Scope of works:
Installation of designed ceiling.
Installation of Spandrill.
Demolition of old wall between living room and kitchen.
Removal of the sticker cover of gutter(free).
Arrangement of electrical wiring that can be affected in ceiling installation(free).
Tile setting
Masonry works
Painting works.
I. Designed Ceiling
Materials:
C-Faring
Carrying channel
Wall Angle
W-Clip
12mm Gypsum board
Gypsum screw
Blind rivets
Concrete nail
Material cost = P 62,000
Labor cost = P 40,000
Total cost = P102,000
II. SPANDRILL
Materials:
Spandrell
Wall angle
Reverse angle
Ventilation
Fascia cover
Blind rivets
1” concrete nail
Drill bit
Material cost = P 51,000
Labor cost = P 20,000
Total cost = P 71,000
Prepared by:
Mark Henry Gamazon