The document outlines the scope of work and materials for a roofing project at the Five Star Terminal in Quezon City, Philippines. The scope involves dismantling the old roof sheets and installing new corrugated and plain roof sheets. Materials include corrugated and plain roof sheets in various sizes, screws, sealant, and miscellaneous supplies. The total cost is estimated at 373,020 PHP for materials and labor.
The document outlines the scope of work and materials for a roofing project at the Five Star Terminal in Quezon City, Philippines. The scope involves dismantling the old roof sheets and installing new corrugated and plain roof sheets. Materials include corrugated and plain roof sheets in various sizes, screws, sealant, and miscellaneous supplies. The total cost is estimated at 373,020 PHP for materials and labor.
The document outlines the scope of work and materials for a roofing project at the Five Star Terminal in Quezon City, Philippines. The scope involves dismantling the old roof sheets and installing new corrugated and plain roof sheets. Materials include corrugated and plain roof sheets in various sizes, screws, sealant, and miscellaneous supplies. The total cost is estimated at 373,020 PHP for materials and labor.
Dismantling of old skylight corrugated sheets top roof. Dismantling of old skylight plain sheets for media agua. Installation of new skylight corrugated sheets for top roof. Installation of new skylight plain sheets for media agua. Cleaning and apply Fed Seal all joints of stainless gutters.
MATERIALS BREAKDOWN:
8 = pcs, corrugated skylight gauge 2.5 MM x 24 ft, long x 4 ft w =P 55,680
8 = pcs, corrugated skylight gauge 2.5 MM x 31 ft long 4 ft w =P 71,920 4 = pcs, corrugated skylight gauge 2.5 MM x 27 ft long x 4 ft w =P 31,320 4 = pcs, corrugated skylight gauge 2.5 MM x 30 ft ft long x 4 ft w =P 34,800 29 = pcs, skylight plain sheets gauge 3.0 MM x 8ft long x 4 ft w =P 74,240 1200 = pcs, texscrew # 12 x 45 for steel =P 1,600 800 = pcs, texscrew # 12 x 25 for steel =P 960 2 = gallons fed seal =P 3,500 Miscellaneous =P 3,500 Delivery Charge =P 5,000 Material Cost: =P 283,020 Labor Cost: =P 90,000 Grand total of supply labor materials: =P 373,020
*Note: Excluding repaint of steel purlins and steel trusses.
I HOPE FOR YOUR USUAL CONSIDERATION REGARDING THIS MATTER.