires, while the starboard crane's boom wire had two broken wires at the 68 degree mark.
WEEKLY AND MONTHLY CHECKS Serial No : N-D6585-48DNS-120-97 N-D6585-48DNS-121-97
Hours : 2450 2710
Location of Crane: Port Stbd N/A Item Item To Be Checked Each Week CRANE CRANE CRANE No OK Fault OK Fault OK Fault 1 Test Rated Capacity Indicator ( S.W.L.I. ) with Calibrated Load Cell at dedicated test point or by a known weight on rig X X 2 Boom Saver System for Proper Operation X X 3 Boom Angle Limiter. Maximum Angle Port Crane 77 deg Starboard 78 deg X X 4 Boom Hoist Lock Pawl Engagement / Disengagement with Ratchet Wheel Teeth. X X 5 Slew Gear - OK / no excessive play X X 6 Spooling & Wedge Socket Terminations X X X 7 Spooling & Wedge Socket Terminations X X 8 Spooling & Wedge Socket Terminations X X ( 31 Jan 02 Stbd Crane) (31 Jan 02 PortCrane) 9 Condition of - Hook - Date Last Close Inspection (M.P.I.) : X X 10 Gear Box Level - Swing X X 11 Gear Box Level - Boom X X 12 Gear Box Level - Hoist Main X X 13 Gear Box Level - Whip Line X X 14 Triple Drive Oil Level X X 15 Hydraulic Oil Reservoir level X X 16 Hydraulic System for leaks X X 17 Air Line & Starter Lubricator Oil Level X X 18 Walkways, Railings & Access Ladders X X 19 Aircraft Warning Lights X X 20 Fire Extinguisher is OK X X 21 Thoroughly Inspect each Wire Rope for Deterioration such as: Reduction of Rope Diameter, X X Broken or Worn Outside Wires, Corroded & Cracked End Connections and Severe Kinking, Crushing and unstranding of Wires. Item To Be Checked Each Month This Section Due : March 31 02 1 Check hooks for cracks and deformation X X 2 Inspect Boom for deformed, cracked, corroded or missing members X X 3 Inspect Main Frame for deformed, cracked, corroded or missing members X X 4 Check for loose bolts on Hyd Pumps & Motors - Swing Bearing, Gantry, Swing Gear Reducer & Shaft Assemblies X X 5 Inspect Sheaves for Cracks, Chips, excessive wear and that they operate freely X X 6 Inspect all load, angle and weight indicating systems over their full range for significant inaccuracies X X 7 Check for worn, cracked, distorted, or dislocated boom pins, wire rope rollers and swing bearing gear teeth X X 8 Check Triple Drive Pump Gearbox Oil Level. X X Port: Boom: 28 Nov 01 Main: 21 Aug 98 Whip: 20 Nov 01 Stbd : Boom: 02 Jan 01 Main: 02 Jan 01 Whip: 01 Mar 01 Wylie system fully functional.- Port Crane Boom Hoist Cable Not Spooling Correctly Crane Cable s on Order- Whip-Fr# 07590,Boom Fr#-07424,Stock-1 whip,1 Boom,1 Main Port Crane boom wire has some damage but no broken wires. It can be seen 1st layer plus 8 wraps on the second layer. Walked Port Crane Boom and did inspection- no damge found-Alex Bray,Gear Oil STbd CraneAux Hoist needs to be Changed(Done March 30 02) Stbd Crane boom wire has 2 broken wires at 68 deg. Visible if standing at hoist. It has been marked w/ chalk.(No Change from Last Report) Signatures and Date March 31 02
Crane Operator Day Shift O.I.M
Achyar W.D Sumrall
Supeno Crane Operator Night Shift Barge Engineer Alex Bray