Assume the following data: - en etectric utility purchases 2,300,000 kw-hr per month of electric energy from
National Power Cbrporation at P 2.OO per kw-hr and sells all this to consumers
4 Sand fill, including rolling and watering = p 100 per cubic meter per kw-hr should
a-fteiJeOucting distribution loss es of 2OYo. At what average rate
B. concrete pavement, 10 inches thick (iabor and materials) including currng
tnii be-sold to break even if the following are other monthly expenses in
= P 220 per sq. meter "n"rgy
Ite operation:
C. Curbs and gutters = p 12 per linear meter
Taxes 2.5Yo of qross revenue
How much will the project cost allowing 15yo for contingency? P 750,000
Salaries
lleoreciation P 2.250.000
A. P 1,207,000
lnterest P 700,000
B. P 1,207,500
P 300,000
c. P 1,208,000 Maintenance
P 200.000
Miscellaneous
A. P 4.90
"V.ur.r- B. P 5.20
c. P 5.90
Let Cr = cost of sand filling, rolling and watering D. P 6.30
Cz = cost of curbs and gutter (both sides)
Co = cost of concrete pavement
,'/,/nt n.
P1 -nr;
.,=[T)(soomtz) AmountpaidtoNPc=[, )1r.ooooo**
1kw - hr /'
Cz = P120,000 = 4600000