1. INPUT DATA.
1.1. Concrete Duct Bank Data.
Width, b = 550 mm
Thickness or depth, t = 500 mm CRITICAL POSITION OF AXLE @ MIDDLE
Clear concrete cover, cc = 75 mm
effective depth, de = 420 mm P P
Diameter of Cable conduit, dc = 110 mm
Number of Cable conduit, nc = 2 pcs.
Length (1-lane roadway), L = 5.00 m 1.80m Road level

1.2. Soil Data.


Minimum depth of backfill, h = 0.50 m h = 0.50m
Unit weight of soil, ϒ = 18.00 kN/m3
*Allowable soil bearing pressure, qa = 150 kPa t duct bank ###
From RGME dated October 10 ,2009 q

1.3. Material Properties. ELEVATION


Concrete strength, fc' = 35 MPa
Reinforcement Bar, fyt = 414 MPa
Modulus of elasticity of Steel, E = 200 GPa L = 5.00m
Unit weight of concrete, ϒc = 24 kN/m³
Unit weight of steel, ϒs = 77 kN/m³ b ###

1.4. Loadings. PLAN


Maximum Axle load, P = 130 kN
Free Body Diagram:
1.5. Reinforcement bars. Pu Pu
Longitudinal bar diameter,Dm = 10 mm 1.80m
Lateral or stirrup bar diameter, Ds = 10 mm
Area of 1 shear bar, Av = 78.540 m2
Actual spacing of stirrups, S = 200 mm wu
Provided number of leg of stirrups, n = 2 pcs. duct bank
wqu

2. DESIGN CALCULATIONS & RESULTS.


2.1. Soil bearing pressure.
A = 2.75 m2 A = b*L - - "duct bank base area"
Wsoil = 24.75 kN Wsoil = ϒ*b*h*L - - "weight of backfill soil"
Wconc. = 33.00 kN Wconc. = ϒc*t*d*L - - "weight of concrete duct bank"
P = 130.00 kN Weight of per wheel axle
∑F = 317.75 kN ∑F = Wsoil + Wconc. + 2P - - "total vertical load"
qact = 115.55 kPa qact = ∑F/A - - "actual bearing pressure at bottom" Since, qact < qa, O.K.!
qu = 176.47 kPa qu = [1.2*(Wsoil+Wconc.)+1.6*2P]/A - - "net upward ultimate soil pressure"
Wqu = 97.06 kN/m Wqu = qu*b
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E

2.2. Maximum shear and moments.


Pu = 208.00 kN Pu = 1.6*P - - "factored live load for axle loading"
Wusoil = 5.94 kN/m Wu = 1.2*(Wsoil)*h*b - - "factored dead load for soil"
Wuconc. = 7.37 kN/m Wuconc. = ɤc*b*t - - "factored dead load for concrete"
Vu = -105.37 kN design, Vu = ((Wusoil + Wuconc)*L)/2+(Pu)/2)-(Wqu*L)/2 - - "maximum shear"
Mu = -1.71 kN-m design, Mu = (Wusoil + Wuconc)*L2/8)+(Pu*L/4) - (Wqu*L2)/4)- - "maximum moment"
*note: since design moment, MU = 0, minimum reinforcement is required

2.3. Duct bank shear strength.


Vc = 232.32 kN Vc = 0.17fc'1/2 B*d - - "concrete shear strength" *ACI 11.2.1.1

2.3. Check shear capacity of reinforcement and concrete base on actual spacing

Av f yt d
Vs  = 136.565 kN
S
Ø = 0.75 Shear reductor factor
Vn  Vc  Vs = 276.67 mm2 safe, shear capacity provided by shear reinf. and concrete is greater than Vu.
2.3.1. Transverse reinforcement bars.
Adopted ρ = 0.00180
As = 3,780 mm2 As = ρbd - - "Required steel area"
Am = 78.54 mm2 Am = πDm2/4 - - "Area of 1-longitudinal bar, selected"
N = 50 pcs N = As/Ab - - "Required number of steel"
Use 10mm @ 207mm O.C Ok, Actual spacing is adequate

2.4. Duct bank reinforcement.


2.4.1. Longitudinal or main reinforcement bars.
de = 420 mm effective depth
Ø = 0.90 Bending reduction factor
Ru = 0.0 kN/m2 Ru = Mu/Øbd2
ρact. = 0.00000 0.85 fc '  2 Ru  - - "Actual steel ratio"
 1  1  
β = 0.81 fy  0.85 fc ' 
ρmin = 0.0018 ρmin = 0.0018 - - "Minimum steel requirement" pmin > p, adopt pmin
ρmax = 0.0258 pmax = 0.75(0.85βfc'/fy)*600/(600+fy) - - "Maximum steel requirement" OK, p < pmax
Adopted ρ = 0.00180
As = 416 mm2 As = ρbd - - "Required steel area"
Am = 78.54 mm2 Am = πDm2/4 - - "Area of 1-longitudinal bar, selected"
N = 10 pcs N = As/Ab - - "Required number of steel"
Use 10mm @ 146mm O.C

fy
 = 0.0213
fc
Moment capacity of section, M cap.  fc ' bd 2 (1  .59 )
Mcap = 64.25 kN-m

2.5 Design summary

USE: 10 pcs 10mm diameter @ 146 mm c/c Longitudinal bars


50 pcs 10mm diameter @ 200 mm c/c Transverse bars
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E

3. ATTACHMENT:
M.O.T. Loading:
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E

1.05m x 0.50m Duct Bank 1x4x110

1. INPUT DATA.
1.1. Concrete Duct Bank Data.
Width, b = 1050 mm
Thickness or depth, t = 500 mm CRITICAL POSITION OF AXLE @ MIDDLE
Clear concrete cover, cc = 75 mm
effective depth, de = 420 mm P P
Diameter of Cable conduit, dc = 110 mm
Number of Cable conduit, nc = 4 pcs.
Length (1-lane roadway), L = 5.00 m 1.80m Road level

1.2. Soil Data.


Minimum depth of backfill, h = 0.50 m h = 0.50m
Unit weight of soil, ϒ = 18.00 kN/m3
*Allowable soil bearing pressure, qa = 150 kPa t duct bank ###
From RGME dated October 10,2009 q

1.3. Material Properties. ELEVATION


Concrete strength, fc' = 35 MPa
Reinforcement Bar, fyt = 414 MPa
Modulus of elasticity of Steel, E = 200 GPa L = 5.00m
Unit weight of concrete, ϒc = 24 kN/m³
Unit weight of steel, ϒs = 77 kN/m³ b ###

1.4. Loadings. PLAN


Maximum Axle load, P = 130 kN
F Free Body Diagram:
1.5. Reinforcement bars. Pu Pu
Longitudinal bar diameter,Dm = 10 mm 1.80m
Lateral or stirrup bar diameter, Ds = 10 mm
Area of 1 shear bar, Av = 78.540 m2
Actual spacing of stirrups, S = 200 mm wu
Provided number of leg of stirrups, n = 2 pcs. duct bank
wqu

2. DESIGN CALCULATIONS & RESULTS.


2.1. Soil bearing pressure.
A = 5.25 m2 A = b*L - - "duct bank base area"
Wsoil = 47.25 kN Wsoil = ϒ*b*h*L - - "weight of backfill soil"
Wconc. = 63.00 kN Wconc. = ϒc*t*d*L - - "weight of concrete duct bank"
P = 130.00 kN Weight of per wheel axle
∑F = 370.25 kN ∑F = Wsoil + Wconc. + 2P - - "total vertical load"
qact = 70.52 kPa qact = ∑F/A - - "actual bearing pressure at bottom" Since, qact < qa, O.K.!
qu = 104.44 kPa qu = [1.2*(Wsoil+Wconc.)+1.6*2P]/A - - "net upward ultimate soil pressure"
Wqu = 109.66 kN/m Wqu = qu*b
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E

2.2. Maximum shear and moments.


Pu = 208.00 kN Pu = 1.6*P - - "factored live load for axle loading"
Wusoil = 11.34 kN/m Wu = 1.2*(Wsoil)*h*b - - "factored dead load for soil"
Wuconc. = 14.03 kN/m Wuconc. = ɤc*b*t - - "factored dead load for concrete"
Vu = -106.74 kN design, Vu = ((Wusoil + Wuconc)*L)/2+(Pu)/2)-(Wqu*L)/2 - - "maximum shear"
Mu = -3.42 kN-m design, Mu = (Wusoil + Wuconc)*L2/8)+(Pu*L/4) - (Wqu*L2)/4)- - "maximum moment"
*note: since design moment, MU = 0, minimum reinforcement is required

2.3. Duct bank shear strength.


Vc = 443.53 kN Vc = 0.17fc'1/2 B*d - - "concrete shear strength" *ACI 11.2.1.1

2.3. Check shear capacity of reinforcement and concrete base on actual spacing

Av f yt d
Vs  = 136.565 kN
S
Ø = 0.75 Shear reductor factor
Vn  Vc  Vs = 435.07 mm2 safe, shear capacity provided by shear reinf. and concrete is greater than Vu.
2.3.1. Transverse reinforcement bars.
Adopted ρ = 0.00180
As = 3,780 mm2 As = ρbd - - "Required steel area"
Am = 78.54 mm2 Am = πDm2/4 - - "Area of 1-longitudinal bar, selected"
N = 50 pcs N = As/Ab - - "Required number of steel"
Use 10mm @ 207mm O.C Ok, Actual spacing is adequate

2.4. Duct bank reinforcement.


2.4.1. Longitudinal or main reinforcement bars.
de = 420 mm effective depth
Ø = 0.90 Bending reduction factor
Ru = 0.0 kN/m2 Ru = Mu/Øbd2
ρact. = 0.00000 0.85 fc '  2 Ru  - - "Actual steel ratio"
 1  1  
β = 0.81 fy  0.85 fc ' 
ρmin = 0.0018 ρmin = 0.0018 - - "Minimum steel requirement" pmin > p, adopt pmin
ρmax = 0.0258 pmax = 0.75(0.85βfc'/fy)*600/(600+fy) - - "Maximum steel requirement" OK, p < pmax
Adopted ρ = 0.00180
As = 794 mm2 As = ρbd - - "Required steel area"
Am = 78.54 mm2 Am = πDm2/4 - - "Area of 1-longitudinal bar, selected"
N = 15 pcs N = As/Ab - - "Required number of steel"
Use 10mm @ 164mm O.C

fy
 = 0.0213
fc
Moment capacity of section, M cap.  fc ' bd 2 (1  .59 )
Mcap = 122.66 kN-m

2.5 Design summary

USE: 15 pcs 10mm diameter @ 164 mm c/c Longitudinal bars


50 pcs 10mm diameter @ 200 mm c/c Transverse bars
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E

3. ATTACHMENT:
M.O.T. Loading:
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E

0.80m x 0.75m Duct Bank 2x3x110

1. INPUT DATA.
1.1. Concrete Duct Bank Data.
Width, b = 800 mm
Thickness or depth, t = 750 mm CRITICAL POSITION OF AXLE @ MIDDLE
Clear concrete cover, cc = 75 mm
effective depth, de = 670 mm P P
Diameter of Cable conduit, dc = 110 mm
Number of Cable conduit, nc = 6 pcs.
Length (1-lane roadway), L = 5.00 m 1.80m Road level

1.2. Soil Data.


Minimum depth of backfill, h = 0.50 m h = 0.50m
Unit weight of soil, ϒ = 18.00 kN/m3
*Allowable soil bearing pressure, qa = 150 kPa t duct bank ###
From RGME dated October 10,2009 q

1.3. Material Properties. ELEVATION


Concrete strength, fc' = 35 MPa
Reinforcement Bar, fyt = 414 MPa
Modulus of elasticity of Steel, E = 200 GPa L = 5.00m
Unit weight of concrete, ϒc = 24 kN/m³
Unit weight of steel, ϒs = 77 kN/m³ b ###

1.4. Loadings. PLAN


Maximum Axle load, P = 130 kN
Free Body Diagram:
1.5. Reinforcement bars. Pu Pu
Longitudinal bar diameter,Dm = 10 mm 1.80m
Lateral or stirrup bar diameter, Ds = 10 mm
Area of 1 shear bar, Av = 78.540 m2
Actual spacing of stirrups, S = 125 mm wu
Provided number of leg of stirrups, n = 2 pcs. duct bank

wqu
2. DESIGN CALCULATIONS & RESULTS.
2.1. Soil bearing pressure.
A = 4.00 m2 A = b*L - - "duct bank base area"
Wsoil = 36.00 kN Wsoil = ϒ*b*h*L - - "weight of backfill soil"
Wconc. = 72.00 kN Wconc. = ϒc*t*d*L - - "weight of concrete duct bank"
P = 130.00 kN Weight of per wheel axle
∑F = 368.00 kN ∑F = Wsoil + Wconc. + 2P - - "total vertical load"
qact = 92.00 kPa qact = ∑F/A - - "actual bearing pressure at bottom" Since, qact < qa, O.K.!
qu = 136.40 kPa qu = [1.2*(Wsoil+Wconc.)+1.6*2P]/A - - "net upward ultimate soil pressure"
Wqu = 109.12 kN/m Wqu = qu*b
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E

2.2. Maximum shear and moments.


Pu = 208.00 kN Pu = 1.6*P - - "factored live load for axle loading"
Wusoil = 8.64 kN/m Wu = 1.2*(Wsoil)*h*b - - "factored dead load for soil"
Wuconc. = 15.64 kN/m Wuconc. = ɤc*b*t - - "factored dead load for concrete"
Vu = -108.11 kN design, Vu = ((Wusoil + Wuconc)*L)/2+(Pu)/2)-(Wqu*L)/2 - - "maximum shear"
Mu = -5.13 kN-m design, Mu = (Wusoil + Wuconc)*L2/8)+(Pu*L/4) - (Wqu*L2)/4)- - "maximum moment"
*note: since design moment, MU = 0, minimum reinforcement is required

2.3. Duct bank shear strength.


Vc = 539.07 kN Vc = 0.17fc'1/2 B*d - - "concrete shear strength" *ACI 11.2.1.1

2.3. Check shear capacity of reinforcement and concrete base on actual spacing

Av f yt d
Vs  = 348.566 kN
S
Ø = 0.75 Shear reductor factor
Vn  Vc  Vs = 665.73 mm2 safe, shear capacity provided by shear reinf. and concrete is greater than Vu.
2.3.1. Transverse reinforcement bars.
Adopted ρ = 0.00180
As = 6,030 mm2 As = ρbd - - "Required steel area"
Am = 78.54 mm2 Am = πDm2/4 - - "Area of 1-longitudinal bar, selected"
N = 80 pcs N = As/Ab - - "Required number of steel"
Use 10mm @ 136mm O.C Ok, Actual spacing is adequate

2.4. Duct bank reinforcement.


2.4.1. Longitudinal or main reinforcement bars.
de = 670 mm effective depth
Ø = 0.90 Bending reduction factor
Ru = 0.0 kN/m2 Ru = Mu/Øbd2
ρact. = 0.00000 0.85 fc '  2 Ru  - - "Actual steel ratio"
 1  1  
β = 0.81 fy  0.85 fc ' 
ρmin = 0.0018 ρmin = 0.0018 - - "Minimum steel requirement" pmin > p, adopt pmin
ρmax = 0.0258 pmax = 0.75(0.85βfc'/fy)*600/(600+fy) - - "Maximum steel requirement" OK, p < pmax
Adopted ρ = 0.00180
As = 965 mm2 As = ρbd - - "Required steel area"
Am = 78.54 mm2 Am = πDm2/4 - - "Area of 1-longitudinal bar, selected"
N = 15 pcs N = As/Ab - - "Required number of steel"
Use 10mm @ 164mm O.C

fy
 = 0.0213
fc
Moment capacity of section, M cap.  fc ' bd 2 (1  .59 )
Mcap = 237.83 kN-m

2.5 Design summary

USE: 15 pcs 10mm diameter @ 164 mm c/c Longitudinal bars


80 pcs 10mm diameter @ 125 mm c/c Transverse bars
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E

3. ATTACHMENT:
M.O.T. Loading:
Calculation Sheet

Project Contract No.: 098-C66 Task No.: 3 Design Stage: IFB


JIC Development
Title: Date: December 2015
Designed by: RSZD Check by: IEAH
Structure: Electrical Duct Bank Revision: E

You might also like