PROJECT: FIVE STAR TERMINAL

LOCATION: EDSA CUBAO QUEZON CITY METRO MANILA


ATTENTION: Maam: Ria Hernandez

SCOPE OF WORKS OF ROOFING WORKS:


 Dismantling of old skylight corrugated sheets top roof.
 Dismantling of old skylight plain sheets for media agua.
 Installation of new skylight corrugated sheets for top roof.
 Installation of new skylight plain sheets for media agua.
 Cleaning and apply Fed Seal all joints of stainless gutters.

MATERIALS BREAKDOWN:

 8 = pcs, corrugated skylight gauge 2.5 MM x 24 ft, long x 4 ft w =P 55,680


 8 = pcs, corrugated skylight gauge 2.5 MM x 31 ft long 4 ft w =P 71,920
 4 = pcs, corrugated skylight gauge 2.5 MM x 27 ft long x 4 ft w =P 31,320
 4 = pcs, corrugated skylight gauge 2.5 MM x 30 ft ft long x 4 ft w =P 34,800
 29 = pcs, skylight plain sheets gauge 3.0 MM x 8ft long x 4 ft w =P 74,240
 1200 = pcs, texscrew # 12 x 45 for steel =P 1,600
 800 = pcs, texscrew # 12 x 25 for steel =P 960
 2 = gallons fed seal =P 3,500
 Miscellaneous =P 3,500
 Delivery Charge =P 5,000
Material Cost: =P 283,020
Labor Cost: =P 90,000
Grand total of supply labor materials: =P 373,020

*Note: Excluding repaint of steel purlins and steel trusses.

I HOPE FOR YOUR USUAL CONSIDERATION REGARDING THIS MATTER.

Conformed: Juan Discipulo Jr

__________________ ______________
Contractor