Name of Work : Construction of Medical Assistant Training School (MATS) at Sadar Upazila in Gazipur

District.
Package No : WP-599/SDP(GOB)-HED.
Name of Contrctor : M/S. Essen Engineering & Co.Ltd,Dhaka-1207.
5th R/A Bill
Part-A (Civil works)
Sl No-1.01 a. Layout and marking for earthwork in Excavation in foundation
= 1,889.81 Sqm
Schedule Qty = 1,745.00 Sqm
@Tk = 15.00 /= P/Sqm Tk= 26,175.00
Sl No-1.02 Earth Work in excavation in Foundation
a). Upto 1.5m depth
= 562.89 cum
@Tk = 175.00 /= P/Cum Sch = 576.80 Tk= 98,505.25
Sl No-1.03 Brick flat Soling
a In Foundation
= 568.36 Sqm
@Tkfor=cast325.00
Boring/drilling P/Sqm
in situ Pile upto require depth and diameter with mim 6m606.16
Sch =
long temporary steel Tk= 184,716.97
Sl No-1.09 casting,true to vertical,providing ventonite slurry and maintaining water level in the hole (450mm dia
upto 20mdia
(450mm depth)
upto 20m depth)
= 492 Nos × 70.00 Rft = 34,440.0 Rft = 10,500.00 Rm
@Tk = 1,250.00 /= P/Rm Sch = 11227.13 Tk= 13,125,000.00

Sl No-1.10 Casting of Cast in Situ bored pile R.C.C work of 1:1.5:3


= 492 × 4 70.00 Rft = 1,726.39 cum
@Tk = 13,000.00 /= P/Cum Sch = 1772.11 Tk= 22,443,058.62

Sl No-1.11 Providing and making point welding


= 492 × 6.00 × 138.00 Point = 407,376.00 Point
@Tk = 0.50 P/point Sch = 371196.00 Tk= 185,598.00
Sl No-1.12 Providing and making joint welding
= 492 × 6.00 × 2.00 = 5,904.00 Rft = 1,800.00 Rm
@Tk = 1.00 P/Rm Sch = 2095.73 Tk= 1,800.00
Sl No-1.13 Labour for breaking of pile head
4 = 73.54 Cum
@Tk = 2,000.00 P/Cum Sch = 73.84 Tk= 147,073.92
Sl No-1.14 a. Conducting static load test for the cast-in-situ pile providing required
= 1 × 3.00 Test = 3.00 Test
@Tk = 80,000.00 P/Test Sch = 3.00 Tk= 240,000.00
b. For Intermediate Loading from 75-125 tonne for each additional tonne
= 3 × 45.00 Ton = 135.00 Test
@Tk = 800.00 P/Ton Sch = 75.00 Tk= 60,000.00
SL No-1.16 Reinforced cement concrete works using steel shutter with mim cement concrete to mix ratio(1:1.5:3)
A. In Foundation (Footing,Raft,Pile cap etc)
i. Concrete
Total Qty = 18,016.49 Cft
= 510.24 cum

5th R/A Bill Page 1


@Tk = 11,000.00 P/Cum Sch = 522.01 Tk= 5,612,613.62
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 1,191.55 Sqm
@Tk = 400.00 P/Sqm Sch = 1204.23 Tk= 476,619.42
B. In Foundation Beam/Grade Beam
i. Concrete
= 112.49 cum
@Tk = 17,000.00 P/Cum Sch = 112.78 Tk= 1,912,283.35
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 1075.10 Sqm
@Tk = 700.00 P/Sqm Sch = 1127.75 Tk= 752,567.66
B. In Floor Slab at plinth level
i) Concrete
Total Qty = 142.31 Cum
For Hostel Bldg
= 2 × 35.83 Rft × 87.00 Rft = 6,234.42 Sft
= 1 × 25.67 Rft × 20.42 Rft = 524.18 Sft
= 2 × 13.33 Rft × 6.00 Rft = 159.96 Sft
= 20 × 6.17 Rft × 1.67 Rft = 206.08 Sft
= 2 × 3.58 Rft × 1.67 Rft = 11.96 Sft
= 2 × 2.17 Rft × 1.67 Rft = 7.25 Sft
= 20 × 1.67 Rft × 1.00 Rft = 33.40 Sft
= 2 × 1.75 Rft × 1.67 Rft = 5.85 Sft
= 7,183.09 Sft x 0.38 Rft

= 2729.57 Cft
Mid Portion = 1 × 26.08 Rft × 24.00 Rft = 625.92 Sft
= 1 × 13.58 Rft × 12.67 Rft = 172.06 Sft
= 1 × 12.67 Rft × 25.00 Rft = 316.75 Sft
= 1,114.73 Sft x 0.42 Rft
= 468.19 Cft
Entry Slab = 1 × 24.17 Rft × 19.83 Rft = 479.29 Sft
= 2 × 5.67 Rft × 9.75 Rft = 110.57 Sft
= 589.86 Sft x 0.50 Rft
= 294.93 Cft
= 3492.69 Cft
= 98.91 Cum
= 241.22 Cum
@Tk = 18,000.00 P/Cum Sch = 241.73 Tk= 4,341,964.86
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
Total Qty = 1250.34 Sqm
For Hostel Bldg
Ref. from Floor Area = 7183.09 Sft
= 1114.73 Sft
Add,Slab out Side = 2 × 2 Nos × 39.17 Rft = 156.68 Rft

= 2 × 4 Nos × 87.08 Rft = 696.64 Rft

= 2 × 2 Nos × 26.50 Rft = 106.00 Rft

= 2 × 4 Nos × 31.33 Rft = 250.64 Rft

5th R/A Bill Page 2


= 4 × 34 Nos × 1.67 Rft = 227.12 Rft

= 2 × 2 Nos × 4.00 Rft = 16.00 Rft

= 1,453.08 Rft x 0.38 Rft


= 552.17 Sft
Add,Slab out Side = 2 × 2 Nos × 26.50 Rft = 106.00 Rft

= 2 × 2 Nos × 23.75 Rft = 95.00 Rft

= 2 × 2 Nos × 13.58 Rft = 54.32 Rft

= 2 × 2 Nos × 0.83 Rft = 3.32 Rft

= 258.64 Rft x 0.42 Rft

= 108.63 Sft
For Entry = Ref. from Floor Area = 589.86 Sft
Side = 2 x 24.17 Rft x 0.50 Rft = 24.17 Sft
= 2 × 19.83 Rft × 0.50 Rft = 19.83 Sft
ST = 633.86 Sft
= 9592.47 Sft
= 891.49 Sqm
= 2,521.84
@Tk = 800.00 P/Sqm Sch = 2568.19 Sqm Tk= 2,017,468.87
C. Beam at Plinth level
a). Concrete.
i) Gr.Floor/Plinth level
= 61.82 cum
For Hostel Bldg
PFB-1,2 = 2 x 3 Nos x 87.08 Rft = 522.48 Rft
"= 2 x 1 Nos x 12.92 Rft = 25.84 Rft
PFB-1,5,13 = 2 x 1 Nos x 87.08 Rft = 174.16 Rft
PFB-3,4 = 2 x 8 Nos x 37.50 Rft = 600.00 Rft
PFB-7 = 2 x 1 Nos x 18.58 Rft = 37.16 Rft
PFB-6 = 2 x 1 Nos x 39.25 Rft = 78.50 Rft
PFB-11 = 2 x 1 Nos x 7.33 Rft = 14.66 Rft
PFB-12 = 2 x 1 Nos x 9.00 Rft = 18.00 Rft
= 1,470.80 Rft x 0.83 x 1.13 Rft
Qty = 1379.46 Cft
PFB-9,9A = 2 x 2 Nos x 26.50 Rft = 106.00 Rft
PFB-11 = 1 x 1 Nos x 12.67 Rft = 12.67 Rft
PFB-6 = 2 x 2 Nos x 39.25 Rft = 157.00 Rft
PFB-8 = 2 x 1 Nos x 30.50 Rft = 61.00 Rft
= 336.67 Rft x 0.83 x 1.08 Rft
Qty = 301.79 Cft
PFB-10 = 2 x 1 Nos x 26.50 Rft = 53.00 Rft x 1.00 x 1.58 Rft
= 83.74 Cft
Qty = 1764.99 Cft = 49.99 Cum
= 111.81
@Tk = 18,000.00 P/Cum Sch = 112.45 Tk= 2,012,514.01
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor

5th R/A Bill Page 3


= 756.93 Sqm
For Hostel Bldg
Rft Qnty Same as 1× 1,470.80 Rft × 3.08 Rft = 4,530.06 Sft

1× 336.67 Rft × 3.00 Rft = 1,010.01 Sft

1× 53.00 Rft × 4.17 Rft = 221.01 Sft


= 5,761.08 Sft

= 535.42 Sqm
= 1292.34 Sqm
Sch.Qty = 1244.48 Sqm
@Tk = 500.00 P/Sqm Sch = 1244.48 Tk= 622,240.00
C. In Pedestal Column,Column,Column capital ,lift wall etc.
a. Concrete
i). Below PL level and in Ground Floor.
BF Qty = 120.37 Cum
Hostel Bldg
C1 = 24 × 1.25 Rft × 1.67 Rft × 11.00 Rft = 551.10 Cft
C2-C5 = 58 × 1.00 Rft × 1.67 Rft × 11.00 Rft = 1065.46 Cft
C6 = 2 × 1.00 Rft × 1.25 Rft × 11.00 Rft = 27.50 Cft
C7 = 2 × 1.77 Sft × 11.00 Rft × 1 = 38.94 Cft
= 1683.00 Cft
= 47.66 Cum
Academic Bldg
C1,C2 = 28 × 1.00 Rft × 1.67 Rft × 11.00 Rft = 514.36 Cft
C3 = 4 × 1.25 Rft × 1.67 Rft × 11.00 Rft = 91.85 Cft
C4,C5 = 22 × 1.33 Rft × 1.33 Rft × 11.00 Rft = 428.07 Cft
C6,C7 = 7 × 1.00 Rft × 1.50 Rft × 11.00 Rft = 115.50 Cft
C8 = 6 × 2.79 Rft × 1.67 Rft × 11.00 Rft = 307.51 Cft
C9 = 2 × 2.67 Rft × 1.67 Rft × 11.00 Rft = 98.10 Cft
C10 = 6 × 1.00 Rft × 1.00 Rft × 11.00 Rft = 66.00 Cft
= 1621.39 Cft
= 45.92 Cum
= 213.95 Cum
@Tk = 17,000.00 P/Cum Sch = 219.67 Tk= 3,637,220.15
ii).1st Floor.
Hostel Bldg
C1 = 24 × 1.25 Rft × 1.67 Rft × 10.00 Rft = 501.00 Cft
C2-C5 = 58 × 1.00 Rft × 1.67 Rft × 10.00 Rft = 968.60 Cft
C7 = 2 × 1.77 Sft × 10.00 Rft × 1 = 35.40 Cft
= 1505.00 Cft
= 42.62 Cum
Academic Bldg
C1,C2 = 28 × 1.00 Rft × 1.67 Rft × 11.00 Rft = 514.36 Cft
C3 = 4 × 1.25 Rft × 1.67 Rft × 11.00 Rft = 91.85 Cft
C4,C5 = 22 × 1.33 Rft × 1.33 Rft × 11.00 Rft = 428.07 Cft
C6,C7 = 7 × 1.00 Rft × 1.50 Rft × 11.00 Rft = 115.50 Cft
C8 = 6 × 2.79 Rft × 1.67 Rft × 11.00 Rft = 307.51 Cft
C9 = 2 × 2.67 Rft × 1.67 Rft × 11.00 Rft = 98.10 Cft

5th R/A Bill Page 4


= 1555.39 Cft
= 44.05 Cum
= 86.67 Cum
@Tk = 17,000.00 P/Cum Sch = 105.89 Tk= 1,473,426.45
iii). 2nd Floor.
Academic Bldg
C1 = 17 × 1.00 Rft × 1.67 Rft × 11.00 Rft = 312.29 Cft
C2 = 2 × 1.00 Rft × 1.67 Rft × 11.00 Rft = 36.74 Cft
C3 = 4 × 1.25 Rft × 1.67 Rft × 11.00 Rft = 91.85 Cft
C4 = 16 × 1.33 Rft × 1.33 Rft × 11.00 Rft = 311.33 Cft
C5 = 2 × 1.33 Rft × 1.33 Rft × 11.00 Rft = 38.92 Cft
C6 = 1 × 1.00 Rft × 1.50 Rft × 11.00 Rft = 16.50 Cft
C7 = 1 × 1.00 Rft × 1.50 Rft × 11.00 Rft = 16.50 Cft
C9 = 1 × 2.67 Rft × 1.67 Rft × 11.00 Rft = 49.05 Cft
= 873.17 Cft
= 24.73 Cum
@Tk = 17,000.00 P/Cum Sch = 119.97 Tk= 420,387.76
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Below PL level and in Ground Floor.
= 1054.67 Sqm
Col, Upto G.F slab
For Hostel Bldg
C1 = 24 × 5.83 Rft × 11.00 Rft = 1539.12 Sft
C2,C3,C4,C5 = 58 × 5.33 Rft × 11.00 Rft = 3400.54 Sft
C6 = 2 × 4.50 Rft × 11.00 Rft = 99.00 Sft
C7 = 2 × 2.36 × 11.00 Rft = 51.92 Sft
= 5090.58 Sft
= 473.10 Sqm
For Academic Bldg
C1,C2 = 28 × 5.33 Rft × 11.00 Rft = 1641.64 Sft
C3 = 4 × 5.83 Rft × 11.00 Rft = 256.52 Sft
C4,C5 = 22 × 5.33 Rft × 11.00 Rft = 1289.86 Sft
C6,C7 = 7 × 5.00 Rft × 11.00 Rft = 385.00 Sft
C8 = 6 × 8.92 Rft × 11.00 Rft = 588.72 Sft
C9 = 2 × 8.67 Rft × 11.00 Rft = 190.74 Sft
C10 = 6 × 4.00 Rft × 11.00 Rft = 264.00 Sft
= 4616.48 Sft
= 429.04 Sqm
= 1956.82 Sqm
@Tk = 450.00 P/Sqm Sch = 2636.00 Tk= 880,568.03
ii). 1st Floor.
For Hostel Bldg
C1 = 24 × 5.83 Rft × 11.00 Rft = 1539.12 Sft
C2,C3,C4,C5 = 58 × 5.33 Rft × 11.00 Rft = 3400.54 Sft
C6 = 2 × 4.50 Rft × 11.00 Rft = 99.00 Sft
C7 = 2 × 2.36 × 11.00 Rft = 51.92 Sft
= 5090.58 Sft

5th R/A Bill Page 5


= 473.10 Sqm
For Academic Bldg
C1,C2 = 28 × 5.33 Rft × 11.00 Rft = 1641.64 Sft
C3 = 4 × 5.83 Rft × 11.00 Rft = 256.52 Sft
C4,C5 = 22 × 5.33 Rft × 11.00 Rft = 1289.86 Sft
C6,C7 = 7 × 5.00 Rft × 11.00 Rft = 385.00 Sft
C8 = 6 × 8.92 Rft × 11.00 Rft = 588.72 Sft
C9 = 2 × 8.67 Rft × 11.00 Rft = 190.74 Sft
= 4352.48 Sft
= 404.51 Sqm
= 877.61 Sqm
@Tk = 450.00 P/Sqm Sch = 1270.72 Tk= 394,923.51
iii). 2nd Floor.
For Academic Bldg
C1,C2 = 19 × 5.33 Rft × 11.00 Rft = 1113.97 Sft
C3 = 4 × 5.83 Rft × 11.00 Rft = 256.52 Sft
C4,C5 = 18 × 5.33 Rft × 11.00 Rft = 1055.34 Sft
C6,C7 = 2 × 5.00 Rft × 11.00 Rft = 110.00 Sft
C9 = 1 × 8.67 Rft × 11.00 Rft = 95.37 Sft
= 2631.20 Sft
= 244.54 Sqm
@Tk = 450.00 P/Sqm Sch = 1439.68 Tk= 110,040.89
D. Beam: (Tee-beam, Ell beam, Rib-beam rectangular beam)
a). Concrete.
i) Gr.Floor
Qty = 10.54 cum
For Academic Bldg
FB-1 = 2 × 115.50 Rft = 231.00 Rft

"= 1 × 70.33 Rft = 70.33 Rft

FB-2 = 2 × 112.21 Rft = 224.43 Rft

"= 2 × 7.00 Rft = 14.00 Rft

= 539.76 Rft x 0.83 Rft x 0.83 Rft


Qty = 371.84 Cft
FB-3 = 1 × 39.00 Rft = 39.00 Rft

FB-5 = 2 × 38.17 Rft = 76.34 Rft

"= 2 × 31.75 Rft = 63.50 Rft

"= 1 × 23.25 Rft = 23.25 Rft

"= 2 × 14.58 Rft = 29.16 Rft

"= 2 × 7.75 Rft = 15.50 Rft

"= 1 × 30.83 Rft = 30.83 Rft

FB-6 = 2 × 30.83 Rft = 61.66 Rft

= 2 × 16.33 Rft = 32.66 Rft

= 371.90 Rft x 0.83 Rft x 1.33 Rft


Qty = 410.54 Cft
FB-4 = 7 × 39.67 Rft = 277.69 Rft

FB-9 = 2 × 19.00 Rft = 38.00 Rft

5th R/A Bill Page 6


= 315.69 Rft x 1.00 Rft x 1.33 Rft
Qty = 419.87 Cft
FB-8 = 2 × 39.00 Rft = 78.00 Rft

FB-7 = 1 × 46.00 Rft = 46.00 Rft

= 124.00 Rft x 0.83 Rft x 1.50 Rft


Qty = 154.38 Cft
= 1356.63 Cft
Qty = 38.42 cum
For Hostel Bldg
FB-1,2 = 2 x 4 Nos x 87.08 Rft = 696.64 Rft
FB-3 = 2 x 1 Nos x 37.50 Rft = 75.00 Rft
FB-3A = 2 x 2 Nos x 44.50 Rft = 178.00 Rft
FB-4 = 2 x 5 Nos x 40.83 Rft = 408.30 Rft
FB-7 = 2 x 1 Nos x 39.25 Rft = 78.50 Rft
FB-10 = 2 x 1 Nos x 18.58 Rft = 37.16 Rft
"= 2 x 1 Nos x 9.00 Rft = 18.00 Rft
FB-11 = 2 x 1 Nos x 7.33 Rft = 14.66 Rft
= 1,506.26 Rft x 0.83 x 1.13 Rft
Qty = 1412.72 Cft
FB-6 = 1 x 2 Nos x 40.00 Rft = 80.00 Rft
FB-12 = 1 x 2 Nos x 19.67 Rft = 39.34 Rft
= 119.34 Rft x 0.83 x 1.50 Rft
Qty = 148.58 Cft
FB-8 = 1 x 2 Nos x 30.08 Rft = 60.16 Rft
FB-9 = 1 x 2 Nos x 19.67 Rft = 39.34 Rft
= 99.50 Rft x 0.83 x 1.00 Rft
Qty = 82.59 Cft
T. Qty = 1643.88 Cft = 46.56 Cum
= 95.51 Cum
@Tk = 18,000.00 P/Cum Sch = 97.64 Tk= 1,719,263.37
ii) 1st. Floor
For Academic Bldg
FB-1 = 1 × 115.50 Rft = 115.50 Rft

"= 1 × 70.33 Rft = 70.33 Rft

FB-2 = 2 × 112.21 Rft = 224.43 Rft

= 410.26 Rft x 0.83 Rft x 0.83 Rft


Qty = 282.63 Cft
FB-3 = 1 × 39.00 Rft = 39.00 Rft

FB-5 = 1 × 38.17 Rft = 38.17 Rft

"= 2 × 31.75 Rft = 63.50 Rft

"= 3 × 23.25 Rft = 69.75 Rft

"= 2 × 7.75 Rft = 15.50 Rft

FB-6 = 1 × 30.83 Rft = 30.83 Rft

= 256.75 Rft x 0.83 Rft x 1.33 Rft


Qty = 283.43 Cft
FB-4 = 7 × 39.67 Rft = 277.69 Rft x 1.00 Rft x 1.33 Rft

5th R/A Bill Page 7


Qty = 369.33 Cft
FB-8 = 2 × 39.00 Rft = 78.00 Rft

FB-7 = 1 × 46.00 Rft = 46.00 Rft

= 124.00 Rft x 0.83 Rft x 1.00 Rft


Qty = 102.92 Cft
FB-10 = 1 × 48.00 Rft = 48.00 Rft

FB-11 = 1 × 45.17 Rft = 45.17 Rft

FB-12 = 1 × 42.50 Rft = 42.50 Rft

FB-13 = 1 × 40.00 Rft = 40.00 Rft

= 175.67 Rft x 1.67 Rft x 3.00 Rft


Qty = 880.11 Cft
FB-14 = 1 × 56.33 Rft = 56.33 Rft

FB-2A = 1 × 36.00 Rft = 36.00 Rft

= 92.33 Rft x 1.00 Rft x 1.50 Rft


Qty = 138.50 Cft
= 2056.90 Cft
Qty = 58.25 cum
@Tk = 18,000.00 P/Cum Sch = 94.12 Tk= 1,048,548.34
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
= 226.46 Sqm
For Academic Bldg
Rft Qnty Same as 1× 539.76 Rft × 3.33 Rft = 1,797.39 Sft

1× 371.90 Rft × 3.50 Rft = 1,301.65 Sft

1× 315.69 Rft × 3.67 Rft = 1,158.58 Sft

1× 124.00 Rft × 3.83 Rft = 474.92 Sft

= 4,732.55 Sft

= 439.83 Sqm
For Hostel Bldg
Rft Qnty Same as 1× 1,506.26 Rft × 3.08 Rft = 4,639.28 Sft

1× 119.34 Rft × 3.83 Rft = 457.07 Sft

1× 99.50 Rft × 2.83 Rft = 281.59 Sft

= 5,377.94 Sft
= 499.81 Sqm
= 1166.09 Sqm
@Tk = 500.00 P/Sqm Sch = 1171.71 Tk= 583,047.28
ii). 1st. Floor
For Academic Bldg
Rft Qnty Same as 1× 410.26 Rft × 2.50 Rft = 1,025.64 Sft

1× 256.75 Rft × 3.50 Rft = 898.63 Sft

1× 277.69 Rft × 3.67 Rft = 1,019.12 Sft

1× 124.00 Rft × 2.83 Rft = 350.92 Sft

2× 175.67 Rft × 7.67 Rft = 2,694.78 Sft

2× 92.33 Rft × 4.00 Rft = 738.64 Sft

= 6,727.73 Sft
= 625.25 Sqm
@Tk = 500.00 P/Sqm Sch = 1129.42 Tk= 312,626.84

5th R/A Bill Page 8


F. Floor & Roof slab
a). Concrete.
i). Gr.Floor
= 23.88 Cum
For Academic Bldg
Main Slab = 1 × 44.00 Rft × 81.00 Rft = 3,564.00 Sft
= 1 × 27.00 Rft × 49.50 Rft = 1,336.50 Sft
= 4 × 11.00 Rft × 9.50 Rft = 418.00 Sft
= 1 × 22.00 Rft × 10.17 Rft = 223.74 Sft
= 5,542.24 Sft x 0.42 rft
= 2327.74 Cft
Porch Slab = 1 × 17.67 Rft × 20.58 Rft = 363.65 Sft
= 1 × 7.00 Rft × 10.50 Rft = 73.50 Sft
= 437.15 Sft x 0.50 rft
= 218.57 Cft
= 2546.32 Cft
= 72.11 Cum
For Hostel Bldg
= 2 × 35.83 Rft × 87.00 Rft = 6,234.42 Sft
= 2 × 25.67 Rft × 20.42 Rft = 1,048.36 Sft
= 2 × 13.33 Rft × 6.00 Rft = 159.96 Sft
= 20 × 6.17 Rft × 1.67 Rft = 206.08 Sft
= 20 × 8.08 Rft × 3.33 Rft = 538.13 Sft
= 2 × 3.58 Rft × 1.67 Rft = 11.96 Sft
= 2 × 2.17 Rft × 1.67 Rft = 7.25 Sft
= 20 × 1.67 Rft × 1.00 Rft = 33.40 Sft
= 2 × 1.75 Rft × 1.67 Rft = 5.85 Sft
Porch = 2 × 9.75 Rft × 5.67 Rft = 110.57 Sft
= 8,355.96 Sft x 0.38 Rft
= 3175.27 Cft
Mid Portion = 1 × 26.08 Rft × 24.00 Rft = 625.92 Sft
= 1 × 13.58 Rft × 12.67 Rft = 172.06 Sft
= 1 × 24.17 Rft × 19.83 Rft = 479.29 Sft
= 2 × 5.67 Rft × 9.75 Rft = 110.57 Sft
= 1,387.83 Sft x 0.50 Rft
= 693.92 Cft
= 3869.18 Cft
= 109.58 cum
Total Qty = 205.57 Cum
@Tk = 20,000.00 P/Cum Sch = 207.91 Tk= 4,111,404.11
ii). 1st.Floor
For Academic Bldg
Main Slab = 1 × 44.00 Rft × 81.00 Rft = 3,564.00 Sft
= 1 × 36.00 Rft × 50.00 Rft = 1,800.00 Sft
= 5,364.00 Sft x 0.42 rft
= 2252.88 Cft
Auditorium = 1 × 45.50 Rft × 48.33 Rft = 2,199.02 Sft x 0.50 rft

5th R/A Bill Page 9


= 1099.51 Cft
= 3352.39 Cft
= 94.94 Cum
@Tk = 20,000.00 P/Cum Sch = 208.87 Tk= 1,898,831.78
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
= 220.89 Sqm
For Academic Bldg
Ref. from Floor Area = 5542.24 Sft
= 437.15 Sft
Add,Slab out Side = 2 x 2 Nos x 130.00 Rft = 520.00 Rft
= 2 x 2 Nos x 45.67 Rft = 182.68 Rft
= 2 x 2 Nos x 37.17 Rft = 148.68 Rft
= 2 × 2 Nos × 81.00 Rft = 324.00 Rft
= 1 × 2 Nos × 9.00 Rft = 18.00 Rft
= 2 x 2 Nos x 8.00 Rft = 32.00 Rft
= 2 x 2 Nos x 49.50 Rft = 198.00 Rft
= 1423.36 Rft
x 0.42 Rft = 597.81 Sft
Total = 6577.20 Sft
= 611.26 Sqm
For Hostel Bldg
Ref. from Floor Area = 8355.96 Sft
= 1387.83 Sft
Add,Slab out Side = 2 x 2 Nos x 130.00 Rft = 520.00 Rft
= 2 x 2 Nos x 45.67 Rft = 182.68 Rft
= 2 x 2 Nos x 37.17 Rft = 148.68 Rft
= 2 × 2 Nos × 81.00 Rft = 324.00 Rft
= 1 × 2 Nos × 9.00 Rft = 18.00 Rft
= 2 x 2 Nos x 8.00 Rft = 32.00 Rft
= 2 x 2 Nos x 49.50 Rft = 198.00 Rft
= 1423.36 Rft
x 0.38 Rft = 540.88 Sft
Total = 10284.68 Sft
= 955.82 Sqm
= 2487.98 Sqm
@Tk = 600.00 P/Sqm Sch = 2494.92 Tk= 1,492,786.17
ii).1st Floor
For Academic Bldg
Ref. from Floor Area = 5364.00 Sft
= 2199.02 Sft
Add,Slab out Side = 2 x 2 Nos x 130.00 Rft = 520.00 Rft
= 2 x 2 Nos x 45.67 Rft = 182.68 Rft
= 2 x 2 Nos x 37.17 Rft = 148.68 Rft
= 2 × 2 Nos × 81.00 Rft = 324.00 Rft

5th R/A Bill Page 10


= 1 × 2 Nos × 9.00 Rft = 18.00 Rft
= 2 x 2 Nos x 8.00 Rft = 32.00 Rft
= 2 x 2 Nos x 49.50 Rft = 198.00 Rft
= 1423.36 Rft
x 0.42 Rft = 597.81 Sft
Total = 8160.83 Sft
= 1158.44 Sqm
@Tk = 500.00 P/Sqm Sch = 2506.44 Tk= 579,220.55
H. In stair case, slab & steps, ramp etc
a). Concrete.
i). Gr.Floor
For Principal Qtr
1st & 2nd Flight
Waist Slab = 1 × 10.67 Rft × 3.50 Rft × 0.54 Sft = 20.17 Cft
= 1 × 9.67 Rft × 3.50 Rft × 0.54 Sft = 18.28 Cft
Step = 19 × 3.50 Rft × 0.92 Rft × 0.25 Sft = 15.30 Cft
Landing = 1 × 9.17 Rft × 5.17 Rft × 0.54 Sft = 25.60 Cft
Beam = 1 × 7.50 Rft × 1.25 Rft × 0.46 Sft = 4.31 Cft
= 83.65 Cft
= 2.37 Cum
Entry Step = 4 × 3.50 Rft × 1.00 Rft × 0.25 Sft = 3.50 Cft
W.Slab = 1 × 4.75 Rft × 3.50 Rft × 0.54 Sft = 8.98 Cft
= 12.48 Cft
= 0.35 Cum
= 2.72 Cum
@Tk = 12,000.00 P/Cum Sch = Tk= 32,668.96
b) Formwork/Shuttering
i). Gr.Floor
For Principal Qtr
Waist Slab = 1 × 1 Nos × 10.67 Rft × 3.50 Rft = 37.35 Sft
= 1 × 1 Nos × 9.67 Rft × 3.50 Rft = 33.85 Sft
Step = 2 × 10 Nos × 3.50 Rft × 0.50 Rft = 35.00 Sft
Side = 2 × 20 Nos × 0.83 Rft × 0.25 Rft = 8.30 Sft
Landing = 1 × 1 Nos × 7.42 Rft × 4.00 Rft = 29.68 Sft
Side = 1 × 2 Nos × 4.00 Rft × 0.54 Rft = 4.32 Sft
= 1 × 1 Nos × 7.42 Rft × 0.54 Rft = 4.01 Sft
Beam = 1 × 1 Nos × 7.50 Rft × 1.67 Rft = 12.53 Sft
= 165.02 Sft
= 15.34 sqm
Entry Front = 1 × 1 Rft × 4.75 Rft × 3.50 Rft = 16.63 Sft
Step = 1 × 4 Rft × 3.50 Rft × 0.50 Rft = 7.00 Sft
Side = 2 × 4 Rft × 1.00 Rft × 0.25 Rft = 2.00 Sft
= 25.63 Sft
= 2.38 sqm
= 17.72 sqm
@Tk = 400.00 P/sqm Sch = Tk= 7,087.24
SL No-1.17 Supplying fabrication and fixing to details as per design deform bar

5th R/A Bill Page 11


b).60 grade deformed bar
BF Qty = 298,090.74 Kg
Hostel Bldg
Column - Gr. Floor & F. Floor
20mmØ,C1 = 24 × 14 Nos = 336.00 Nos

C2 = 36 × 14 Nos = 504.00 Nos

C3 = 9 × 12 Nos = 108.00 Nos

C4 = 9 × 8 Nos = 72.00 Nos

C5 = 4 × 6 Nos = 24.00 Nos

C7 = 2 × 12 Nos = 24.00 Nos


No
= 1,068.00 s x 21.00 Rft = 22428.00 Rft
No
Lapping = 1,068.00 Nos x 2 s x 2.67 Rft = 5703.12 Rft
= 28131.12 Rft

16mmØ,C4 = 9 × 4 Nos = 36.00 Nos

C5 = 4 × 6 Nos = 24.00 Nos

C6 = 2 × 8 Nos = 16.00 Nos


No
= 76.00 s x 21.00 Rft = 1596.00 Rft
No
Lapping = 76.00 Nos x 2 s x 2.17 Rft = 329.84 Rft
= 1925.84 Rft

10mmØ stirup
Upto PL level
C1 = 24 × 39 Nos × 5.33 Rft × 2 Floor = 9977.76 Rft

= 24 × 39 Nos × 4.17 Rft × 2 Floor = 7806.24 Rft

= 24 × 39 Nos × 4.00 Rft × 2 Floor = 7488.00 Rft

C2 = 36 × 39 Nos × 4.83 Rft × 2 Floor = 13562.64 Rft

= 36 × 39 Nos × 2.67 Rft × 2 Floor = 7497.36 Rft

C3,C4,C5 = 22 × 39 Nos × 4.83 Rft × 2 Floor = 8288.28 Rft

= 22 × 39 Nos × 3.67 Rft × 2 Floor = 6297.72 Rft

C6 = 2 × 39 Nos × 4.00 Rft × 2 Floor = 624.00 Rft

C7 = 2 × 45 Nos × 4.67 Rft × 2 Floor = 840.60 Rft


= 62382.60 Rft

Column Summary
20mm Ø = 28131.12 = 21184.11 Kg
Rft

16mm Ø = 1,925.84 Rft = 927.69 Kg


10mm Ø = 62,382.60 Rft = 11791.83 Kg
For Column = 33903.63 kg
Academic Bldg
Column
1st. Floor
20mmØ,C1 = 25 × 14 Nos = 350.00 Nos

C2 = 3 × 12 Nos = 36.00 Nos

C3 = 4 × 14 Nos = 56.00 Nos

C4 = 18 × 14 Nos = 252.00 Nos

C5 = 4 × 12 Nos = 48.00 Nos

C6 = 6 × 10 Nos = 60.00 Nos

C7 = 1 × 6 Nos = 6.00 Nos

C8 = 6 × 20 Nos = 120.00 Nos

C9 = 2 × 20 Nos = 40.00 Nos

5th R/A Bill Page 12


No
= 968.00 s x 11.00 Rft = 10648.00 Rft
No
Lapping = 968.00 Nos x 1 s x 2.67 Rft = 2584.56 Rft
= 13232.56 Rft

25mmØ,C8 = 6 × 12 Nos = 72.00 Nos

C9 = 2 × 12 Nos = 24.00 Nos


No
= 96.00 s x 11.00 Rft = 1056.00 Rft
No
Lapping = 96.00 Nos x 1 s x 3.33 Rft = 319.68 Rft
= 1375.68 Rft

16mmØ,C7 = 1 × 4 Nos = 4.00 Nos


No
= 4.00 s x 11.00 Rft = 44.00 Rft
No
Lapping = 4.00 Nos x 1 s x 2.17 Rft = 8.68 Rft
= 52.68 Rft

10mmØ stirup
Upto PL level
C1 = 25 × 29 Nos × 4.83 Rft = 3501.75 Rft

= 25 × 29 Nos × 2.67 Rft = 1935.75 Rft

C2 = 3 × 29 Nos × 4.83 Rft = 420.21 Rft

= 3 × 29 Nos × 3.50 Rft = 304.50 Rft

C3 = 4 × 24 Nos × 5.33 Rft = 511.68 Rft

= 4 × 24 Nos × 4.17 Rft = 400.32 Rft

= 4 × 24 Nos × 4.00 Rft = 384.00 Rft

C4,C5 = 22 × 23 Nos × 4.83 Rft = 2443.98 Rft

= 22 × 23 Nos × 3.17 Rft = 1604.02 Rft

= 22 × 23 Nos × 3.00 Rft = 1518.00 Rft

C6,C7 = 7 × 27 Nos × 4.50 Rft = 850.50 Rft

= 7 × 27 Nos × 3.00 Rft = 567.00 Rft

C8,C9 = 8 × 20 Nos × 8.17 Rft = 1307.20 Rft

= 8 × 20 Nos × 6.17 Rft = 987.20 Rft

= 8 × 20 Nos × 6.17 Rft = 987.20 Rft

= 8 × 20 Nos × 7.17 Rft = 1147.20 Rft

= 18870.51 Rft

Column Summary
25mm Ø = 1375.68 = 1614.75
Rft Kg
20mm Ø = 13232.56 Rft = 9964.76 Kg
16mm Ø = 52.68 Rft = 25.38 Kg
10mm Ø = 18,870.51 Rft = 3566.99 Kg
For Column = 15171.87 kg
2nd. Floor
20mmØ,C1 = 17 × 14 Nos = 238.00 Nos

C2 = 2 × 12 Nos = 24.00 Nos

C3 = 4 × 14 Nos = 56.00 Nos

C4 = 16 × 14 Nos = 224.00 Nos

C5 = 2 × 12 Nos = 24.00 Nos

C6 = 1 × 10 Nos = 10.00 Nos

C7 = 1 × 6 Nos = 6.00 Nos

C9 = 1 × 20 Nos = 20.00 Nos


No
= 602.00 s x 11.00 Rft = 6622.00 Rft

5th R/A Bill Page 13


No
Lapping = 602.00 Nos x 1 s x 2.67 Rft = 1607.34 Rft
= 8229.34 Rft
No
25mmØ,C9 = 1 × 12 Nos = 12.00 s x 11.00 Rft = 132.00 Rft
No
Lapping = 12.00 Nos x 1 s x 3.33 Rft = 39.96 Rft
= 171.96 Rft
No
16mmØ,C7 = 1 × 4 Nos = 4.00 s x 11.00 Rft = 44.00 Rft
No
Lapping = 4.00 Nos x 1 s x 2.17 Rft = 8.68 Rft
= 52.68 Rft

10mmØ stirup
Upto PL level
C1 = 17 × 29 Nos × 4.83 Rft = 2381.19 Rft

= 17 × 29 Nos × 2.67 Rft = 1316.31 Rft

C2 = 2 × 29 Nos × 4.83 Rft = 280.14 Rft

= 2 × 29 Nos × 3.50 Rft = 203.00 Rft

C3 = 4 × 24 Nos × 5.33 Rft = 511.68 Rft

= 4 × 24 Nos × 4.17 Rft = 400.32 Rft

= 4 × 24 Nos × 4.00 Rft = 384.00 Rft

C4,C5 = 18 × 23 Nos × 4.83 Rft = 1999.62 Rft

= 18 × 23 Nos × 3.17 Rft = 1312.38 Rft

= 18 × 23 Nos × 3.00 Rft = 1242.00 Rft

C6,C7 = 2 × 27 Nos × 4.50 Rft = 243.00 Rft

= 2 × 27 Nos × 3.00 Rft = 162.00 Rft

C9 = 1 × 20 Nos × 8.17 Rft = 163.40 Rft

= 1 × 20 Nos × 6.17 Rft = 123.40 Rft

= 1 × 20 Nos × 6.17 Rft = 123.40 Rft

= 1 × 20 Nos × 7.17 Rft = 143.40 Rft

= 10989.24 Rft

Column Summary
25mm Ø = 171.96 Rft = 201.84 Kg
20mm Ø = 8229.34 Rft = 6197.09 Kg
16mm Ø = 52.68 Rft = 25.38 Kg
10mm Ø = 10,989.24 Rft = 2077.23 Kg
For Column = 8501.55 kg
Total for Column = 57577.05 kg
Academic Bldg
Gr. Floor Slab Beam
FB-1 = 1 Nos
16mm Ø St = 1 × 5 Nos × 131.50 Rft = 657.50 Rft
" Laping = 5 × 6 Nos × 2.17 Rft = 65.10 Rft
10mmØ,Strriup = 1 × 261 Nos × 3.67 Rft = 957.87 Rft
FB-1 = 1 Nos
16mm Ø St = 1 × 5 Nos × 82.42 Rft = 412.10 Rft
" Laping = 5 × 3 Nos × 2.17 Rft = 32.55 Rft
10mmØ,Strriup = 1 × 163 Nos × 3.67 Rft = 598.21 Rft
FB-2 = 2 Nos
16mm Ø St = 2 × 6 Nos × 131.50 Rft = 1,578.00 Rft
" Laping = 12 × 6 Nos × 2.17 Rft = 156.24 Rft
10mmØ,Strriup = 2 × 261 Nos × 3.67 Rft = 1,915.74 Rft

5th R/A Bill Page 14


FB-2 = 1 Nos
16mm Ø St = 1 × 6 Nos × 41.42 Rft = 248.52 Rft
" Laping = 1 × 6 Nos × 2.17 Rft = 13.02 Rft
10mmØ,Strriup = 1 × 78 Nos × 3.67 Rft = 286.26 Rft
FB-7 = 1 Nos
20 mm Ø St = 1 × 6 Nos × 52.75 Rft = 316.50 Rft
" Laping = 1 × 8 Nos × 2.67 Rft = 21.36 Rft
10 mmØ,Strriup = 1 × 103 Nos × 4.17 Rft = 429.51 Rft
FB-3 = 2 Nos
20 mm Ø St = 2 × 4 Nos × 47.67 Rft = 381.36 Rft
20 mm Ø Laping = 2 × 4 Nos × 2.67 Rft = 21.36 Rft
" Ext/End = 4 × 2 Nos × 6.83 Rft = 54.64 Rft
" Ext/Mid = 2 × 3 Nos × 21.08 Rft = 126.48 Rft
" Ext/Bott = 4 × 2 Nos × 12.00 Rft = 96.00 Rft
10 mmØ,Strriup = 2 × 81 Nos × 4.67 Rft = 756.54 Rft
FB-4 = 7 Nos
20 mm Ø St = 7 × 6 Nos × 47.67 Rft = 2,002.14 Rft
20 mm Ø Laping = 7 × 6 Nos × 2.67 Rft = 112.14 Rft
16 mm Ø Ext/End = 7 × 4 Nos × 6.83 Rft = 191.24 Rft
20 mm Ø Ext/Mid = 7 × 2 Nos × 21.08 Rft = 295.12 Rft
16 mm Ø Ext/Bott = 7 × 4 Nos × 12.00 Rft = 336.00 Rft
10 mmØ,Strriup = 7 × 81 Nos × 5.00 Rft = 2,835.00 Rft
FB-5 = 1 Nos
20 mm Ø St = 1 × 4 Nos × 47.67 Rft = 190.68 Rft
20 mm Ø Laping = 1 × 4 Nos × 2.67 Rft = 10.68 Rft
16 mm Ø Ext/End = 2 × 2 Nos × 6.83 Rft = 27.32 Rft
20 mm Ø Ext/Mid = 1 × 3 Nos × 15.75 Rft = 47.25 Rft
20 mm Ø Ext/Bott = 2 × 2 Nos × 12.00 Rft = 48.00 Rft
10 mmØ,Strriup = 1 × 81 Nos × 4.67 Rft = 378.27 Rft
FB-5 = 3 Nos
20 mm Ø St = 3 × 4 Nos × 39.25 Rft = 471.00 Rft
20 mm Ø Laping = 3 × 4 Nos × 2.67 Rft = 32.04 Rft
16 mm Ø Ext/End = 3 × 2 Nos × 6.83 Rft = 40.98 Rft
20 mm Ø Ext/Mid = 3 × 3 Nos × 15.75 Rft = 141.75 Rft
20 mm Ø Ext/Bott = 3 × 2 Nos × 12.00 Rft = 72.00 Rft
10 mmØ,Strriup = 3 × 68 Nos × 4.67 Rft = 952.68 Rft
FB-6 = 1 Nos
20 mm Ø St = 1 × 4 Nos × 43.83 Rft = 175.32 Rft
20 mm Ø Laping = 1 × 4 Nos × 2.67 Rft = 10.68 Rft
20 mm Ø Ext/End = 1 × 2 Nos × 6.83 Rft = 13.66 Rft
20 mm Ø Ext/Mid = 1 × 3 Nos × 15.75 Rft = 47.25 Rft
20 mm Ø Ext/Bott = 1 × 3 Nos × 12.00 Rft = 36.00 Rft
10 mmØ,Strriup = 1 × 75 Nos × 4.67 Rft = 350.25 Rft
FB-6 = 1 Nos
20 mm Ø St = 1 × 4 Nos × 61.67 Rft = 246.68 Rft
20 mm Ø Laping = 1 × 4 Nos × 2.67 Rft = 10.68 Rft
" Ext/End = 1 × 2 Nos × 6.83 Rft = 13.66 Rft

5th R/A Bill Page 15


" Ext/Mid = 1 × 3 Nos × 15.75 Rft = 47.25 Rft
" Ext/Bott = 1 × 2 Nos × 12.00 Rft = 24.00 Rft
10 mmØ,Strriup = 1 × 103 Nos × 4.67 Rft = 481.01 Rft
FB-8 = 2 Nos
20 mm Ø St = 2 × 6 Nos × 44.25 Rft = 531.00 Rft
20 mm Ø Laping = 12 × 1 Nos × 2.67 Rft = 32.04 Rft
10 mmØ,Strriup = 2 × 90 Nos × 4.17 Rft = 750.60 Rft
FB-9 = 2 Nos
20 mm Ø St = 2 × 4 Nos × 22.00 Rft = 176.00 Rft
20 mm Ø Laping = 2 × 12 Nos × 2.67 Rft = 64.08 Rft
20 mm Ø Ext/End = 2 × 2 Nos × 7.50 Rft = 30.00 Rft
16 mm Ø Ext/Bott = 2 × 2 Nos × 15.00 Rft = 60.00 Rft
10 mmØ,Strriup = 2 × 45 Nos × 5.00 Rft = 450.00 Rft
25mm Ø Separator = 2 × 90 Nos × 0.75 Rft = 135.00 Rft
Beam Summary
10mm Ø = 11,141.94 = Rft 2106.10 Kg
16mm Ø = 3,818.57 Rft = 1839.43 Kg
20mm Ø = 5,868.80 Rft = 4419.49 Kg
25mm Ø = 135.00 Rft = 158.46 Kg
Total For Gr. Floor Slab Beam = 8523.48 kg

Academic Bldg
Gr. Floor Slab
Long Direction
10mm Ø St 2 × 25 Nos × 129.75 Rft = 6,487.50 Rft
2 × 17 Nos × 80.67 Rft = 2,742.78 Rft
1 × 9 Nos × 10.67 Rft = 96.03 Rft
Laping25 × 6 Nos × 1.33 Rft = 199.50 Rft
" 17 × 3 Nos × 1.33 Rft = 67.83 Rft
Cut 7 × 41 Nos × 6.75 Rft = 1,937.25 Rft
" 1 × 41 Nos × 6.50 Rft = 266.50 Rft
" 2 × 24 Nos × 6.75 Rft = 324.00 Rft
" 2 × 24 Nos × 6.50 Rft = 312.00 Rft
" 1 × 33 Nos × 6.50 Rft = 214.50 Rft
Ext.top FB-3 1 × 85 Nos × 3.00 Rft = 255.00 Rft
FB-6 1 × 69 Nos × 3.00 Rft = 207.00 Rft
FB-4 7 × 120 Nos × 7.00 Rft = 5,880.00 Rft
FB-5 2 × 70 Nos × 6.83 Rft = 956.20 Rft
" 1 × 76 Nos × 3.00 Rft = 228.00 Rft
" 2 × 70 Nos × 6.75 Rft = 945.00 Rft
" 2 × 20 Nos × 10.50 Rft = 420.00 Rft
" 1 × 70 Nos × 6.67 Rft = 466.90 Rft
Ext.top
Binder8 × 40 Nos × 5.67 Rft = 1,814.40 Rft
= 4 × 26 Nos × 5.67 Rft = 589.68 Rft
= 1 × 33 Nos × 5.67 Rft = 187.11 Rft
Short Direction
= 8 × 8 Nos × 43.75 Rft = 2,800.00 Rft
= 2 × 8 Nos × 26.58 Rft = 425.28 Rft
= 2 × 7 Nos × 26.58 Rft = 372.12 Rft
= 1 × 8 Nos × 35.75 Rft = 286.00 Rft

5th R/A Bill Page 16


Laping = 8 × 8 Nos × 1.33 Rft = 85.12 Rft
" = 1 × 38 Nos × 1.33 Rft = 50.54 Rft
Cut = 8 × 14 Nos × 12.00 Rft = 1,344.00 Rft
" = 8 × 7 Nos × 6.00 Rft = 336.00 Rft
" = 3 × 8 Nos × 12.00 Rft = 288.00 Rft
" = 2 × 6 Nos × 12.00 Rft = 144.00 Rft
" = 3 × 8 Nos × 6.00 Rft = 144.00 Rft
" = 2 × 6 Nos × 6.00 Rft = 72.00 Rft
" = 1 × 6 Nos × 6.00 Rft = 36.00 Rft
Ext.top FB-1 = 19 × 19 Nos × 5.00 Rft = 1,805.00 Rft
" = 2 × 18 Nos × 5.00 Rft = 180.00 Rft
FB-2 = 21 × 22 Nos × 9.00 Rft = 4,158.00 Rft
" = 2 × 28 Nos × 3.50 Rft = 196.00 Rft
" = 2 × 27 Nos × 6.67 Rft = 360.18 Rft
" = 1 × 23 Nos × 6.25 Rft = 143.75 Rft
" = 1 × 23 Nos × 2.83 Rft = 65.09 Rft
Ext.top Binder = 42 × 5 Nos × 8.00 Rft = 1,680.00 Rft
= 28 × 5 Nos × 5.33 Rft = 746.20 Rft
Corner Bar = 7 × 5 Nos × 6.83 Rft = 239.05 Rft
" = 7 × 5 Nos × 5.17 Rft = 180.95 Rft
= 40,734.46 Rft = 7699.80646 Kg
Porch
10mm Ø St = 1 × 15 Nos × 20.08 Rft = 301.20 Rft
Cut = 1 × 15 Nos × 14.00 Rft = 210.00 Rft
Ext.top = 2 × 27 Nos × 6.83 Rft = 368.82 Rft
= 2 × 6 Nos × 20.08 Rft = 240.96 Rft
Ext.top = 1 × 35 Nos × 5.83 Rft = 204.05 Rft
= 1 × 57 Nos × 10.83 Rft = 617.31 Rft
= 2 × 6 Nos × 15.83 Rft = 189.96 Rft
Corner Bar = 2 × 5 Nos × 6.83 Rft = 68.30 Rft
"= 2 × 5 Nos × 5.17 Rft = 51.70 Rft
= 2,252.30 Rft = 425.7 Kg
12mm Ø St = 2 × 18 Nos × 15.50 Rft = 558.00 Rft
Cut = 2 × 17 Nos × 11.58 Rft = 393.72 Rft
= 951.72 Rft = 258.2 Kg
Total for Slab = 8383.79 Kg
Academic Bldg
1st Floor Slab Beam
FB-1 = 1 Nos
16mm Ø St = 1 × 5 Nos × 131.50 Rft = 657.50 Rft
" Laping = 5 × 6 Nos × 2.17 Rft = 65.10 Rft
10mmØ,Strriup = 1 × 261 Nos × 3.67 Rft = 957.87 Rft
FB-1 = 1 Nos
16mm Ø St = 1 × 5 Nos × 82.42 Rft = 412.10 Rft
" Laping = 5 × 3 Nos × 2.17 Rft = 32.55 Rft
10mmØ,Strriup = 1 × 163 Nos × 3.67 Rft = 598.21 Rft
FB-2 = 2 Nos
16mm Ø St = 2 × 6 Nos × 131.50 Rft = 1,578.00 Rft
" Laping = 12 × 6 Nos × 2.17 Rft = 156.24 Rft
10mmØ,Strriup = 2 × 261 Nos × 3.67 Rft = 1,915.74 Rft
FB-2 = 1 Nos

5th R/A Bill Page 17


16mm Ø St = 1 × 6 Nos × 41.42 Rft = 248.52 Rft
" Laping = 1 × 6 Nos × 2.17 Rft = 13.02 Rft
10mmØ,Strriup = 1 × 78 Nos × 3.67 Rft = 286.26 Rft
FB-2A = 1 Nos
20 mm Ø St = 1 × 6 Nos × 52.42 Rft = 314.52 Rft
" Laping = 1 × 6 Nos × 2.67 Rft = 16.02 Rft
25 mm Ø Ext/End = 2 × 3 Nos × 16.42 Rft = 98.52 Rft
" Ext/Bott = 1 × 3 Nos × 15.75 Rft = 47.25 Rft
" Separator = 1 × 8 Nos × 0.75 Rft = 6.00 Rft
10mmØ,Strriup = 1 × 105 Nos × 5.50 Rft = 577.50 Rft
FB-13 = 1 Nos
25 mm Ø St = 1 × 16 Nos × 46.00 Rft = 736.00 Rft
" Laping = 1 × 16 Nos × 3.33 Rft = 53.28 Rft
20 mm Ø St = 1 × 4 Nos × 46.00 Rft = 184.00 Rft
" Laping = 1 × 4 Nos × 2.67 Rft = 10.68 Rft
25 mm Ø Ext/End = 2 × 3 Nos × 18.67 Rft = 112.02 Rft
25 mm Ø Ext/Bott = 1 × 3 Nos × 30.75 Rft = 92.25 Rft
25 mm Ø Separtr = 1 × 45 Nos × 1.42 Rft = 63.90 Rft
10 mmØ,Strriup = 1 × 93 Nos × 9.83 Rft = 914.19 Rft
" = 1 × 93 Nos × 9.58 Rft = 890.94 Rft
" = 1 × 93 Nos × 9.33 Rft = 867.69 Rft
" = 1 × 93 Nos × 8.33 Rft = 774.69 Rft
FB-12 = 1 Nos
25 mm Ø St = 1 × 20 Nos × 48.50 Rft = 970.00 Rft
" Laping = 1 × 20 Nos × 3.33 Rft = 66.60 Rft
20 mm Ø St = 1 × 4 Nos × 48.50 Rft = 194.00 Rft
" Laping = 1 × 4 Nos × 2.67 Rft = 10.68 Rft
25 mm Ø Ext/End = 2 × 3 Nos × 17.17 Rft = 103.02 Rft
" Ext/Bott = 1 × 3 Nos × 34.50 Rft = 103.50 Rft
" Separtr = 1 × 45 Nos × 1.42 Rft = 63.90 Rft
10 mmØ,Strriup = 1 × 97 Nos × 9.83 Rft = 953.51 Rft
" = 1 × 97 Nos × 9.58 Rft = 929.26 Rft
" = 1 × 97 Nos × 9.33 Rft = 905.01 Rft
" = 1 × 97 Nos × 8.33 Rft = 808.01 Rft
FB-11 = 1 Nos
25 mm Ø St = 1 × 16 Nos × 51.50 Rft = 824.00 Rft
" Laping = 1 × 16 Nos × 3.33 Rft = 53.28 Rft
20 mm Ø St = 1 × 4 Nos × 51.50 Rft = 206.00 Rft
" Laping = 1 × 4 Nos × 2.67 Rft = 10.68 Rft
25 mm Ø Ext/End = 2 × 4 Nos × 17.17 Rft = 137.36 Rft
" Ext/Bott = 1 × 4 Nos × 34.50 Rft = 138.00 Rft
" Separtr = 1 × 45 Nos × 1.42 Rft = 63.90 Rft
10 mmØ,Strriup = 1 × 104 Nos × 9.83 Rft = 1,022.32 Rft
" = 1 × 104 Nos × 9.58 Rft = 996.32 Rft
" = 1 × 104 Nos × 9.33 Rft = 970.32 Rft
" = 1 × 104 Nos × 8.33 Rft = 866.32 Rft
FB-10 = 1 Nos

5th R/A Bill Page 18


25 mm Ø St = 1 × 20 Nos × 54.33 Rft = 1,086.60 Rft
" Laping = 1 × 20 Nos × 3.33 Rft = 66.60 Rft
20 mm Ø St = 1 × 4 Nos × 54.33 Rft = 217.32 Rft
" Laping = 1 × 4 Nos × 2.67 Rft = 10.68 Rft
25 mm Ø Ext/End = 2 × 4 Nos × 19.83 Rft = 158.64 Rft
" Ext/Bott = 1 × 4 Nos × 36.75 Rft = 147.00 Rft
" Separtr = 1 × 55 Nos × 1.42 Rft = 78.10 Rft
10 mmØ,Strriup = 1 × 109 Nos × 9.83 Rft = 1,071.47 Rft
" = 1 × 109 Nos × 9.58 Rft = 1,044.22 Rft
" = 1 × 109 Nos × 9.33 Rft = 1,016.97 Rft
" = 1 × 109 Nos × 8.33 Rft = 907.97 Rft
FB-7 = 1 Nos
20 mm Ø St = 2 × 6 Nos × 52.75 Rft = 633.00 Rft
" Laping = 2 × 6 Nos × 2.67 Rft = 32.04 Rft
10 mmØ,Strriup = 2 × 107 Nos × 4.17 Rft = 892.38 Rft
FB-3 = 1 Nos
20 mm Ø St = 1 × 4 Nos × 47.67 Rft = 190.68 Rft
20 mm Ø Laping = 1 × 4 Nos × 2.67 Rft = 10.68 Rft
" Ext/End = 2 × 2 Nos × 6.83 Rft = 27.32 Rft
" Ext/Mid = 1 × 3 Nos × 21.08 Rft = 63.24 Rft
" Ext/Bott = 2 × 2 Nos × 12.00 Rft = 48.00 Rft
10 mmØ,Strriup = 1 × 81 Nos × 4.67 Rft = 378.27 Rft
FB-4 = 7 Nos
20 mm Ø St = 7 × 6 Nos × 47.67 Rft = 2,002.14 Rft
20 mm Ø Laping = 7 × 6 Nos × 2.67 Rft = 112.14 Rft
16 mm Ø Ext/End = 7 × 4 Nos × 6.83 Rft = 191.24 Rft
20 mm Ø Ext/Mid = 7 × 2 Nos × 21.08 Rft = 295.12 Rft
16 mm Ø Ext/Bott = 7 × 4 Nos × 12.00 Rft = 336.00 Rft
10 mmØ,Strriup = 7 × 81 Nos × 5.00 Rft = 2,835.00 Rft
FB-5 = 2 Nos
20 mm Ø St = 2 × 4 Nos × 47.67 Rft = 381.36 Rft
20 mm Ø Laping = 2 × 4 Nos × 2.67 Rft = 21.36 Rft
16 mm Ø Ext/End = 2 × 2 Nos × 6.83 Rft = 27.32 Rft
20 mm Ø Ext/Mid = 2 × 3 Nos × 15.75 Rft = 94.50 Rft
16 mm Ø Ext/Bott = 2 × 2 Nos × 12.00 Rft = 48.00 Rft
10 mmØ,Strriup = 2 × 81 Nos × 4.67 Rft = 756.54 Rft
FB-5 = 3 Nos
20 mm Ø St = 3 × 4 Nos × 39.25 Rft = 471.00 Rft
20 mm Ø Laping = 3 × 4 Nos × 2.67 Rft = 32.04 Rft
16 mm Ø Ext/End = 3 × 2 Nos × 6.83 Rft = 40.98 Rft
20 mm Ø Ext/Mid = 3 × 3 Nos × 15.75 Rft = 141.75 Rft
16 mm Ø Ext/Bott = 3 × 2 Nos × 12.00 Rft = 72.00 Rft
10 mmØ,Strriup = 3 × 68 Nos × 4.67 Rft = 952.68 Rft
FB-5 = 1 Nos
20 mm Ø St = 1 × 4 Nos × 30.17 Rft = 120.68 Rft
20 mm Ø Laping = 1 × 4 Nos × 2.67 Rft = 10.68 Rft
16 mm Ø Ext/End = 1 × 2 Nos × 6.83 Rft = 13.66 Rft

5th R/A Bill Page 19


20 mm Ø Ext/Mid = 1 × 3 Nos × 15.75 Rft = 47.25 Rft
16 mm Ø Ext/Bott = 1 × 2 Nos × 12.00 Rft = 24.00 Rft
10 mmØ,Strriup = 1 × 52 Nos × 4.67 Rft = 242.84 Rft
FB-8 = 2 Nos
20 mm Ø St = 2 × 6 Nos × 61.17 Rft = 734.04 Rft
20 mm Ø Laping = 2 × 12 Nos × 2.67 Rft = 64.08 Rft
10 mmØ,Strriup = 2 × 120 Nos × 4.17 Rft = 1,000.80 Rft
FB-14 = 1 Nos
20 mm Ø St = 1 × 6 Nos × 63.25 Rft = 379.50 Rft
20 mm Ø Laping = 6 × 2 Nos × 2.67 Rft = 32.04 Rft
10 mmØ,Strriup = 1 × 127 Nos × 5.00 Rft = 635.00 Rft
25mm Ø Separator = 1 × 190 Nos × 0.75 Rft = 142.50 Rft
Beam Summary
10mm Ø = 26,968.30 = 5097.67
Rft Kg
16mm Ø = 3,916.23 Rft = 1886.48 Kg
20mm Ø = 7,119.22 Rft = 5361.12 Kg
25mm Ø = 5,412.22 Rft = 6352.76 Kg
Total For Floor Slab Beam = 18698.02 kg

Academic Bldg
1st. Floor Slab
Long Direction
10mm Ø St = 1 × 25 Nos × 129.75 Rft = 3,243.75 Rft
= 2 × 17 Nos × 80.67 Rft = 2,742.78 Rft
= 1 × 9 Nos × 10.67 Rft = 96.03 Rft
Laping = 25 × 6 Nos × 1.33 Rft = 199.50 Rft
" = 17 × 3 Nos × 1.33 Rft = 67.83 Rft
Cut = 7 × 41 Nos × 6.75 Rft = 1,937.25 Rft
" = 1 × 41 Nos × 6.50 Rft = 266.50 Rft
" = 2 × 24 Nos × 6.75 Rft = 324.00 Rft
" = 2 × 24 Nos × 6.50 Rft = 312.00 Rft
" = 1 × 33 Nos × 6.50 Rft = 214.50 Rft
Ext.top PFB-3 = 1 × 85 Nos × 3.00 Rft = 255.00 Rft
PFB-6 = 1 × 69 Nos × 3.00 Rft = 207.00 Rft
PFB-4 = 7 × 120 Nos × 7.00 Rft = 5,880.00 Rft
PFB-5 = 2 × 70 Nos × 6.83 Rft = 956.20 Rft
" = 1 × 76 Nos × 3.00 Rft = 228.00 Rft
" = 2 × 70 Nos × 6.75 Rft = 945.00 Rft
" = 2 × 20 Nos × 10.50 Rft = 420.00 Rft
" = 4 × 70 Nos × 6.67 Rft = 1,867.60 Rft
Ext.top Binder = 8 × 40 Nos × 9.00 Rft = 2,880.00 Rft
= 4 × 26 Nos × 9.00 Rft = 936.00 Rft
= 6 × 33 Nos × 9.00 Rft = 1,782.00 Rft
Short Direction
= 8 × 8 Nos × 43.75 Rft = 2,800.00 Rft
= 2 × 8 Nos × 26.58 Rft = 425.28 Rft
= 2 × 7 Nos × 26.58 Rft = 372.12 Rft
= 2 × 8 Nos × 35.75 Rft = 572.00 Rft
Laping = 8 × 8 Nos × 1.33 Rft = 85.12 Rft
" = 1 × 38 Nos × 1.33 Rft = 50.54 Rft

5th R/A Bill Page 20


Cut = 8 × 14 Nos × 12.00 Rft = 1,344.00 Rft
" = 8 × 7 Nos × 6.00 Rft = 336.00 Rft
" = 3 × 8 Nos × 12.00 Rft = 288.00 Rft
" = 8 × 6 Nos × 12.00 Rft = 576.00 Rft
" = 3 × 8 Nos × 6.00 Rft = 144.00 Rft
" = 2 × 6 Nos × 6.00 Rft = 72.00 Rft
" = 1 × 6 Nos × 6.08 Rft = 36.48 Rft
Ext.top PFB-1 = 19 × 19 Nos × 5.00 Rft = 1,805.00 Rft
" = 4 × 18 Nos × 5.00 Rft = 360.00 Rft
PFB-2 = 21 × 22 Nos × 9.00 Rft = 4,158.00 Rft
" = 2 × 28 Nos × 3.50 Rft = 196.00 Rft
" = 2 × 27 Nos × 6.67 Rft = 360.18 Rft
" = 1 × 23 Nos × 6.25 Rft = 143.75 Rft
" = 1 × 23 Nos × 2.83 Rft = 65.09 Rft
Ext.top Binder = 42 × 5 Nos × 8.00 Rft = 1,680.00 Rft
= 28 × 5 Nos × 5.33 Rft = 746.20 Rft
Corner Bar = 7 × 6 Nos × 6.83 Rft = 286.86 Rft
" = 7 × 6 Nos × 7.17 Rft = 301.14 Rft
= 42,964.70 Rft = 8121.37622 Kg
Auditorium
Short Direction
10mm Ø St = 1 × 14 Nos × 39.58 Rft = 554.12 Rft
= 2 × 28 Nos × 45.00 Rft = 2,520.00 Rft
= 1 × 42 Nos × 1.33 Rft = 55.86 Rft
= 2 × 7 Nos × 6.33 Rft = 88.62 Rft
= 1 × 7 Nos × 14.67 Rft = 102.69 Rft
= 2 × 5 Nos × 13.67 Rft = 136.70 Rft
= 2 × 28 Nos × 15.50 Rft = 868.00 Rft
= 2 × 21 Nos × 6.33 Rft = 265.86 Rft
= 2 × 15 Nos × 6.83 Rft = 204.90 Rft
= 2 × 80 Nos × 6.00 Rft = 960.00 Rft
= 4 × 24 Nos × 15.08 Rft = 1,447.68 Rft
= 2 × 10 Nos × 8.00 Rft = 160.00 Rft
= 2 × 8 Nos × 9.00 Rft = 144.00 Rft
= 2 × 40 Nos × 17.00 Rft = 1,360.00 Rft
Long Direction
10mm Ø St = 4 × 22 Nos × 58.83 Rft = 5,177.04 Rft
= 2 × 44 Nos × 1.33 Rft = 117.04 Rft
= 1 × 38 Nos × 6.25 Rft = 237.50 Rft
= 2 × 19 Nos × 5.42 Rft = 205.96 Rft
= 8 × 22 Nos × 7.00 Rft = 1,232.00 Rft
= 2 × 22 Nos × 3.50 Rft = 154.00 Rft
= 2 × 28 Nos × 3.50 Rft = 196.00 Rft
= 2 × 24 Nos × 6.00 Rft = 288.00 Rft
= 1 × 65 Nos × 6.00 Rft = 390.00 Rft
= 2 × 58 Nos × 6.58 Rft = 763.28 Rft
= 2 × 61 Nos × 7.58 Rft = 924.76 Rft
= 2 × 65 Nos × 7.58 Rft = 985.40 Rft
= 2 × 70 Nos × 7.50 Rft = 1,050.00 Rft
= 2 × 49 Nos × 3.00 Rft = 294.00 Rft
= 4 × 5 Nos × 5.50 Rft = 110.00 Rft
= 2 × 10 Nos × 5.50 Rft = 110.00 Rft

5th R/A Bill Page 21


= 4 × 9 Nos × 5.08 Rft = 182.88 Rft
= 16 × 11 Nos × 5.83 Rft = 1,026.08 Rft
= 22,312.37 Rft = 4217.58213 Kg
Total for Slab = 12338.96 Kg
Female Hostel Bldg.
Plinth level Floor Slab Beam
PFB-1 = 2 Nos
No
20 mm Ø St = 2 × 1 Nos × 4 s × 88.50 Rft = 708.00 Rft
No
" Laping = 2 × 4 Nos × 3 s × 2.67 Rft = 64.08 Rft
No
16mmØ,Ext t/End = 2 × 2 Nos × 2 s × 4.17 Rft = 33.36 Rft
No
20mm Ø Ext/Mid = 2 × 1 Nos × 2 s × 8.33 Rft = 33.32 Rft
No
"= 2 × 1 Nos × 2 s × 8.17 Rft = 32.68 Rft
No
"= 2 × 4 Nos × 2 s × 9.58 Rft = 153.28 Rft
No
16mmØ,Ext/Bott = 2 × 1 Nos × 2 s × 9.67 Rft = 38.68 Rft
No
"= 2 × 1 Nos × 2 s × 6.58 Rft = 26.32 Rft
No
"= 2 × 5 Nos × 2 s × 9.67 Rft = 193.40 Rft
No
25mm Ø Separor = 2 × 1 Nos × 39 s × 0.58 Rft = 45.24 Rft
No
10mmØ,Strriup = 2 × 1 Nos × 174 s × 4.17 Rft = 1,451.16 Rft
PFB-2 = 4 Nos
No
20 mm Ø St = 4 × 2 Nos × 4 s × 88.50 Rft = 2,832.00 Rft
No
" Laping = 4 × 4 Nos × 3 s × 2.67 Rft = 128.16 Rft
No
16mmØ,Ext.t/End = 4 × 2 Nos × 1 s × 4.17 Rft = 33.36 Rft
No
20mm Ø Ext/Mid = 4 × 1 Nos × 1 s × 8.33 Rft = 33.32 Rft
No
"= 4 × 1 Nos × 1 s × 8.17 Rft = 32.68 Rft
No
"= 4 × 4 Nos × 1 s × 9.58 Rft = 153.28 Rft
No
16mmØ,Ext/Bott = 4 × 1 Nos × 1 s × 9.67 Rft = 38.68 Rft
No
"= 4 × 1 Nos × 1 s × 6.58 Rft = 26.32 Rft
No
"= 4 × 5 Nos × 1 s × 9.67 Rft = 193.40 Rft
No
10mmØ,Strriup = 4 × 1 Nos × 174 s × 4.17 Rft = 2,902.32 Rft
PFB-1 = 2 Nos
No
20 mm Ø St = 2 × 2 Nos × 4 s × 66.58 Rft = 1,065.28 Rft
No
" Laping = 2 × 4 Nos × 2 s × 2.67 Rft = 42.72 Rft
No
20mmØ,Ext/End = 2 × 2 Nos × 2 s × 4.00 Rft = 32.00 Rft
No
20mm Ø Ext/Mid = 2 × 4 Nos × 2 s × 9.50 Rft = 152.00 Rft
No
16mmØ,Ext/Bott = 2 × 5 Nos × 2 s × 9.67 Rft = 193.40 Rft
No
25mm Ø Separt = 2 × 1 Nos × 30 s × 0.58 Rft = 34.80 Rft
No
10mmØ,Strriup = 2 × 1 Nos × 131 s × 4.17 Rft = 1,092.54 Rft
PFB-13 = 2 Nos
No
16mm Ø St = 2 × 1 Nos × 4 s × 10.83 Rft = 86.64 Rft
No
10mmØ,Strriup = 2 × 1 Nos × 20 s × 4.17 Rft = 166.80 Rft
PFB-5 = 2 Nos
No
20mm Ø St = 2 × 1 Nos × 4 s × 15.58 Rft = 124.64 Rft
No
20mm Ø Ext/End = 2 × 2 Nos × 2 s × 4.17 Rft = 33.36 Rft
No
16mmØ,Ext/Bott = 2 × 1 Nos × 2 s × 9.83 Rft = 39.32 Rft
No
10mmØ,Strriup = 2 × 1 Nos × 26 s × 4.17 Rft = 216.84 Rft
PFB-11 = 2 Nos
No
20mm Ø St = 2 × 1 Nos × 6 s × 23.25 Rft = 279.00 Rft
No
" Laping = 2 × 6 Nos × 1 s × 2.67 Rft = 32.04 Rft

5th R/A Bill Page 22


No
10mmØ,Strriup = 2 × 1 Nos × 44 s × 4.17 Rft = 366.96 Rft
PFB-12 = 2 Nos
No
16mm Ø St = 2 × 1 Nos × 4 s × 11.08 Rft = 88.64 Rft
No
10mmØ,Strriup = 2 × 1 Nos × 19 s × 3.67 Rft = 139.46 Rft
PFB-3 = 2 Nos
No
20 mm Ø St = 2 × 2 Nos × 4 s × 40.00 Rft = 640.00 Rft
No
" Laping = 2 × 4 Nos × 1 s × 2.67 Rft = 21.36 Rft
No
20mmØ,Ext t/End = 2 × 2 Nos × 1 s × 6.00 Rft = 24.00 Rft
No
20mm Ø Ext/Mid = 2 × 2 Nos × 2 s × 9.17 Rft = 73.36 Rft
No
16mmØ,Ext/Bott = 2 × 2 Nos × 2 s × 10.00 Rft = 80.00 Rft
No
25mm Ø Separor = 2 × 2 Nos × 6 s × 0.58 Rft = 13.92 Rft
No
10mmØ,Strriup = 2 × 1 Nos × 76 s × 4.17 Rft = 633.84 Rft
PFB-4 = 14 Nos
No
20 mm Ø St = 14 × 1 Nos × 4 s × 40.00 Rft = 2,240.00 Rft
No
" Laping = 14 × 4 Nos × 1 s × 2.67 Rft = 149.52 Rft
No
20mmØ,Ext t/End = 14 × 2 Nos × 1 s × 6.00 Rft = 168.00 Rft
No
20mm Ø Ext/Mid = 14 × 2 Nos × 2 s × 9.17 Rft = 513.52 Rft
No
16mmØ,Ext/Bott = 14 × 2 Nos × 2 s × 10.00 Rft = 560.00 Rft
No
25mm Ø Separor = 14 × 2 Nos × 6 s × 0.58 Rft = 97.44 Rft
No
10mmØ,Strriup = 14 × 1 Nos × 69 s × 4.17 Rft = 4,028.22 Rft
PFB-7 = 2 Nos
No
20 mm Ø St = 2 × 1 Nos × 4 s × 19.75 Rft = 158.00 Rft
No
10mmØ,Strriup = 2 × 1 Nos × 38 s × 4.17 Rft = 316.92 Rft
PFB-6 = 4 Nos
No
20 mm Ø St = 4 × 1 Nos × 6 s × 27.58 Rft = 661.92 Rft
No
" Laping = 4 × 1 Nos × 6 s × 2.17 Rft = 52.08 Rft
No
10mmØ,Strriup = 4 × 1 Nos × 54 s × 4.17 Rft = 900.72 Rft
PFB-8 = 2 Nos
No
20 mm Ø St = 2 × 1 Nos × 4 s × 31.58 Rft = 252.64 Rft
No
" Laping = 2 × 4 Nos × 1 s × 2.67 Rft = 21.36 Rft
No
16mmØ,Ext t/End = 2 × 1 Nos × 2 s × 7.00 Rft = 28.00 Rft
No
"= 2 × 2 Nos × 1 s × 6.00 Rft = 24.00 Rft
No
20mm Ø Ext/Mid = 2 × 1 Nos × 2 s × 11.25 Rft = 45.00 Rft
No
16mmØ,Ext/Bott = 2 × 1 Nos × 2 s × 12.00 Rft = 48.00 Rft
No
"= 2 × 1 Nos × 2 s × 9.67 Rft = 38.68 Rft
No
25mm Ø Separor = 2 × 14 Nos × 1 s × 0.58 Rft = 16.24 Rft
No
10mmØ,Strriup = 2 × 1 Nos × 56 s × 4.17 Rft = 467.04 Rft
PFB-9 = 1 Nos
No
20 mm Ø St = 1 × 1 Nos × 4 s × 25.25 Rft = 101.00 Rft
No
" Laping = 1 × 4 Nos × 1 s × 2.67 Rft = 10.68 Rft
No
20mmØ,Ext t/End = 1 × 2 Nos × 2 s × 10.33 Rft = 41.32 Rft
No
16mmØ,Ext/Bott = 1 × 1 Nos × 2 s × 8.75 Rft = 17.50 Rft
No
25mm Ø Separor = 1 × 5 Nos × 1 s × 0.58 Rft = 2.90 Rft
No
10mmØ,Strriup = 1 × 1 Nos × 44 s × 4.17 Rft = 183.48 Rft
PFB-9A = 1 Nos
No
20 mm Ø St = 1 × 1 Nos × 4 s × 25.25 Rft = 101.00 Rft
No
" Laping = 1 × 4 Nos × 1 s × 2.67 Rft = 10.68 Rft

5th R/A Bill Page 23


No
20mmØ,Ext t/End = 1 × 2 Nos × 2 s × 10.33 Rft = 41.32 Rft
No
16mmØ,Ext/Bott = 1 × 1 Nos × 2 s × 8.75 Rft = 17.50 Rft
No
25mm Ø Separt = 1 × 5 Nos × 1 s × 0.58 Rft = 2.90 Rft
No
10mmØ,Strriup = 1 × 1 Nos × 44 s × 4.17 Rft = 183.48 Rft
PFB-11 = 1 Nos
No
20 mm Ø St = 1 × 1 Nos × 6 s × 14.08 Rft = 84.48 Rft
No
10mmØ,Strriup = 1 × 1 Nos × 26 s × 4.17 Rft = 108.42 Rft
PFB-10 = 1 Nos
No
20 mm Ø St = 1 × 1 Nos × 6 s × 25.17 Rft = 151.02 Rft
No
" Laping = 1 × 6 Nos × 1 s × 2.67 Rft = 16.02 Rft
No
20mmØ,Ext t/End = 1 × 2 Nos × 3 s × 8.50 Rft = 51.00 Rft
No
20mmØ,Ext/Bott = 1 × 1 Nos × 3 s × 17.00 Rft = 51.00 Rft
No
25mm Ø Separor = 1 × 10 Nos × 1 s × 0.75 Rft = 7.50 Rft
No
10mmØ,Strriup = 1 × 1 Nos × 44 s × 5.50 Rft = 242.00 Rft
Beam Summary
10mm Ø = 13,083.28 Rft = = 2473.06 Kg
@ 0.62 kg/m
16mm Ø = 1,805.20 Rft =
@ 1.58 kg/m = 869.58 Kg
20mm Ø = 11,612.12 Rft =
@ 2.47 kg/m = 8744.49 Kg
25mm Ø = 220.94 Rft =
@ 3.85 kg/m = 259.34 Kg
For Plinth Slab Beam = 12346.46 kg
Female Hostel Bldg.
Plinth level Floor Slab
Short Direction
No
10mm Ø St = 2 × 92 Nos × 1 s × 35.67 Rft = 6,563.28 Rft
No
" = 2 × 10 Nos × 7 s × 1.67 Rft = 233.80 Rft
No
" = 2 × 1 Nos × 5 s × 1.67 Rft = 16.70 Rft
No
" = 2 × 2 Nos × 5 s × 1.67 Rft = 33.40 Rft
No
Laping = 2 × 92 Nos × 1 s × 1.33 Rft = 244.72 Rft
No
Cut = 2 × 2 Nos × 86 s × 8.92 Rft = 3,068.48 Rft
No
" = 2 × 1 Nos × 86 s × 6.25 Rft = 1,075.00 Rft
No
Ext.top PFB-1 = 2 × 2 Nos × 251 s × 4.00 Rft = 4,016.00 Rft
No
" = 2 × 10 Nos × 20 s × 1.67 Rft = 668.00 Rft
No
" = 2 × 2 Nos × 8 s × 1.67 Rft = 53.44 Rft
No
Ext.top PFB-2 = 2 × 2 Nos × 251 s × 8.33 Rft = 8,363.32 Rft
No
Ext.top PFB-5 = 2 × 1 Nos × 8 s × 1.67 Rft = 26.72 Rft
No
Ext.top Binder = 2 × 2 Nos × 92 s × 10.00 Rft = 3,680.00 Rft
No
" = 2 × 92 Nos × 1 s × 6.00 Rft = 1,104.00 Rft
No
Col Side = 2 × 16 Nos × 4 s × 3.50 Rft = 448.00 Rft
No
Gap 10mmØ St = 2 × 35 Nos × 1 s × 12.00 Rft = 840.00 Rft
No
Cut = 2 × 25 Nos × 1 s × 12.00 Rft = 600.00 Rft
No
Ext.top = 2 × 27 Nos × 1 s × 4.17 Rft = 225.18 Rft
No
PFB-11 = 2 × 13 Nos × 1 s × 8.33 Rft = 216.58 Rft
No
" = 2 × 27 Nos × 1 s × 3.17 Rft = 171.18 Rft
No
PFB-12 = 2 × 23 Nos × 1 s × 8.33 Rft = 383.18 Rft
No
PFB-6 = 2 × 51 Nos × 1 s × 4.58 Rft = 467.16 Rft
No
Ext.top Binder = 2 × 4 Nos × 1 s × 35.00 Rft = 280.00 Rft
No
" = 2 × 4 Nos × 1 s × 8.00 Rft = 64.00 Rft
No
" = 2 × 5 Nos × 1 s × 24.83 Rft = 248.30 Rft
Long Direction
No
10mm Ø St = 2 × 33 Nos × 2 s × 86.83 Rft = 11,461.56 Rft

5th R/A Bill Page 24


No
Laping = 2 × 33 Nos × 4 s × 1.33 Rft = 351.12 Rft
No
Cut = 2 × 32 Nos × 1 s × 9.50 Rft = 608.00 Rft
No
" = 2 × 28 Nos × 1 s × 6.00 Rft = 336.00 Rft
No
" = 2 × 5 Nos × 32 s × 9.00 Rft = 2,880.00 Rft
No
Ext.top PFB-3 = 2 × 70 Nos × 1 s × 4.00 Rft = 560.00 Rft
No
PFB-4 = 2 × 85 Nos × 1 s × 8.00 Rft = 1,360.00 Rft
No
" = 2 × 17 Nos × 1 s × 4.83 Rft = 164.22 Rft
No
" = 2 × 85 Nos × 1 s × 7.50 Rft = 1,275.00 Rft
No
" = 2 × 17 Nos × 1 s × 4.00 Rft = 136.00 Rft
No
" = 2 × 4 Nos × 98 s × 8.83 Rft = 6,922.72 Rft
No
" = 2 × 1 Nos × 103 s × 10.83 Rft = 2,230.98 Rft
No
Ext.top Binder = 2 × 2 Nos × 16 s × 10.00 Rft = 640.00 Rft
No
" = 2 × 2 Nos × 16 s × 7.00 Rft = 448.00 Rft
No
" = 2 × 5 Nos × 32 s × 10.00 Rft = 3,200.00 Rft
No
Cantilever = 2 × 10 Nos × 6 s × 6.00 Rft = 720.00 Rft
No
" = 2 × 2 Nos × 6 s × 2.00 Rft = 48.00 Rft
No
" = 2 × 1 Nos × 6 s × 3.42 Rft = 41.04 Rft
No
" = 2 × 5 Nos × 6 s × 0.83 Rft = 49.80 Rft
No
Gap 10Ø St = 2 × 13 Nos × 1 s × 6.00 Rft = 156.00 Rft
No
" = 2 × 13 Nos × 1 s × 7.00 Rft = 182.00 Rft
No
" = 2 × 8 Nos × 1 s × 15.00 Rft = 240.00 Rft
No
Cut = 2 × 13 Nos × 1 s × 5.00 Rft = 130.00 Rft
No
" = 2 × 13 Nos × 1 s × 5.25 Rft = 136.50 Rft
No
" = 2 × 7 Nos × 1 s × 10.00 Rft = 140.00 Rft
No
Ext.top Binder = 2 × 32 Nos × 1 s × 10.00 Rft = 640.00 Rft
Mid Portion
No
S/D,10mm Ø St = 1 × 16 Nos × 1 s × 23.42 Rft = 374.72 Rft
No
" = 1 × 13 Nos × 1 s × 12.50 Rft = 162.50 Rft
No
" = 1 × 7 Nos × 1 s × 23.42 Rft = 163.94 Rft
No
Cut = 1 × 15 Nos × 1 s × 8.25 Rft = 123.75 Rft
No
" = 2 × 15 Nos × 1 s × 4.17 Rft = 125.10 Rft
No
" = 1 × 12 Nos × 1 s × 7.83 Rft = 93.96 Rft
No
" = 1 × 6 Nos × 1 s × 16.50 Rft = 99.00 Rft
No
Ext.top PFB-6 = 2 × 49 Nos × 1 s × 2.25 Rft = 220.50 Rft
No
= 2 × 19 Nos × 1 s × 8.17 Rft = 310.46 Rft
No
PFB-8 = 2 × 49 Nos × 1 s × 6.00 Rft = 588.00 Rft
No
" = 2 × 37 Nos × 1 s × 3.58 Rft = 264.92 Rft
No
Ext.top Binder = 1 × 12 Nos × 1 s × 22.00 Rft = 264.00 Rft
No
" = 2 × 7 Nos × 1 s × 10.00 Rft = 140.00 Rft
No
" = 2 × 14 Nos × 1 s × 4.00 Rft = 112.00 Rft
No
" = 2 × 6 Nos × 1 s × 10.83 Rft = 129.96 Rft
No
L/D,10mm Ø St = 1 × 9 Nos × 1 s × 29.67 Rft = 267.03 Rft
No
" = 2 × 4 Nos × 1 s × 16.92 Rft = 135.36 Rft
No
" = 1 × 23 Nos × 1 s × 9.50 Rft = 218.50 Rft
No
Cut = 1 × 8 Nos × 1 s × 11.42 Rft = 91.36 Rft
No
" = 1 × 8 Nos × 1 s × 9.00 Rft = 72.00 Rft
No
" = 2 × 3 Nos × 1 s × 11.42 Rft = 68.52 Rft
No
" = 1 × 22 Nos × 1 s × 6.00 Rft = 132.00 Rft
No
Ext.top PFB-10 = 1 × 68 Nos × 1 s × 14.67 Rft = 997.56 Rft
No
PFB-9 = 1 × 34 Nos × 1 s × 9.83 Rft = 334.22 Rft
No
" = 2 × 15 Nos × 1 s × 4.58 Rft = 137.40 Rft
No
PFB-11 = 1 × 34 Nos × 1 s × 3.83 Rft = 130.22 Rft

5th R/A Bill Page 25


No
Ext.top Binder = 2 × 6 Nos × 1 s × 11.00 Rft = 132.00 Rft
No
" = 2 × 12 Nos × 1 s × 11.00 Rft = 264.00 Rft
No
" = 2 × 5 Nos × 1 s × 9.00 Rft = 90.00 Rft
No
Corner Bar = 2 × 6 Nos × 1 s × 5.00 Rft = 60.00 Rft
No
" = 2 × 6 Nos × 1 s × 4.25 Rft = 51.00 Rft
No
Ext.top PFB-10 = 2 × 6 Nos × 1 s × 3.50 Rft = 42.00 Rft
No
PFB-9 = 2 × 6 Nos × 1 s × 2.83 Rft = 33.96 Rft
No
" = 2 × 6 Nos × 1 s × 2.08 Rft = 24.96 Rft
No
PFB-11 = 2 × 6 Nos × 1 s × 1.42 Rft = 17.04 Rft
No
Ext.top Binder = 2 × 6 Nos × 1 s × 3.33 Rft = 39.96 Rft
No
" = 2 × 6 Nos × 2 s × 2.50 Rft = 60.00 Rft
No
" = 2 × 6 Nos × 2 s × 2.00 Rft = 48.00 Rft
= 74,767.28 Rft
= 14132.84 Kg
Female Hostel Bldg.
Gr. Floor Slab Beam
FB-1 = 2 Nos
No
20 mm Ø St = 2 × 1 Nos × 4 × 88.50 Rft = 708.00 Rft
s
No
" Laping = 2 × 4 Nos × 3 × 2.67 Rft = 64.08 Rft
s
No
16mmØ,Ext t/End = 2 × 2 Nos × 2 × 4.17 Rft = 33.36 Rft
s
No
20mm Ø Ext/Mid = 2 × 1 Nos × 2 × 8.33 Rft = 33.32 Rft
s
No
" = 2 × 1 Nos × 2 × 8.17 Rft = 32.68 Rft
s
No
" = 2 × 4 Nos × 2 × 9.58 Rft = 153.28 Rft
s
No
16mmØ,Ext/Bott = 2 × 1 Nos × 2 × 9.67 Rft = 38.68 Rft
s
No
" = 2 × 1 Nos × 2 × 6.58 Rft = 26.32 Rft
s
No
" = 2 × 5 Nos × 2 × 9.67 Rft = 193.40 Rft
s
No
25mm Ø Separor = 2 × 1 Nos × 39 × 0.58 Rft = 45.24 Rft
s
No
10mmØ,Strriup = 2 × 1 Nos × 174 × 4.17 Rft = 1,451.16 Rft
s
FB-2 = 4 Nos
No
20 mm Ø St = 4 × 1 Nos × 4 × 88.50 Rft = 1,416.00 Rft
s
No
" Laping = 4 × 4 Nos × 3 × 2.67 Rft = 128.16 Rft
s
No
16mmØ,Ext.t/End = 4 × 2 Nos × 1 × 4.17 Rft = 33.36 Rft
s
No
20mm Ø Ext/Mid = 4 × 1 Nos × 1 × 8.33 Rft = 33.32 Rft
s
No
" = 4 × 1 Nos × 1 × 8.17 Rft = 32.68 Rft
s
No
" = 4 × 4 Nos × 1 × 9.58 Rft = 153.28 Rft
s
No
16mmØ,Ext/Bott = 4 × 1 Nos × 1 × 9.67 Rft = 38.68 Rft
s
No
" = 4 × 1 Nos × 1 × 6.58 Rft = 26.32 Rft
s
No
" = 4 × 5 Nos × 1 × 9.67 Rft = 193.40 Rft
s
No
10mmØ,Strriup = 4 × 1 Nos × 174 × 4.17 Rft = 2,902.32 Rft
s
FB-1 = 2 Nos
No
20 mm Ø St = 2 × 1 Nos × 4 × 66.58 Rft = 532.64 Rft
s
No
" Laping = 2 × 4 Nos × 2 × 2.67 Rft = 42.72 Rft
s
No
20mmØ,Ext/End = 2 × 2 Nos × 2 × 4.00 Rft = 32.00 Rft
s
No
20mm Ø Ext/Mid = 2 × 4 Nos × 2 × 9.50 Rft = 152.00 Rft
s
No
16mmØ,Ext/Bott = 2 × 5 Nos × 2 × 9.67 Rft = 193.40 Rft
s
No
25mm Ø Separt = 2 × 1 Nos × 30 × 0.58 Rft = 34.80 Rft
s
No
10mmØ,Strriup = 2 × 1 Nos × 131 × 4.17 Rft = 1,092.54 Rft
s
FB-5 = 2 Nos
No
20mm Ø St = 2 × 1 Nos × 4 × 15.58 Rft = 124.64 Rft
s

5th R/A Bill Page 26


No
20mm Ø Ext/End = 2 × 2 Nos × 2 × 4.17 Rft = 33.36 Rft
s
No
16mmØ,Ext/Bott = 2 × 1 Nos × 2 × 9.83 Rft = 39.32 Rft
s
No
10mmØ,Strriup = 2 × 1 Nos × 26 × 4.17 Rft = 216.84 Rft
s
FB-11 = 2 Nos
No
20mm Ø St = 2 × 1 Nos × 6 × 23.25 Rft = 279.00 Rft
s
No
" Laping = 2 × 6 Nos × 1 × 2.67 Rft = 32.04 Rft
s
No
10mmØ,Strriup = 2 × 1 Nos × 44 × 4.17 Rft = 366.96 Rft
s
FB-12 = 2 Nos
No
16mm Ø St = 2 × 1 Nos × 4 × 11.08 Rft = 88.64 Rft
s
No
10mmØ,Strriup = 2 × 1 Nos × 19 × 3.67 Rft = 139.46 Rft
s
FB-3 = 2 Nos
No
20 mm Ø St = 2 × 1 Nos × 4 × 40.00 Rft = 320.00 Rft
s
No
" Laping = 2 × 4 Nos × 1 × 2.67 Rft = 21.36 Rft
s
No
20mmØ,Ext t/End = 2 × 2 Nos × 1 × 6.00 Rft = 24.00 Rft
s
No
20mm Ø Ext/Mid = 2 × 2 Nos × 2 × 9.17 Rft = 73.36 Rft
s
No
16mmØ,Ext/Bott = 2 × 2 Nos × 2 × 10.00 Rft = 80.00 Rft
s
No
25mm Ø Separor = 2 × 2 Nos × 6 × 0.58 Rft = 13.92 Rft
s
No
10mmØ,Strriup = 2 × 1 Nos × 76 × 4.17 Rft = 633.84 Rft
s
FB-3A = 4 Nos
No
20 mm Ø St = 4 × 1 Nos × 4 × 43.67 Rft = 698.72 Rft
s
No
" Laping = 4 × 4 Nos × 1 × 2.67 Rft = 42.72 Rft
s
No
20mmØ,Ext t/End = 4 × 2 Nos × 1 × 6.00 Rft = 48.00 Rft
s
No
20mm Ø Ext/Mid = 4 × 2 Nos × 2 × 9.17 Rft = 146.72 Rft
s
No
16mmØ,Ext/Bott = 4 × 2 Nos × 2 × 10.00 Rft = 160.00 Rft
s
No
25mm Ø Separor = 4 × 2 Nos × 6 × 0.58 Rft = 27.84 Rft
s
No
10mmØ,Strriup = 4 × 1 Nos × 69 × 4.17 Rft = 1,150.92 Rft
s
FB-4 = 10 Nos
No
20 mm Ø St = 10 × 1 Nos × 4 × 46.67 Rft = 1,866.80 Rft
s
No
" Laping = 10 × 4 Nos × 1 × 2.67 Rft = 106.80 Rft
s
No
20mmØ,Ext t/End = 10 × 2 Nos × 1 × 6.00 Rft = 120.00 Rft
s
No
20mm Ø Ext/Mid = 10 × 2 Nos × 2 × 9.17 Rft = 366.80 Rft
s
No
16mmØ,Ext/Bott = 10 × 2 Nos × 2 × 10.00 Rft = 400.00 Rft
s
No
25mm Ø Separor = 10 × 2 Nos × 6 × 0.58 Rft = 69.60 Rft
s
No
10mmØ,Strriup = 10 × 1 Nos × 69 × 4.17 Rft = 2,877.30 Rft
s
FB-10 = 2 Nos
No
20 mm Ø St = 2 × 1 Nos × 4 × 19.75 Rft = 158.00 Rft
s
No
10mmØ,Strriup = 2 × 1 Nos × 38 × 4.17 Rft = 316.92 Rft
s
FB-6 = 2 Nos
No
20 mm Ø St = 2 × 1 Nos × 6 × 49.08 Rft = 588.96 Rft
s
No
" Laping = 2 × 1 Nos × 6 × 2.17 Rft = 26.04 Rft
s
No
10mmØ,Strriup = 2 × 1 Nos × 54 × 4.17 Rft = 450.36 Rft
s
FB-7 = 2 Nos
No
20 mm Ø St = 2 × 1 Nos × 6 × 27.58 Rft = 330.96 Rft
s
No
" Laping = 2 × 1 Nos × 6 × 2.17 Rft = 26.04 Rft
s
No
10mmØ,Strriup = 2 × 1 Nos × 54 × 4.17 Rft = 450.36 Rft
s
FB-8 = 2 Nos
No
20 mm Ø St = 2 × 1 Nos × 4 × 31.58 Rft = 252.64 Rft
s

5th R/A Bill Page 27


No
" Laping = 2 × 4 Nos × 1 × 2.67 Rft = 21.36 Rft
s
No
16mmØ,Ext t/End = 2 × 1 Nos × 2 × 7.00 Rft = 28.00 Rft
s
No
"= 2 × 2 Nos × 1 × 6.00 Rft = 24.00 Rft
s
No
20mm Ø Ext/Mid = 2 × 1 Nos × 2 × 11.25 Rft = 45.00 Rft
s
No
16mmØ,Ext/Bott = 2 × 1 Nos × 2 × 12.00 Rft = 48.00 Rft
s
No
"= 2 × 1 Nos × 2 × 9.67 Rft = 38.68 Rft
s
No
25mm Ø Separor = 2 × 14 Nos × 1 × 0.58 Rft = 16.24 Rft
s
No
10mmØ,Strriup = 2 × 1 Nos × 56 × 4.17 Rft = 467.04 Rft
s
FB-9 = 2 Nos
No
20 mm Ø St = 2 × 1 Nos × 4 × 25.25 Rft = 202.00 Rft
s
No
" Laping = 2 × 4 Nos × 1 × 2.67 Rft = 21.36 Rft
s
No
20mmØ,Ext t/End = 2 × 2 Nos × 2 × 10.33 Rft = 82.64 Rft
s
No
16mmØ,Ext/Bott = 2 × 1 Nos × 2 × 8.75 Rft = 35.00 Rft
s
No
25mm Ø Separor = 2 × 5 Nos × 1 × 0.58 Rft = 5.80 Rft
s
No
10mmØ,Strriup = 2 × 1 Nos × 44 × 4.17 Rft = 366.96 Rft
s
FB-12 = 2 Nos
No
20 mm Ø St = 2 × 1 Nos × 4 × 25.25 Rft = 202.00 Rft
s
No
" Laping = 2 × 4 Nos × 1 × 2.67 Rft = 21.36 Rft
s
No
20mmØ,Ext t/End = 2 × 2 Nos × 2 × 10.33 Rft = 82.64 Rft
s
No
16mmØ,Ext/Bott = 2 × 1 Nos × 2 × 8.75 Rft = 35.00 Rft
s
No
25mm Ø Separt = 2 × 5 Nos × 1 × 0.58 Rft = 5.80 Rft
s
No
10mmØ,Strriup = 2 × 1 Nos × 44 × 4.17 Rft = 366.96 Rft
s
Beam Summary
10mm Ø = 13,249.94 Rft = @ 0.62 kg/m = 2504.56 Kg
16mm Ø = 1,753.56 Rft = @ 1.58 kg/m = 844.70 Kg
20mm Ø = 11,646.57 Rft = @ 2.47 kg/m = 8770.43 Kg
25mm Ø = 219.24 Rft = @ 3.85 kg/m = 257.34 Kg
For Plinth Slab Beam = 12377.04 kg
Female Hostel Bldg.
Gr. Floor Slab
Short Direction
No
10mm Ø St = 2 × 92 Nos × 1 s × 35.67 Rft = 6,563.28 Rft
No
" = 2 × 10 Nos × 7 s × 1.67 Rft = 233.80 Rft
No
" = 2 × 1 Nos × 5 s × 1.67 Rft = 16.70 Rft
No
" = 2 × 2 Nos × 5 s × 1.67 Rft = 33.40 Rft
No
Laping = 2 × 92 Nos × 1 s × 1.33 Rft = 244.72 Rft
No
Cut = 2 × 2 Nos × 86 s × 8.92 Rft = 3,068.48 Rft
No
" = 2 × 1 Nos × 86 s × 6.25 Rft = 1,075.00 Rft
No
Ext.top PFB-1 = 2 × 2 Nos × 251 s × 4.00 Rft = 4,016.00 Rft
No
" = 2 × 10 Nos × 20 s × 1.67 Rft = 668.00 Rft
No
" = 2 × 2 Nos × 8 s × 1.67 Rft = 53.44 Rft
No
Ext.top PFB-2 = 2 × 2 Nos × 251 s × 8.33 Rft = 8,363.32 Rft
No
Ext.top PFB-5 = 2 × 1 Nos × 8 s × 1.67 Rft = 26.72 Rft
No
Ext.top Binder = 2 × 2 Nos × 92 s × 10.00 Rft = 3,680.00 Rft
No
" = 2 × 92 Nos × 1 s × 6.00 Rft = 1,104.00 Rft
No
Col Side = 2 × 16 Nos × 4 s × 3.50 Rft = 448.00 Rft
No
Gap 10mmØ St = 2 × 35 Nos × 1 s × 12.00 Rft = 840.00 Rft
No
Cut = 2 × 25 Nos × 1 s × 12.00 Rft = 600.00 Rft
No
Ext.top = 2 × 27 Nos × 1 s × 4.17 Rft = 225.18 Rft

5th R/A Bill Page 28


No
PFB-11 = 2 × 13 Nos × 1 s × 8.33 Rft = 216.58 Rft
No
" = 2 × 27 Nos × 1 s × 3.17 Rft = 171.18 Rft
No
PFB-12 = 2 × 23 Nos × 1 s × 8.33 Rft = 383.18 Rft
No
PFB-6 = 2 × 51 Nos × 1 s × 4.58 Rft = 467.16 Rft
No
Ext.top Binder = 2 × 4 Nos × 1 s × 35.00 Rft = 280.00 Rft
No
" = 2 × 4 Nos × 1 s × 8.00 Rft = 64.00 Rft
No
" = 2 × 5 Nos × 1 s × 24.83 Rft = 248.30 Rft
Long Direction
No
10mm Ø St = 4 × 33 Nos × 2 s × 86.83 Rft = 22,923.12 Rft
No
Laping = 2 × 33 Nos × 4 s × 1.33 Rft = 351.12 Rft
No
Cut = 2 × 32 Nos × 1 s × 9.50 Rft = 608.00 Rft
No
" = 2 × 28 Nos × 1 s × 6.00 Rft = 336.00 Rft
No
" = 2 × 5 Nos × 32 s × 9.00 Rft = 2,880.00 Rft
No
Ext.top PFB-3 = 2 × 70 Nos × 1 s × 4.00 Rft = 560.00 Rft
No
PFB-4 = 2 × 85 Nos × 1 s × 8.00 Rft = 1,360.00 Rft
No
" = 2 × 17 Nos × 1 s × 4.83 Rft = 164.22 Rft
No
" = 2 × 85 Nos × 1 s × 7.50 Rft = 1,275.00 Rft
No
" = 2 × 17 Nos × 1 s × 4.00 Rft = 136.00 Rft
No
" = 2 × 4 Nos × 98 s × 8.83 Rft = 6,922.72 Rft
No
" = 2 × 1 Nos × 103 s × 10.83 Rft = 2,230.98 Rft
No
Ext.top Binder = 2 × 2 Nos × 16 s × 10.00 Rft = 640.00 Rft
No
" = 2 × 2 Nos × 16 s × 7.00 Rft = 448.00 Rft
No
" = 2 × 5 Nos × 32 s × 10.00 Rft = 3,200.00 Rft
No
Cantilever = 2 × 10 Nos × 6 s × 6.00 Rft = 720.00 Rft
No
" = 2 × 2 Nos × 6 s × 2.00 Rft = 48.00 Rft
No
" = 2 × 1 Nos × 6 s × 3.42 Rft = 41.04 Rft
No
" = 2 × 5 Nos × 6 s × 0.83 Rft = 49.80 Rft
No
Gap 10 Ø St = 2 × 13 Nos × 1 s × 6.00 Rft = 156.00 Rft
No
" = 2 × 13 Nos × 1 s × 7.00 Rft = 182.00 Rft
No
" = 2 × 8 Nos × 1 s × 15.00 Rft = 240.00 Rft
No
Cut = 2 × 13 Nos × 1 s × 5.00 Rft = 130.00 Rft
No
" = 2 × 13 Nos × 1 s × 5.25 Rft = 136.50 Rft
No
" = 2 × 7 Nos × 1 s × 10.00 Rft = 140.00 Rft
No
Ext.top Binder = 2 × 32 Nos × 1 s × 10.00 Rft = 640.00 Rft
Mid Portion
No
S/D,10mm Ø St = 1 × 16 Nos × 1 s × 23.42 Rft = 374.72 Rft
No
" = 1 × 13 Nos × 1 s × 12.50 Rft = 162.50 Rft
No
" = 1 × 7 Nos × 1 s × 23.42 Rft = 163.94 Rft
No
Cut = 1 × 15 Nos × 1 s × 8.25 Rft = 123.75 Rft
No
" = 2 × 15 Nos × 1 s × 4.17 Rft = 125.10 Rft
No
" = 1 × 12 Nos × 1 s × 7.83 Rft = 93.96 Rft
No
" = 1 × 6 Nos × 1 s × 16.50 Rft = 99.00 Rft
No
Ext.top PFB-6 = 2 × 49 Nos × 1 s × 2.25 Rft = 220.50 Rft
No
= 2 × 19 Nos × 1 s × 8.17 Rft = 310.46 Rft
No
PFB-8 = 2 × 49 Nos × 1 s × 6.00 Rft = 588.00 Rft
No
" = 2 × 37 Nos × 1 s × 3.58 Rft = 264.92 Rft
No
Ext.top Binder = 1 × 12 Nos × 1 s × 22.00 Rft = 264.00 Rft
No
" = 2 × 7 Nos × 1 s × 10.00 Rft = 140.00 Rft
No
" = 2 × 14 Nos × 1 s × 4.00 Rft = 112.00 Rft
No
" = 2 × 6 Nos × 1 s × 10.83 Rft = 129.96 Rft
No
L/D,10mm Ø St = 1 × 9 Nos × 1 s × 29.67 Rft = 267.03 Rft
No
" = 2 × 4 Nos × 1 s × 16.92 Rft = 135.36 Rft

5th R/A Bill Page 29


No
" = 1 × 23 Nos × 1 s × 9.50 Rft = 218.50 Rft
No
Cut = 1 × 8 Nos × 1 s × 11.42 Rft = 91.36 Rft
No
" = 1 × 8 Nos × 1 s × 9.00 Rft = 72.00 Rft
No
" = 2 × 3 Nos × 1 s × 11.42 Rft = 68.52 Rft
No
" = 1 × 22 Nos × 1 s × 6.00 Rft = 132.00 Rft
No
Ext.top PFB-10 = 1 × 68 Nos × 1 s × 14.67 Rft = 997.56 Rft
No
PFB-9 = 1 × 34 Nos × 1 s × 9.83 Rft = 334.22 Rft
No
" = 2 × 15 Nos × 1 s × 4.58 Rft = 137.40 Rft
No
PFB-11 = 1 × 34 Nos × 1 s × 3.83 Rft = 130.22 Rft
No
Ext.top Binder = 2 × 6 Nos × 1 s × 11.00 Rft = 132.00 Rft
No
" = 2 × 12 Nos × 1 s × 11.00 Rft = 264.00 Rft
No
" = 2 × 5 Nos × 1 s × 9.00 Rft = 90.00 Rft
No
Corner Bar = 2 × 6 Nos × 1 s × 5.00 Rft = 60.00 Rft
No
" = 2 × 6 Nos × 1 s × 4.25 Rft = 51.00 Rft
No
Ext.top PFB-10 = 2 × 6 Nos × 1 s × 3.50 Rft = 42.00 Rft
No
PFB-9 = 2 × 6 Nos × 1 s × 2.83 Rft = 33.96 Rft
No
" = 2 × 6 Nos × 1 s × 2.08 Rft = 24.96 Rft
No
PFB-11 = 2 × 6 Nos × 1 s × 1.42 Rft = 17.04 Rft
No
Ext.top Binder = 2 × 6 Nos × 1 s × 3.33 Rft = 39.96 Rft
No
" = 2 × 6 Nos × 2 s × 2.50 Rft = 60.00 Rft
No
" = 2 × 6 Nos × 2 s × 2.00 Rft = 48.00 Rft
= 86,228.84 Rft
Gr.Floor = 28676.39 kg = 16299.35 kg
= 160677.00 kg
= 458,767.74 kg
@Tk = 90.00 P/Kg Sch = 616804.75 Tk= 41,289,096.43
Civil Work Tk= 114,251,347.39
B. External Work
B.1. External Civil Work
B.1.a Site Development
Qty BF from 1st R/A Bill Page No-8 of TMB = 41317.71 Cum
@Tk = 175.00 P/Cum Sch = 51100.00 Tk= 7,230,599.25
Tk= 121,481,946.64
Less Tk. - 14.15% Tk= -17,189,695.45
Total Tk= 104,292,251.19
Deduction upto 4th R/A Bill Tk= -75,420,383.16
Payable Amount Tk= 28,871,868.03

5th R/A Bill Page 30


Name of Work : Construction of Medical Assistant Training School (MATS) at Sadar Upazila in Gazipur
District.
Package No : WP-599/SDP(GOB)-HED.
Name of Contrctor : M/S. Essen Engineering & Co.Ltd,Dhaka-1207.
6th R/A Bill
Part-A (Civil works)
Sl No-1.01 a. Layout and marking for earthwork in Excavation in foundation
= 1,889.81 Sqm
Schedule Qty = 1,745.00 Sqm
@Tk = 15.00 /= P/Sqm Tk= 26,175.00
Sl No-1.02 Earth Work in excavation in Foundation
a). Upto 1.5m depth
= 562.89 cum
@Tk = 175.00 /= P/Cum Sch = 576.80 Tk= 98,505.25
Sl No-1.03 Brick flat Soling
a In Foundation
= 568.36 Sqm
@Tk = 325.00 P/Sqm Sch = 606.16 Tk= 184,716.97
Sl No-1.07 a.Exposed Brick work in foundation & Plinth (1:6)
For Academic Bldg
Front = 1 × 117.00 = 117.00
Rft Rft
Rear = 1 × 87.83 = 87.83
Rft Rft
= 1 × 39.00 Rft = 39.00 Rft
= 1 × 9.00 Rft = 9.00 Rft
= 1 × 30.58 Rft = 30.58 Rft
= 1 × 6.75 Rft = 6.75 Rft
= 2 × 33.76 Rft = 67.52 Rft
Side = 1 × 48.50 Rft = 48.50 Rft
= 406.18 Rft x 2.25 Rft x 0.83 = 758.54 Cft
Lect.Hall = 2 × 38.83 rft = 77.66 Rft x 3.00 Rft x 0.83 = 193.37 Cft
Side = 1 × 46.00 rft = 46.00 Rft x 4.25 Rft x 0.83 = 162.27 Cft
= 1,114.18 Cft
For Hostel Bldg
Front = 4 × 77.58 Rft = 310.32 Rft
Side = 2 × 30.83 Rft = 61.66 Rft
= 2 × 15.00 Rft = 30.00 Rft
= 2 × 10.25 Rft = 20.50 Rft
= 2 × 27.75 Rft = 55.50 Rft
= 1 × 59.17 Rft = 59.17 Rft
= 537.15 Rft x 1.83 Rft x 0.83 = 815.88 Cft
For Principal Qtr
= 1 × 33.50 Rft = 33.50 Rft
= 1 × 37.42 Rft = 37.42 Rft
= 1 × 6.42 Rft = 6.42 Rft
= 1 × 10.50 Rft = 10.50 Rft
= 1 × 30.42 Rft = 30.42 Rft
= 1 × 12.50 Rft = 12.50 Rft
= 1 × 11.25 Rft = 11.25 Rft
= 1 × 18.21 Rft = 18.21 Rft
= 160.22 Rft x 1.83 Rft x 0.83 =243.36 Cft
=
2,173.41 Cft
=
61.55 Cum
@Tkfor=cast6,800.00
Boring/drilling P/cum
in situ Pile upto require depth and diameter with mim 6m82.87
Sch =
long temporary steel Tk= 418,556.24
Sl No-1.09 casting,true to vertical,providing ventonite slurry and maintaining water level in the hole (450mm dia
upto 20m depth)

4th R/A Bill Page 31


(450mm dia upto 20m depth)
= 492 Nos × 70.00 Rft = 34,440.0 Rft = 10,500.00 Rm
@Tk = 1,250.00 /= P/Rm Sch = 11227.13 Tk= 13,125,000.00

Sl No-1.10 Casting of Cast in Situ bored pile R.C.C work of 1:1.5:3


= 492 × 4 70.00 Rft = 1,726.39 cum
@Tk = 13,000.00 /= P/Cum Sch = 1772.11 Tk= 22,443,058.62

Sl No-1.11 Providing and making point welding


= 492 × 6.00 × 138.00 Point = 407,376.00 Point
@Tk = 0.50 P/point Sch = 371196.00 Tk= 185,598.00
Sl No-1.12 Providing and making joint welding
= 492 × 6.00 × 2.00 = 5,904.00 Rft = 1,800.00 Rm
@Tk = 1.00 P/Rm Sch = 2095.73 Tk= 1,800.00
Sl No-1.13 Labour for breaking of pile head
4 = 73.54 Cum
@Tk = 2,000.00 P/Cum Sch = 73.84 Tk= 147,073.92
Sl No-1.14 a. Conducting static load test for the cast-in-situ pile providing required
= 1 × 3.00 Test = 3.00 Test
@Tk = 80,000.00 P/Test Sch = 3.00 Tk= 240,000.00
b. For Intermediate Loading from 75-125 tonne for each additional tonne
= 3 × 45.00 Ton = 135.00 Test
@Tk = 800.00 P/Ton Sch = 75.00 Tk= 60,000.00
SL No-1.16 Reinforced cement concrete works using steel shutter with mim cement concrete to mix ratio(1:1.5:3)
A. In Foundation (Footing,Raft,Pile cap etc)
i. Concrete
Total Qty = 18,016.49 Cft
= 510.24 cum
@Tk = 11,000.00 P/Cum Sch = 522.01 Tk= 5,612,613.62
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 1,191.55 Sqm
@Tk = 400.00 P/Sqm Sch = 1204.23 Tk= 476,619.42
B. In Foundation Beam/Grade Beam
i. Concrete
= 112.49 cum
@Tk = 17,000.00 P/Cum Sch = 112.78 Tk= 1,912,283.35
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 1075.10 Sqm
@Tk = 700.00 P/Sqm Sch = 1127.75 Tk= 752,567.66
B. In Floor Slab at plinth level
i) Concrete
= 241.22 Cum
@Tk = 18,000.00 P/Cum Sch = 241.73 Tk= 4,341,964.86
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 2,521.84
@Tk = 800.00 P/Sqm Sch = 2568.19 Sqm Tk= 2,017,468.87
C. Beam at Plinth level

4th R/A Bill Page 32


a). Concrete.
i) Gr.Floor/Plinth level
= 111.81
@Tk = 18,000.00 P/Cum Sch = 112.45 Tk= 2,012,514.01

b). Formwork/Shuttering.prop and necessary suports including curing etc.


i). Gr.Floor
= 1292.34 Sqm
Sch.Qty = 1244.48 Sqm
@Tk = 500.00 P/Sqm Sch = 1244.48 Tk= 622,240.00
C. In Pedestal Column,Column,Column capital ,lift wall etc.
a. Concrete
i). Below PL level and in Ground Floor.
= 213.95 Cum
@Tk = 17,000.00 P/Cum Sch = 219.67 Tk= 3,637,220.15
ii).1st Floor.
= 86.67 Cum
@Tk = 17,000.00 P/Cum Sch = 105.89 Tk= 1,473,426.45
iii). 2nd Floor.
= 24.73 Cum
Hostel Bldg
C1 = 24 × 1.25 Rft × 1.67 Rft × 10.00 Rft = 501.00 Cft
C2,C3,C4,C5 56 × 1.00 Rft × 1.67 Rft × 10.00 Rft = 935.20 Cft
= 1436.20 Cft
= 40.67 Cum
= 69.40 Cum
@Tk = 17,000.00 P/Cum Sch = 119.97 Tk= 1,179,846.27
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Below PL level and in Ground Floor.
= 1956.82 Sqm
@Tk = 450.00 P/Sqm Sch = 2636.00 Tk= 880,568.03
ii). 1st Floor.
= 877.61 Sqm
@Tk = 450.00 P/Sqm Sch = 1270.72 Tk= 394,923.51
iii). 2nd Floor.
= 244.54 Sqm
For Hostel Bldg
C1 = 24 × 5.83 Rft × 10.00 Rft = 1399.20 Sft
C2,C3,C4,C5 = 56 × 5.33 Rft × 10.00 Rft = 2984.80 Sft
= 4384.00 Sft
= 407.43 Sqm
= 951.97 Sqm
@Tk = 450.00 P/Sqm Sch = 1439.68 Tk= 428,386.50
D. Beam: (Tee-beam, Ell beam, Rib-beam rectangular beam)

4th R/A Bill Page 33


a). Concrete.
i) Gr.Floor
= 95.51 Cum
@Tk = 18,000.00 P/Cum Sch = 97.64 Tk= 1,719,263.37
ii) 1st. Floor
Qty = 58.25 cum
For Hostel Bldg
FB-1,2 = 2 x 4 Nos x 87.08 Rft = 696.64 Rft
FB-3 = 2 x 1 Nos x 37.50 Rft = 75.00 Rft
FB-3A = 2 x 2 Nos x 44.50 Rft = 178.00 Rft
FB-4 = 2 x 5 Nos x 40.83 Rft = 408.30 Rft
FB-7 = 2 x 1 Nos x 39.25 Rft = 78.50 Rft
FB-10 = 2 x 1 Nos x 18.58 Rft = 37.16 Rft
"= 2 x 1 Nos x 9.00 Rft = 18.00 Rft
FB-11 = 2 x 1 Nos x 7.33 Rft = 14.66 Rft
= 1,506.26 Rft x 0.83 x 1.13 Rft
Qty = 1412.72 Cft
FB-6 = 1 x 2 Nos x 40.00 Rft = 80.00 Rft
FB-12 = 1 x 2 Nos x 19.67 Rft = 39.34 Rft
= 119.34 Rft x 0.83 x 1.50 Rft
Qty = 148.58 Cft
FB-8 = 1 x 2 Nos x 30.08 Rft = 60.16 Rft
FB-9 = 1 x 2 Nos x 19.67 Rft = 39.34 Rft
= 99.50 Rft x 0.83 x 1.00 Rft
Qty = 82.59 Cft
T. Qty = 1643.88 Cft = 46.56 Cum
= 104.81 cum
@Tk = 18,000.00 P/Cum Sch = 94.12 Tk= 1,886,552.36
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
= 1166.09 Sqm
@Tk = 500.00 P/Sqm Sch = 1171.71 Tk= 583,047.28
ii). 1st. Floor
= 625.25 Sqm
For Hostel Bldg
Rft Qnty Same as 1× 1,506.26 Rft × 3.08 Rft = 4,639.28 Sft

1× 119.34 Rft × 3.83 Rft = 457.07 Sft

1× 99.50 Rft × 2.83 Rft = 281.59 Sft

= 5,377.94 Sft
= 499.81 Sqm
= 1125.06 Sqm
@Tk = 500.00 P/Sqm Sch = 1129.42 Tk= 562,530.00
F. Floor & Roof slab
a). Concrete.
i). Gr.Floor
Total Qty = 205.57 Cum

4th R/A Bill Page 34


@Tk = 20,000.00 P/Cum Sch = 207.91 Tk= 4,111,404.11
ii). 1st.Floor
= 94.94 Cum
For Hostel Bldg
= 2 × 35.83 Rft × 87.00 Rft = 6,234.42 Sft
= 2 × 25.67 Rft × 20.42 Rft = 1,048.36 Sft
= 2 × 13.33 Rft × 6.00 Rft = 159.96 Sft
= 20 × 6.17 Rft × 1.67 Rft = 206.08 Sft
= 20 × 8.08 Rft × 3.33 Rft = 538.13 Sft
= 2 × 3.58 Rft × 1.67 Rft = 11.96 Sft
= 2 × 2.17 Rft × 1.67 Rft = 7.25 Sft
= 20 × 1.67 Rft × 1.00 Rft = 33.40 Sft
= 2 × 1.75 Rft × 1.67 Rft = 5.85 Sft
Porch = 2 × 9.75 Rft × 5.67 Rft = 110.57 Sft
= 8,355.96 Sft x 0.38 Rft

= 3175.27 Cft

Mid Portion = 1 × 26.08 Rft × 24.00 Rft = 625.92 Sft


= 1 × 13.58 Rft × 12.67 Rft = 172.06 Sft
= 1 × 24.17 Rft × 19.83 Rft = 479.29 Sft
= 2 × 5.67 Rft × 9.75 Rft = 110.57 Sft
= 1,387.83 Sft x 0.50 Rft

= 693.92 Cft
= 3869.18 Cft
= 109.58 cum
= 204.52 cum
@Tk = 20,000.00 P/Cum Sch = 208.87 Tk= 4,090,400.00
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
= 2487.98 Sqm
@Tk = 600.00 P/Sqm Sch = 2494.92 Tk= 1,492,786.17
ii).1st Floor
= 1158.44 Sqm
For Hostel Bldg
Ref. from Floor Area = 8355.96 Sft
= 1387.83 Sft
Add,Slab out Side = 2 x 2 Nos x 130.00 Rft = 520.00 Rft
= 2 x 2 Nos x 45.67 Rft = 182.68 Rft
= 2 x 2 Nos x 37.17 Rft = 148.68 Rft
= 2 × 2 Nos × 81.00 Rft = 324.00 Rft
= 1 × 2 Nos × 9.00 Rft = 18.00 Rft
= 2 x 2 Nos x 8.00 Rft = 32.00 Rft
= 2 x 2 Nos x 49.50 Rft = 198.00 Rft
= 1423.36 Rft
x 0.38 Rft = 540.88 Sft
Total = 10284.68 Sft

4th R/A Bill Page 35


= 955.82 Sqm
= 2114.27 Sqm
@Tk = 500.00 P/Sqm Sch = 2506.44 Tk= 1,057,135.00
H. In stair case, slab & steps, ramp etc
a). Concrete.
i). Gr.Floor
= 2.72 Cum
Academic Bldg
1st & 2nd Flight
Waist Slab = 2 × 10.67 Rft × 4.42 Rft × 0.54 Sft = 50.93 Cft
Step = 20 × 4.42 Rft × 0.92 Rft × 0.25 Sft = 20.33 Cft
Landing = 1 × 5.00 Rft × 9.00 Rft × 0.50 Sft = 22.50 Cft
= 2 × 0.83 Rft × 0.42 Rft × 0.50 Sft = 0.35 Cft
Beam = 1 × 9.00 Rft × 0.75 Rft × 0.83 Sft = 5.60 Cft
= 99.72 Cft
= 2.82 Cum
Entry Step = 4 × 8.00 Rft × 1.00 Rft × 0.25 Sft = 8.00 Cft
= 4 × 20.50 Rft × 1.00 Rft × 0.25 Sft = 20.50 Cft
= 4 × 8.75 Rft × 0.83 Rft × 0.25 Sft = 7.26 Cft
= 4 × 2.50 Rft × 0.83 Rft × 0.25 Sft = 2.08 Cft

W.Slab = 1 × 8.00 Rft × 4.00 Rft × 0.54 Sft = 17.28 Cft


= 1 × 20.50 Rft × 4.00 Rft × 0.54 Sft = 44.28 Cft
= 2 × 8.75 Rft × 4.00 Rft × 0.54 Sft = 37.80 Cft
= 2 × 2.50 Rft × 4.00 Rft × 0.54 Sft = 10.80 Cft
= 148.00 Cft
= 4.19 Cum
Hostel Bldg
1st & 2nd Flight
Waist Slab = 4 × 10.67 Rft × 3.50 Rft × 0.54 Sft = 80.67 Cft
Step = 40 × 3.50 Rft × 0.92 Rft × 0.25 Sft = 32.20 Cft
Landing = 2 × 5.00 Rft × 8.33 Rft × 0.50 Sft = 41.65 Cft
= 4 × 0.83 Rft × 0.42 Rft × 0.50 Sft = 0.70 Cft
Beam = 2 × 7.50 Rft × 0.75 Rft × 0.83 Sft = 9.34 Cft
= 164.55 Cft
= 4.66 Cum
Entry Step = 8 × 7.50 Rft × 1.00 Rft × 0.25 Sft = 15.00 Cft
= 4 × 21.67 Rft × 1.00 Rft × 0.25 Sft = 21.67 Cft
W.Slab = 2 × 7.50 Rft × 4.00 Rft × 0.54 Sft = 32.40 Cft
= 1 × 20.50 Rft × 4.00 Rft × 0.54 Sft = 44.28 Cft
= 2 × 7.50 Rft × 0.83 Rft × 0.54 Sft = 6.72 Cft
= 1 × 21.67 Rft × 1.00 Rft × 0.83 Sft = 17.99 Cft
= 138.06 Cft
= 3.91 Cum
= 18.31 Cum
Sch Qty = 16.00 Cum
@Tk = 12,000.00 P/Cum Sch = 16.00 Tk= 192,000.00

4th R/A Bill Page 36


ii). 1st.Floor
Academic Bldg
3rd & 4th Flight
Waist Slab = 2 × 10.67 Rft × 4.42 Rft × 0.54 Sft = 50.93 Cft
Step = 20 × 4.42 Rft × 0.92 Rft × 0.25 Sft = 20.33 Cft
Landing = 1 × 5.00 Rft × 9.00 Rft × 0.50 Sft = 22.50 Cft
= 2 × 0.83 Rft × 0.42 Rft × 0.50 Sft = 0.35 Cft
Beam = 1 × 9.00 Rft × 0.75 Rft × 0.83 Sft = 5.60 Cft
= 99.72 Cft
= 2.82 Cum
Hostel Bldg
3rd & 4th Flight
Waist Slab = 4 × 10.67 Rft × 3.50 Rft × 0.54 Sft = 80.67 Cft
Step = 40 × 3.50 Rft × 0.92 Rft × 0.25 Sft = 32.20 Cft
Landing = 2 × 5.00 Rft × 8.33 Rft × 0.50 Sft = 41.65 Cft
= 4 × 0.83 Rft × 0.42 Rft × 0.50 Sft = 0.70 Cft
Beam = 2 × 7.50 Rft × 0.75 Rft × 0.83 Sft = 9.34 Cft
= 164.55 Cft
= 4.66 Cum
Mid Portion
Waist Slab = 4 × 10.67 Rft × 3.50 Rft × 0.54 Sft = 80.67 Cft
Step = 40 × 3.50 Rft × 0.92 Rft × 0.25 Sft = 32.20 Cft
Landing = 2 × 5.00 Rft × 8.33 Rft × 0.50 Sft = 41.65 Cft
= 4 × 0.83 Rft × 0.42 Rft × 0.50 Sft = 0.70 Cft

Beam = 2 × 7.50 Rft × 0.75 Rft × 0.83 Sft = 9.34 Cft


= 164.55 Cft
= 4.66 Cum
= 12.14 Cum
@Tk = 12,000.00 P/Cum Sch = 12.40 Tk= 145,680.00
b) Formwork/Shuttering
i). Gr.Floor
= 17.72 sqm
For Academic Bldg
Waist Slab = 1 × 1 Nos × 10.67 Rft × 4.42 Rft = 47.16 Sft
= 1 × 1 Nos × 9.67 Rft × 4.42 Rft = 42.74 Sft
Step = 2 × 10 Nos × 4.42 Rft × 0.50 Rft = 44.20 Sft
Side = 2 × 20 Nos × 0.83 Rft × 0.25 Rft = 8.30 Sft
Landing = 1 × 1 Nos × 9.00 Rft × 4.00 Rft = 36.00 Sft
Side = 1 × 2 Nos × 4.00 Rft × 0.54 Rft = 4.32 Sft
= 1 × 1 Nos × 9.00 Rft × 0.54 Rft = 4.86 Sft
Beam = 1 × 1 Nos × 9.00 Rft × 1.67 Rft = 15.03 Sft
= 202.61 Sft
= 18.83 sqm
Entry Front = 1 × 1 Rft × 21.50 Rft × 4.50 Rft = 96.75 Sft
Step = 1 × 4 Rft × 21.50 Rft × 0.50 Rft = 43.00 Sft

4th R/A Bill Page 37


Side = 2 × 4 Rft × 1.00 Rft × 0.25 Rft = 2.00 Sft
Entry Front = 2 × 1 Rft × 7.50 Rft × 4.00 Rft = 60.00 Sft
Step = 2 × 4 Rft × 7.50 Rft × 0.50 Rft = 30.00 Sft
Side = 4 × 4 Rft × 1.00 Rft × 0.25 Rft = 4.00 Sft
= 235.75 Sft
= 21.91 sqm
For Hostel Bldg
Waist Slab = 2 × 1 Nos × 10.67 Rft × 3.33 Rft = 71.06 Sft
= 2 × 1 Nos × 9.67 Rft × 3.33 Rft = 64.40 Sft
Step = 2 × 10 Nos × 3.33 Rft × 0.50 Rft = 33.30 Sft
Side = 2 × 20 Nos × 0.83 Rft × 0.25 Rft = 8.30 Sft
Landing = 1 × 1 Nos × 7.50 Rft × 4.50 Rft = 33.75 Sft
Side = 1 × 2 Nos × 4.00 Rft × 0.54 Rft = 4.32 Sft
= 1 × 1 Nos × 9.00 Rft × 0.54 Rft = 4.86 Sft
Beam = 1 × 1 Nos × 7.50 Rft × 1.67 Rft = 12.53 Sft
= 232.52 Sft
= 21.61 sqm
Entry Front = 1 × 1 Rft × 20.00 Rft × 4.50 Rft = 90.00 Sft
Step = 1 × 4 Rft × 20.00 Rft × 0.50 Rft = 40.00 Sft
Side = 2 × 4 Rft × 1.00 Rft × 0.25 Rft = 2.00 Sft
Entry Front = 2 × 1 Rft × 7.50 Rft × 3.75 Rft = 56.25 Sft
Step = 2 × 4 Rft × 7.50 Rft × 0.50 Rft = 30.00 Sft
Side = 4 × 4 Rft × 1.00 Rft × 0.25 Rft = 4.00 Sft
= 222.25 Sft
= 20.66 sqm
= 100.72 sqm
@Tk = 400.00 P/sqm Sch = 192.00 Tk= 40,288.00
ii). First Floor
For Academic Bldg
Waist Slab = 1 × 1 Nos × 10.67 Rft × 4.42 Rft = 47.16 Sft
= 1 × 1 Nos × 9.67 Rft × 4.42 Rft = 42.74 Sft
Step = 2 × 10 Nos × 4.42 Rft × 0.50 Rft = 44.20 Sft
Side = 2 × 20 Nos × 0.83 Rft × 0.25 Rft = 8.30 Sft
Landing = 1 × 1 Nos × 9.00 Rft × 4.00 Rft = 36.00 Sft
Side = 1 × 2 Nos × 4.00 Rft × 0.54 Rft = 4.32 Sft
= 1 × 1 Nos × 9.00 Rft × 0.54 Rft = 4.86 Sft
Beam = 1 × 1 Nos × 9.00 Rft × 1.67 Rft = 15.03 Sft
= 202.61 Sft
= 18.83 sqm
For Hostel Bldg
Waist Slab = 2 × 1 Nos × 10.67 Rft × 3.33 Rft = 71.06 Sft
= 2 × 1 Nos × 9.67 Rft × 3.33 Rft = 64.40 Sft
Step = 2 × 10 Nos × 3.33 Rft × 0.50 Rft = 33.30 Sft
Side = 2 × 20 Nos × 0.83 Rft × 0.25 Rft = 8.30 Sft
Landing = 1 × 1 Nos × 7.50 Rft × 4.50 Rft = 33.75 Sft
Side = 1 × 2 Nos × 4.00 Rft × 0.54 Rft = 4.32 Sft
= 1 × 1 Nos × 9.00 Rft × 0.54 Rft = 4.86 Sft

4th R/A Bill Page 38


Beam = 1 × 1 Nos × 7.50 Rft × 1.67 Rft = 12.53 Sft
= 232.52 Sft
= 21.61 sqm
= 40.44 sqm
@Tk = 400.00 P/sqm Sch = 148.80 Tk= 16,175.92
SL No-1.17 Supplying fabrication and fixing to details as per design deform bar
b).60 grade deformed bar
= 458,767.74 kg
Hostel Bldg
Column - 2nd Floor
20mmØ,C1 = 24 × 14 Nos = 336.00 Nos
C2 = 34 × 14 Nos = 476.00 Nos
C3 = 9 × 12 Nos = 108.00 Nos

C4 = 9 × 8 Nos = 72.00 Nos

C5 = 4 × 6 Nos = 24.00 Nos


No
= 1,016.00 s x 10.00 Rft = 10160.00 Rft
No
Lapping = 1,016.00 Nos x 1 s x 2.67 Rft = 2712.72 Rft
= 12872.72 Rft

16mmØ,C4 = 9 × 4 Nos = 36.00 Nos

C5 = 4 × 6 Nos = 24.00 Nos


No
= 60.00 s x 10.00 Rft = 600.00 Rft
No
Lapping = 60.00 Nos x 1 s x 2.17 Rft = 130.20 Rft
= 730.20 Rft

10mmØ stirup
C1 = 24 × 29 Nos × 5.33 Rft × = 3709.68 Rft

= 24 × 29 Nos × 4.17 Rft × = 2902.32 Rft

= 24 × 29 Nos × 4.00 Rft × = 2784.00 Rft

C2 = 34 × 29 Nos × 4.83 Rft × = 4762.38 Rft

= 34 × 29 Nos × 2.67 Rft × = 2632.62 Rft

C3,C4,C5 = 22 × 29 Nos × 4.83 Rft × = 3081.54 Rft

= 22 × 29 Nos × 3.67 Rft × = 2341.46 Rft


= 22214.00 Rft
Column Summary
20mm Ø = 12872.72 Rft = 9693.79 Kg
16mm Ø = 730.20 Rft = 351.74 Kg
10mm Ø = 22,214.00 Rft = 4198.99 Kg
For Column = 14244.52 kg
Academic Bldg
Stair Reinforcement. For Gr Floor & F.Floor
12 mm Ø/ M = 2 × 2 Nos × 14 × 19.83 Rft = 1,110.48 Rft
Top = 2 × 1 Nos × 14 × 6.83 Rft = 191.24 Rft
" = 2 × 1 Nos × 14 × 8.75 Rft = 245.00 Rft
" = 2 × 2 Nos × 14 × 8.42 Rft = 471.52 Rft
" = 2 × 2 Nos × 2 × 5.00 Rft = 40.00 Rft
= 2,058.24 Rft
10mm Ø binder = 2 × 2 Nos × 38 × 4.25 Rft = 646.00 Rft
" = 2 × 4 Nos × 11 × 9.25 Rft = 814.00 Rft
= 1,460.00 Rft
20mm Ø -L.B = 2 × 1 Nos × 6 × 12.00 Rft = 144.00 Rft

4th R/A Bill Page 39


10mm Ø Striup = 2 × 1 Nos × 20 × 3.67 Rft = 146.80 Rft

Stair Summary
10mm Ø = 1,606.80 Rft = 303.72 Kg
12mm Ø = 2,058.24 Rft = 558.49 Kg
20mm Ø = 144.00 Rft = 108.44 Kg
Qty = 970.65 Kg
Hostel Bldg
Stair Reinforcement. For Gr Floor & F.Floor
12 mm Ø/ M = × 2 Nos × 12 × 19.83 Rft = 0.00 Rft

Top = 4 × 1 Nos × 12 × 6.83 Rft = 327.84 Rft

" = 4 × 1 Nos × 12 × 8.75 Rft = 420.00 Rft

" = 4 × 2 Nos × 12 × 8.42 Rft = 808.32 Rft

" = 4 × 2 Nos × 2 × 5.00 Rft = 80.00 Rft

= 1,636.16 Rft
10mm Ø binder = 4 × 2 Nos × 38 × 3.33 Rft = 1,012.32 Rft

" = 4 × 4 Nos × 11 × 9.25 Rft = 1,628.00 Rft

= 2,640.32 Rft

20mm Ø -L.B = 4 × 1 Nos × 6 × 11.17 Rft = 268.08 Rft

10mm Ø Striup = 4 × 1 Nos × 20 × 3.67 Rft = 293.60 Rft

Stair Summary
10mm Ø = 2,933.92 Rft = 554.58 Kg
12mm Ø = 1,636.16 Rft = 443.96 Kg
20mm Ø = 268.08 Rft = 201.88 Kg
Qty = 1200.42 Kg
Stair Reinforcement. For Gr Floor & F.Floor
12 mm Ø/ M = 2 × 2 Nos × 16 × 21.00 Rft = 1,344.00 Rft

Top = 2 × 1 Nos × 16 × 5.83 Rft = 186.56 Rft

" = 2 × 1 Nos × 16 × 11.00 Rft = 352.00 Rft

" = 2 × 2 Nos × 16 × 12.00 Rft = 768.00 Rft

" = 2 × 4 Nos × 2 × 8.00 Rft = 128.00 Rft

= 2,778.56 Rft
10mm Ø binder = 2 × 2 Nos × 42 × 5.00 Rft = 840.00 Rft

" = 2 × 4 Nos × 17 × 12.00 Rft = 1,632.00 Rft

= 2,472.00 Rft

20mm Ø -L.B = 2 × 1 Nos × 6 × 15.00 Rft = 180.00 Rft

= 2 × 2 Nos × 2 × 3.67 Rft = 29.36 Rft

= 2 × 1 Nos × 2 × 7.67 Rft = 30.68 Rft

= 240.04 Rft

10mm Ø Striup = 2 × 1 Nos × 26 × 4.50 Rft = 234.00 Rft

Stair Summary
10mm Ø = 2,706.00 Rft = 511.50 Kg
12mm Ø = 2,778.56 Rft = 753.94 Kg
20mm Ø = 240.04 Rft = 180.76 Kg
Qty = 1446.20 Kg
Female Hostel Bldg.
1st. Floor Slab Beam
Gr.Floor Qty Same as For first Floor Slab Beam = 10953.92 kg

4th R/A Bill Page 40


Female Hostel Bldg.
1st. Floor Slab
Gr.Floor Qty Same as For first Floor Slab = 16299.35 kg
= 45115.06 Kg
= 503,882.80 kg
@Tk = 90.00 P/Kg Sch = 616804.75 Tk= 45,349,451.68
SL No-1.19 Brick work in super structure 250mm thick wall
a. Exposed brick work in superstructure in (1:4) with special quality sorted out 1st class
i. Ground Floor
For Principal Qtr
= 1 × 58.25 Rft = 58.25 Rft x 9.00 Rft x 0.83 = 435.13 Cft
For Academic Bldg
= 1 × 98.50 Rft = 98.50 Rft
= 1 × 39.67 Rft = 39.67 Rft
= 1 × 71.00 Rft = 71.00 Rft
= 2 × 34.00 Rft = 68.00 Rft
= 1 × 46.00 Rft = 46.00 Rft
= 1 × 37.17 Rft = 37.17 Rft
= 1 × 9.58 Rft = 9.58 Rft
= 369.92 Rft x 9.75 Rft x 0.83 = 2,993.58 Cft
= 3,428.71 Cft
= 97.10 Cum
@Tk = 7,200.00 P/cum Sch = 278.00 Tk= 699,141.23
b In (1:6) proportion for non exposed brick wall.
i. Ground Floor
For Principal Qtr
= 2 × 1.67 Rft = 3.34 Rft
= 1 × 1.25 Rft = 1.25 Rft
= 1 × 5.00 Rft = 5.00 Rft
= 9.59 Rft x 9.00 Rft x 0.83 = 71.64 Cft
For Academic Bldg
= 2 × 7.67 Rft = 15.34 Rft
= 1 × 6.92 Rft = 6.92 Rft
= 2 × 7.67 Rft = 15.34 Rft
= 37.60 Rft x 9.25 Rft x 0.83 = 288.67 Cft
= 360.31 Cft
= 10.20 Cum
@Tk = 6,800.00 P/cum Sch = 88.50 Tk= 69,388.75
SL No-1.20 125mm thick brick work in (1:4)
b On-Exposed brick work 125mm thick in (1:4)
i. Ground Floor
For Principal Qtr
Inner Wall = 1 × 12.25 Rft x 9.00 Rft = 110.25 Sft
" = 2 × 12.25 Rft x 10.00 Rft = 245.00 Sft
" = 1 × 3.83 Rft x 10.00 Rft = 38.30 Sft
" = 1 × 10.92 Rft x 9.00 Rft = 98.28 Sft
" = 1 × 4.25 Rft x 10.00 Rft = 42.50 Sft
" = 1 × 1.67 Rft x 10.00 Rft = 16.70 Sft
" = 1 × 4.58 Rft x 10.00 Rft = 45.80 Sft
" = 1 × 7.42 Rft x 10.00 Rft = 74.20 Sft
" = 1 × 11.67 Rft x 9.00 Rft = 105.03 Sft
" = 1 × 5.00 Rft x 10.00 Rft = 50.00 Sft
" = 1 × 5.67 Rft x 10.00 Rft = 56.70 Sft
" = 1 × 8.25 Rft x 10.00 Rft = 82.50 Sft
" = 1 × 12.67 Rft x 9.00 Rft = 114.03 Sft
" = 1 × 4.33 Rft x 9.00 Rft = 38.97 Sft
" = 1 × 10.42 Rft x 9.00 Rft = 93.78 Sft

4th R/A Bill Page 41


" = 1 × 12.67 Rft x 10.00 Rft = 126.70 Sft
" = 1 × 8.42 Rft x 10.00 Rft = 84.20 Sft
" = 1 × 12.67 Rft x 9.00 Rft = 114.03 Sft
" = 1 × 3.75 Rft x 9.00 Rft = 33.75 Sft
" = 1 × 11.08 Rft x 9.00 Rft = 99.72 Sft
" = 1 × 6.25 Rft x 9.00 Rft = 56.25 Sft
" = 1 × 7.50 Rft x 10.00 Rft = 75.00 Sft
= 1,801.69 Sft
Outer Wall
W60 = 9 × 5.00 Rft x 4.50 Rft = 202.50 Sft
W37 = 1 × 3.08 Rft x 4.50 Rft = 13.86 Sft
W30 = 2 × 2.50 Rft x 2.00 Rft = 10.00 Sft
HW20 = 2 × 1.67 Rft x 7.00 Rft = 23.38 Sft
HW24 = 1 × 2.00 Rft x 7.00 Rft = 14.00 Sft
= 263.74 Sft
= 2,065.43 Sft
For Academic Bldg
Inner Wall = 3 × 10.17 Rft x 10.50 Rft = 320.36 Sft
" = 16 × 9.00 Rft x 9.25 Rft = 1,332.00 Sft
" = 1 × 9.58 Rft x 9.25 Rft = 88.62 Sft
" = 1 × 9.58 Rft x 10.50 Rft = 100.59 Sft
" = 2 × 5.00 Rft x 5.00 Rft = 50.00 Sft
" = 2 × 4.50 Rft x 10.50 Rft = 94.50 Sft
" = 2 × 4.92 Rft x 7.00 Rft = 68.88 Sft
" = 11 × 16.08 Rft x 9.25 Rft = 1,636.14 Sft
" = 4 × 6.00 Rft x 7.00 Rft = 168.00 Sft
= 3,859.08 Sft
= 5,924.51 Sft = 550.61 Sqm
@Tk = 850.00 P/sqm Sch = 707.00 Tk= 468,014.27
Civil Work Tk= 125,156,384.82
B. External Work
B.1. External Civil Work
B.1.a Site Development
Qty BF from 1st R/A Bill Page No-8 of TMB = 41317.71 Cum
@Tk = 175.00 P/Cum Sch = 51100.00 Tk= 7,230,599.25
Tk= 132,386,984.07
Less Tk. - 14.15% Tk= -18,732,758.25
Total Tk= 113,654,225.83
Deduction upto 5th R/A Bill Tk= -104,291,741.64
Payable Amount Tk= 9,362,484.19

4th R/A Bill Page 42


Name of Work : Construction of Medical Assistant Training School (MATS) at Sadar Upazila in Gazipur
District.
Package No : WP-599/SDP(GOB)-HED.
Name of Contrctor : BBL & Essen Engineering & Co.Ltd.
6th R/A Bill
Part-A (Civil works)
Sl No-1.01 a. Layout and marking for earthwork in Excavation in foundation
= 1,889.81 Sqm
Schedule Qty = 1,745.00 Sqm
@Tk = 15.00 /= P/Sqm Tk= 26,175.00
Sl No-1.02 Earth Work in excavation in Foundation
a). Upto 1.5m depth
= 562.89 cum
@Tk = 175.00 /= P/Cum Sch = 576.80 Tk= 98,505.25
Sl No-1.03 Brick flat Soling
a In Foundation
= 568.36 Sqm
@Tkfor=cast 325.00
Boring/drilling P/Sqm
in situ Pile upto require depth and diameter with mim 606.16
Sch =
6m long temporary steel Tk= 184,716.97
Sl No-1.09 casting,true to vertical,providing ventonite slurry and maintaining water level in the hole (450mm dia
upto 20mdia
(450mm depth)
upto 20m depth)
= 492 Nos × 70.00 Rft = 34,440.0 Rft = 10,500.00 Rm
@Tk = 1,250.00 /= P/Rm Sch = 11227.13 Tk= 13,125,000.00

Sl No-1.10 Casting of Cast in Situ bored pile R.C.C work of 1:1.5:3


= 492 × 4 70.00 Rft = 1,726.39 cum
@Tk = 13,000.00 /= P/Cum Sch = 1772.11 Tk= 22,443,058.62

Sl No-1.11 Providing and making point welding


= 492 × 6.00 × 138.00 Point = 407,376.00 Point
@Tk = 0.50 P/point Sch = 371196.00 Tk= 185,598.00
Sl No-1.12 Providing and making joint welding
= 492 × 6.00 × 2.00 = 5,904.00 Rft = 1,800.00 Rm
@Tk = 1.00 P/Rm Sch = 2095.73 Tk= 1,800.00
Sl No-1.13 Labour for breaking of pile head
4 = 73.54 Cum
@Tk = 2,000.00 P/Cum Sch = 73.84 Tk= 147,073.92
Sl No-1.14 a. Conducting static load test for the cast-in-situ pile providing required
= 1 × 3.00 Test = 3.00 Test
@Tk = 80,000.00 P/Test Sch = 3.00 Tk= 240,000.00
b. For Intermediate Loading from 75-125 tonne for each additional tonne
= 3 × 45.00 Ton = 135.00 Test
@Tk = 800.00 P/Ton Sch = 75.00 Tk= 60,000.00
SL No-1.16 Reinforced cement concrete works using steel shutter with mim cement concrete to mix ratio(1:1.5:3)
A. In Foundation (Footing,Raft,Pile cap etc)
i. Concrete
Total Qty = 18,016.49 Cft

6th R/A Bill Page 43


= 510.24 cum
@Tk = 11,000.00 P/Cum Sch = 522.01 Tk= 5,612,613.62
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 1,191.55 Sqm
@Tk = 400.00 P/Sqm Sch = 1204.23 Tk= 476,619.42
B. In Foundation Beam/Grade Beam
i. Concrete
= 112.49 cum
@Tk = 17,000.00 P/Cum Sch = 112.78 Tk= 1,912,283.35
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 1075.10 Sqm
@Tk = 700.00 P/Sqm Sch = 1127.75 Tk= 752,567.66
B. In Floor Slab at plinth level
i) Concrete
= 241.22 Cum
@Tk = 18,000.00 P/Cum Sch = 241.73 Tk= 4,341,964.86
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 2,521.84
@Tk = 800.00 P/Sqm Sch = 2568.19 Sqm Tk= 2,017,468.87
C. Beam at Plinth level
a). Concrete.
i) Gr.Floor/Plinth level
= 111.81
@Tk = 18,000.00 P/Cum Sch = 112.45 Tk= 2,012,514.01

b). Formwork/Shuttering.prop and necessary suports including curing etc.


i). Gr.Floor
= 1292.34 Sqm
Sch.Qty = 1244.48 Sqm
@Tk = 500.00 P/Sqm Sch = 1244.48 Tk= 622,240.00
C. In Pedestal Column,Column,Column capital ,lift wall etc.
a. Concrete
i). Below PL level and in Ground Floor.
= 213.95 Cum
@Tk = 17,000.00 P/Cum Sch = 219.67 cum Tk= 3,637,220.15
ii).1st Floor.
= 86.67 Cum
Principal Qtr
C2 = 2 × 1.25 Rft × 1.00 Rft × 10.00 Rft = 25.00 Cft
C3 3 × 1.25 Rft × 1.00 Rft × 10.00 Rft = 37.50 Cft
= 62.50 Cft
= 1.77 Cum
= 88.44 Cum
@Tk = 17,000.00 P/Cum Sch = 105.89 cum Tk= 1,503,517.07

6th R/A Bill Page 44


iii). 2nd Floor.
= 24.73 Cum
Hostel Bldg
C1 = 24 × 1.67 Rft × 1.25 Rft × 10.00 Rft = 501.00 Cft
C2 37 × 1.67 Rft × 1.00 Rft × 10.00 Rft = 617.90 Cft
C3 = 8 × 1.67 Rft × 1.00 Rft × 10.00 Rft = 133.60 Cft
C4 9 × 1.33 Rft × 1.00 Rft × 10.00 Rft = 119.70 Cft
C5 = 4 × 1.33 Rft × 1.00 Rft × 10.00 Rft = 53.20 Cft
C6 2 × 1.25 Rft × 1.00 Rft × 10.00 Rft = 25.00 Cft
= 1450.40 Cft
= 41.08 Cum
Academic Bldg
C1 = 5 × 1.00 Rft × 1.67 Rft × 2.50 Rft = 20.88 Cft
C8 = 6 × 2.79 Rft × 1.67 Rft × 2.50 Rft = 69.89 Cft
C9 = 1 × 2.67 Rft × 1.67 Rft × 2.50 Rft = 11.15 Cft
= 101.91 Cft
= 2.89 Cum
= 74.69 Cum
@Tk = 17,000.00 P/Cum Sch = 119.97 cum Tk= 1,269,748.27
iv). 3rd Floor.
Hostel Bldg
Same Measurement at 2nd Floor Qty = 1450.40 Cft
= 41.08 Cum
Academic Bldg
C1 = 20 × 1.67 Rft × 1.00 Rft × 2.50 Rft = 83.50 Cft
1 × 1.67 Rft × 1.00 Rft × 11.00 Rft = 18.37 Cft
C2 3 × 1.67 Rft × 1.00 Rft × 2.50 Rft = 12.53 Cft
C3 = 4 × 1.67 Rft × 1.25 Rft × 2.50 Rft = 20.88 Cft
= 2 × 1.67 Rft × 1.25 Rft × 11.00 Rft = 45.93 Cft
C4 18 × 1.33 Rft × 1.33 Rft × 2.50 Rft = 79.60 Cft
1 × 1.33 Rft × 1.33 Rft × 11.00 Rft = 19.46 Cft
C5 = 4 × 1.33 Rft × 1.33 Rft × 2.50 Rft = 17.69 Cft
C6 6 × 1.50 Rft × 1.00 Rft × 2.50 Rft = 22.50 Cft
C7 = 1 × 1.50 Rft × 1.00 Rft × 2.50 Rft = 3.75 Cft
C9 1 × 1.67 Rft × 2.67 Rft × 2.50 Rft = 11.15 Cft
= 335.34 Cft
= 9.50 Cum
= 50.57 Cum
@Tk = 17,000.00 P/Cum Sch = 57.50 cum Tk= 859,744.38
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Below PL level and in Ground Floor.
= 1956.82 Sqm
@Tk = 450.00 P/Sqm Sch = 2636.00 cum Tk= 880,568.03
ii). 1st Floor.
= 877.61 Sqm
Principal Qtr
C2 = 2 × 4.50 Rft × 10.00 Rft = 90.00 Sft

6th R/A Bill Page 45


C3 3 × 4.50 Rft × 10.00 Rft = 135.00 Sft
= 225.00 Sft
= 20.91 Sqm
= 898.52 Sqm
@Tk = 450.00 P/Sqm Sch = 1270.72 sqm Tk= 404,333.36
iii). 2nd Floor.
BF Qty = 244.54 Sqm
Hostel Bldg
C1 = 24 × 5.83 Rft × 10.00 Rft = 1399.20 Sft
C2 37 × 5.33 Rft × 10.00 Rft = 1972.10 Sft
C3 = 8 × 5.33 Rft × 10.00 Rft = 426.40 Sft
C4 9 × 4.67 Rft × 10.00 Rft = 420.30 Sft
C5 = 4 × 4.67 Rft × 10.00 Rft = 186.80 Sft
C6 2 × 4.50 Rft × 10.00 Rft = 90.00 Sft
= 4494.80 Sft
= 417.73 Sqm
Academic Bldg
C1 = 5 × 5.33 Rft × 2.50 Rft = 66.63 Sft
C8 = 6 × 8.92 Rft × 2.50 Rft = 133.80 Sft
C9 = 1 × 8.67 Rft × 2.50 Rft = 21.68 Sft
= 222.10 Sft
= 20.64 Sqm
= 682.91 Sqm
@Tk = 450.00 P/Sqm Sch = 1439.68 Tk= 307,309.01
iv). 3rd Floor.
Hostel Bldg
C1 = 24 × 5.83 Rft × 10.00 Rft = 1399.20 Sft
C2 37 × 5.33 Rft × 10.00 Rft = 1972.10 Sft
C3 = 8 × 5.33 Rft × 10.00 Rft = 426.40 Sft
C4 9 × 4.67 Rft × 10.00 Rft = 420.30 Sft
C5 = 4 × 4.67 Rft × 10.00 Rft = 186.80 Sft
C6 2 × 4.50 Rft × 10.00 Rft = 90.00 Sft
= 4494.80 Sft
= 417.73 Sqm
Academic Bldg
C1 = 20 × 5.33 Rft × 2.50 Rft = 266.50 Sft
1 × 5.33 Rft × 11.00 Rft = 58.63 Sft
C2 3 × 5.33 Rft × 2.50 Rft = 39.98 Sft
C3 = 4 × 5.83 Rft × 2.50 Rft = 58.30 Sft
= 2 × 5.83 Rft × 11.00 Rft = 128.26 Sft
C4 18 × 5.33 Rft × 2.50 Rft = 239.85 Sft
1 × 5.33 Rft × 11.00 Rft = 58.63 Sft
C5 = 4 × 5.33 Rft × 2.50 Rft = 53.30 Sft
C6 6 × 5.00 Rft × 2.50 Rft = 75.00 Sft
C7 = 1 × 5.00 Rft × 2.50 Rft = 12.50 Sft
C9 1 × 8.67 Rft × 2.50 Rft = 21.68 Sft
= 1012.62 Sft

6th R/A Bill Page 46


= 94.11 Sqm
= 511.84 Sqm
@Tk = 450.00 P/Sqm Sch = 690.00 Tk= 230,328.90
D. Beam: (Tee-beam, Ell beam, Rib-beam rectangular beam)
a). Concrete.
i) Gr.Floor
= 95.51 Cum
@Tk = 18,000.00 P/Cum Sch = 97.64 Tk= 1,719,263.37
ii) 1st. Floor
BF Qty = 58.25 cum
For Hostel Bldg
FB-1 = 4 x 77.32 Nos x 0.83 Rft x 0.83 Rft = 213.06 Cft
FB-2 = 4 x 77.32 Nos x 0.83 Rft x 0.83 Rft = 213.06 Cft
FB-3 = 6 x 32.50 Nos x 0.83 Rft x 0.83 Rft = 134.34 Cft
FB-4 = 10 x 37.50 Nos x 0.83 Rft x 1.33 Rft = 413.96 Cft
FB-5 = 2 x 12.17 Nos x 1.00 Rft x 1.33 Rft = 32.37 Cft
FB-7 = 4 x 21.58 Nos x 1.00 Rft x 1.33 Rft = 114.81 Cft
FB-6 = 2 x 7.17 Nos x 0.83 Rft x 1.33 Rft = 15.83 Cft
FB-8 = 4 x 26.33 Nos x 0.83 Rft x 1.08 Rft = 94.41 Cft
FB-9 = 2 x 19.75 Nos x 0.83 Rft x 1.08 Rft = 35.41 Cft
FB-11 = 2 x 21.50 Nos x 1.00 Rft x 1.83 Rft = 78.69 Cft
FB-10 = 2 x 11.67 Nos x 1.00 Rft x 1.83 Rft = 42.71 Cft
FB-12 = 1 x 20.75 Nos x 1.00 Rft x 1.58 Rft = 32.79 Cft
FB-13 = 2 x 19.58 Nos x 1.00 Rft x 1.58 Rft = 61.87 Cft
FB-14 = 1 x 19.75 Nos x 0.83 Rft x 1.58 Rft = 25.90 Cft
= 1,509.21 Cft

= 42.74 Cum
Principal Qtr
P.house PHB1 = 1 x 18.17 Nos x 0.83 Rft x 1.12 Rft = 16.89 Cft
PHB2 = 2 x 9.67 Nos x 0.83 Rft x 0.87 Rft = 13.97 Cft
= 1 x 18.17 Nos x 0.83 Rft x 0.87 Rft = 13.12 Cft
= 43.98 Cft
= 1.25 Cum
= 102.24 cum
Sch.Qty = 94.12 cum
@Tk = 18,000.00 P/Cum Sch = 94.12 Tk= 1,694,160.00
iii) 2nd. Floor
For Academic Bldg
FB-1 = 1 × 112.75 Rft = 112.75 Rft

"= 1 × 68.75 Rft = 68.75 Rft

FB-2 = 2 × 112.75 Rft = 225.50 Rft

= 407.00 Rft x 0.83 Rft x 0.83 Rft


Qty = 280.38 Cft
FB-4 = 8 × 37.99 Rft = 303.92 Rft x 1.00 Rft x 1.33 Rft
Qty = 404.21 Cft

6th R/A Bill Page 47


FB-3 = 2 × 37.99 Rft = 75.98 Rft

FB-5 = 4 × 37.99 Rft = 151.96 Rft

FB-6 = 4 × 37.99 Rft = 151.96 Rft

"= 2 × 16.33 Rft = 32.66 Rft

= 412.56 Rft x 0.83 Rft x 1.33 Rft


Qty = 455.42 Cft
FB-8 = 8 × 33.00 Rft = 264.00 Rft

FB-9 = 1 × 19.50 Rft = 19.50 Rft

= 283.50 Rft x 0.83 Rft x 1.08 Rft


Qty = 254.13 Cft
Qty = 1394.15 Cft
= 39.48 Cum
For Hostel Bldg
FB-1 = 4 x 77.32 Nos x 0.83 Rft x 1.12 Rft = 287.51 Cft
FB-2 = 4 x 77.32 Nos x 0.83 Rft x 1.12 Rft = 287.51 Cft
FB-3 = 6 x 32.50 Nos x 0.83 Rft x 1.12 Rft = 181.27 Cft
FB-4 = 10 x 37.50 Nos x 0.83 Rft x 1.12 Rft = 348.60 Cft
FB-5 = 2 x 12.17 Nos x 0.83 Rft x 1.12 Rft = 22.63 Cft
FB-7 = 4 x 22.25 Nos x 0.83 Rft x 1.12 Rft = 82.73 Cft
FB-7 = 2 x 14.33 Nos x 0.83 Rft x 1.12 Rft = 26.64 Cft
FB-8 = 2 x 26.33 Nos x 0.83 Rft x 1.12 Rft = 48.95 Cft
FB-9 = 2 x 19.75 Nos x 0.83 Rft x 1.12 Rft = 36.72 Cft
FB-10 = 2 x 10.67 Nos x 0.83 Rft x 1.62 Rft = 28.69 Cft
FB-11 = 4 x 21.50 Nos x 0.83 Rft x 1.12 Rft = 79.95 Cft
= 1,431.20 Cft
= 40.53 Cum
Qty = 80.02 cum
@Tk = 18,000.00 P/Cum Sch = 94.12 Tk= 1,440,280.46
iv). 3rd Floor
For Academic Bldg
Pent House,PB1 = 2 × 19.17 Rft × 0.83 Rft x 1.08 Rft = 34.37 Cft
PB2 = 2 × 10.25 Rft × 0.83 Rft x 0.83 Rft = 14.12 Cft
= 48.49 Cft
= 1.37 cum
@Tk = 20,000.00 P/Cum Sch = 110.03 Tk= 27,465.55
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF. Qty = 1166.09 Sqm
@Tk = 500.00 P/Sqm Sch = 1171.71 Tk= 583,047.28
ii). 1st. Floor
BF. Qty = 625.25 Sqm
Principal Qtr
P.house PHB1 = 1 x 18.17 Nos x 3.08 Rft = 55.96 Sft
PHB2 = 2 x 9.67 Nos x 2.58 Rft = 49.90 Sft
= 1 x 18.17 Nos x 2.58 Rft = 46.88 Sft
= 152.74 Sft = 14.20 Sqm

6th R/A Bill Page 48


For Hostel Bldg
FB-1 = 4 x 77.32 Nos x 3.08 Rft = 952.58 Sft
FB-2 = 4 x 77.32 Nos x 3.08 Rft = 952.58 Sft
FB-3 = 6 x 32.50 Nos x 3.08 Rft = 600.60 Sft
FB-4 = 10 x 37.50 Nos x 3.08 Rft = 1155.00 Sft
FB-5 = 2 x 12.17 Nos x 3.08 Rft = 74.97 Sft
FB-6 = 4 x 7.17 Nos x 3.08 Rft = 88.33 Sft
FB-7 = 2 x 21.58 Nos x 3.08 Rft = 132.93 Sft
FB-8 = 4 x 26.33 Nos x 3.08 Rft = 324.39 Sft
FB-9 = 2 x 19.75 Nos x 3.08 Rft = 121.66 Sft
FB-10 = 2 x 10.67 Nos x 3.08 Rft = 65.73 Sft
FB-11 = 4 x 21.50 Nos x 4.08 Rft = 350.88 Sft
FB-12 = 2 x 19.75 Nos x 2.58 Rft = 101.91 Sft
FB-13 = 2 x 19.58 Nos x 2.58 Rft = 101.03 Sft
FB-14 = 1 x 19.75 Nos x 2.58 Rft = 50.96 Sft
= 5,073.55 Sft = 471.52 Sqm
= 1110.97 Sqm
@Tk = 500.00 P/Sqm Sch = 1129.42 Tk= 555,484.14
iv). 2nd. Floor
For Academic Bldg
FB-1 = 1 × 112.75 Rft = 112.75 Rft

"= 1 × 68.75 Rft = 68.75 Rft

FB-2 = 2 × 112.75 Rft = 225.50 Rft

= 407.00 Rft x 2.50 Rft = 1017.50 Sft


FB-4 = 8 × 37.99 Rft = 303.92 Rft x 3.67 Rft = 1115.39 Sft
FB-3 = 2 × 37.99 Rft = 75.98 Rft

FB-5 = 4 × 37.99 Rft = 151.96 Rft

FB-6 = 4 × 37.99 Rft = 151.96 Rft

"= 2 × 16.33 Rft = 32.66 Rft

= 412.56 Rft x 3.50 Rft = 1443.96 Sft


FB-8 = 8 × 33.00 Rft = 264.00 Rft

FB-9 = 1 × 19.50 Rft = 19.50 Rft

= 283.50 Rft x 3.00 Rft = 850.50 Sft


= 4427.35 Sft
= 411.46 Sqm
For Hostel Bldg
FB-1 = 4 x 77.32 Nos x 3.08 Rft = 952.58 Sft
FB-2 = 4 x 77.32 Nos x 3.08 Rft = 952.58 Sft
FB-3 = 6 x 32.50 Nos x 3.08 Rft = 600.60 Sft
FB-4 = 10 x 37.50 Nos x 3.08 Rft = 1155.00 Sft
FB-5 = 2 x 12.17 Nos x 3.08 Rft = 74.97 Sft
FB-7 = 4 x 22.25 Nos x 3.08 Rft = 274.12 Sft
FB-7 = 2 x 14.33 Nos x 3.08 Rft = 88.27 Sft
FB-8 = 2 x 26.33 Nos x 3.08 Rft = 162.19 Sft
FB-9 = 2 x 19.75 Nos x 3.08 Rft = 121.66 Sft

6th R/A Bill Page 49


FB-10 = 2 x 10.67 Nos x 3.08 Rft = 65.73 Sft
FB-11 = 4 x 21.50 Nos x 4.08 Rft = 350.88 Sft
= 4,798.58 Sft = 445.97 Sqm
= 857.43 Sqm
@Tk = 500.00 P/Sqm Sch = 1129.42 Tk= 428,714.28
iv). 3rd Floor
Academic Bldg
Pent House,PB1 = 2 × 19.17 Rft × 3.00 Rft = 115.02 Sft
PB2 = 2 × 10.25 Rft × 2.50 Rft = 51.25 Sft
= 166.27 Sft = 15.45 Sqm
@Tk = 500.00 P/Sqm Sch = 526.20 Tk= 7,726.30
E. Lintel & Tie Beam
a). Concrete.
i). Gr.Floor
Academic Bldg
On 10'' Wall = 1 × 20 Nos × 9.00 Rft = 180.00 Rft

= 1 × 3 Nos × 8.50 Rft = 25.50 Rft

= 1 × 2 Nos × 7.50 Rft = 15.00 Rft

= 1 × 2 Nos × 7.58 Rft = 15.16 Rft

= 1 × 1 Nos × 7.92 Rft = 7.92 Rft

= 1 × 4 Nos × 7.50 Rft = 30.00 Rft

= 1 × 1 Nos × 16.08 Rft = 16.08 Rft

= 2 × 4 Nos × 8.58 Rft = 68.64 Rft

= 358.30 Rft x 0.83 x 0.75


= 223.04 Cft
On 5'' Wall = 1 × 17 Nos × 9.00 Rft = 153.00 Rft

= 1 × 11 Nos × 16.17 Rft = 177.87 Rft

= 330.87 Rft x 0.42 x 0.50


= 69.48 Cft
= 292.52 Cft
= 8.28 Cum
@Tk = 12,000.00 P/Cum Sch = 24.00 Tk= 99,413.58
ii). 1st Floor
Academic Bldg
On 10'' Wall = 1 × 20 Nos × 9.00 Rft = 180.00 Rft

= 1 × 3 Nos × 8.50 Rft = 25.50 Rft

= 1 × 4 Nos × 7.50 Rft = 30.00 Rft

= 1 × 3 Nos × 7.58 Rft = 22.74 Rft

= 1 × 1 Nos × 16.08 Rft = 16.08 Rft

= 2 × 4 Nos × 8.58 Rft = 68.64 Rft

= 342.96 Rft x 0.83 x 0.75


= 213.49 Cft
On 5'' Wall = 1 × 20 Nos × 9.00 Rft = 180.00 Rft

= 1 × 2 Nos × 7.50 Rft = 15.00 Rft

= 1 × 1 Nos × 10.25 Rft = 10.25 Rft

= 1 × 6 Nos × 16.17 Rft = 97.02 Rft

= 302.27 Rft x 0.42 x 0.50

6th R/A Bill Page 50


= 63.48 Cft
= 276.97 Cft
= 7.84 Cum
@Tk = 12,000.00 P/Cum Sch = 18.75 Tk= 94,127.20
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
Academic Bldg
On 10'' Wall = Rft Qty Same as,Qty = 358.30 Rft x 2.33 = 834.84 Sft
On 5'' Wall = Rft Qty Same as,Qty = 330.87 Rft x 1.42 = 469.84 Sft
= 1304.67 Sft
= 121.25 Sqm
@Tk = 400.00 P/Sqm Sch = 288.00 Tk= 48,500.91
ii). 1st Floor
Academic Bldg
On 10'' Wall = Rft Qty Same as,Qty = 342.96 Rft x 2.33 = 799.10 Sft
On 5'' Wall = Rft Qty Same as,Qty = 302.27 Rft x 1.42 = 429.22 Sft
= 1228.32 Sft
= 114.16 Sqm
@Tk = 400.00 P/Sqm Sch = 225.00 Tk= 45,662.46
F. Floor & Roof slab
a). Concrete.
i). Gr.Floor
BF Qty = 205.57 Cum
False Slab
Academic Bldg
Toilet = 2 × 10.42 Rft × 6.83 Rft = 142.34 Sft
= 1 × 10.42 Rft × 7.83 Rft = 81.59 Sft
= 1 × 5.17 Rft × 8.25 Rft = 42.65 Sft
= 1 × 7.42 Rft × 4.83 Rft = 35.84 Sft
= 302.42 Sft x 0.25 Rft
= 75.60 Cft
= 2.14 Cum
= 207.71 Cum
@Tk = 20,000.00 P/Cum Sch = 207.91 Tk= 4,154,227.24
ii). 1st Floor
For Academic Bldg
Main Slab = 1 × 81.25 Rft × 45.25 Rft = 3,676.56 Sft
= 1 × 51.25 Rft × 36.50 Rft = 1,870.63 Sft
= 1 × 23.00 Rft × 9.17 Rft = 210.91 Sft
= 1 × 7.00 Rft × 10.50 Rft = 73.50 Sft
Deduct,Stair = 1 × 11.67 Rft × 8.50 Rft = -99.20 Sft
= 5,732.40 Sft x 0.42 rft
= 2407.61 Cft
Auditorium = 1 × 46.00 Rft × 49.83 Rft = 2,292.18 Sft x 0.50 rft
= 1146.09 Cft
= 3553.70 Cft
BF Qty = 100.64 Cum
For Hostel Bldg

6th R/A Bill Page 51


= 2 × 36.83 Rft × 87.33 Rft = 6,432.73 Sft
= 2 × 25.67 Rft × 20.00 Rft = 1,026.80 Sft
Ver = 20 × 8.25 Rft × 3.50 Rft = 577.50 Sft
= 20 × 5.00 Rft × 1.67 Rft = 167.00 Sft
= 6 × 3.58 Rft × 1.67 Rft = 35.87 Sft
= 12 × 0.83 Rft × 0.83 Rft = 8.27 Sft
Gap = 2 × 7.50 Rft × 13.33 Rft = 199.95 Sft
Deduct,Gap = 2 × 12.00 Rft × 8.33 Rft = -199.92 Sft
= 8,248.20 Sft x 0.38 Rft

= 3134.31 Cft
Mid Portion = 1 × 24.17 Rft × 46.75 Rft = 1,129.95 Sft
= 1,129.95 Sft x 0.50 Rft

= 564.97 Cft
= 3699.29 Cft
= 104.77 cum
For Principal Qtr
Pent House = 1 × 13.00 Rft × 16.00 Rft x 0.38 Rft = 79.04 Cft
= 2.24 cum
Main Slab Qty = 207.65 cum
For Hostel Bldg
1st Floor-Bed Room
Ver, Portion = 18 × 8.08 Rft × 3.58 Rft = 520.68 Sft x 0.38 Rft

= 197.86 Cft
False Slab = 5.60 cum
Academic Bldg
Toilet = 1 × 5.17 Rft × 8.25 Rft = 42.65 Sft
= 1 × 7.42 Rft × 5.50 Rft = 40.81 Sft
= 83.46 Sft x 0.25 Rft

= 20.87 Cft
= 0.59 Cum
Total Qty = 213.84 cum
Sch.Qty = 208.87 Cum
@Tk = 20,000.00 P/Cum Sch = 208.87 Tk= 4,177,400.00
iii). 2nd Floor
For Hostel Bldg
Same measuremnt at1st Floor Qty = 3134.31 Cft
Mid Portion = 1 × 24.67 Rft × 21.75 Rft = 536.57 Sft
= 1 × 17.50 Rft × 18.00 Rft = 315.00 Sft
= 851.57 Sft x 0.50 Rft
= 425.79 Cft
= 3560.10 Cft
= 100.82 cum
For Academic Bldg
Rf
Main Slab = 1 × 81.25 Rft × 45.42 x 0.42 Rft = 1549.96 Cft
t
Rf
= 2 × 21.25 Rft × 27.67 x 0.42 Rft = 493.91 Cft
t
Rf
= 1 × 19.67 Rft × 10.33 x 0.42 Rft = 85.34 Cft
t
Rf
= 2 × 10.33 Rft × 14.67 x 0.50 Rft = 151.54 Cft
t

6th R/A Bill Page 52


= 2280.75 = 64.59 Cum
Total Qty = 165.42 cum
@Tk = 20,000.00 P/Cum Sch = 178.16 Tk= 3,308,325.78
iv). 3rd Floor
For Academic Bldg
Pent House = 1 × 22.17 Rft × 13.75 Rft x 0.38 Rft = 115.84 Cft
= 3.28 cum
@Tk = 20,000.00 P/Cum Sch = 110.03 Tk= 65,612.15
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF. Qty = 1787.98 Sqm
False Slab
Academic Bldg
Toilet = 2 × 11.08 Rft × 7.50 Rft = 166.20 Sft
= 1 × 11.08 Rft × 8.50 Rft = 94.18 Sft
= 1 × 5.83 Rft × 8.92 Rft = 52.00 Sft
= 1 × 8.08 Rft × 5.50 Rft = 44.44 Sft
= 356.82 Sft = 33.16 Sqm
= 1821.14 Sqm
@Tk = 600.00 P/Sqm Sch = 2494.92 Tk= 1,092,683.39
ii).1st Floor
For Academic Bldg
Ref. from Floor Area = 5732.40 Sft
= 2292.18 Sft
Add,Slab out Side = 2 x 2 Nos x 130.00 Rft = 520.00 Rft
= 2 x 2 Nos x 45.67 Rft = 182.68 Rft
= 2 x 2 Nos x 37.17 Rft = 148.68 Rft
= 2 × 2 Nos × 81.00 Rft = 324.00 Rft
= 1 × 2 Nos × 9.00 Rft = 18.00 Rft
= 2 x 2 Nos x 8.00 Rft = 32.00 Rft
= 4 x 2 Nos x 49.50 Rft = 396.00 Rft
= 1621.36 Rft
x 0.42 Rft = 680.97 Sft
Total = 8705.55 Sft
= 809.07 Sqm
For Hostel Bldg
Ref. from Floor Area = 8248.20 Sft
" = 1129.95 Sft
Add,Slab out Side = 2 x 2 Nos x 36.83 Rft = 147.32 Rft
= 2 x 2 Nos x 87.33 Rft = 349.32 Rft
= 2 x 2 Nos x 25.67 Rft = 102.68 Rft
= 2 × 1 Nos × 20.00 Rft = 40.00 Rft
= 2 × 2 Nos × 13.33 Rft = 53.32 Rft
= 2 x 20 Nos x 3.50 Rft = 140.00 Rft
= 2 × 10 Nos × 1.67 Rft = 33.40 Rft
= 2 × 6 Nos × 1.67 Rft = 20.04 Rft

6th R/A Bill Page 53


= 2 x 12 Nos x 0.83 Rft = 19.92 Rft
= 2 x 2 Nos x 12.00 Rft = 48.00 Rft
= 954.00 Rft
x 0.42 Rft = 400.68 Sft
Qty = 9778.82 Sft
Mid Portion = 1 × 24.17 Rft x 46.25 Rft = 1117.86 Sft
= 2 × 24.17 Rft x 0.50 Rft = 24.17 Sft
= 2 × 46.25 Rft x 0.50 Rft = 46.25 Sft
Qty = 1188.28 Sft
Total = 10967.11 Sft

= 1019.25 Sqm
Main Slab Qty = 1828.31 Sqm
For Hostel Bldg
Ver, Portion = 18 × 8.83 Rft × 4.33 Rft = 688.21 Sft = 63.96 Sqm
For Principal Qtr
Pent House = 1 × 13.75 Rft × 16.75 Rft = 230.31 Sft
= 21.40 Sqm
False Slab
Academic Bldg
Toilet = 1 × 5.17 Rft × 8.92 Rft = 46.12 Sft
= 1 × 8.08 Rft × 5.50 Rft = 44.44 Sft
= 90.56 Sft = 8.42 Sqm
= 1922.09 Sqm
@Tk = 500.00 P/Sqm Sch = 2506.44 Tk= 961,047.35
iii). 2nd Floor
For Hostel Bldg
Same measuremnt at1st Floor Qty = 9778.82 Sft
Mid Portion = 1 × 24.67 Rft x 21.75 Rft = 536.57 Sft
= 2 × 24.67 Rft x 0.50 Rft = 24.67 Sft
= 2 × 21.75 Rft x 0.50 Rft = 21.75 Sft
Qty = 10361.82 Sft
For Academic Bldg
= 1 × 81.25 Rft x 45.25 Rft = 3676.56 Sft
= 2 × 21.25 Rft x 27.67 Rft = 1175.98 Sft
= 1 × 19.67 Rft x 10.33 Rft = 203.19 Sft
= 2 × 10.33 Rft x 14.67 Rft = 303.08 Sft
= 2 × 111.50 Rft x 0.42 Rft = 93.66 Sft
= 2 × 45.67 Rft x 0.42 Rft = 38.36 Sft
Qty = 5490.83 Sft
Total = 15852.65 Sft

Total Qty = 1473.29 Sqm


@Tk = 500.00 P/Sqm Sch = 2137.96 Tk= 736,647.30
iv). 3rd Floor
Academic Bldg
Pent House = 1 × 23.17 Rft × 14.75 Rft = 341.76 Sft = 31.76 Sqm
@Tk = 500.00 P/Sqm Sch = 1320.36 Tk= 15,880.92

6th R/A Bill Page 54


G. Sunshade, drop wall, railing shelves, cornice, louver, fins, parapet etc.
a). Concrete.
i). Gr.Floor
Academic Bldg
Sunshade
L/D = 1 × 19 Nos × 9.00 Rft = 171.00 Rft

S/D = 1 × 1 Nos × 8.83 Rft = 8.83 Rft

= 1 × 1 Nos × 9.33 Rft = 9.33 Rft

= 1 × 1 Nos × 19.00 Rft = 19.00 Rft

= 2 × 4 Nos × 8.58 Rft = 68.64 Rft

= 276.80 Rft x 0.83 x 0.25


= 57.44 Cft
= 1.63 Cum
@Tk = 12,000.00 P/Cum Sch = 9.75 Tk= 19,519.46
ii). 1st.Floor
Academic Bldg
Sunshade
L/D = 1 × 20 Nos × 9.00 Rft = 180.00 Rft

S/D = 1 × 1 Nos × 8.83 Rft = 8.83 Rft

= 1 × 1 Nos × 9.33 Rft = 9.33 Rft

= 1 × 1 Nos × 19.00 Rft = 19.00 Rft

= 2 × 4 Nos × 8.58 Rft = 68.64 Rft

= 285.80 Rft x 0.83 x 0.25


= 59.30 Cft
= 1.68 Cum

@Tk = 12,000.00 P/Cum Sch = 13.60 Tk= 20,154.12


b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
Academic Bldg
Sunshade
= Rft Qty Same as,Qty = 276.80 Rft x 1.08 = 298.94 Sft
= 27.78 Sqm
@Tk = 400.00 P/Sqm Sch = 117.00 Tk= 11,113.16
ii). 1st.Floor
Academic Bldg
Sunshade
= Rft Qty Same as,Qty = 285.80 Rft x 1.08 = 308.66 Sft
= 28.69 Sqm
@Tk = 400.00 P/Sqm Sch = 163.20 Tk= 11,474.50
H. In stair case, slab & steps, ramp etc
a). Concrete.
i). Gr.Floor
BF. Qty = 2.72 Cum
Academic Bldg
1st & 2nd Flight
Waist Slab = 2 × 11.50 Rft × 4.42 Rft × 0.54 Sft = 54.90 Cft

6th R/A Bill Page 55


Step = 20 × 4.42 Rft × 0.92 Rft × 0.25 Sft = 20.33 Cft
Landing = 1 × 5.00 Rft × 9.00 Rft × 0.50 Sft = 22.50 Cft
= 2 × 0.83 Rft × 0.42 Rft × 0.50 Sft = 0.35 Cft
LB1 = 1 × 10.75 Rft × 1.00 Rft × 1.50 Sft = 16.13 Cft
= 114.20 Cft
= 3.23 Cum
Entry Step = 4 × 8.00 Rft × 1.00 Rft × 0.25 Sft = 8.00 Cft
= 4 × 20.50 Rft × 1.00 Rft × 0.25 Sft = 20.50 Cft
= 4 × 8.75 Rft × 0.83 Rft × 0.25 Sft = 7.26 Cft
= 4 × 2.50 Rft × 0.83 Rft × 0.25 Sft = 2.08 Cft
W.Slab = 1 × 8.00 Rft × 4.00 Rft × 0.54 Sft = 17.28 Cft
= 1 × 20.50 Rft × 4.00 Rft × 0.54 Sft = 44.28 Cft
= 2 × 8.75 Rft × 4.00 Rft × 0.54 Sft = 37.80 Cft
= 2 × 2.50 Rft × 4.00 Rft × 0.54 Sft = 10.80 Cft
= 148.00 Cft
= 4.19 Cum
Hostel Bldg
Stair-1 1st & 2nd Flight
Waist Slab = 4 × 11.50 Rft × 3.50 Rft × 0.54 Sft = 86.94 Cft
Step = 40 × 3.50 Rft × 0.92 Rft × 0.25 Sft = 32.20 Cft
Landing = 2 × 5.00 Rft × 8.33 Rft × 0.50 Sft = 41.65 Cft
= 4 × 0.83 Rft × 0.42 Rft × 0.50 Sft = 0.70 Cft
Beam = 2 × 10.00 Rft × 1.00 Rft × 1.50 Sft = 30.00 Cft
= 191.49 Cft
= 5.42 Cum
Entry Step = 8 × 7.50 Rft × 1.00 Rft × 0.25 Sft = 15.00 Cft
= 4 × 21.67 Rft × 1.00 Rft × 0.25 Sft = 21.67 Cft
W.Slab = 2 × 7.50 Rft × 4.00 Rft × 0.54 Sft = 32.40 Cft
= 1 × 20.50 Rft × 4.00 Rft × 0.54 Sft = 44.28 Cft
= 2 × 7.50 Rft × 0.83 Rft × 0.54 Sft = 6.72 Cft
= 1 × 21.67 Rft × 1.00 Rft × 0.83 Sft = 17.99 Cft
= 138.06 Cft
= 3.91 Cum
= 19.48 Cum
Sch Qty = 16.00 Cum
@Tk = 12,000.00 P/Cum Sch = 16.00 Tk= 192,000.00

ii). 1st.Floor
Academic Bldg
3rd & 4th Flight
Same Qty at Gr.For Qty = 3.23 Cum
Hostel Bldg
3rd & 4th Flight
Same Qty at Gr.For Qty = 5.42 Cum
Stair-2
Waist Slab = 2 × 12.50 Rft × 5.00 Rft × 0.54 Sft = 67.50 Cft
Step = 22 × 5.00 Rft × 0.92 Rft × 0.25 Sft = 25.30 Cft

6th R/A Bill Page 56


Landing = 1 × 12.00 Rft × 8.33 Rft × 0.50 Sft = 49.98 Cft
= 2 × 0.83 Rft × 0.42 Rft × 0.50 Sft = 0.35 Cft
Beam = 1 × 11.50 Rft × 1.00 Rft × 1.50 Sft = 17.25 Cft
= 160.38 Cft
= 4.54 Cum
= 9.97 Cum
Qty = 13.20 Cum
Sch Qty = 12.40 Cum
@Tk = 12,000.00 P/Cum Sch = 12.40 Tk= 148,800.00
iii). 2nd.Floor
Academic Bldg
3rd & 4th Flight
Same Qty at Gr.For Qty = 3.23 Cum
Hostel Bldg
3rd & 4th Flight
Same Qty at Gr.For Qty = 9.97 Cum
= 13.20 Cum
Sch Qty = 12.15 Cum
@Tk = 12,000.00 P/Cum Sch = 12.15 Tk= 145,800.00
b) Formwork/Shuttering
i). Gr.Floor
= 17.72 sqm
For Academic Bldg
Waist Slab = 2 × 1 Nos × 11.50 Rft × 4.42 Rft = 101.66 Sft
Side = 4 × 1 Nos × 11.50 Rft × 1.00 Rft = 46.00 Sft
Step = 2 × 10 Nos × 4.42 Rft × 0.50 Rft = 44.20 Sft
Side = 2 × 20 Nos × 0.83 Rft × 0.25 Rft = 8.30 Sft
Landing = 1 × 1 Nos × 9.00 Rft × 4.00 Rft = 36.00 Sft
Side = 1 × 2 Nos × 4.00 Rft × 0.54 Rft = 4.32 Sft
= 1 × 1 Nos × 9.00 Rft × 0.54 Rft = 4.86 Sft
Beam = 1 × 1 Nos × 10.75 Rft × 1.67 Rft = 17.95 Sft
= 263.29 Sft
= 24.47 sqm
Entry Front = 1 × 1 Rft × 21.50 Rft × 4.50 Rft = 96.75 Sft
Step = 1 × 4 Rft × 21.50 Rft × 0.50 Rft = 43.00 Sft
Side = 2 × 4 Rft × 1.00 Rft × 0.25 Rft = 2.00 Sft
Entry Front = 2 × 1 Rft × 7.50 Rft × 4.00 Rft = 60.00 Sft
Step = 2 × 4 Rft × 7.50 Rft × 0.50 Rft = 30.00 Sft
Side = 4 × 4 Rft × 1.00 Rft × 0.25 Rft = 4.00 Sft
= 235.75 Sft
= 21.91 sqm
For Hostel Bldg
Stair-1
Waist Slab = 4 × 1 Nos × 11.50 Rft × 4.00 Rft = 184.00 Sft
Side = 8 × 1 Nos × 11.50 Rft × 1.00 Rft = 92.00 Sft
Step = 2 × 20 Nos × 3.50 Rft × 0.50 Rft = 70.00 Sft
Side = 2 × 20 Nos × 0.83 Rft × 0.25 Rft = 8.30 Sft

6th R/A Bill Page 57


Landing = 2 × 1 Nos × 7.50 Rft × 4.58 Rft = 68.70 Sft
Side = 1 × 2 Nos × 4.00 Rft × 0.54 Rft = 4.32 Sft
= 1 × 1 Nos × 9.00 Rft × 0.54 Rft = 4.86 Sft
Beam = 2 × 1 Nos × 10.00 Rft × 1.67 Rft = 33.40 Sft
= 465.58 Sft
= 43.27 sqm
Stair-2
Waist Slab = 2 × 1 Nos × 12.50 Rft × 5.00 Rft = 125.00 Sft
Side = 4 × 1 Nos × 12.50 Rft × 1.00 Rft = 50.00 Sft
Step = 2 × 11 Nos × 5.00 Rft × 0.50 Rft = 55.00 Sft
Side = 2 × 22 Nos × 0.83 Rft × 0.25 Rft = 9.13 Sft
Landing = 1 × 1 Nos × 7.50 Rft × 4.50 Rft = 33.75 Sft
Side = 1 × 2 Nos × 4.00 Rft × 0.54 Rft = 4.32 Sft
= 1 × 1 Nos × 9.00 Rft × 0.54 Rft = 4.86 Sft
Beam = 1 × 1 Nos × 11.50 Rft × 1.67 Rft = 19.21 Sft
= 301.27 Sft
= 28.00 sqm
= 71.27 sqm
Entry Front = 1 × 1 Rft × 20.00 Rft × 4.50 Rft = 90.00 Sft
Step = 1 × 4 Rft × 20.00 Rft × 0.50 Rft = 40.00 Sft
Side = 2 × 4 Rft × 1.00 Rft × 0.25 Rft = 2.00 Sft
Entry Front = 2 × 1 Rft × 7.50 Rft × 3.75 Rft = 56.25 Sft
Step = 2 × 4 Rft × 7.50 Rft × 0.50 Rft = 30.00 Sft
Side = 4 × 4 Rft × 1.00 Rft × 0.25 Rft = 4.00 Sft
= 222.25 Sft
= 20.66 sqm
= 156.02 sqm
@Tk = 400.00 P/sqm Sch = 192.00 Tk= 62,408.34
ii). First Floor
For Academic Bldg
Same Qty at Gr.For Qty = 24.47 Cum
For Hostel Bldg
Same Qty at Gr.For Qty = 71.27 Cum
= 95.74 sqm
@Tk = 400.00 P/sqm Sch = 148.80 Tk= 38,295.07
iii). 2nd Floor
For Academic Bldg
Same Qty at Gr.For Qty = 24.47 Cum
For Hostel Bldg
Same Qty at Gr.For Qty = 71.27 Cum
= 95.74 sqm
@Tk = 400.00 P/sqm Sch = 145.80 Tk= 38,295.07
SL No-1.17 Supplying fabrication and fixing to details as per design deform bar
b).60 grade deformed bar
= 458,767.74 kg
Principal Qtr
Column - Pent house
20mmØ,C2 = 2 × 8 Nos = 16.00 Nos

6th R/A Bill Page 58


C3 = 3 × 10 Nos = 30.00 Nos

= 46.00 Nos x 8.75 Rft = 402.50 Rft

Lapping = 46.00 Nos x 1 Nos x 2.67 Rft = 122.82 Rft


= 525.32 Rft

10mmØ stirup
C1 = 2 × 23 Nos × 4.00 Rft × = 184.00 Rft

C2 = 3 × 23 Nos × 4.00 Rft × = 276.00 Rft

= 3 × 23 Nos × 2.67 Rft × = 184.23 Rft


= 644.23 Rft
Column Summary
20mm Ø = 525.32 Rft = 395.59 Kg
10mm Ø = 644.23 Rft = 121.78 Kg
For Column = 517.37 kg
Hostel Bldg
Column - 2nd Floor
20mmØ,C1 = 24 × 14 Nos = 336.00 Nos
C2 = 34 × 14 Nos = 476.00 Nos
C3 = 9 × 12 Nos = 108.00 Nos

C4 = 9 × 8 Nos = 72.00 Nos

C5 = 4 × 6 Nos = 24.00 Nos


No
= 1,016.00 s x 10.00 Rft = 10160.00 Rft
No
Lapping = 1,016.00 Nos x 1 s x 2.67 Rft = 2712.72 Rft
= 12872.72 Rft

16mmØ,C4 = 9 × 4 Nos = 36.00 Nos

C5 = 4 × 6 Nos = 24.00 Nos


No
= 60.00 s x 10.00 Rft = 600.00 Rft
No
Lapping = 60.00 Nos x 1 s x 2.17 Rft = 130.20 Rft
= 730.20 Rft

10mmØ stirup
C1 = 24 × 29 Nos × 5.33 Rft × = 3709.68 Rft

= 24 × 29 Nos × 4.17 Rft × = 2902.32 Rft

= 24 × 29 Nos × 4.00 Rft × = 2784.00 Rft

C2 = 34 × 29 Nos × 4.83 Rft × = 4762.38 Rft

= 34 × 29 Nos × 2.67 Rft × = 2632.62 Rft

C3,C4,C5 = 22 × 29 Nos × 4.83 Rft × = 3081.54 Rft

= 22 × 29 Nos × 3.67 Rft × = 2341.46 Rft


= 22214.00 Rft
Column Summary
20mm Ø = 12872.72 Rft = 9693.79 Kg
16mm Ø = 730.20 Rft = 351.74 Kg
10mm Ø = 22,214.00 Rft = 4198.99 Kg
For Column = 14244.52 kg
Academic Bldg
Column - 2nd Floor
False Column
20mmØ,C1 = 3 × 14 Nos = 42.00 Nos
C2 = 1 × 12 Nos = 12.00 Nos
C4 = 2 × 14 Nos = 28.00 Nos

C5 = 2 × 12 Nos = 24.00 Nos

C6 = 5 × 10 Nos = 50.00 Nos

6th R/A Bill Page 59


C7 = 1 × 6 Nos = 6.00 Nos

C9 = 1 × 20 Nos = 20.00 Nos


No
= 182.00 s x 2.67 Rft = 485.94 Rft
No
Lapping = 182.00 Nos x 1 s x 2.67 Rft = 485.94 Rft
= 971.88 Rft

25mmØ,C9 = 1 × 12 Nos = 12.00 Nos

= 12.00 Nos x 2.67 Rft = 32.04 Rft

Lapping = 12.00 Nos x 1 Nos x 3.33 Rft = 39.96 Rft


= 72.00 Rft

16mmØ,C7 = 1 × 4 Nos = 4.00 Nos


No
= 4.00 s x 2.67 Rft = 10.68 Rft
No
Lapping = 4.00 Nos x 1 s x 2.17 Rft = 8.68 Rft
= 19.36 Rft

10mmØ stirup
C1 = 3 × 7 Nos × 4.83 Rft × = 101.43 Rft

= 3 × 7 Nos × 2.67 Rft × = 56.07 Rft

C2 = 1 × 7 Nos × 4.83 Rft × = 33.81 Rft

= 1 × 7 Nos × 3.50 Rft × = 24.50 Rft

C4 = 2 × 6 Nos × 4.83 Rft × = 57.96 Rft

= 2 × 6 Nos × 3.17 Rft × = 38.04 Rft

= 2 × 6 Nos × 3.00 Rft × = 36.00 Rft

C6 = 5 × 7 Nos × 4.50 Rft × = 157.50 Rft

= 5 × 7 Nos × 3.00 Rft × = 105.00 Rft

C7 = 1 × 7 Nos × 4.50 Rft × = 31.50 Rft

= 1 × 7 Nos × 3.00 Rft × = 21.00 Rft

C9 = 1 × 6 Nos × 8.17 Rft × = 49.02 Rft

= 1 × 6 Nos × 7.17 Rft × = 43.02 Rft

= 1 × 6 Nos × 6.17 Rft × = 37.02 Rft

= 1 × 6 Nos × 6.17 Rft × = 37.02 Rft


= 828.89 Rft
Column Summary
25mm Ø = 72.00 Rft = 84.51 Kg
20mm Ø = 971.88 Rft = 731.87 Kg
16mm Ø = 19.36 Rft = 9.33 Kg
10mm Ø = 828.89 Rft = 156.68 Kg
For Column = 982.39 kg
Academic Bldg
Column - 3rd Floor
False Column
20mmØ,C2 = 2 × 12 Nos = 24.00 Nos
C2 = 2 × 12 Nos = 24.00 Nos
C4 = 16 × 8 Nos = 128.00 Nos

C6 = 1 × 6 Nos = 6.00 Nos

C9 = 1 × 20 Nos = 20.00 Nos


No
= 202.00 s x 2.67 Rft = 539.34 Rft
No
Lapping = 202.00 Nos x 1 s x 2.67 Rft = 539.34 Rft
= 1078.68 Rft

25mmØ,C9 = 1 × 12 Nos = 12.00 Nos


No
= 12.00 s x 2.67 Rft = 32.04 Rft

6th R/A Bill Page 60


No
Lapping = 12.00 Nos x 1 s x 3.33 Rft = 39.96 Rft
= 72.00 Rft

16mmØ,C4 = 16 × 4 Nos = 64.00 Nos

C6 = 1 × 4 Nos = 4.00 Nos


No
= 68.00 s x 2.67 Rft = 181.56 Rft
No
Lapping = 68.00 Nos x 1 s x 2.17 Rft = 147.56 Rft
= 329.12 Rft

10mmØ stirup
C2 = 2 × 7 Nos × 4.83 Rft × = 67.62 Rft

= 2 × 7 Nos × 3.50 Rft × = 49.00 Rft

C2 = 2 × 7 Nos × 4.83 Rft × = 67.62 Rft

= 2 × 7 Nos × 3.50 Rft × = 49.00 Rft

C4 = 16 × 6 Nos × 4.83 Rft × = 463.68 Rft

= 16 × 6 Nos × 3.17 Rft × = 304.32 Rft

= 16 × 6 Nos × 3.00 Rft × = 288.00 Rft

C6 = 1 × 7 Nos × 4.50 Rft × = 31.50 Rft

= 1 × 7 Nos × 3.00 Rft × = 21.00 Rft

C9 = 1 × 6 Nos × 8.17 Rft × = 49.02 Rft

= 1 × 6 Nos × 7.17 Rft × = 43.02 Rft

= 1 × 6 Nos × 6.17 Rft × = 37.02 Rft

= 1 × 6 Nos × 6.17 Rft × = 37.02 Rft


= 1507.82 Rft
Column Summary
25mm Ø = 72.00 Rft = 84.51 Kg
20mm Ø = 1078.68 Rft = 812.30 Kg
16mm Ø = 329.12 Rft = 158.54 Kg
10mm Ø = 1,507.82 Rft = 285.01 Kg
For Column = 1340.37 kg
Academic Bldg
Column - 3rd Floor
Pent house
20mmØ,C3 = 4 × 14 Nos = 56.00 Nos
C5 = 2 × 8 Nos = 16.00 Nos
No
= 72.00 s x 11.00 Rft = 792.00 Rft
No
Lapping = 72.00 Nos x 1 s x 2.67 Rft = 192.24 Rft
= 984.24 Rft

16mmØ,C5 = 2 × 4 Nos = 8.00 Nos


No
= 8.00 s x 11.00 Rft = 88.00 Rft
No
Lapping = 8.00 Nos x 1 s x 2.17 Rft = 17.36 Rft
= 105.36 Rft

10mmØ stirup
C3 = 4 × 24 Nos × 5.33 Rft × = 511.68 Rft

= 4 × 24 Nos × 4.17 Rft × = 400.32 Rft

= 4 × 24 Nos × 4.00 Rft × = 384.00 Rft

C5 = 2 × 23 Nos × 4.83 Rft × = 222.18 Rft

= 2 × 23 Nos × 3.17 Rft × = 145.82 Rft

= 2 × 23 Nos × 3.00 Rft × = 138.00 Rft


= 1802.00 Rft
Column Summary

6th R/A Bill Page 61


20mm Ø = 984.24 =Rft 741.18 Kg
16mm Ø = Rft =
105.36 50.75 Kg
10mm Ø = 1,802.00 Rft = 340.62 Kg
For Column = 1132.56 kg
Acd.Column,Qty = 3455.31 Kg
Hostel Bldg
Column - 3rd Floor
Same measurement at 2nd Floor,Qty = 14244.52 Kg
Academic Bldg
Stair Reinforcement.
For Gr.Floor
12 mm Ø/ M = 1 × 2 Nos × 14 × 19.83 Rft = 555.24 Rft

Top = 1 × 1 Nos × 14 × 6.83 Rft = 95.62 Rft

" = 1 × 1 Nos × 14 × 8.75 Rft = 122.50 Rft

" = 1 × 2 Nos × 14 × 8.42 Rft = 235.76 Rft

" = 1 × 2 Nos × 2 × 5.00 Rft = 20.00 Rft

= 1,029.12 Rft
10mm Ø binder = 1 × 2 Nos × 38 × 4.25 Rft = 323.00 Rft

" = 1 × 4 Nos × 11 × 9.25 Rft = 407.00 Rft

= 730.00 Rft

20mm Ø -L.B = 1 × 1 Nos × 6 × 12.00 Rft = 72.00 Rft

10mm Ø Striup = 1 × 1 Nos × 20 × 3.67 Rft = 73.40 Rft

Stair Summary
10mm Ø = 803.40 =
Rft 151.86 Kg
12mm Ø = 1,029.12 Rft = 279.24 Kg
20mm Ø = 72.00 Rft = 54.22 Kg
Gr. Floor Stair Qty = 485.32 Kg
For 1st.Floor
Same Measurement at Gr.Floor Qty = 485.32 Kg
For 2nd.Floor
Same Measurement at 1st.Floor Qty = 485.32 Kg
Stair Qty = 1455.97 kg
Hostel Bldg
Stair Reinforcement-E/W.
For Gr.Floor
12 mm Ø/ M = 2 × 2 Nos × 12 × 19.83 Rft = 951.84 Rft

Top = 2 × 1 Nos × 12 × 6.83 Rft = 163.92 Rft

" = 2 × 1 Nos × 12 × 8.75 Rft = 210.00 Rft

" = 2 × 2 Nos × 12 × 8.42 Rft = 404.16 Rft

" = 2 × 2 Nos × 2 × 5.00 Rft = 40.00 Rft

= 1,769.92 Rft
10mm Ø binder = 2 × 2 Nos × 38 × 3.33 Rft = 506.16 Rft

" = 2 × 4 Nos × 11 × 9.25 Rft = 814.00 Rft

= 1,320.16 Rft

20mm Ø -L.B = 2 × 1 Nos × 6 × 11.17 Rft = 134.04 Rft

10mm Ø Striup = 2 × 1 Nos × 20 × 3.67 Rft = 146.80 Rft

Stair Summary
10mm Ø = 1,466.96 Rft = 277.29 Kg

6th R/A Bill Page 62


12mm Ø = 1,769.92 Rft= 480.25 Kg
20mm Ø = 134.04 Rft = 100.94 Kg
Qty = 858.48 Kg
Stair Reinforcement-Mid Portion.
12 mm Ø/ M = 1 × 2 Nos × 16 × 21.00 Rft = 672.00 Rft

Top = 1 × 1 Nos × 16 × 5.83 Rft = 93.28 Rft

" = 1 × 1 Nos × 16 × 11.00 Rft = 176.00 Rft

" = 1 × 2 Nos × 16 × 12.00 Rft = 384.00 Rft

" = 1 × 4 Nos × 2 × 8.00 Rft = 64.00 Rft

= 1,389.28 Rft
10mm Ø binder = 1 × 2 Nos × 42 × 5.00 Rft = 420.00 Rft

" = 1 × 4 Nos × 17 × 12.00 Rft = 816.00 Rft

= 1,236.00 Rft

20mm Ø -L.B = 1 × 1 Nos × 6 × 15.00 Rft = 90.00 Rft

= 1 × 2 Nos × 2 × 3.67 Rft = 14.68 Rft

= 2 × 1 Nos × 2 × 7.67 Rft = 30.68 Rft

= 135.36 Rft

10mm Ø Striup = 2 × 1 Nos × 26 × 4.50 Rft = 234.00 Rft

Stair Summary
10mm Ø = 1,470.00 Rft = 277.87 Kg
12mm Ø = 1,389.28 =
Rft 376.97 Kg
20mm Ø = 135.36 Rft = 101.93 Kg
Qty = 756.77 Kg
Gr. Floor Stair Qty = 1615.25 kg
For 1st.Floor
Same Measurement at Gr.Floor,Qty = 1615.25 Kg
For 2nd.Floor
Same Measurement at 1st.Floor,Qty = 1615.25 Kg
For 3rd.Floor
Same Measurement at 2nd.Floor,Qty = 1615.25 Kg
Stair Qty = 6461.00 kg
Principal Qtr
Pent house Slab
L/D,10 mm Ø/ ST = 1 × 10 Nos × 16.42 Rft = 164.20 Rft

Cut = 1 × 9 Nos × 10.33 Rft = 92.97 Rft

Ext.top = 1 × 19 Nos × 6.58 Rft = 125.02 Rft

" = 1 × 19 Nos × 9.17 Rft = 174.23 Rft

Binder = 2 × 3 Nos × 20.33 Rft = 121.98 Rft

S/D,10 mm Ø/ ST = 1 × 14 Nos × 9.00 Rft = 126.00 Rft

Cut = 1 × 13 Nos × 5.67 Rft = 73.71 Rft

Ext.top = 2 × 38 Nos × 4.75 Rft = 361.00 Rft

Binder = 2 × 6 Nos × 12.58 Rft = 150.96 Rft

= 1,390.07 Rft

Pent house Beam


B1,20mmØ ST = 2 × 6 Nos × 18.00 Rft = 216.00 Rft

10mm Ø Striup = 2 × 36 Nos × 3.67 Rft = 264.24 Rft

B2,16mmØ ST = 2 × 6 Nos × 10.42 Rft = 125.04 Rft

6th R/A Bill Page 63


10mm Ø Striup = 2 × 19 Nos × 3.17 Rft = 120.46 Rft

Summary
10mm Ø = 1,774.77 Rft = 335.47 Kg
16mm Ø = 125.04 =
Rft 60.23 Kg
20mm Ø = 216.00 Rft = 162.66 Kg
Qty = 558.37 Kg
Female Hostel Bldg.
1st. Floor Slab
Long direction
10mm Ø St = 2 × 2 Nos × 13 Nos × 86.83 Rft = 4,515.16 Rft

" = 2 × 1 Nos × 7 Nos × 86.83 Rft = 1,215.62 Rft

Cut = 2 × 5 Nos × 30 Nos × 9.00 Rft = 2,700.00 Rft

"= 2 × 1 Nos × 22 Nos × 6.00 Rft = 264.00 Rft

"= 2 × 1 Nos × 30 Nos × 9.50 Rft = 570.00 Rft

Ext.top End = 2 × 1 Nos × 27 Nos × 4.00 Rft = 216.00 Rft

"= 2 × 1 Nos × 41 Nos × 8.33 Rft = 683.06 Rft

"= 2 × 1 Nos × 68 Nos × 5.00 Rft = 680.00 Rft

Ext.top Mid = 2 × 4 Nos × 80 Nos × 9.00 Rft = 5,760.00 Rft

"= 2 × 1 Nos × 80 Nos × 7.50 Rft = 1,200.00 Rft

"= 2 × 1 Nos × 80 Nos × 7.83 Rft = 1,252.80 Rft

Ver = 2 × 10 Nos × 11 Nos × 8.25 Rft = 1,815.00 Rft

"= 2 × 10 Nos × 6 Nos × 5.00 Rft = 600.00 Rft

"= 2 × 3 Nos × 6 Nos × 3.50 Rft = 126.00 Rft

"= 2 × 6 Nos × 4 Nos × 0.83 Rft = 39.84 Rft

Ext.top Binder = 2 × 5 Nos × 38 Nos × 12.00 Rft = 4,560.00 Rft

" = 2 × 1 Nos × 38 Nos × 8.00 Rft = 608.00 Rft

" = 2 × 1 Nos × 38 Nos × 12.33 Rft = 937.08 Rft

Laping = 2 × 26 Nos × 3 Nos × 1.33 Rft = 207.48 Rft

" = 2 × 7 Nos × 3 Nos × 1.33 Rft = 55.86 Rft


Gap 10Ø St = 2 × 13 Nos × 1 Nos × 6.00 Rft = 156.00 Rft
" = 2 × 13 Nos × 1 Nos × 7.00 Rft = 182.00 Rft
" = 2 × 8 Nos × 1 Nos × 15.00 Rft = 240.00 Rft
Cut = 2 × 13 Nos × 1 Nos × 5.00 Rft = 130.00 Rft
" = 2 × 13 Nos × 1 Nos × 5.25 Rft = 136.50 Rft
" = 2 × 7 Nos × 1 Nos × 10.00 Rft = 140.00 Rft
Ext.top Binder = 2 × 32 Nos × 1 Nos × 10.00 Rft = 640.00 Rft

= 29,630.40 Rft

Short direction
10mm Ø St = 2 × 5 Nos × 9 Nos × 42.83 Rft = 3,854.70 Rft

" = 2 × 5 Nos × 5 Nos × 39.17 Rft = 1,958.50 Rft

" = 2 × 1 Nos × 9 Nos × 22.67 Rft = 408.06 Rft

" = 2 × 1 Nos × 14 Nos × 35.58 Rft = 996.24 Rft

" = 2 × 3 Nos × 5 Nos × 1.67 Rft = 50.10 Rft

" = 2 × 6 Nos × 3 Nos × 3.00 Rft = 108.00 Rft

Alt. Cut = 2 × 9 Nos × 13 Nos × 9.42 Rft = 2,204.28 Rft

" = 2 × 5 Nos × 13 Nos × 6.75 Rft = 877.50 Rft

" = 2 × 1 Nos × 8 Nos × 6.75 Rft = 108.00 Rft

" = 2 × 1 Nos × 13 Nos × 6.75 Rft = 175.50 Rft

6th R/A Bill Page 64


" = 2 × 2 Nos × 13 Nos × 9.42 Rft = 489.84 Rft

" = 2 × 1 Nos × 8 Nos × 9.42 Rft = 150.72 Rft

10mm Ø Ext.top = 2 × 10 Nos × 37 Nos × 8.17 Rft = 6,045.80 Rft

" = 2 × 2 Nos × 25 Nos × 8.17 Rft = 817.00 Rft

" = 2 × 2 Nos × 40 Nos × 8.17 Rft = 1,307.20 Rft

" = 2 × 2 Nos × 26 Nos × 5.17 Rft = 537.68 Rft

" = 2 × 1 Nos × 16 Nos × 5.17 Rft = 165.44 Rft

Ext.top Binder = 2 × 18 Nos × 6 Nos × 12.33 Rft = 2,663.28 Rft

" = 2 × 10 Nos × 6 Nos × 8.33 Rft = 999.60 Rft

" = 2 × 1 Nos × 32 Nos × 12.33 Rft = 789.12 Rft

" = 2 × 1 Nos × 20 Nos × 8.33 Rft = 333.20 Rft

Laping = 2 × 45 Nos × 1 Nos × 1.33 Rft = 119.70 Rft

" = 2 × 25 Nos × 1 Nos × 1.33 Rft = 66.50 Rft

" = 2 × 14 Nos × 1 Nos × 1.33 Rft = 37.24 Rft


Gap 10 Ø St = 2 × 35 Nos × 1 Nos × 12.00 Rft = 840.00 Rft
Cut = 2 × 25 Nos × 1 Nos × 12.00 Rft = 600.00 Rft
Ext.top " = 2 × 27 Nos × 1 Nos × 4.17 Rft = 225.18 Rft
PFB-11 = 2 × 13 Nos × 1 Nos × 8.33 Rft = 216.58 Rft
" = 2 × 27 Nos × 1 Nos × 3.17 Rft = 171.18 Rft
PFB-12 = 2 × 23 Nos × 1 Nos × 8.33 Rft = 383.18 Rft
PFB-6 = 2 × 51 Nos × 1 Nos × 4.58 Rft = 467.16 Rft
Ext.top Binder = 2 × 4 Nos × 1 Nos × 35.00 Rft = 280.00 Rft
" = 2 × 4 Nos × 1 Nos × 8.00 Rft = 64.00 Rft
" = 2 × 5 Nos × 1 Nos × 24.83 Rft = 248.30 Rft

= 28,758.78 Rft

= 58,389.18 Rft

Qty = 9256.82 kg
12mm Ø Ext.top = 2 × 10 Nos × 25 Nos × 8.67 Rft = 4,335.00 Rft

" = 2 × 10 Nos × 16 Nos × 6.83 Rft = 2,185.60 Rft

" = 2 × 1 Nos × 37 Nos × 9.33 Rft = 690.42 Rft

" = 2 × 1 Nos × 25 Nos × 8.83 Rft = 441.50 Rft

= 7,652.52 Rft
= 2076.446 kg
Mid Portion
Long direction
10mm Ø St = 1 × 1 Nos × 17 Nos × 23.50 Rft = 399.50 Rft

" = 1 × 1 Nos × 23 Nos × 29.17 Rft = 670.91 Rft

Cut = 1 × 1 Nos × 16 Nos × 8.25 Rft = 132.00 Rft

"= 2 × 1 Nos × 16 Nos × 4.17 Rft = 133.44 Rft

"= 1 × 1 Nos × 22 Nos × 14.67 Rft = 322.74 Rft

"= 1 × 1 Nos × 22 Nos × 6.58 Rft = 144.76 Rft

Ext.top = 2 × 1 Nos × 33 Nos × 3.00 Rft = 198.00 Rft

" = 2 × 1 Nos × 33 Nos × 6.50 Rft = 429.00 Rft

" = 1 × 1 Nos × 67 Nos × 19.50 Rft = 1,306.50 Rft

" = 1 × 1 Nos × 53 Nos × 7.33 Rft = 388.49 Rft

Binder = 2 × 1 Nos × 8 Nos × 20.33 Rft = 325.28 Rft

" = 2 × 1 Nos × 11 Nos × 26.67 Rft = 586.74 Rft

Short direction

6th R/A Bill Page 65


10mm Ø St = 1 × 1 Nos × 24 Nos × 16.25 Rft = 390.00 Rft

" = 1 × 1 Nos × 20 Nos × 24.33 Rft = 486.60 Rft

" = 1 × 1 Nos × 9 Nos × 23.42 Rft = 210.78 Rft

Cut = 1 × 1 Nos × 23 Nos × 12.00 Rft = 276.00 Rft

" = 1 × 1 Nos × 27 Nos × 16.50 Rft = 445.50 Rft

Ext.top = 2 × 1 Nos × 64 Nos × 6.25 Rft = 800.00 Rft

" = 2 × 1 Nos × 46 Nos × 8.92 Rft = 820.64 Rft

" = 2 × 1 Nos × 20 Nos × 8.08 Rft = 323.20 Rft

Binder = 2 × 1 Nos × 22 Nos × 15.42 Rft = 678.48 Rft

" = 2 × 1 Nos × 9 Nos × 21.75 Rft = 391.50 Rft

" = 2 × 1 Nos × 4 Nos × 21.75 Rft = 174.00 Rft

= 10,034.06 Rft

= 1896.6821 kg
Slab,Qty = 13229.949 kg
Female Hostel Bldg.
1st. Floor Slab Beam
FB-1
20 mm Ø St = 2 × 1 Nos × 4 Nos × 66.83 Rft = 534.64 Rft

" Laping = 2 × 4 Nos × 2 Nos × 2.67 Rft = 42.72 Rft

20mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 5.00 Rft = 40.00 Rft

20mm Ø Ext/Mid = 2 × 4 Nos × 2 Nos × 9.33 Rft = 149.28 Rft

16mmØ,Ext/Bott = 2 × 5 Nos × 2 Nos × 9.58 Rft = 191.60 Rft

25mm Ø Separor = 2 × 5 Nos × 3 Nos × 0.58 Rft = 17.40 Rft

10mmØ,Strriup = 2 × 1 Nos × 119 Nos × 4.17 Rft = 992.46 Rft

FB-1
20 mm Ø St = 2 × 1 Nos × 4 Nos × 50.25 Rft = 402.00 Rft

" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

20mmØ,Ext t/End = 2 × 1 Nos × 2 Nos × 5.00 Rft = 20.00 Rft

16mmØ,Ext/End = 2 × 1 Nos × 2 Nos × 5.25 Rft = 21.00 Rft

20mm Ø Ext/Mid = 2 × 1 Nos × 2 Nos × 9.33 Rft = 37.32 Rft

" = 2 × 1 Nos × 2 Nos × 8.00 Rft = 32.00 Rft

" = 2 × 1 Nos × 2 Nos × 8.17 Rft = 32.68 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 2 Nos × 9.58 Rft = 76.64 Rft

" = 2 × 1 Nos × 2 Nos × 6.58 Rft = 26.32 Rft

" = 2 × 1 Nos × 2 Nos × 9.75 Rft = 39.00 Rft

25mm Ø Separor = 2 × 2 Nos × 6 Nos × 0.58 Rft = 13.92 Rft

10mmØ,Strriup = 2 × 1 Nos × 89 Nos × 4.17 Rft = 742.26 Rft

FB-1
20 mm Ø St = 2 × 1 Nos × 4 Nos × 28.33 Rft = 226.64 Rft

" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

16mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 5.00 Rft = 40.00 Rft

20mm Ø Ext/Mid = 2 × 2 Nos × 1 Nos × 9.33 Rft = 37.32 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 2 Nos × 9.58 Rft = 76.64 Rft

25mm Ø Separor = 2 × 2 Nos × 3 Nos × 0.58 Rft = 6.96 Rft

10mmØ,Strriup = 2 × 1 Nos × 49 Nos × 4.17 Rft = 408.66 Rft

FB-2
20 mm Ø St = 2 × 2 Nos × 4 Nos × 88.75 Rft = 1,420.00 Rft

" Laping = 2 × 2 Nos × 12 Nos × 2.67 Rft = 128.16 Rft

6th R/A Bill Page 66


16mmØ,Ext.t/End = 2 × 2 Nos × 2 Nos × 5.17 Rft = 41.36 Rft

20mm Ø Ext/Mid = 2 × 2 Nos × 4 Nos × 9.33 Rft = 149.28 Rft

" = 2 × 2 Nos × 1 Nos × 8.00 Rft = 32.00 Rft

" = 2 × 2 Nos × 1 Nos × 8.17 Rft = 32.68 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 5 Nos × 9.58 Rft = 191.60 Rft

" = 2 × 2 Nos × 1 Nos × 6.58 Rft = 26.32 Rft

" = 2 × 2 Nos × 1 Nos × 9.75 Rft = 39.00 Rft

10mmØ,Strriup = 2 × 2 Nos × 159 Nos × 4.17 Rft = 2,652.12 Rft

FB-3
20mm Ø St = 2 × 3 Nos × 4 Nos × 40.17 Rft = 964.08 Rft

" Laping = 2 × 3 Nos × 4 Nos × 2.67 Rft = 64.08 Rft

20mm Ø Ext/End = 2 × 3 Nos × 2 Nos × 6.50 Rft = 78.00 Rft

20mm Ø Ext/Mid = 2 × 3 Nos × 4 Nos × 8.33 Rft = 199.92 Rft

16mmØ,Ext/Bott = 2 × 3 Nos × 4 Nos × 10.00 Rft = 240.00 Rft

25mm Ø Separor = 2 × 3 Nos × 6 Nos × 0.58 Rft = 20.88 Rft

10mmØ,Strriup = 2 × 3 Nos × 71 Nos × 4.17 Rft = 1,776.42 Rft

FB-4
20mm Ø St = 2 × 5 Nos × 4 Nos × 43.50 Rft = 1,740.00 Rft

" Laping = 2 × 5 Nos × 4 Nos × 2.67 Rft = 106.80 Rft

20mm Ø Ext/End = 2 × 5 Nos × 4 Nos × 9.83 Rft = 393.20 Rft

20mm Ø Ext/Mid = 2 × 5 Nos × 4 Nos × 8.33 Rft = 333.20 Rft

16mmØ,Ext/Bott = 2 × 5 Nos × 4 Nos × 10.00 Rft = 400.00 Rft

25mm Ø Separor = 2 × 5 Nos × 6 Nos × 0.58 Rft = 34.80 Rft

10mmØ,Strriup = 2 × 5 Nos × 77 Nos × 4.17 Rft = 3,210.90 Rft

FB-6
20mm Ø St = 2 × 1 Nos × 6 Nos × 10.42 Rft = 125.04 Rft

20mm Ø Ext/Mid = 2 × 1 Nos × 3 Nos × 16.00 Rft = 96.00 Rft

10mmØ,Strriup = 2 × 1 Nos × 17 Nos × 4.17 Rft = 141.78 Rft

FB-7 =
16mm Ø St = 2 × 1 Nos × 6 Nos × 28.00 Rft = 336.00 Rft

" Laping = 2 × 6 Nos × 1 Nos × 2.17 Rft = 26.04 Rft

10mmØ,Strriup = 2 × 1 Nos × 49 Nos × 4.17 Rft = 408.66 Rft

FB-7 =
16mm Ø St = 2 × 1 Nos × 6 Nos × 19.33 Rft = 231.96 Rft

10mmØ,Strriup = 2 × 1 Nos × 34 Nos × 4.17 Rft = 283.56 Rft

FB-8
20 mm Ø St = 2 × 1 Nos × 4 Nos × 32.17 Rft = 257.36 Rft

" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

16mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 7.00 Rft = 56.00 Rft

" = 2 × 2 Nos × 2 Nos × 5.92 Rft = 47.36 Rft

20mm Ø Ext/Mid = 2 × 2 Nos × 1 Nos × 10.42 Rft = 41.68 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 1 Nos × 12.00 Rft = 48.00 Rft

" = 2 × 2 Nos × 1 Nos × 9.50 Rft = 38.00 Rft

25mm Ø Separor = 2 × 7 Nos × 1 Nos × 0.58 Rft = 8.12 Rft

10mmØ,Strriup = 2 × 1 Nos × 56 Nos × 4.17 Rft = 467.04 Rft

FB-9
20 mm Ø St = 2 × 1 Nos × 4 Nos × 26.17 Rft = 209.36 Rft

6th R/A Bill Page 67


" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

20mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 10.33 Rft = 82.64 Rft

16mmØ,Ext/Bott = 2 × 1 Nos × 2 Nos × 8.75 Rft = 35.00 Rft

25mm Ø Separor = 2 × 1 Nos × 3 Nos × 0.58 Rft = 3.48 Rft

10mmØ,Strriup = 2 × 1 Nos × 46 Nos × 4.17 Rft = 383.64 Rft

FB-10 =
16mm Ø St = 2 × 1 Nos × 4 Nos × 11.50 Rft = 92.00 Rft

10mmØ,Strriup = 2 × 1 Nos × 19 Nos × 3.67 Rft = 139.46 Rft

FB-11 =
20mm Ø St = 2 × 1 Nos × 6 Nos × 19.83 Rft = 237.96 Rft

10mmØ,Strriup = 2 × 1 Nos × 34 Nos × 4.17 Rft = 283.56 Rft

FB-12
25 mm Ø St = 1 × 1 Nos × 6 Nos × 26.08 Rft = 156.48 Rft

" Laping = 1 × 1 Nos × 6 Nos × 3.33 Rft = 19.98 Rft

25mmØ,Ext t/End = 1 × 2 Nos × 3 Nos × 9.33 Rft = 55.98 Rft

25mmØ,Ext/Bott = 1 × 1 Nos × 3 Nos × 17.00 Rft = 51.00 Rft

25mm Ø Separor = 1 × 1 Nos × 6 Nos × 0.58 Rft = 3.48 Rft

10mmØ,Strriup = 1 × 1 Nos × 45 Nos × 5.50 Rft = 247.50 Rft

FB-13
20mm Ø St = 2 × 1 Nos × 6 Nos × 22.08 Rft = 264.96 Rft

16mmØ,Ext/End = 2 × 1 Nos × 2 Nos × 6.50 Rft = 26.00 Rft

16mm Ø Ext/Mid = 2 × 1 Nos × 2 Nos × 14.50 Rft = 58.00 Rft

10mmØ,Strriup = 2 × 1 Nos × 38 Nos × 4.17 Rft = 316.92 Rft

FB-14
25 mm Ø St = 2 × 1 Nos × 6 Nos × 22.08 Rft = 264.96 Rft

20mmØ,Ext/End = 2 × 1 Nos × 2 Nos × 6.50 Rft = 26.00 Rft

20mm Ø Ext/Mid = 2 × 1 Nos × 2 Nos × 14.50 Rft = 58.00 Rft

10mmØ,Strriup = 2 × 1 Nos × 38 Nos × 4.17 Rft = 316.92 Rft

Beam Summary
10mm Ø = 12,771.86 =
Rft @ 0.62 kg/m = 2414.19 Kg

16mm Ø = 2,377.80 Rft = @ 1.58 kg/m = 1145.40 Kg

20mm Ø = 8,347.24 Rft = @ 2.47 kg/m = 6285.88 Kg

25mm Ø = 657.44 Rft = @ 3.85 kg/m = 771.69 Kg

Beam = 10617.17 kg
Slab & Beam = 23,847.12 kg
Female Hostel Bldg.
2nd. Floor Slab
Long direction
10mm Ø St = 2 × 2 Nos × 13 Nos × 86.83 Rft = 4,515.16 Rft

" = 2 × 1 Nos × 7 Nos × 86.83 Rft = 1,215.62 Rft

Cut = 2 × 5 Nos × 30 Nos × 9.00 Rft = 2,700.00 Rft

"= 2 × 1 Nos × 22 Nos × 6.00 Rft = 264.00 Rft

"= 2 × 1 Nos × 30 Nos × 9.50 Rft = 570.00 Rft

Ext.top End = 2 × 1 Nos × 27 Nos × 4.00 Rft = 216.00 Rft

"= 2 × 1 Nos × 41 Nos × 8.33 Rft = 683.06 Rft

"= 2 × 1 Nos × 68 Nos × 5.00 Rft = 680.00 Rft

Ext.top Mid = 2 × 4 Nos × 80 Nos × 9.00 Rft = 5,760.00 Rft

6th R/A Bill Page 68


" = 2 × 1 Nos × 80 Nos × 7.50 Rft = 1,200.00 Rft

" = 2 × 1 Nos × 80 Nos × 7.83 Rft = 1,252.80 Rft

Ver = 2 × 10 Nos × 11 Nos × 8.25 Rft = 1,815.00 Rft

"= 2 × 10 Nos × 6 Nos × 5.00 Rft = 600.00 Rft

"= 2 × 3 Nos × 6 Nos × 3.50 Rft = 126.00 Rft

"= 2 × 6 Nos × 4 Nos × 0.83 Rft = 39.84 Rft

Ext.top Binder = 2 × 5 Nos × 38 Nos × 12.00 Rft = 4,560.00 Rft

" = 2 × 1 Nos × 38 Nos × 8.00 Rft = 608.00 Rft

" = 2 × 1 Nos × 38 Nos × 12.33 Rft = 937.08 Rft

Laping = 2 × 26 Nos × 3 Nos × 1.33 Rft = 207.48 Rft

" = 2 × 7 Nos × 3 Nos × 1.33 Rft = 55.86 Rft


Gap 10Ø St = 2 × 13 Nos × 1 Nos × 6.00 Rft = 156.00 Rft
" = 2 × 13 Nos × 1 Nos × 7.00 Rft = 182.00 Rft
" = 2 × 8 Nos × 1 Nos × 15.00 Rft = 240.00 Rft
Cut = 2 × 13 Nos × 1 Nos × 5.00 Rft = 130.00 Rft
" = 2 × 13 Nos × 1 Nos × 5.25 Rft = 136.50 Rft
" = 2 × 7 Nos × 1 Nos × 10.00 Rft = 140.00 Rft
Ext.top Binder = 2 × 32 Nos × 1 Nos × 10.00 Rft = 640.00 Rft

= 29,630.40 Rft

Short direction
10mm Ø St = 2 × 5 Nos × 9 Nos × 42.83 Rft = 3,854.70 Rft

" = 2 × 5 Nos × 5 Nos × 39.17 Rft = 1,958.50 Rft

" = 2 × 1 Nos × 9 Nos × 22.67 Rft = 408.06 Rft

" = 2 × 1 Nos × 14 Nos × 35.58 Rft = 996.24 Rft

" = 2 × 3 Nos × 5 Nos × 1.67 Rft = 50.10 Rft

" = 2 × 6 Nos × 3 Nos × 3.00 Rft = 108.00 Rft

Alt. Cut = 2 × 9 Nos × 13 Nos × 9.42 Rft = 2,204.28 Rft

" = 2 × 5 Nos × 13 Nos × 6.75 Rft = 877.50 Rft

" = 2 × 1 Nos × 8 Nos × 6.75 Rft = 108.00 Rft

" = 2 × 1 Nos × 13 Nos × 6.75 Rft = 175.50 Rft

" = 2 × 2 Nos × 13 Nos × 9.42 Rft = 489.84 Rft

" = 2 × 1 Nos × 8 Nos × 9.42 Rft = 150.72 Rft

10mm Ø Ext.top = 2 × 10 Nos × 37 Nos × 8.17 Rft = 6,045.80 Rft

" = 2 × 2 Nos × 25 Nos × 8.17 Rft = 817.00 Rft

" = 2 × 2 Nos × 40 Nos × 8.17 Rft = 1,307.20 Rft

" = 2 × 2 Nos × 26 Nos × 5.17 Rft = 537.68 Rft

" = 2 × 1 Nos × 16 Nos × 5.17 Rft = 165.44 Rft

Ext.top Binder = 2 × 18 Nos × 6 Nos × 12.33 Rft = 2,663.28 Rft

" = 2 × 10 Nos × 6 Nos × 8.33 Rft = 999.60 Rft

" = 2 × 1 Nos × 32 Nos × 12.33 Rft = 789.12 Rft

" = 2 × 1 Nos × 20 Nos × 8.33 Rft = 333.20 Rft

Laping = 2 × 45 Nos × 1 Nos × 1.33 Rft = 119.70 Rft

" = 2 × 25 Nos × 1 Nos × 1.33 Rft = 66.50 Rft

" = 2 × 14 Nos × 1 Nos × 1.33 Rft = 37.24 Rft


Gap 10Ø St = 2 × 35 Nos × 1 Nos × 12.00 Rft = 840.00 Rft
Cut = 2 × 25 Nos × 1 Nos × 12.00 Rft = 600.00 Rft
Ext.top = 2 × 27 Nos × 1 Nos × 4.17 Rft = 225.18 Rft
" = 2 × 13 Nos × 1 Nos × 8.33 Rft = 216.58 Rft
" = 2 × 27 Nos × 1 Nos × 3.17 Rft = 171.18 Rft

6th R/A Bill Page 69


" = 2 × 23 Nos × 1 Nos × 8.33 Rft = 383.18 Rft
" = 2 × 51 Nos × 1 Nos × 4.58 Rft = 467.16 Rft
Ext.top Binder = 2 × 4 Nos × 1 Nos × 35.00 Rft = 280.00 Rft
" = 2 × 4 Nos × 1 Nos × 8.00 Rft = 64.00 Rft
" = 2 × 5 Nos × 1 Nos × 24.83 Rft = 248.30 Rft

= 28,758.78 Rft

= 58,389.18 Rft

Qty = 9256.82 kg
12mm Ø Ext.top = 2 × 10 Nos × 25 Nos × 8.67 Rft = 4,335.00 Rft

= 2 × 10 Nos × 16 Nos × 6.83 Rft = 2,185.60 Rft

= 2 × 1 Nos × 37 Nos × 9.33 Rft = 690.42 Rft

= 2 × 1 Nos × 25 Nos × 8.83 Rft = 441.50 Rft

= 7,652.52 Rft

= 2076.446 kg
Mid Portion
Long direction
10mm Ø St = 1 × 1 Nos × 17 Nos × 23.50 Rft = 399.50 Rft

= 1 × 1 Nos × 16 Nos × 8.25 Rft = 132.00 Rft

= 2 × 1 Nos × 16 Nos × 4.17 Rft = 133.44 Rft

= 2 × 1 Nos × 33 Nos × 3.00 Rft = 198.00 Rft

= 2 × 1 Nos × 33 Nos × 6.50 Rft = 429.00 Rft

= 2 × 1 Nos × 8 Nos × 20.33 Rft = 325.28 Rft

Short direction
10mm Ø St = 1 × 1 Nos × 24 Nos × 16.25 Rft = 390.00 Rft

= 1 × 1 Nos × 23 Nos × 12.00 Rft = 276.00 Rft

= 2 × 1 Nos × 64 Nos × 6.25 Rft = 800.00 Rft

= 1 × 1 Nos × 22 Nos × 15.42 Rft = 339.24 Rft

= 3,422.46 Rft

= 646.92841 kg
Slab,Qty = 11980.196 kg
Female Hostel Bldg.
2nd. Floor Slab Beam
FB-1
20 mm Ø St = 2 × 1 Nos × 4 Nos × 66.83 Rft = 534.64 Rft

" Laping = 2 × 4 Nos × 2 Nos × 2.67 Rft = 42.72 Rft

20mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 5.00 Rft = 40.00 Rft

20mm Ø Ext/Mid = 2 × 4 Nos × 2 Nos × 9.33 Rft = 149.28 Rft

16mmØ,Ext/Bott = 2 × 5 Nos × 2 Nos × 9.58 Rft = 191.60 Rft

25mm Ø Separor = 2 × 5 Nos × 3 Nos × 0.58 Rft = 17.40 Rft

10mmØ,Strriup = 2 × 1 Nos × 119 Nos × 4.17 Rft = 992.46 Rft

FB-1
20 mm Ø St = 2 × 1 Nos × 4 Nos × 50.25 Rft = 402.00 Rft

" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

20mmØ,Ext t/End = 2 × 1 Nos × 2 Nos × 5.00 Rft = 20.00 Rft

16mmØ,Ext/End = 2 × 1 Nos × 2 Nos × 5.25 Rft = 21.00 Rft

20mm Ø Ext/Mid = 2 × 1 Nos × 2 Nos × 9.33 Rft = 37.32 Rft

" = 2 × 1 Nos × 2 Nos × 8.00 Rft = 32.00 Rft

" = 2 × 1 Nos × 2 Nos × 8.17 Rft = 32.68 Rft

6th R/A Bill Page 70


16mmØ,Ext/Bott = 2 × 2 Nos × 2 Nos × 9.58 Rft = 76.64 Rft

" = 2 × 1 Nos × 2 Nos × 6.58 Rft = 26.32 Rft

" = 2 × 1 Nos × 2 Nos × 9.75 Rft = 39.00 Rft

25mm Ø Separor = 2 × 2 Nos × 6 Nos × 0.58 Rft = 13.92 Rft

10mmØ,Strriup = 2 × 1 Nos × 89 Nos × 4.17 Rft = 742.26 Rft

FB-1
20 mm Ø St = 2 × 1 Nos × 4 Nos × 28.33 Rft = 226.64 Rft

" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

16mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 5.00 Rft = 40.00 Rft

20mm Ø Ext/Mid = 2 × 2 Nos × 1 Nos × 9.33 Rft = 37.32 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 2 Nos × 9.58 Rft = 76.64 Rft

25mm Ø Separor = 2 × 2 Nos × 3 Nos × 0.58 Rft = 6.96 Rft

10mmØ,Strriup = 2 × 1 Nos × 49 Nos × 4.17 Rft = 408.66 Rft

FB-2
20 mm Ø St = 2 × 2 Nos × 4 Nos × 88.75 Rft = 1,420.00 Rft

" Laping = 2 × 2 Nos × 12 Nos × 2.67 Rft = 128.16 Rft

16mmØ,Ext.t/End = 2 × 2 Nos × 2 Nos × 5.17 Rft = 41.36 Rft

20mm Ø Ext/Mid = 2 × 2 Nos × 4 Nos × 9.33 Rft = 149.28 Rft

" = 2 × 2 Nos × 1 Nos × 8.00 Rft = 32.00 Rft

" = 2 × 2 Nos × 1 Nos × 8.17 Rft = 32.68 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 5 Nos × 9.58 Rft = 191.60 Rft

" = 2 × 2 Nos × 1 Nos × 6.58 Rft = 26.32 Rft

" = 2 × 2 Nos × 1 Nos × 9.75 Rft = 39.00 Rft

10mmØ,Strriup = 2 × 2 Nos × 159 Nos × 4.17 Rft = 2,652.12 Rft

FB-3
20mm Ø St = 2 × 3 Nos × 4 Nos × 40.17 Rft = 964.08 Rft

" Laping = 2 × 3 Nos × 4 Nos × 2.67 Rft = 64.08 Rft

20mm Ø Ext/End = 2 × 3 Nos × 2 Nos × 6.50 Rft = 78.00 Rft

20mm Ø Ext/Mid = 2 × 3 Nos × 4 Nos × 8.33 Rft = 199.92 Rft

16mmØ,Ext/Bott = 2 × 3 Nos × 4 Nos × 10.00 Rft = 240.00 Rft

25mm Ø Separor = 2 × 3 Nos × 6 Nos × 0.58 Rft = 20.88 Rft

10mmØ,Strriup = 2 × 3 Nos × 71 Nos × 4.17 Rft = 1,776.42 Rft

FB-4
20mm Ø St = 2 × 5 Nos × 4 Nos × 43.50 Rft = 1,740.00 Rft

" Laping = 2 × 5 Nos × 4 Nos × 2.67 Rft = 106.80 Rft

20mm Ø Ext/End = 2 × 5 Nos × 4 Nos × 9.83 Rft = 393.20 Rft

20mm Ø Ext/Mid = 2 × 5 Nos × 4 Nos × 8.33 Rft = 333.20 Rft

16mmØ,Ext/Bott = 2 × 5 Nos × 4 Nos × 10.00 Rft = 400.00 Rft

25mm Ø Separor = 2 × 5 Nos × 6 Nos × 0.58 Rft = 34.80 Rft

10mmØ,Strriup = 2 × 5 Nos × 77 Nos × 4.17 Rft = 3,210.90 Rft

FB-7 =
16mm Ø St = 2 × 1 Nos × 6 Nos × 28.00 Rft = 336.00 Rft

" Laping = 2 × 6 Nos × 1 Nos × 2.17 Rft = 26.04 Rft

10mmØ,Strriup = 2 × 1 Nos × 49 Nos × 4.17 Rft = 408.66 Rft

FB-7 =
16mm Ø St = 2 × 1 Nos × 6 Nos × 19.33 Rft = 231.96 Rft

10mmØ,Strriup = 2 × 1 Nos × 34 Nos × 4.17 Rft = 283.56 Rft

6th R/A Bill Page 71


FB-8
20 mm Ø St = 2 × 1 Nos × 4 Nos × 32.17 Rft = 257.36 Rft

" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

16mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 7.00 Rft = 56.00 Rft

" = 2 × 2 Nos × 2 Nos × 5.92 Rft = 47.36 Rft

20mm Ø Ext/Mid = 2 × 2 Nos × 1 Nos × 10.42 Rft = 41.68 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 1 Nos × 12.00 Rft = 48.00 Rft

" = 2 × 2 Nos × 1 Nos × 9.50 Rft = 38.00 Rft

25mm Ø Separor = 2 × 7 Nos × 1 Nos × 0.58 Rft = 8.12 Rft

10mmØ,Strriup = 2 × 1 Nos × 56 Nos × 4.17 Rft = 467.04 Rft

FB-9
20 mm Ø St = 2 × 1 Nos × 4 Nos × 26.17 Rft = 209.36 Rft

" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

20mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 10.33 Rft = 82.64 Rft

16mmØ,Ext/Bott = 2 × 1 Nos × 2 Nos × 8.75 Rft = 35.00 Rft

25mm Ø Separor = 2 × 1 Nos × 3 Nos × 0.58 Rft = 3.48 Rft

10mmØ,Strriup = 2 × 1 Nos × 46 Nos × 4.17 Rft = 383.64 Rft

FB-10 =
16mm Ø St = 2 × 1 Nos × 4 Nos × 11.50 Rft = 92.00 Rft

10mmØ,Strriup = 2 × 1 Nos × 19 Nos × 3.67 Rft = 139.46 Rft

FB-11 =
20mm Ø St = 2 × 1 Nos × 6 Nos × 19.83 Rft = 237.96 Rft

10mmØ,Strriup = 2 × 1 Nos × 34 Nos × 4.17 Rft = 283.56 Rft

Beam Summary
10mm Ø = 11,748.74 =
Rft @ 0.62 kg/m = 2220.80 Kg

16mm Ø = 2,293.80 Rft = @ 1.58 kg/m = 1104.94 Kg

20mm Ø = 7,777.24 Rft = @ 2.47 kg/m = 5856.64 Kg

25mm Ø = 105.56 Rft = @ 3.85 kg/m = 123.90 Kg

Beam = 9306.28 kg
Slab & Beam = 21,286.48 kg

Academic Bldg
2nd. Floor Slab Beam
FB-1
16mm Ø St = 1 × 5 Nos × 82.08 Rft = 410.40 Rft
" Laping = 5 × 3 Nos × 2.17 Rft = 32.55 Rft
10mmØ,Strriup = 1 × 173 Nos × 3.67 Rft = 634.91 Rft
FB-1
16mm Ø St = 1 × 5 Nos × 92.08 Rft = 460.40 Rft
" Laping = 5 × 3 Nos × 2.17 Rft = 32.55 Rft
10mmØ,Strriup = 1 × 194 Nos × 3.67 Rft = 711.98 Rft
FB-2
16mm Ø St = 2 × 6 Nos × 101.58 Rft = 1,218.96 Rft
" Laping = 12 × 4 Nos × 2.17 Rft = 104.16 Rft
10mmØ,Strriup = 2 × 214 Nos × 3.67 Rft = 1,570.76 Rft
FB-3
20 mm Ø St = 1 × 4 Nos × 47.08 Rft = 188.32 Rft
20 mm Ø Laping = 1 × 4 Nos × 2.67 Rft = 10.68 Rft
" Ext/End = 1 × 2 Nos × 6.83 Rft = 13.66 Rft

6th R/A Bill Page 72


" Ext/Mid = 1 × 3 Nos × 20.50 Rft = 61.50 Rft
" Ext/Bott = 1 × 4 Nos × 12.25 Rft = 49.00 Rft
25mm Ø Seprt = 1 × 6 Nos × 0.58 Rft = 3.48 Rft
10 mmØ,Strriup = 1 × 84 Nos × 4.67 Rft = 392.28 Rft
FB-4
20 mm Ø St = 8 × 6 Nos × 47.08 Rft = 2,259.84 Rft
20 mm Ø Laping = 8 × 6 Nos × 2.67 Rft = 128.16 Rft
16 mm Ø Ext/End = 8 × 4 Nos × 7.42 Rft = 237.44 Rft
20 mm Ø Ext/Mid = 8 × 2 Nos × 20.50 Rft = 328.00 Rft
16 mm Ø Ext/Bott = 8 × 4 Nos × 12.25 Rft = 392.00 Rft
25mm Ø Seprt = 8 × 6 Nos × 0.75 Rft = 36.00 Rft
10 mmØ,Strriup = 8 × 84 Nos × 5.00 Rft = 3,360.00 Rft
FB-5
20 mm Ø St = 2 × 4 Nos × 29.33 Rft = 234.64 Rft
20 mm Ø Laping = 2 × 4 Nos × 2.67 Rft = 21.36 Rft
16 mm Ø Ext/End = 2 × 2 Nos × 7.42 Rft = 29.68 Rft
20 mm Ø Ext/Mid = 2 × 3 Nos × 15.00 Rft = 90.00 Rft
20 mm Ø Ext/Bott = 2 × 2 Nos × 12.25 Rft = 49.00 Rft
25mm Ø Seprt = 2 × 6 Nos × 0.58 Rft = 6.96 Rft
10 mmØ,Strriup = 2 × 51 Nos × 4.67 Rft = 476.34 Rft
Beam Summary
10mm Ø = 7,146.27 =
Rft 1350.82 Kg
16mm Ø = 2,918.14 Rft = 1405.69 Kg
20mm Ø = 3,434.16 Rft = 2586.09 Kg
25mm Ø = 46.44 Rft = 54.51 Kg
Slab Beam = 5397.11 kg
Academic Bldg
2nd. Floor Slab
N/S Direction
10mm Ø St = 1 × 17 Nos × 80.75 Rft = 1,372.75 Rft
" = 1 × 7 Nos × 100.25 Rft = 701.75 Rft
" = 1 × 17 Nos × 90.75 Rft = 1,542.75 Rft
" = 1 × 5 Nos × 9.50 Rft = 47.50 Rft
Cut = 8 × 41 Nos × 6.83 Rft = 2,240.24 Rft
"= 1 × 24 Nos × 6.83 Rft = 163.92 Rft
"= 1 × 12 Nos × 7.33 Rft = 87.96 Rft
Ext Top End = 1 × 75 Nos × 3.33 Rft = 249.75 Rft
Mid = 7 × 113 Nos × 7.50 Rft = 5,932.50 Rft
"= 1 × 65 Nos × 7.50 Rft = 487.50 Rft
"= 1 × 28 Nos × 7.00 Rft = 196.00 Rft
End = 2 × 48 Nos × 3.33 Rft = 319.68 Rft
"= 1 × 25 Nos × 3.33 Rft = 83.25 Rft
Laping = 1 × 147 Nos × 1.33 Rft = 195.51 Rft
Ext top Binder = 8 × 36 Nos × 9.00 Rft = 2,592.00 Rft
"= 1 × 22 Nos × 9.00 Rft = 198.00 Rft
"= 2 × 8 Nos × 8.50 Rft = 136.00 Rft
E/W Direction
10mm Ø St = 8 × 7 Nos × 43.75 Rft = 2,450.00 Rft
"= 1 × 7 Nos × 26.42 Rft = 184.94 Rft
"= 1 × 7 Nos × 13.83 Rft = 96.81 Rft

6th R/A Bill Page 73


Cut = 17 × 6 Nos × 12.25 Rft = 1,249.50 Rft
" = 10 × 6 Nos × 6.00 Rft = 360.00 Rft
" = 1 × 6 Nos × 3.75 Rft = 22.50 Rft
Ext top End = 17 × 17 Nos × 5.00 Rft = 1,445.00 Rft
Mid = 8 × 19 Nos × 20.50 Rft = 3,116.00 Rft
" = 1 × 19 Nos × 15.00 Rft = 285.00 Rft
" = 1 × 27 Nos × 14.67 Rft = 396.09 Rft
Ext top Binder = 17 × 10 Nos × 16.33 Rft = 2,776.10 Rft
" = 10 × 10 Nos × 8.00 Rft = 800.00 Rft
" = 1 × 10 Nos × 5.00 Rft = 50.00 Rft
Laping = 1 × 56 Nos × 1.33 Rft = 74.48 Rft
= = 5643.03585 Kg
29,853.48 Rft
Slab & Beam = 11040.14 Kg
Academic Bldg
Pent house Slab-3rd Floor
L/D,10 mm Ø/ ST = 1 × 8 Nos × 17.42 Rft = 139.36 Rft

Cut = 1 × 8 Nos × 13.00 Rft = 104.00 Rft

Ext.top = 2 × 21 Nos × 7.33 Rft = 307.86 Rft

Binder = 2 × 3 Nos × 20.75 Rft = 124.50 Rft

S/D,10 mm Ø/ ST = 1 × 20 Nos × 9.92 Rft = 198.40 Rft

Cut = 1 × 20 Nos × 6.42 Rft = 128.40 Rft

Ext.top = 2 × 40 Nos × 5.17 Rft = 413.60 Rft

Binder = 2 × 3 Nos × 13.33 Rft = 79.98 Rft

= 1,496.10 Rft

Pent house Beam


B1,16mmØ ST = 2 × 6 Nos × 20.50 Rft = 246.00 Rft

20mm Ø Ext.top = 2 × 4 Nos × 7.00 Rft = 56.00 Rft

16mm Ø Ext.Bott = 2 × 2 Nos × 12.00 Rft = 48.00 Rft

10mm Ø Striup = 2 × 40 Nos × 4.17 Rft = 333.60 Rft

B2,16mmØ ST = 2 × 6 Nos × 11.67 Rft = 140.04 Rft

10mm Ø Striup = 2 × 22 Nos × 3.67 Rft = 161.48 Rft

Summary
10mm Ø = 1,991.18 Rft = 376.38 Kg
16mm Ø = 434.04 =
Rft 209.08 Kg
20mm Ø = 56.00 Rft = 42.17 Kg
Qty = 627.63 Kg
Lintel
For Gr.Floor
Academic Bldg
On 10" Wall with Sunshade
12 mm Ø/ M = 1 × 1 Nos × 6 × 90.75 Rft = 544.50 Rft

" = 1 × 2 Nos × 6 × 10.75 Rft = 129.00 Rft

" = 1 × 1 Nos × 6 × 80.75 Rft = 484.50 Rft

" = 1 × 2 Nos × 6 × 18.83 Rft = 225.96 Rft

" = 1 × 2 Nos × 6 × 42.00 Rft = 504.00 Rft

= 1,887.96 Rft

= 512.28 kg
10mm Ø Strp = 1 × 1 Nos × 216 × 4.50 Rft = 972.00 Rft
" = 1 × 2 Nos × 27 × 4.50 Rft = 243.00 Rft

6th R/A Bill Page 74


" = 1 × 1 Nos × 193 × 4.50 Rft = 868.50 Rft

" = 1 × 2 Nos × 46 × 4.50 Rft = 414.00 Rft

" = 1 × 2 Nos × 101 × 4.50 Rft = 909.00 Rft

10mm Ø binder = 1 × 1 Nos × 2 × 90.75 Rft = 181.50 Rft

" = 1 × 2 Nos × 2 × 10.75 Rft = 43.00 Rft

" = 1 × 1 Nos × 2 × 80.75 Rft = 161.50 Rft

" = 1 × 2 Nos × 2 × 18.75 Rft = 75.00 Rft

" = 1 × 2 Nos × 2 × 42.00 Rft = 168.00 Rft

= 4,035.50 Rft

= 762.81 kg
On 10" Wall without Sunshade
12 mm Ø/ M = 1 × 1 Nos × 6 × 20.42 Rft = 122.52 Rft

" = 1 × 2 Nos × 6 × 9.33 Rft = 111.96 Rft

" = 1 × 1 Nos × 6 × 11.08 Rft = 66.48 Rft

= 300.96 Rft

= 81.66 kg
10mm Ø Strp = 1 × 1 Nos × 50 × 3.00 Rft = 150.00 Rft

" = 1 × 2 Nos × 23 × 3.00 Rft = 138.00 Rft

" = 1 × 1 Nos × 27 × 3.00 Rft = 81.00 Rft


= 369.00 Rft

= 69.75 kg
On 5" Wall without Sunshade
12 mm Ø/ M = 1 × 17 Nos × 4 × 10.00 Rft = 680.00 Rft

" = 1 × 11 Nos × 4 × 18.83 Rft = 828.52 Rft

= 1,508.52 Rft
= 409.32 kg
10mm Ø Strp = 1 × 17 Nos × 25 × 1.67 Rft = 709.75 Rft

" = 1 × 11 Nos × 46 × 1.67 Rft = 845.02 Rft

= 1,554.77 Rft
= 293.89 kg
= 2129.72 kg
For 1st.Floor
Academic Bldg
On 10" Wall with Sunshade
12 mm Ø/ M = 1 × 1 Nos × 6 × 129.58 Rft = 777.48 Rft

" = 1 × 1 Nos × 6 × 80.75 Rft = 484.50 Rft

" = 1 × 1 Nos × 6 × 20.75 Rft = 124.50 Rft

" = 1 × 1 Nos × 6 × 19.25 Rft = 115.50 Rft

" = 1 × 1 Nos × 6 × 27.67 Rft = 166.02 Rft

" = 1 × 2 Nos × 6 × 42.00 Rft = 504.00 Rft

= 2,172.00 Rft
= 589.35 kg
10mm Ø Strp = 1 × 1 Nos × 310 × 4.50 Rft = 1,395.00 Rft
" = 1 × 1 Nos × 193 × 4.50 Rft = 868.50 Rft

" = 1 × 1 Nos × 50 × 4.50 Rft = 225.00 Rft

" = 1 × 1 Nos × 47 × 4.50 Rft = 211.50 Rft

" = 1 × 1 Nos × 67 × 4.50 Rft = 301.50 Rft

6th R/A Bill Page 75


" = 1 × 2 Nos × 101 × 4.50 Rft = 909.00 Rft

10mm Ø binder = 1 × 1 Nos × 2 × 129.58 Rft = 259.16 Rft

" = 1 × 1 Nos × 2 × 80.75 Rft = 161.50 Rft

" = 1 × 1 Nos × 2 × 20.75 Rft = 41.50 Rft

" = 1 × 1 Nos × 2 × 19.25 Rft = 38.50 Rft

" = 1 × 1 Nos × 2 × 27.67 Rft = 55.34 Rft

" = 1 × 2 Nos × 2 × 42.00 Rft = 168.00 Rft

= 4,634.50 Rft

= 876.03 kg
On 10" Wall without Sunshade
12 mm Ø/ M = 1 × 1 Nos × 6 × 20.42 Rft = 122.52 Rft

" = 1 × 2 Nos × 6 × 9.33 Rft = 111.96 Rft

" = 1 × 1 Nos × 6 × 11.08 Rft = 66.48 Rft

= 300.96 Rft

= 81.66 kg
10mm Ø Strp = 1 × 1 Nos × 50 × 3.00 Rft = 150.00 Rft

" = 1 × 2 Nos × 23 × 3.00 Rft = 138.00 Rft

" = 1 × 1 Nos × 27 × 3.00 Rft = 81.00 Rft


= 369.00 Rft
= 69.75 kg
On 5" Wall without Sunshade
12 mm Ø/ M = 1 × 20 Nos × 4 × 10.00 Rft = 800.00 Rft

" = 1 × 1 Nos × 4 × 7.50 Rft = 30.00 Rft

" = 1 × 1 Nos × 4 × 9.17 Rft = 36.68 Rft

" = 1 × 1 Nos × 4 × 10.25 Rft = 41.00 Rft

" = 1 × 6 Nos × 4 × 18.75 Rft = 450.00 Rft

= 1,357.68 Rft
= 368.39 kg
10mm Ø Strp = 1 × 20 Nos × 21 × 1.67 Rft = 701.40 Rft

" = 1 × 1 Nos × 16 × 1.67 Rft = 26.72 Rft

" = 1 × 1 Nos × 19 × 1.67 Rft = 31.73 Rft

" = 1 × 1 Nos × 21 × 1.67 Rft = 35.07 Rft

" = 1 × 1 Nos × 39 × 1.67 Rft = 65.13 Rft

= 860.05 Rft
= 162.57 kg
= 2147.77 kg
Lintel Qty = 4277.48 kg
Sunshade
Hostel Bldg
Gr.Floor
10mmØ W80 = 18 × 3 Nos × 6.75 Rft = 364.50 Rft

= 18 × 15 Nos × 2.33 Rft = 629.10 Rft

W50 = 4 × 3 Nos × 4.00 Rft = 48.00 Rft

= 4 × 9 Nos × 2.33 Rft = 83.88 Rft


W48 = 2 × 3 Nos × 3.83 Rft = 22.98 Rft
= 2 × 9 Nos × 2.33 Rft = 41.94 Rft
W90 = 2 × 3 Nos × 7.33 Rft = 43.98 Rft
= 2 × 16 Nos × 2.33 Rft = 74.56 Rft

6th R/A Bill Page 76


HW24 = 10 × 3 Nos × 1.83 Rft = 54.90 Rft
= 10 × 5 Nos × 2.33 Rft = 116.50 Rft
Gap = 2 × 3 Nos × 4.17 Rft = 25.02 Rft
= 2 × 9 Nos × 2.33 Rft = 41.94 Rft
Mid = 10 × 3 Nos × 13.08 Rft = 392.40 Rft
= 10 × 28 Nos × 2.33 Rft = 652.40 Rft
= 2,592.10 Rft = 489.97 kg
On Cup Board
Hostel Bldg
Gr.Floor
10mmØ = 18 × 11 Nos × 2.00 Rft = 396.00 Rft

= 18 × 5 Nos × 5.00 Rft =450.00 Rft


= 846.00 Rft
= 159.91 kg
Lintel
Hostel Bldg
Gr.Floor
12mmØ 10" Wall = 18 × 4 Nos × 9.08 Rft = 653.76 Rft
= 4 × 4 Nos × 13.75 Rft = 220.00 Rft
= 2 × 4 Nos × 7.25 Rft = 58.00 Rft
= 6 × 4 Nos × 8.00 Rft = 192.00 Rft
= 4 × 4 Nos × 3.00 Rft = 48.00 Rft
= 2 × 4 Nos × 12.50 Rft = 100.00 Rft
= 4 × 4 Nos × 5.00 Rft = 80.00 Rft
= 2 × 4 Nos × 14.00 Rft = 112.00 Rft
= 2 × 4 Nos × 12.00 Rft = 96.00 Rft
= 1,559.76 Rft = 423.23 kg
10mmØ Binder = 18 × 19 Nos × 2.50 Rft = 855.00 Rft
= 4 × 29 Nos × 2.50 Rft = 290.00 Rft
= 2 × 16 Nos × 2.50 Rft = 80.00 Rft
= 6 × 17 Nos × 2.50 Rft = 255.00 Rft
= 4 × 7 Nos × 2.50 Rft = 70.00 Rft
= 2 × 26 Nos × 2.50 Rft = 130.00 Rft
= 4 × 11 Nos × 2.50 Rft = 110.00 Rft
= 2 × 29 Nos × 2.50 Rft = 145.00 Rft
= 2 × 25 Nos × 2.50 Rft = 125.00 Rft
= 2,060.00 Rft = 389.39 kg
10mmØ 5" Wall
West TLT = 2 × 4 Nos × 11.58 Rft = 92.64 Rft
= 2 × 4 Nos × 4.00 Rft = 32.00 Rft
Wash = 2 × 4 Nos × 11.50 Rft = 92.00 Rft
C.S Room = 2 × 4 Nos × 7.33 Rft = 58.64 Rft
= 2 × 4 Nos × 11.50 Rft = 92.00 Rft
= 2 × 4 Nos × 10.25 Rft = 82.00 Rft
= 2 × 4 Nos × 4.58 Rft = 36.64 Rft
Kitchen = 2 × 4 Nos × 11.67 Rft = 93.36 Rft
Pantry = 2 × 4 Nos × 11.33 Rft = 90.64 Rft
Entry = 2 × 4 Nos × 11.50 Rft = 92.00 Rft
East Portin Bulk.St = 3 × 4 Nos × 12.00 Rft = 144.00 Rft
Corridor = 10 × 4 Nos × 11.67 Rft = 466.80 Rft
TLT = 2 × 4 Nos × 7.33 Rft = 58.64 Rft
= 1 × 4 Nos × 8.08 Rft = 32.32 Rft
C.TLT = 1 × 4 Nos × 11.50 Rft = 46.00 Rft
Stair = 4 × 4 Nos × 11.50 Rft = 184.00 Rft

6th R/A Bill Page 77


Round.St = 1 × 4 Nos × 19.33 Rft = 77.32 Rft
10mmØ Binder = 2 × 24 Nos × 1.67 Rft = 80.16 Rft
= 2 × 9 Nos × 1.67 Rft = 30.06 Rft
= 2 × 24 Nos × 1.67 Rft = 80.16 Rft
= 2 × 15 Nos × 1.67 Rft = 50.10 Rft
= 2 × 24 Nos × 1.67 Rft = 80.16 Rft
= 2 × 21 Nos × 1.67 Rft = 70.14 Rft
= 2 × 11 Nos × 1.67 Rft = 36.74 Rft
= 2 × 25 Nos × 1.67 Rft = 83.50 Rft
= 2 × 23 Nos × 1.67 Rft = 76.82 Rft
= 2 × 24 Nos × 1.67 Rft = 80.16 Rft
= 3 × 25 Nos × 1.67 Rft = 125.25 Rft
= 10 × 5 Nos × 1.67 Rft = 83.50 Rft
= 2 × 15 Nos × 1.67 Rft = 50.10 Rft
= 1 × 17 Nos × 1.67 Rft = 28.39 Rft
= 1 × 23 Nos × 1.67 Rft = 38.41 Rft
= 4 × 23 Nos × 1.67 Rft = 153.64 Rft
= 1 × 39 Nos × 1.67 Rft = 65.13 Rft
= 2,983.42 Rft = 563.94 kg
Qty = 2026.44 kg
Hostel Bldg
1st.Floor
Verandah Slab
10mmØ = 18 × 5 Nos × 7.83 Rft = 704.70 Rft

= 18 × 20 Nos × 5.00 Rft = 1,800.00 Rft


= 2,504.70 Rft = 473.45 kg
Railing
1st.Floor
10mmØ = 18 × 18 Nos × 3.67 Rft = 1,189.08 Rft

= 18 × 5 Nos × 8.50 Rft = 765.00 Rft


= 1,954.08 Rft = 369.37 kg
Sunshade
1st.Floor
Hostel Bldg
10mmØ Gap = 2 × 25 Nos × 2.33 Rft = 116.50 Rft

= 2 × 3 Nos × 11.83 Rft = 70.98 Rft

W50 = 8 × 3 Nos × 4.00 Rft = 96.00 Rft

= 8 × 9 Nos × 2.33 Rft = 167.76 Rft


W48 = 2 × 3 Nos × 3.83 Rft = 22.98 Rft
= 2 × 9 Nos × 2.33 Rft = 41.94 Rft
W90 = 8 × 3 Nos × 7.33 Rft = 175.92 Rft
= 8 × 16 Nos × 2.33 Rft = 298.24 Rft
HW24 = 10 × 3 Nos × 1.83 Rft = 54.90 Rft
= 10 × 5 Nos × 2.33 Rft = 116.50 Rft
Gap = 2 × 3 Nos × 4.17 Rft = 25.02 Rft
= 2 × 9 Nos × 2.33 Rft = 41.94 Rft
TV = 2 × 3 Nos × 19.00 Rft = 114.00 Rft
= 2 × 39 Nos × 2.33 Rft = 181.74 Rft
Mid = 10 × 3 Nos × 13.08 Rft = 392.40 Rft
= 10 × 28 Nos × 2.33 Rft = 652.40 Rft
= 2,569.22 Rft = 485.65 kg
On Cup Board

6th R/A Bill Page 78


1st.Floor
Hostel Bldg
10mmØ = 18 × 11 Nos × 2.00 Rft = 396.00 Rft

= 18 × 5 Nos × 5.00 Rft =450.00 Rft


= 846.00 Rft = 159.91 kg
Lintel
Hostel Bldg
1st.Floor
12mmØ 10" Wall = 18 × 4 Nos × 8.08 Rft = 581.76 Rft
= 4 × 4 Nos × 12.25 Rft = 196.00 Rft
= 2 × 4 Nos × 7.75 Rft = 62.00 Rft
W45 = 2 × 4 Nos × 4.00 Rft = 32.00 Rft
W50 = 2 × 4 Nos × 5.00 Rft = 40.00 Rft
HW24 = 4 × 4 Nos × 2.25 Rft = 36.00 Rft
TV = 2 × 4 Nos × 19.25 Rft = 154.00 Rft
Stair = 2 × 4 Nos × 11.25 Rft = 90.00 Rft
Mid = 4 × 4 Nos × 4.58 Rft = 73.28 Rft
= 2 × 4 Nos × 13.58 Rft = 108.64 Rft
= 1 × 4 Nos × 12.00 Rft = 48.00 Rft
Gap = 2 × 4 Nos × 13.08 Rft = 104.64 Rft
= 1,526.32 Rft = 414.15 kg

10mmØ Binder = 18 × 17 Nos × 3.00 Rft = 918.00 Rft


= 4 × 25 Nos × 2.50 Rft = 250.00 Rft
= 2 × 16 Nos × 2.50 Rft = 80.00 Rft
W45 = 2 × 9 Nos × 2.50 Rft = 45.00 Rft
W50 = 2 × 11 Nos × 2.50 Rft = 55.00 Rft
HW24 = 4 × 5 Nos × 2.50 Rft = 50.00 Rft
TV = 2 × 39 Nos × 2.50 Rft = 195.00 Rft
Stair = 2 × 23 Nos × 2.50 Rft = 115.00 Rft
Mid = 4 × 10 Nos × 2.50 Rft = 100.00 Rft
= 2 × 28 Nos × 2.50 Rft = 140.00 Rft
= 1 × 25 Nos × 2.50 Rft = 62.50 Rft
Gap = 2 × 27 Nos × 2.50 Rft = 135.00 Rft
= 2,145.50 Rft = 405.55 kg

10mmØ 5" Wall


Corridor = 18 × 4 Nos × 12.17 Rft = 876.24 Rft
= 2 × 4 Nos × 7.75 Rft = 62.00 Rft
Ver = 18 × 4 Nos × 8.00 Rft = 576.00 Rft
Gap = 2 × 4 Nos × 12.67 Rft = 101.36 Rft
Wash = 2 × 4 Nos × 12.50 Rft = 100.00 Rft
TLT = 12 × 4 Nos × 4.00 Rft = 192.00 Rft
= 4 × 4 Nos × 16.50 Rft = 264.00 Rft
Stair = 4 × 4 Nos × 11.50 Rft = 184.00 Rft
Store = 4 × 4 Nos × 8.75 Rft = 140.00 Rft
Round.St = 1 × 4 Nos × 19.75 Rft = 79.00 Rft
Gap = 2 × 4 Nos × 6.25 Rft = 50.00 Rft
10mmØ Binder = 18 × 25 Nos × 1.67 Rft = 751.50 Rft
= 2 × 15 Nos × 1.67 Rft = 50.10 Rft
= 18 × 17 Nos × 1.67 Rft = 511.02 Rft
= 2 × 26 Nos × 1.67 Rft = 86.84 Rft
= 2 × 26 Nos × 1.67 Rft = 86.84 Rft
= 12 × 9 Nos × 1.67 Rft = 180.36 Rft

6th R/A Bill Page 79


= 4 × 34 Nos × 1.67 Rft = 227.12 Rft
= 4 × 24 Nos × 1.67 Rft = 160.32 Rft
= 4 × 18 Nos × 1.67 Rft = 120.24 Rft
= 1 × 40 Nos × 1.67 Rft = 66.80 Rft
= 2 × 13 Nos × 1.67 Rft = 43.42 Rft
= 4,909.16 Rft = 927.95 kg
Qty = 3236.03 kg
Principal Qtr
Gr.Floor-Sunshade
10mmØ W60 = 8 × 13 Nos × 3.58 Rft = 372.32 Rft

= 8 × 3 Nos × 6.33 Rft = 151.92 Rft

W37 = 1 × 10 Nos × 3.58 Rft = 35.80 Rft

= 1 × 3 Nos × 5.00 Rft = 15.00 Rft


HW24 = 2 × 6 Nos × 3.58 Rft = 42.96 Rft
= 2 × 3 Nos × 3.17 Rft = 19.02 Rft
HW20 = 1 × 6 Nos × 3.58 Rft = 21.48 Rft
= 1 × 3 Nos × 3.17 Rft = 9.51 Rft
HW18 = 1 × 6 Nos × 3.58 Rft = 21.48 Rft
= 1 × 3 Nos × 3.00 Rft = 9.00 Rft
= 698.49 Rft = 132.03 kg
Principal Qtr
Drop Wall
10mmØ = 4 × 25 Nos × 4.00 Rft = 400.00 Rft
= 4 × 6 Nos × 16.00 Rft = 384.00 Rft
= 2 × 11 Nos × 4.00 Rft = 88.00 Rft
= 2 × 6 Nos × 6.83 Rft = 81.96 Rft
= 2 × 18 Nos × 4.00 Rft = 144.00 Rft
= 2 × 6 Nos × 11.25 Rft = 135.00 Rft
= 1,232.96 Rft = 233.06 kg
Railling
10mmØ = 2 × 33 Nos × 3.83 Rft = 252.78 Rft
= 2 × 5 Nos × 16.00 Rft = 160.00 Rft
= 1 × 15 Nos × 3.83 Rft = 57.45 Rft
= 1 × 5 Nos × 6.83 Rft = 34.15 Rft
= 1 × 23 Nos × 3.83 Rft = 88.09 Rft
= 1 × 5 Nos × 11.25 Rft = 56.25 Rft
= 648.72 Rft = 122.62 kg

Parapet
10mmØ = 2 × 105 Nos × 5.00 Rft = 1,050.00 Rft
= 2 × 79 Nos × 5.00 Rft = 790.00 Rft
= 4 × 5 Nos × 5.00 Rft = 100.00 Rft
= 2 × 4 Nos × 54.25 Rft = 434.00 Rft
= 2 × 4 Nos × 40.75 Rft = 326.00 Rft
= 4 × 4 Nos × 1.83 Rft = 29.28 Rft
= 2,729.28 Rft = 515.90 kg
False Slab
10mmØ M.Bed = 1 × 27 Nos × 5.67 Rft = 153.09 Rft
= 1 × 13 Nos × 12.83 Rft = 166.79 Rft
C.Bed = 1 × 21 Nos × 4.83 Rft = 101.43 Rft
= 1 × 11 Nos × 9.83 Rft = 108.13 Rft
F.Space = 1 × 21 Nos × 5.17 Rft = 108.57 Rft
= 1 × 11 Nos × 9.50 Rft = 104.50 Rft

6th R/A Bill Page 80


Servent = 2 × 11 Nos × 4.83 Rft = 106.26 Rft
Lobby = 1 × 11 Nos × 8.50 Rft = 93.50 Rft
= 1 × 18 Nos × 5.58 Rft = 100.44 Rft
= 1,042.71 Rft = 197.10 kg
Lintel
12mmØ 10" Wall = 2 × 4 Nos × 12.50 Rft = 100.00 Rft
= 1 × 4 Nos × 9.50 Rft = 38.00 Rft
= 2 × 4 Nos × 10.75 Rft = 86.00 Rft
= 1 × 4 Nos × 11.75 Rft = 47.00 Rft
= 1 × 4 Nos × 4.67 Rft = 18.68 Rft
= 1 × 4 Nos × 12.67 Rft = 50.68 Rft
= 1 × 4 Nos × 7.75 Rft = 31.00 Rft
= 1 × 4 Nos × 15.33 Rft = 61.32 Rft
= 432.68 Rft = 117.40 kg
10mmØ Binder = 2 × 26 Nos × 2.50 Rft = 130.00 Rft
= 1 × 20 Nos × 2.50 Rft = 50.00 Rft
= 2 × 23 Nos × 2.50 Rft = 115.00 Rft
= 1 × 11 Nos × 2.50 Rft = 27.50 Rft
= 1 × 26 Nos × 2.50 Rft = 65.00 Rft
= 1 × 17 Nos × 2.50 Rft = 42.50 Rft
= 1 × 31 Nos × 2.50 Rft = 77.50 Rft
= 507.50 Rft = 95.93 kg
10mmØ 5" Wall = 6 × 4 Nos × 13.50 Rft = 324.00 Rft
= 2 × 4 Nos × 5.50 Rft = 44.00 Rft
= 1 × 4 Nos × 5.08 Rft = 20.32 Rft
= 1 × 4 Nos × 12.50 Rft = 50.00 Rft
= 2 × 4 Nos × 9.00 Rft = 72.00 Rft
= 2 × 4 Nos × 10.50 Rft = 84.00 Rft
= 2 × 4 Nos × 8.00 Rft = 64.00 Rft
10mmØ 10" Wall = 6 × 28 Nos × 1.67 Rft = 280.56 Rft
= 2 × 12 Nos × 1.67 Rft = 40.08 Rft
= 1 × 11 Nos × 1.67 Rft = 18.37 Rft
= 1 × 26 Nos × 1.67 Rft = 43.42 Rft
= 2 × 19 Nos × 1.67 Rft = 63.46 Rft
= 2 × 22 Nos × 1.67 Rft = 73.48 Rft
= 2 × 17 Nos × 1.67 Rft = 56.78 Rft
= 1,234.47 Rft = 233.34 kg
Qty = 1647.39 kg
False Slab
Academic Bldg
Gr.Floor
Toilet
10 mm Ø/ M = 2 × 26 Nos × 6.67 Rft = 346.84 Rft

= 2 × 17 Nos × 10.25 Rft = 348.50 Rft

= 1 × 26 Nos × 7.67 Rft = 199.42 Rft

= 1 × 20 Nos × 10.25 Rft = 205.00 Rft

= 1 × 13 Nos × 8.08 Rft = 105.04 Rft

= 1 × 21 Nos × 5.00 Rft = 105.00 Rft

= 1 × 19 Nos × 4.67 Rft = 88.73 Rft

= 1 × 13 Nos × 7.25 Rft = 94.25 Rft

= 1,492.78 Rft = 282.17 kg


1st.Floor

6th R/A Bill Page 81


Toilet
10 mm Ø/ M = 1 × 13 Nos × 8.08 Rft = 105.04 Rft
= 1 × 21 Nos × 5.00 Rft = 105.00 Rft
= 1 × 19 Nos × 4.67 Rft = 88.73 Rft
= 1 × 13 Nos × 7.25 Rft = 94.25 Rft
= 393.02 Rft = 74.29 kg
Qty = 356.46 kg

Total Qty = 110,150.24 kg


G.Total Qty = 568,917.98 kg
@Tk = 90.00 P/Kg Sch = 616804.75 Tk= 51,202,617.84
SL No-1.19 Brick work in super structure 250mm thick wall
a. Exposed brick work in superstructure in (1:4) with special quality sorted out 1st class brick

i. Ground Floor
For Principal Qtr
Front Side = 2 × 2.33 Rft x 9.25 Rft = 43.11 Sft
Lin.top = 1 × 5.00 Rft x 1.75 Rft = 8.75 Sft
TLT = 1 × 2.00 Rft x 9.25 Rft = 18.50 Sft
= 1 × 7.08 Rft x 1.75 Rft = 12.39 Sft
Living = 2 × 2.75 Rft x 9.25 Rft = 50.88 Sft
= 1 × 5.00 Rft x 1.75 Rft = 8.75 Sft
Rear Side Kitchen = 1 × 5.08 Rft x 9.25 Rft = 46.99 Sft
= 1 × 1.75 Rft x 9.25 Rft = 16.19 Sft
Bath = 1 × 3.33 Rft x 9.25 Rft = 30.80 Sft
G.Bed = 1 × 1.67 Rft x 9.25 Rft = 15.45 Sft
= 1 × 4.75 Rft x 9.25 Rft = 43.94 Sft
HW18 = 1 × 1.50 Rft x 1.75 Rft = 2.63 Sft
W60 = 2 × 5.00 Rft x 1.75 Rft = 17.50 Sft
HW24 = 1 × 2.00 Rft x 1.75 Rft = 3.50 Sft
F.Space = 1 × 2.42 Rft x 1.75 Rft = 4.24 Sft
East Side M.Bed = 1 × 4.33 Rft x 9.25 Rft = 40.05 Sft
= 1 × 3.17 Rft x 9.25 Rft = 29.32 Sft
TLT = 1 × 3.67 Rft x 9.25 Rft = 33.95 Sft
Sevent = 1 × 2.25 Rft x 9.25 Rft = 20.81 Sft
Kitchen = 1 × 4.17 Rft x 9.25 Rft = 38.57 Sft
W60 = 1 × 5.00 Rft x 1.75 Rft = 8.75 Sft
HW24 = 1 × 2.00 Rft x 1.75 Rft = 3.50 Sft
W37 = 1 × 3.08 Rft x 1.75 Rft = 5.39 Sft
West Side G.Bed = 1 × 3.00 Rft x 9.25 Rft = 27.75 Sft
Living = 2 × 1.67 Rft x 9.25 Rft = 30.90 Sft
= 1 × 1.50 Rft x 9.25 Rft = 13.88 Sft
W60 = 3 × 5.00 Rft x 1.75 Rft = 26.25 Sft
Stair = 1 × 7.00 Rft x 9.25 Rft = 64.75 Sft
= 2 × 2.00 Rft x 9.25 Rft = 37.00 Sft
= 704.46 Sft x 0.83 = 584.70 Cft
For Academic Bldg = 16.56 Cum
Out side = 19 × 9.00 Rft x 9.00 Rft = 1,539.00 Sft
Stair = 1 × 8.50 Rft x 9.95 Rft = 84.58 Sft
Side = 3 × 16.50 Rft x 8.50 Rft = 420.75 Sft
= 2 × 7.58 Rft x 8.50 Rft = 128.86 Sft
= 1 × 7.83 Rft x 8.50 Rft = 66.56 Sft
Lect.Hall = 8 × 8.58 Rft x 8.75 Rft = 600.60 Sft
= 1 × 6.75 Rft x 9.50 Rft = 64.13 Sft
= 4 × 11.50 Rft x 9.50 Rft = 437.00 Sft
= 3,341.47 Sft x 0.83 = 2,773.42 Cft
Deduction
W/88 = 13 × 7.33 Rft x 4.50 Rft = 428.81 Sft

6th R/A Bill Page 82


HW/24 = 10 × 2.00 Rft x 2.00 Rft = 40.00 Sft
W/69 = 1 × 5.75 Rft x 4.50 Rft = 25.88 Sft
W/51 = 1 × 4.08 Rft x 4.50 Rft = 18.36 Sft
W/45 = 1 × 3.75 Rft x 4.50 Rft = 16.88 Sft
W/20 = 12 × 6.00 Rft x 4.50 Rft = 324.00 Sft
W/50 = 1 × 4.17 Rft x 4.50 Rft = 18.77 Sft
= 872.68 Sft x 0.83 = -724.32 Cft
= 2,049.09 Cft
For Hostel Bldg = 58.03 Cum
W50 = 4 × 4.17 Rft x 9.00 Rft = 150.12 Sft
Cup Board = 16 × 6.83 Rft x 10.38 Rft = 1,134.33 Sft
= 3 × 7.00 Rft x 10.38 Rft = 217.98 Sft
W80 = 18 × 6.67 Rft x 9.00 Rft = 1,080.54 Sft
HW/24 = 8 × 2.00 Rft x 9.00 Rft = 144.00 Sft
W48 = 2 × 4.00 Rft x 9.00 Rft = 72.00 Sft
Gap = 2 × 6.25 Rft x 10.38 Rft = 129.75 Sft
Side = 4 × 12.17 Rft x 10.38 Rft = 505.30 Sft
W90 = 2 × 8.25 Rft x 9.00 Rft = 148.50 Sft
= 12 × 0.83 Rft x 10.58 Rft = 105.38 Sft
= 3,687.89 Sft x 0.83 = 3,060.95 Cft
Deduction
W50 = 4 × 4.17 Rft x 4.50 Rft = 75.06 Sft
W80 = 18 × 6.67 Rft x 4.50 Rft = 540.27 Sft
HW24 = 8 × 2.00 Rft x 2.00 Rft = 32.00 Sft
W48 = 2 × 4.00 Rft x 4.50 Rft = 36.00 Sft
W90 = 2 × 8.25 Rft x 4.50 Rft = 74.25 Sft
= 757.58 Sft x 0.83 = -628.79 Cft
= 2,432.16 Cft
= 68.88 Cum
= 143.47 Cum
@Tk = 7,200.00 P/cum Sch = 278.00 Tk= 1,032,989.78
ii. 1st Floor
For Academic Bldg
Out side = 20 × 9.00 Rft x 9.00 Rft = 1,620.00 Sft
Stair Side = 2 × 8.50 Rft x 9.95 Rft = 169.15 Sft
= 3 × 16.50 Rft x 8.50 Rft = 420.75 Sft
= 2 × 7.58 Rft x 8.50 Rft = 128.86 Sft
= 1 × 7.83 Rft x 8.50 Rft = 66.56 Sft
Lect.Hall = 9 × 8.58 Rft x 8.75 Rft = 675.68 Sft
= 4 × 11.50 Rft x 9.50 Rft = 437.00 Sft
= 3,517.99 Sft x 0.83 = 2,919.93 Cft
Deduction
W/88 = 18 × 7.33 Rft x 4.50 Rft = 593.73 Sft
HW/24 = 5 × 2.00 Rft x 2.00 Rft = 20.00 Sft
W/30 = 1 × 2.50 Rft x 4.50 Rft = 11.25 Sft
W/91 = 2 × 5.75 Rft x 4.50 Rft = 51.75 Sft
W/45 = 1 × 3.75 Rft x 4.50 Rft = 16.88 Sft
W/82 = 1 × 6.83 Rft x 4.50 Rft = 30.74 Sft
W/50 = 1 × 4.17 Rft x 4.50 Rft = 18.77 Sft
= 743.11 Sft x 0.83 = -616.78 Cft
= 2,303.15 Cft
For Hostel Bldg
W50 = 4 × 4.17 Rft x 8.00 Rft = 133.44 Sft
W90 = 2 × 7.50 Rft x 8.00 Rft = 120.00 Sft
Cup Board = 4 × 7.75 Rft x 9.50 Rft = 294.50 Sft
= 14 × 6.67 Rft x 9.50 Rft = 887.11 Sft
= 18 × 2.50 Rft x 8.00 Rft = 360.00 Sft
HW24 = 8 × 2.00 Rft x 8.00 Rft = 128.00 Sft
W48 = 2 × 4.00 Rft x 8.00 Rft = 64.00 Sft

6th R/A Bill Page 83


= 8 × 0.83 Rft x 9.58 Rft = 63.61 Sft
Side = 2 × 7.92 Rft x 8.00 Rft = 126.72 Sft
= 2 × 4.58 Rft x 8.00 Rft = 73.28 Sft
= 2 × 7.58 Rft x 8.00 Rft = 121.28 Sft
= 2,371.94 Sft x 0.83 = 1,968.71 Cft
Deduction
W50 = 4 × 4.17 Rft x 4.50 Rft = 75.06 Sft
W90 = 2 × 7.50 Rft x 4.50 Rft = 67.50 Sft
HW24 = 8 × 2.00 Rft x 2.00 Rft = 32.00 Sft
W48 = 2 × 4.00 Rft x 4.50 Rft = 36.00 Sft
= 210.56 Sft x 0.83 = -174.76 Cft
= 1,793.95 Cft
51.11 = 4,097.10 Cft
= 116.03 Cum
@Tk = 7,200.00 P/cum Sch = 188.00 Tk= 835,432.65
iii. 2nd Floor
For Academic Bldg
Out side = 16 × 9.00 Rft x 9.00 Rft = 1,296.00 Sft
Side = 4 × 16.50 Rft x 9.25 Rft = 610.50 Sft
= 2 × 7.58 Rft x 9.25 Rft = 140.23 Sft
Stair = 1 × 8.50 Rft x 9.75 Rft = 82.88 Sft
W88 = 1 × 1.33 Rft x 9.00 Rft = 11.97 Sft
= 2,141.58 Sft x 0.83 = 1,777.51 Cft
Deduction
W/108 = 14 × 7.33 Rft x 4.50 Rft = 461.79 Sft
HW/24 = 2 × 2.00 Rft x 2.00 Rft = 8.00 Sft
W/88 = 1 × 5.50 Rft x 4.50 Rft = 24.75 Sft
W/91 = 1 × 5.75 Rft x 4.50 Rft = 25.88 Sft
W/45 = 1 × 3.75 Rft x 4.50 Rft = 16.88 Sft
W/50 = 1 × 4.17 Rft x 4.50 Rft = 18.77 Sft
W/40 = 1 × 3.33 Rft x 9.00 Rft = 29.97 Sft
= 586.03 Sft x 0.83 = -486.40 Cft
= 1,291.11 Cft
For Hostel Bldg
Same measurement at First.Floor,Qty - = 1,793.95 Cft
Qty = 3,085.05 Cft
= 87.37 Cum
iii. 2nd Floor
For Hostel Bldg
Same measurement at First.Floor,Qty - = 1,793.95 Cft
= 50.81 Cum
= 397.68 Cum

b In (1:6) proportion for non exposed brick wall.


i. Ground Floor
For Principal Qtr
= 2 × 1.67 Rft = 3.34 Rft
= 1 × 1.25 Rft = 1.25 Rft
= 1 × 5.00 Rft = 5.00 Rft
= 289.12 Rft x 9.00 Rft x 0.83 = 2,159.73 Cft

6th R/A Bill Page 84


For Academic Bldg
= 2 × 8.50 Rft x 9.75 Rft = 165.75 Sft
= 4 × 7.58 Rft x 9.25 Rft = 280.46 Sft
= 1 × 6.75 Rft x 9.25 Rft = 62.44 Sft
= 2 × 7.50 Rft x 11.25 Rft = 168.75 Sft
Deduct,D/60 = 2 × 5.00 Rft x 7.00 Rft = -70.00 Sft
= 607.40 Sft x 0.83 = 504.14 Cft
For Hostel Bldg
= 2 × 9.50 Rft x 9.50 Rft = 180.50 Sft
= 2 × 17.75 Rft x 9.50 Rft = 337.25 Sft
= 2 × 13.33 Rft x 9.50 Rft = 253.27 Sft
= 4 × 4.33 Rft x 9.50 Rft = 164.54 Sft
= 2 × 11.25 Rft x 9.50 Rft = 213.75 Sft
= 1 × 10.67 Rft x 9.50 Rft = 101.37 Sft
= 4 × 7.50 Rft x 9.50 Rft = 285.00 Sft
= 2 × 12.83 Rft x 9.50 Rft = 243.77 Sft
= 5 × 0.83 Rft x 1.50 Rft = 6.23 Sft
= 2 × 9.17 Rft x 9.50 Rft = 174.23 Sft
= 2 × 7.50 Rft x 4.50 Rft = 67.50 Sft
Deduct,Gap = 2 × 13.33 Rft x 4.50 Rft = -119.97 Sft
= 2 × 4.33 Rft x 4.50 Rft = -38.97 Sft
D60 = 2 × 5.00 Rft x 7.00 Rft = -70.00 Sft
= 1,798.46 Sft x 0.83 = 1,492.72 Cft
= 4,156.59 Cft
= 117.72 Cum
@Tk = 6,800.00 P/cum Sch = 88.50 Tk= 800,475.76
ii. 1st Floor
For Academic Bldg
= 2 × 8.50 Rft x 9.75 Rft = 165.75 Sft
= 3 × 7.58 Rft x 9.25 Rft = 210.35 Sft
= 2 × 7.50 Rft x 9.25 Rft = 138.75 Sft
= 1 × 6.75 Rft x 11.25 Rft = 75.94 Sft
Deduct,W/40 = 1 × 3.33 Rft x 4.50 Rft = -14.99 Sft
= 575.80 Sft x 0.83 = 477.91 Cft
For Hostel Bldg
= 2 × 9.50 Rft x 8.50 Rft = 161.50 Sft
= 2 × 17.75 Rft x 8.50 Rft = 301.75 Sft
= 2 × 13.33 Rft x 8.50 Rft = 226.61 Sft
= 4 × 4.33 Rft x 8.50 Rft = 147.22 Sft
= 2 × 11.25 Rft x 8.50 Rft = 191.25 Sft
= 1 × 10.67 Rft x 8.50 Rft = 90.70 Sft
= 4 × 7.50 Rft x 8.50 Rft = 255.00 Sft
= 2 × 18.08 Rft x 8.50 Rft = 307.36 Sft
= 1 × 21.17 Rft x 8.50 Rft = 179.95 Sft
Deduct,Gap = 2 × 13.33 Rft x 4.50 Rft = -119.97 Sft
= 2 × 4.33 Rft x 4.50 Rft = -38.97 Sft
D60 = 2 × 5.00 Rft x 7.00 Rft = -70.00 Sft
= 1,632.39 Sft x 0.83 = 1,354.88 Cft
= 1,832.80 Cft
= 51.91 Cum
@Tk = 6,800.00 P/cum Sch = 44.00 Tk= 352,959.79
SL No-1.20 125mm thick brick work in (1:4)
b On-Exposed brick work 125mm thick in (1:4)
i. Ground Floor
For Principal Qtr
Inner Wall = 1 × 12.25 Rft x 9.00 Rft = 110.25 Sft
" = 2 × 12.25 Rft x 10.00 Rft = 245.00 Sft
" = 1 × 3.83 Rft x 10.00 Rft = 38.30 Sft
" = 1 × 10.92 Rft x 9.00 Rft = 98.28 Sft

6th R/A Bill Page 85


" = 1 × 4.25 Rft x 10.00 Rft = 42.50 Sft
" = 1 × 1.67 Rft x 10.00 Rft = 16.70 Sft
" = 1 × 4.58 Rft x 10.00 Rft = 45.80 Sft
" = 1 × 7.42 Rft x 10.00 Rft = 74.20 Sft
" = 1 × 11.67 Rft x 9.00 Rft = 105.03 Sft
" = 1 × 5.00 Rft x 10.00 Rft = 50.00 Sft
" = 1 × 5.67 Rft x 10.00 Rft = 56.70 Sft
" = 1 × 8.25 Rft x 10.00 Rft = 82.50 Sft
" = 1 × 12.67 Rft x 9.00 Rft = 114.03 Sft
" = 1 × 4.33 Rft x 9.00 Rft = 38.97 Sft
" = 1 × 10.42 Rft x 9.00 Rft = 93.78 Sft
" = 1 × 12.67 Rft x 10.00 Rft = 126.70 Sft
" = 1 × 8.42 Rft x 10.00 Rft = 84.20 Sft
" = 1 × 12.67 Rft x 9.00 Rft = 114.03 Sft
" = 1 × 3.75 Rft x 9.00 Rft = 33.75 Sft
" = 1 × 11.08 Rft x 9.00 Rft = 99.72 Sft
" = 1 × 6.25 Rft x 9.00 Rft = 56.25 Sft
" = 1 × 7.50 Rft x 10.00 Rft = 75.00 Sft
= 1,801.69 Sft
Outer Wall
W60 = 9 × 5.00 Rft x 4.50 Rft = 202.50 Sft
W37 = 1 × 3.08 Rft x 4.50 Rft = 13.86 Sft
W30 = 2 × 2.50 Rft x 2.00 Rft = 10.00 Sft
HW20 = 2 × 1.67 Rft x 7.00 Rft = 23.38 Sft
HW24 = 1 × 2.00 Rft x 7.00 Rft = 14.00 Sft
= 263.74 Sft
= 2,065.43 Sft
For Academic Bldg
Inner Wall = 17 × 9.00 Rft x 9.25 Rft = 1,415.25 Sft
TLT = 3 × 9.00 Rft x 10.75 Rft = 290.25 Sft
"= 2 × 8.75 Rft x 10.25 Rft = 179.38 Sft
Urinal = 2 × 3.50 Rft x 7.00 Rft = 49.00 Sft
" = 2 × 7.00 Rft x 10.50 Rft = 147.00 Sft
C.TLT = 2 × 4.00 Rft x 10.50 Rft = 84.00 Sft
Partition = 11 × 16.50 Rft x 9.25 Rft = 1,678.88 Sft
TLT = 2 × 6.00 Rft x 7.00 Rft = 84.00 Sft
"= 1 × 7.00 Rft x 7.00 Rft = 49.00 Sft
= 3,976.75 Sft
Deduction
W/84 = 8 × 7.00 Rft x 4.50 Rft = -252.00 Sft
W/50 = 6 × 4.17 Rft x 4.50 Rft = -112.59 Sft
W/45 = 2 × 3.75 Rft x 4.50 Rft = -33.75 Sft
D/40 = 9 × 3.33 Rft x 7.00 Rft = -209.79 Sft
D/36 = 1 × 3.00 Rft x 7.00 Rft = -21.00 Sft
D/30 = 11 × 2.50 Rft x 7.00 Rft = -192.50 Sft
= -821.63 Sft
Qty = 3,155.12 Sft
For Hostel Bldg
West Unit
Stair side = 4 × 11.83 Rft x 9.75 Rft = 461.37 Sft
TLT = 2 × 8.50 Rft x 10.58 Rft = 179.86 Sft
"= 4 × 4.17 Rft x 10.58 Rft = 176.47 Sft
Duct = 1 × 10.17 Rft x 10.58 Rft = 107.60 Sft
Store = 2 × 17.92 Rft x 9.50 Rft = 340.48 Sft
= 3 × 10.42 Rft x 10.58 Rft = 330.73 Sft
S.Tlt = 1 × 6.42 Rft x 10.33 Rft = 66.32 Sft
Kitchen = 2 × 11.83 Rft x 9.50 Rft = 224.77 Sft
= 1 × 6.00 Rft x 9.50 Rft = 57.00 Sft
= 1 × 11.50 Rft x 10.58 Rft = 121.67 Sft
= 2 × 7.50 Rft x 9.50 Rft = 142.50 Sft

6th R/A Bill Page 86


= 1 × 2.50 Rft x 10.57 Rft = 26.43 Sft
= 2,235.20 Sft
Deduction
D/40 = 2 × 3.33 Rft x 7.00 Rft = -46.62 Sft
D/30 = 7 × 2.50 Rft x 7.00 Rft = -122.50 Sft
W/40 = 1 × 3.33 Rft x 4.50 Rft = -14.99 Sft
= -184.11 Sft
= 2,051.09 Sft

East Unit
= 10 × 12.58 Rft x 9.50 Rft = 1,195.10 Sft
= 3 × 12.17 Rft x 9.50 Rft = 346.85 Sft
= 2 × 5.75 Rft x 9.50 Rft = 109.25 Sft
= 2 × 7.50 Rft x 9.50 Rft = 142.50 Sft
Partition = 11 × 11.67 Rft x 9.50 Rft = 1,219.52 Sft
= 2 × 7.50 Rft x 9.50 Rft = 142.50 Sft
TLT = 1 × 8.25 Rft x 10.33 Rft = 85.22 Sft
= 1 × 7.50 Rft x 10.33 Rft = 77.48 Sft
Ablution = 1 × 17.08 Rft x 1.50 Rft = 25.62 Sft
Round = 1 × 19.50 Rft x 10.58 Rft = 206.31 Sft
= 3,550.34 Sft
Deduction
D/40 = 9 × 3.33 Rft x 7.00 Rft =-209.79 Sft
D/60 = 1 × 5.00 Rft x 7.00 Rft =-35.00 Sft
D/30 = 5 × 2.50 Rft x 7.00 Rft = -87.50 Sft
W/60 = 9 × 5.00 Rft x 4.50 Rft = -202.50 Sft
W/80 = 1 × 6.67 Rft x 4.50 Rft = -30.02 Sft
= -564.81 Sft
= 2,985.53 Sft
Qty = 5,036.62 Sft
Total Qty = 10,257.17 Sft = 953.27 Sqm
@Tk = 850.00 P/sqm Sch = 707.00 Tk= 600,950.00
ii. 1st Floor
For Academic Bldg
Inner Wall = 20 × 9.00 Rft x 9.25 Rft = 1,665.00 Sft
TLT = 1 × 7.00 Rft x 10.50 Rft = 73.50 Sft
"= 1 × 11.00 Rft x 10.50 Rft = 115.50 Sft
"= 2 × 8.42 Rft x 10.50 Rft = 176.82 Sft
Partition = 6 × 16.50 Rft x 9.25 Rft = 915.75 Sft
TLT = 1 × 7.58 Rft x 9.25 Rft = 70.12 Sft
Urinal = 2 × 3.50 Rft x 7.00 Rft = 49.00 Sft
= 3,065.69 Sft
Deduction
W/84 = 8 × 7.00 Rft x 4.50 Rft = -252.00 Sft
W/50 = 8 × 4.17 Rft x 4.50 Rft = -150.12 Sft
D/40 = 10 × 3.33 Rft x 7.00 Rft = -233.10 Sft
D/36 = 1 × 3.00 Rft x 7.00 Rft = -21.00 Sft
D/30 = 5 × 2.50 Rft x 7.00 Rft = -87.50 Sft
= -743.72 Sft
Qty = 2,321.97 Sft
For Hostel Bldg
Room = 28 × 12.50 Rft x 8.50 Rft = 2,975.00 Sft
= 18 × 12.67 Rft x 8.50 Rft = 1,938.51 Sft
= 2 × 8.33 Rft x 8.50 Rft = 141.61 Sft
Ver = 18 × 7.83 Rft x 8.50 Rft = 1,197.99 Sft
= 2 × 12.00 Rft x 9.58 Rft = 229.92 Sft
Wash = 2 × 12.50 Rft x 9.58 Rft = 239.50 Sft
SH,WC = 12 × 5.00 Rft x 9.58 Rft = 574.80 Sft
Kitchen = 12 × 4.58 Rft x 9.58 Rft = 526.52 Sft

6th R/A Bill Page 87


= 2 × 7.50 Rft x 8.50 Rft = 127.50 Sft
SW90 = 2 × 7.50 Rft x 1.50 Rft = 22.50 Sft
Store = 2 × 8.50 Rft x 8.50 Rft = 144.50 Sft
= 2 × 7.50 Rft x 8.50 Rft = 127.50 Sft
= 2 × 6.00 Rft x 8.50 Rft = 102.00 Sft
Round = 1 × 19.50 Rft x 10.57 Rft = 206.12 Sft
= 8,553.96 Sft
Deduction
D/40 = 20 × 3.33 Rft x 7.00 Rft =-466.20 Sft
D/30 = 32 × 2.50 Rft x 7.00 Rft =-560.00 Sft
W/144 = 2 × 12.00 Rft x 4.50 Rft = -108.00 Sft
W/42 = 18 × 3.50 Rft x 4.50 Rft = -283.50 Sft
= -1,417.70 Sft
Qty = 7,136.26 Sft
Total Qty = 9,458.23 Sft = 879.02 Sqm
@Tk = 850.00 P/sqm Sch = 502.00 Tk= 426,700.00
SL No-1.35 Plastering work
C. On R.C.C. surface 6mm & above thick in (1:4)
i. Ground Floor
For Academic Bldg
Ceiling = 2 × 81.00 Rft x 44.00 Rft = 7,128.00 Sft
= 2 × 49.83 Rft x 36.42 Rft = 3,629.62 Sft
= 1 × 49.08 Rft x 45.00 Rft = 2,208.60 Sft
Beam = 3 × 116.00 Rft x 1.75 Rft = 609.00 Sft
= 1 × 73.00 Rft x 1.75 Rft = 127.75 Sft
= 9 × 39.67 Rft x 2.75 Rft = 981.83 Sft
= 5 × 29.67 Rft x 2.75 Rft = 407.96 Sft
= 8 × 8.58 Rft x 2.17 Rft = 148.95 Sft
= 1 × 50.00 Rft x 1.75 Rft = 87.50 Sft
Coln = 28 × 5.33 Rft x 9.75 Rft = 1,455.09 Sft
= 4 × 5.83 Rft x 9.75 Rft = 227.37 Sft
= 22 × 5.33 Rft x 9.75 Rft = 1,143.29 Sft
= 7 × 5.00 Rft x 9.75 Rft = 341.25 Sft
= 8 × 8.67 Rft x 9.75 Rft = 676.26 Sft
= 2 × 4.00 Rft x 9.75 Rft = 78.00 Sft
TLT = 4 × 4.58 Rft x 6.00 Rft = 109.92 Sft
= 2 × 4.58 Rft x 7.00 Rft = 64.12 Sft
= 2 × 3.08 Rft x 4.00 Rft = 24.64 Sft
= 2 × 4.50 Rft x 4.00 Rft = 36.00 Sft
= 19,485.15 Sft
Porch = 1 × 9.60 Rft x 7.00 Rft = 67.20 Sft
TLT = 2 × 7.00 Rft x 1.75 Rft = 24.50 Sft
= 1 × 20.58 Rft x 16.00 Rft = 329.28 Sft
= 2 × 16.00 Rft x 1.70 Rft = 54.40 Sft
= 1 × 20.58 Rft x 1.75 Rft = 36.02 Sft
= 511.40 Sft
= 19,996.54 Sft = 1858.41 Sqm
@Tk = 170.00 P/sqm Sch = 4604.78 Tk= 315,930.48
ii. 1st Floor
For Academic Bldg
Same measurement at Gr.Floor,Qty = 19,485.15 Sft
Lect.Hall = 1 × 9.60 Rft x 7.00 Rft = 67.20 Sft
= 19,552.35 Sft = 1817.13 Sqm

@Tk = 170.00 P/sqm Sch = 4398.05 Tk= 308,912.53


Civil Work Tk= 141,173,466.94
B. External Work

6th R/A Bill Page 88


B.1. External Civil Work
B.1.a Site Development
Qty BF from 1st R/A Bill Page No-8 of TMB = 41317.71 Cum
@Tk = 175.00 P/Cum Sch = 51100.00 Tk= 7,230,599.25
Tk= 148,404,066.19
Less Tk. - 14.15% Tk= -20,999,175.37
Total Tk= 127,404,890.83
Deduction upto 5th R/A Bill Tk= -104,291,741.64
Payable Amount Tk= 23,113,149.19

6th R/A Bill Page 89


Name of Work : Construction of Medical Assistant Training School (MATS) at Sadar Upazila in Gazipur
District.
Package No : WP-599/SDP(GOB)-HED.
Name of Contrctor : BBL & Essen Engineering & Co.Ltd.
6th R/A Bill
Part-A (Civil works)
Sl No-1.01 a. Layout and marking for earthwork in Excavation in foundation
= 1,889.81 Sqm
Schedule Qty = 1,745.00 Sqm
@Tk = 15.00 /= P/Sqm Tk= 26,175.00
Sl No-1.02 Earth Work in excavation in Foundation
a). Upto 1.5m depth
= 562.89 cum
@Tk = 175.00 /= P/Cum Sch = 576.80 Tk= 98,505.25
Sl No-1.03 Brick flat Soling
a In Foundation
= 568.36 Sqm
@Tkfor=cast 325.00
Boring/drilling P/Sqm
in situ Pile upto require depth and diameter with mim 606.16
Sch =
6m long temporary steel Tk= 184,716.97
Sl No-1.09 casting,true to vertical,providing ventonite slurry and maintaining water level in the hole (450mm dia
upto 20mdia
(450mm depth)
upto 20m depth)
= 492 Nos × 70.00 Rft = 34,440.0 Rft = 10,500.00 Rm
@Tk = 1,250.00 /= P/Rm Sch = 11227.13 Tk= 13,125,000.00

Sl No-1.10 Casting of Cast in Situ bored pile R.C.C work of 1:1.5:3


= 492 × 4 70.00 Rft = 1,726.39 cum
@Tk = 13,000.00 /= P/Cum Sch = 1772.11 Tk= 22,443,058.62

Sl No-1.11 Providing and making point welding


= 492 × 6.00 × 138.00 Point = 407,376.00 Point
@Tk = 0.50 P/point Sch = 371196.00 Tk= 185,598.00
Sl No-1.12 Providing and making joint welding
= 492 × 6.00 × 1.33 = 3,926.16 Rft = 1,197.00 Rm
@Tk = 1.00 P/Rm Sch = 2095.73 Tk= 1,197.00
Sl No-1.13 Labour for breaking of pile head
4 = 73.54 Cum
@Tk = 2,000.00 P/Cum Sch = 73.84 Tk= 147,073.92
Sl No-1.14 a. Conducting static load test for the cast-in-situ pile providing required
= 1 × 3.00 Test = 3.00 Test
@Tk = 80,000.00 P/Test Sch = 3.00 Tk= 240,000.00
b. For Intermediate Loading from 75-125 tonne for each additional tonne
= 3 × 45.00 Ton = 135.00 Test
@Tk = 800.00 P/Ton Sch = 75.00 Tk= 60,000.00
SL No-1.16 Reinforced cement concrete works using steel shutter with mim cement concrete to mix ratio(1:1.5:3)
A. In Foundation (Footing,Raft,Pile cap etc)
i. Concrete
Total Qty = 18,016.49 Cft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 90
= 510.24 cum
@Tk = 11,000.00 P/Cum Sch = 522.01 Tk= 5,612,613.62
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 1,191.55 Sqm
@Tk = 400.00 P/Sqm Sch = 1204.23 Tk= 476,619.42
B. In Foundation Beam/Grade Beam
i. Concrete
= 112.49 cum
@Tk = 17,000.00 P/Cum Sch = 112.78 Tk= 1,912,283.35
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 1075.10 Sqm
@Tk = 700.00 P/Sqm Sch = 1127.75 Tk= 752,567.66
B. In Floor Slab at plinth level
i) Concrete
= 241.22 Cum
@Tk = 18,000.00 P/Cum Sch = 241.73 Tk= 4,341,964.86
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
BF Qty = 2,521.84
@Tk = 800.00 P/Sqm Sch = 2568.19 Sqm Tk= 2,017,468.87
C. Beam at Plinth level
a). Concrete.
i) Gr.Floor/Plinth level
= 111.81
@Tk = 18,000.00 P/Cum Sch = 112.45 Tk= 2,012,514.01
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF Qty = 1292.34 Sqm
Sch.Qty = 1244.48 Sqm
@Tk = 500.00 P/Sqm Sch = 1244.48 Tk= 622,240.00
C. In Pedestal Column,Column,Column capital ,lift wall etc.
a. Concrete
i). Below PL level and in Ground Floor.
= 213.95 Cum
@Tk = 17,000.00 P/Cum Sch = 219.67 cum Tk= 3,637,220.15
ii).1st Floor.
BF Qty = 86.67 Cum
Principal Qtr
C2 = 2 × 1.25 Rft × 1.00 Rft × 10.00 Rft = 25.00 Cft
C3 3 × 1.25 Rft × 1.00 Rft × 10.00 Rft = 37.50 Cft
= 62.50 Cft
= 1.77 Cum
= 88.44 Cum
@Tk = 17,000.00 P/Cum Sch = 105.89 cum Tk= 1,503,517.07
iii). 2nd Floor.
BF Qty = 24.73 Cum
Hostel Bldg
C1 = 24 × 1.67 Rft × 1.25 Rft × 10.00 Rft = 501.00 Cft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 91
C2 37 × 1.67 Rft × 1.00 Rft × 10.00 Rft = 617.90 Cft
C3 = 8 × 1.67 Rft × 1.00 Rft × 10.00 Rft = 133.60 Cft
C4 9 × 1.33 Rft × 1.00 Rft × 10.00 Rft = 119.70 Cft
C5 = 4 × 1.33 Rft × 1.00 Rft × 10.00 Rft = 53.20 Cft
C6 2 × 1.25 Rft × 1.00 Rft × 10.00 Rft = 25.00 Cft
= 1450.40 Cft
= 41.08 Cum
Academic Bldg
C1 = 5 × 1.00 Rft × 1.67 Rft × 2.50 Rft = 20.88 Cft
C8 = 6 × 2.79 Rft × 1.67 Rft × 2.50 Rft = 69.89 Cft
C9 = 1 × 2.67 Rft × 1.67 Rft × 2.50 Rft = 11.15 Cft
= 101.91 Cft
= 2.89 Cum
= 94.69 Cum
@Tk = 17,000.00 P/Cum Sch = 119.97 cum Tk= 1,609,748.27
iv). 3rd Floor.
Hostel Bldg
Same Measurement at 2nd Floor Qty = 1450.40 Cft
= 41.08 Cum
Academic Bldg
C1 = 20 × 1.67 Rft × 1.00 Rft × 2.50 Rft = 83.50 Cft
1 × 1.67 Rft × 1.00 Rft × 11.00 Rft = 18.37 Cft
C2 3 × 1.67 Rft × 1.00 Rft × 2.50 Rft = 12.53 Cft
C3 = 4 × 1.67 Rft × 1.25 Rft × 2.50 Rft = 20.88 Cft
= 2 × 1.67 Rft × 1.25 Rft × 11.00 Rft = 45.93 Cft
C4 18 × 1.33 Rft × 1.33 Rft × 2.50 Rft = 79.60 Cft
1 × 1.33 Rft × 1.33 Rft × 11.00 Rft = 19.46 Cft
C5 = 4 × 1.33 Rft × 1.33 Rft × 2.50 Rft = 17.69 Cft
C6 6 × 1.50 Rft × 1.00 Rft × 2.50 Rft = 22.50 Cft
C7 = 1 × 1.50 Rft × 1.00 Rft × 2.50 Rft = 3.75 Cft
C9 1 × 1.67 Rft × 2.67 Rft × 2.50 Rft = 11.15 Cft
= 335.34 Cft
= 9.50 Cum
= 50.57 Cum
@Tk = 17,000.00 P/Cum Sch = 57.50 cum Tk= 859,744.38
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Below PL level and in Ground Floor.
= 1956.82 Sqm
@Tk = 450.00 P/Sqm Sch = 2636.00 cum Tk= 880,568.03
ii). 1st Floor.
= 877.61 Sqm
Principal Qtr
C2 = 2 × 4.50 Rft × 10.00 Rft = 90.00 Sft
C3 3 × 4.50 Rft × 10.00 Rft = 135.00 Sft
= 225.00 Sft
= 20.91 Sqm
= 898.52 Sqm

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 92
@Tk = 450.00 P/Sqm Sch = 1270.72 sqm Tk= 404,333.36
iii). 2nd Floor.
BF Qty = 244.54 Sqm
Hostel Bldg
C1 = 24 × 5.83 Rft × 10.00 Rft = 1399.20 Sft
C2 37 × 5.33 Rft × 10.00 Rft = 1972.10 Sft
C3 = 8 × 5.33 Rft × 10.00 Rft = 426.40 Sft
C4 9 × 4.67 Rft × 10.00 Rft = 420.30 Sft
C5 = 4 × 4.67 Rft × 10.00 Rft = 186.80 Sft
C6 2 × 4.50 Rft × 10.00 Rft = 90.00 Sft
= 4494.80 Sft
= 417.73 Sqm
Academic Bldg
C1 = 5 × 5.33 Rft × 2.50 Rft = 66.63 Sft
C8 = 6 × 8.92 Rft × 2.50 Rft = 133.80 Sft
C9 = 1 × 8.67 Rft × 2.50 Rft = 21.68 Sft
= 222.10 Sft
= 20.64 Sqm
= 982.91 Sqm
@Tk = 450.00 P/Sqm Sch = 1439.68 Tk= 442,309.01
iv). 3rd Floor.
Hostel Bldg
C1 = 24 × 5.83 Rft × 10.00 Rft = 1399.20 Sft
C2 37 × 5.33 Rft × 10.00 Rft = 1972.10 Sft
C3 = 8 × 5.33 Rft × 10.00 Rft = 426.40 Sft
C4 9 × 4.67 Rft × 10.00 Rft = 420.30 Sft
C5 = 4 × 4.67 Rft × 10.00 Rft = 186.80 Sft
C6 2 × 4.50 Rft × 10.00 Rft = 90.00 Sft
= 4494.80 Sft
= 417.73 Sqm
Academic Bldg
C1 = 20 × 5.33 Rft × 2.50 Rft = 266.50 Sft
1 × 5.33 Rft × 11.00 Rft = 58.63 Sft
C2 3 × 5.33 Rft × 2.50 Rft = 39.98 Sft
C3 = 4 × 5.83 Rft × 2.50 Rft = 58.30 Sft
= 2 × 5.83 Rft × 11.00 Rft = 128.26 Sft
C4 18 × 5.33 Rft × 2.50 Rft = 239.85 Sft
1 × 5.33 Rft × 11.00 Rft = 58.63 Sft
C5 = 4 × 5.33 Rft × 2.50 Rft = 53.30 Sft
C6 6 × 5.00 Rft × 2.50 Rft = 75.00 Sft
C7 = 1 × 5.00 Rft × 2.50 Rft = 12.50 Sft
C9 1 × 8.67 Rft × 2.50 Rft = 21.68 Sft
= 1012.62 Sft
= 94.11 Sqm
= 611.84 Sqm
@Tk = 450.00 P/Sqm Sch = 690.00 Tk= 275,328.90
D. Beam: (Tee-beam, Ell beam, Rib-beam rectangular beam)

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 93
a). Concrete.
i) Gr.Floor
= 95.51 Cum
@Tk = 18,000.00 P/Cum Sch = 97.64 Tk= 1,719,263.37
ii) 1st. Floor
BF Qty = 58.25 cum
For Hostel Bldg
FB-1 = 4 x 77.32 Nos = 309.28 Rft

FB-2 = 4 x 77.32 Nos = 309.28 Rft

FB-3 = 6 x 32.50 Nos = 195.00 Rft

= 813.56 Rft x 0.83 x 0.83 = 560.46 Cft


FB-4 = 10 x 37.50 Nos = 375.00 Rft

FB-6 = 2 x 7.17 Nos = 14.34 Rft

= 389.34 Rft x 0.83 x 1.33 = 429.79 Cft


FB-5 = 2 x 12.17 Nos = 24.34 Rft

FB-7 = 4 x 21.58 Nos = 86.32 Rft

= 110.66 Rft x 1.00 x 1.33 = 147.18 Cft


FB-8 = 4 x 26.33 Nos = 105.32 Rft

FB-9 = 2 x 19.75 Nos = 39.50 Rft

= 144.82 Rft x 0.83 x 1.08 = 129.82 Cft


FB-11 = 2 x 21.50 Nos = 43.00 Rft

FB-10 = 2 x 11.67 Nos = 23.34 Rft

= 66.34 Rft x 1.00 x 1.83 = 121.40 Cft


FB-12 = 1 x 20.75 Nos = 20.75 Rft

FB-13 = 2 x 19.58 Nos = 39.16 Rft

FB-14 = 1 x 19.75 Nos = 19.75 Rft

= 79.66 Rft x 1.00 x 1.58 = 125.86 Cft


= 1514.51 Cft
Principal Qtr = 42.89 Cum
P.house PHB1 = 1 x 18.17 Nos x 0.83 Rft x 1.12 Rft = 16.89 Cft
PHB2 = 2 x 9.67 Nos x 0.83 Rft x 0.87 Rft = 13.97 Cft
= 1 x 18.17 Nos x 0.83 Rft x 0.87 Rft = 13.12 Cft
= 43.98 Cft
= 1.25 Cum
= 102.39 cum
Sch.Qty = 94.12 cum
@Tk = 18,000.00 P/Cum Sch = 94.12 Tk= 1,694,160.00
iii) 2nd. Floor
For Academic Bldg
FB-1 = 1 × 112.75 Rft = 112.75 Rft

"= 1 × 68.75 Rft = 68.75 Rft

FB-2 = 2 × 112.75 Rft = 225.50 Rft

= 407.00 Rft x 0.83 Rft x 0.83 Rft


Qty = 280.38 Cft
FB-4 = 8 × 38.00 Rft = 304.00 Rft x 1.00 Rft x 1.33 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 94
Qty = 404.32 Cft
FB-3 = 2 × 38.00 Rft = 76.00 Rft

FB-5 = 4 × 38.00 Rft = 152.00 Rft

FB-6 = 4 × 38.00 Rft = 152.00 Rft

"= 2 × 16.33 Rft = 32.66 Rft

= 412.66 Rft x 0.83 Rft x 1.33 Rft


Qty = 455.54 Cft
FB-8 = 8 × 33.00 Rft = 264.00 Rft

FB-9 = 1 × 19.50 Rft = 19.50 Rft

= 283.50 Rft x 0.83 Rft x 1.08 Rft


Qty = 254.13 Cft
Qty = 1394.37 Cft
= 39.49 Cum
For Hostel Bldg
FB-1 = 4 x 77.33 Nos = 309.32 Rft

FB-2 = 4 x 77.33 Nos = 309.32 Rft

FB-3 = 6 x 32.50 Nos = 195.00 Rft

FB-4 = 10 x 37.50 Nos = 375.00 Rft

FB-5 = 2 x 12.17 Nos = 24.34 Rft

FB-7 = 4 x 22.25 Nos = 89.00 Rft

FB-7 = 2 x 14.33 Nos = 28.66 Rft

FB-8 = 2 x 26.33 Nos = 52.66 Rft

FB-9 = 2 x 19.75 Nos = 39.50 Rft

FB-11 = 4 x 21.50 Nos = 86.00 Rft

= 1,508.80 Rft x 0.83 Rft x 1.50 = 1878.456 Cft


FB-10 = 2 x 10.67 Nos = 21.34 Rft x 0.83 Rft x 1.62 = 28.69 Cft
= 1,907.15 Cft

= 54.01 Cum
Qty = 93.50 cum
@Tk = 18,000.00 P/Cum Sch = 94.12 Tk= 1,683,016.23
iv). 3rd Floor
For Academic Bldg
Pent House,PB1 = 2 × 19.17 Rft × 0.83 Rft x 1.08 Rft = 34.37 Cft
PB2 = 2 × 10.25 Rft × 0.83 Rft x 0.83 Rft = 14.12 Cft
= 48.49 Cft
= 1.37 cum
@Tk = 18,000.00 P/Cum Sch = 43.85 cum Tk= 24,718.99
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF. Qty = 1166.09 Sqm
@Tk = 500.00 P/Sqm Sch = 1171.71 Tk= 583,047.28
ii). 1st. Floor
BF. Qty = 625.25 Sqm
Principal Qtr
P.house PHB1 = 1 x 18.17 Nos x 3.08 Rft = 55.96 Sft
PHB2 = 2 x 9.67 Nos x 2.58 Rft = 49.90 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 95
= 1 x 18.17 Nos x 2.58 Rft = 46.88 Sft
= 152.74 Sft = 14.20 Sqm
For Hostel Bldg
Rft Qty Same as Gr.Floor,Qty = 813.56 Rft x 2.83 Rft = 2302.37 Sft
= 389.34 Rft x 3.50 Rft = 1362.69 Sft
= 110.66 Rft x 3.67 Rft = 406.12 Sft
= 144.82 Rft x 3.00 Rft = 434.46 Sft
= 66.34 Rft x 4.67 Rft = 309.81 Sft
= 79.66 Rft x 4.17 Rft = 332.18 Sft
= 5147.64 Sft
= 478.40 Sqm
= 1117.85 Sqm
@Tk = 500.00 P/Sqm Sch = 1129.42 Tk= 558,926.86
iv). 2nd. Floor
For Academic Bldg
FB-1 = 1 × 112.75 Rft = 112.75 Rft

"= 1 × 68.75 Rft = 68.75 Rft

FB-2 = 2 × 112.75 Rft = 225.50 Rft

= 407.00 Rft x 2.50 Rft = 1017.50 Sft


FB-4 = 8 × 38.00 Rft = 304.00 Rft x 3.67 Rft = 1115.68 Sft
FB-3 = 2 × 38.00 Rft = 76.00 Rft

FB-5 = 4 × 38.00 Rft = 152.00 Rft

FB-6 = 4 × 38.00 Rft = 152.00 Rft

"= 2 × 16.33 Rft = 32.66 Rft

= 412.66 Rft x 3.50 Rft = 1444.31 Sft


FB-8 = 8 × 33.00 Rft = 264.00 Rft

FB-9 = 1 × 19.50 Rft = 19.50 Rft

= 283.50 Rft x 3.00 Rft = 850.50 Sft


= 4427.99 Sft
= 411.52 Sqm
For Hostel Bldg
Rft Qty Same as Gr.Floor,Qty = 1508.80 Rft x 3.83 Rft = 5778.70 Sft
= 21.34 Rft x 4.08 Rft = 87.07 Sft
= 5865.77 Sft
= 545.15 Sqm
= 956.67 Sqm
@Tk = 500.00 P/Sqm Sch = 1129.42 Tk= 478,334.63
iv). 3rd Floor
Academic Bldg
Pent House,PB1 = 2 × 19.17 Rft × 3.00 Rft = 115.02 Sft
PB2 = 2 × 10.25 Rft × 2.50 Rft = 51.25 Sft
= 166.27 Sft = 15.45 Sqm
@Tk = 500.00 P/Sqm Sch = 526.20 Tk= 7,726.30
E. Lintel & Tie Beam
a). Concrete.
i). Gr.Floor

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 96
Academic Bldg
On 10'' Wall = 1 × 20 Nos × 9.00 Rft = 180.00 Rft

= 1 × 3 Nos × 8.50 Rft = 25.50 Rft

= 1 × 2 Nos × 7.50 Rft = 15.00 Rft

= 1 × 2 Nos × 7.58 Rft = 15.16 Rft

= 1 × 1 Nos × 7.92 Rft = 7.92 Rft

= 1 × 4 Nos × 7.50 Rft = 30.00 Rft

= 2 × 2 Nos × 16.08 Rft = 64.32 Rft

= 2 × 4 Nos × 8.58 Rft = 68.64 Rft

= 406.54 Rft x 0.83 x 0.75


= 253.07 Cft
On 5'' Wall = 1 × 17 Nos × 9.00 Rft = 153.00 Rft

= 2 × 11 Nos × 16.17 Rft = 355.74 Rft

= 508.74 Rft x 0.42 x 0.50


= 106.84 Cft
Hostel Bldg = 359.91 Cft
On 10'' Wall
W80 = 2 × 10 Nos × 7.83 Rft = 156.60 Rft

Gap = 2 × 2 Nos × 11.92 Rft = 47.68 Rft

= 2 × 1 Nos × 6.67 Rft = 13.34 Rft

= 2 × 3 Nos × 7.50 Rft = 45.00 Rft

HW24 = 2 × 2 Nos × 2.50 Rft = 10.00 Rft

Door = 2 × 2 Nos × 11.67 Rft = 46.68 Rft

Mid portion = 2 × 2 Nos × 4.33 Rft = 17.32 Rft

= 2 × 2 Nos × 13.33 Rft = 53.32 Rft

Stair = 2 × 2 Nos × 11.00 Rft = 44.00 Rft

= 433.94 Rft x 0.83 x 0.50


= 180.09 Cft
On 5'' Wall
West Block TLT = 2 × 1 Nos × 11.75 Rft = 23.50 Rft

= 2 × 1 Nos × 4.17 Rft = 8.34 Rft

Wash = 2 × 1 Nos × 11.67 Rft = 23.34 Rft

C.S Room = 2 × 1 Nos × 7.50 Rft = 15.00 Rft

= 2 × 1 Nos × 11.67 Rft = 23.34 Rft

= 3 × 1 Nos × 10.42 Rft = 31.26 Rft

= 2 × 1 Nos × 4.75 Rft = 9.50 Rft

Kitchen = 2 × 2 Nos × 11.83 Rft = 47.32 Rft

Pantry = 2 × 1 Nos × 11.50 Rft = 23.00 Rft

Entry = 2 × 1 Nos × 11.67 Rft = 23.34 Rft

West Block Bulk S = 3 × 1 Nos × 12.17 Rft = 36.51 Rft

Corrid = 2 × 5 Nos × 11.83 Rft = 118.30 Rft

TLT = 2 × 1 Nos × 7.50 Rft = 15.00 Rft

= 1 × 1 Nos × 18.25 Rft = 18.25 Rft

C.TLT = 1 × 2 Nos × 11.67 Rft = 23.34 Rft

Stair = 2 × 2 Nos × 11.67 Rft = 46.68 Rft

Round S = 2 × 1 Nos × 19.50 Rft = 39.00 Rft

= 525.02 Rft x 0.42 x 0.50

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 97
= 110.25 Cft
= 290.34 Cft
Principal Qtr
On 10'' Wall
= 2 × 1 Nos × 12.00 Rft = 24.00 Rft

= 1 × 1 Nos × 9.25 Rft = 9.25 Rft

= 2 × 1 Nos × 10.50 Rft = 21.00 Rft

= 1 × 2 Nos × 11.50 Rft = 23.00 Rft

= 1 × 1 Nos × 14.50 Rft = 14.50 Rft

= 2 × 2 Nos × 12.50 Rft = 50.00 Rft

= 1 × 1 Nos × 7.50 Rft = 7.50 Rft

= 1 × 1 Nos × 15.00 Rft = 15.00 Rft

= 164.25 Rft x 0.83 x 0.50


= 68.16 Cft
On 5'' Wall
= 2 × 3 Nos × 13.00 Rft = 78.00 Rft

= 3 × 1 Nos × 5.00 Rft = 15.00 Rft

= 1 × 2 Nos × 12.00 Rft = 24.00 Rft

= 2 × 1 Nos × 19.00 Rft = 38.00 Rft

= 2 × 2 Nos × 10.00 Rft = 40.00 Rft

= 2 × 2 Nos × 7.50 Rft = 30.00 Rft

= 389.25 Rft x 0.50 x 0.42


= 81.74 Cft
= 149.91 Cft
= 800.15 Cft
Total Qty = 22.66 Cum
@Tk = 12,000.00 P/Cum Sch = 24.00 Tk= 271,929.35
ii). 1st Floor
Academic Bldg
On 10'' Wall = 1 × 20 Nos × 9.00 Rft = 180.00 Rft

= 1 × 3 Nos × 8.50 Rft = 25.50 Rft

= 1 × 4 Nos × 7.50 Rft = 30.00 Rft

= 1 × 3 Nos × 7.58 Rft = 22.74 Rft

= 1 × 2 Nos × 16.08 Rft = 32.16 Rft

= 2 × 4 Nos × 8.58 Rft = 68.64 Rft

= 359.04 Rft x 0.83 x 0.75


= 223.50 Cft
On 5'' Wall = 1 × 20 Nos × 9.00 Rft = 180.00 Rft

= 1 × 2 Nos × 7.50 Rft = 15.00 Rft

= 1 × 1 Nos × 10.25 Rft = 10.25 Rft

= 1 × 6 Nos × 16.17 Rft = 97.02 Rft

= 302.27 Rft x 0.42 x 0.50


= 63.48 Cft
= 286.98 Cft
Hostel Bldg
On 10'' Wall
Room = 2 × 10 Nos × 7.83 Rft x 0.83 Rft x 0.75 = 97.48 Cft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 98
Gap = 2 × 2 Nos × 11.92 Rft = 47.68 Rft

= 2 × 1 Nos × 7.50 Rft = 15.00 Rft

W45 = 2 × 1 Nos × 3.75 Rft = 7.50 Rft

W50 = 2 × 1 Nos × 5.00 Rft = 10.00 Rft

HW24 = 2 × 2 Nos × 2.00 Rft = 8.00 Rft

TV.Room = 2 × 1 Nos × 19.00 Rft = 38.00 Rft

Stair = 2 × 1 Nos × 11.00 Rft = 22.00 Rft

Mid portion = 2 × 2 Nos × 4.33 Rft = 17.32 Rft

= 2 × 1 Nos × 13.22 Rft = 26.44 Rft

TV.Room = 1 × 1 Nos × 11.67 Rft = 11.67 Rft

Gap = 2 × 2 Nos × 12.83 Rft = 51.32 Rft

= 254.93 Rft x 0.83 x 0.50


= 105.80 Cft
On 5'' Wall
E/W Block Corrid = 2 × 10 Nos × 11.83 Rft = 236.60 Rft

= 2 × 1 Nos × 7.50 Rft = 15.00 Rft

Wash = 2 × 9 Nos × 7.83 Rft = 140.94 Rft

C.S Room = 2 × 1 Nos × 12.00 Rft = 24.00 Rft

= 2 × 1 Nos × 12.17 Rft = 24.34 Rft

= 2 × 6 Nos × 4.17 Rft = 50.04 Rft

= 2 × 2 Nos × 16.67 Rft = 66.68 Rft

= 2 × 2 Nos × 11.67 Rft = 46.68 Rft

Kitchen = 2 × 2 Nos × 8.50 Rft = 34.00 Rft

Pantry = 1 × 1 Nos × 19.50 Rft = 19.50 Rft

Entry = 2 × 1 Nos × 6.00 Rft = 12.00 Rft

= 669.78 Rft x 0.42 x 0.50


= 140.65 Cft
= 343.93 Cft
= 630.91 Cft
Total Qty = 17.87 Cum
@Tk = 12,000.00 P/Cum Sch = 18.75 Tk= 214,413.71
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
Academic Bldg
On 10'' Wall = Rft Qty Same as,Qty = 406.54 Rft x 2.33 = 947.24 Sft
On 5'' Wall = Rft Qty Same as,Qty = 508.74 Rft x 1.42 = 722.41 Sft
= 1669.65 Sft
Hostel Bldg
On 10'' Wall = Rft Qty Same as,Qty = 433.94 Rft x 1.83 = 794.11 Sft
On 5'' Wall = Rft Qty Same as,Qty = 525.02 Rft x 1.42 = 745.53 Sft
= 1539.64 Sft
Principal Qtr
On 10'' Wall = Rft Qty Same as,Qty = 164.25 Rft x 1.83 = 300.58 Sft
On 5'' Wall = Rft Qty Same as,Qty = 389.25 Rft x 1.42 = 552.74 Sft
= 853.31 Sft
= 4062.60 Sft
= 377.57 Sqm

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 99
Sch.Qty = 288.00 Sqm
@Tk = 400.00 P/Sqm Sch = 288.00 Tk= 115,200.00
ii). 1st Floor
Academic Bldg
On 10'' Wall = Rft Qty Same as,Qty = 359.04 Rft x 2.33 = 836.56 Sft
On 5'' Wall = Rft Qty Same as,Qty = 302.27 Rft x 1.42 = 429.22 Sft
= 1265.79 Sft
Hostel Bldg
On 10'' Wall = Rft Qty Same as,Qty = 254.93 Rft x 1.83 = 466.52 Sft
On 5'' Wall = Rft Qty Same as,Qty = 669.78 Rft x 1.42 = 951.09 Sft
= 1417.61 Sft
= 2683.40 Sft
= 249.39 Sqm
Sch.Qty = 225.00 Sqm
@Tk = 400.00 P/Sqm Sch = 225.00 Tk= 90,000.00
F. Floor & Roof slab
a). Concrete.
i). Gr.Floor
BF Qty = 205.57 Cum
False Slab
Academic Bldg
Toilet = 2 × 10.42 Rft × 6.83 Rft = 142.34 Sft
= 1 × 10.42 Rft × 7.83 Rft = 81.59 Sft
= 1 × 5.17 Rft × 8.25 Rft = 42.65 Sft
= 1 × 7.42 Rft × 4.83 Rft = 35.84 Sft
= 302.42 Sft x 0.25 = 75.60 Cft
False Slab
Principal Qtr
M.Bed = 1 × 9.92 Rft × 5.83 Rft = 57.83 Sft
C.Bed = 1 × 5.08 Rft × 10.00 Rft = 50.80 Sft
F.Space = 1 × 5.42 Rft × 9.67 Rft = 52.41 Sft
Servent = 1 × 5.08 Rft × 5.00 Rft = 25.40 Sft
Lobby = 1 × 8.75 Rft × 5.83 Rft = 51.01 Sft
= 237.46 Sft x 0.25 = 59.36 Cft
= 134.97 Cft
= 3.82 Cum
= 209.39 Cum
Sch.Qty = 207.91 Cum
@Tk = 20,000.00 P/Cum Sch = 207.91 Tk= 4,158,200.00
ii). 1st Floor
For Academic Bldg
Main Slab = 1 × 81.25 Rft × 45.25 Rft = 3,676.56 Sft
= 1 × 51.25 Rft × 36.50 Rft = 1,870.63 Sft
= 1 × 23.00 Rft × 9.17 Rft = 210.91 Sft
= 1 × 7.00 Rft × 10.50 Rft = 73.50 Sft
Deduct,Stair = 1 × 11.67 Rft × 8.50 Rft = -99.20 Sft
= 5,732.40 Sft x 0.42 rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 100


= 2407.61 Cft
Auditorium = 1 × 46.00 Rft × 49.83 Rft = 2,292.18 Sft x 0.50 rft
= 1146.09 Cft
= 3553.70 Cft
BF Qty = 100.64 Cum
For Hostel Bldg
= 2 × 36.83 Rft × 87.33 Rft = 6,432.73 Sft
= 2 × 25.67 Rft × 20.00 Rft = 1,026.80 Sft
Ver = 20 × 8.25 Rft × 3.50 Rft = 577.50 Sft
= 20 × 5.00 Rft × 1.67 Rft = 167.00 Sft
= 6 × 3.58 Rft × 1.67 Rft = 35.87 Sft
= 12 × 0.83 Rft × 0.83 Rft = 8.27 Sft
Gap = 2 × 7.50 Rft × 13.33 Rft = 199.95 Sft
Deduct,Gap = 2 × 12.00 Rft × 8.33 Rft = -199.92 Sft
= 8,248.20 Sft x 0.38 Rft

= 3134.31 Cft
Mid Portion = 1 × 24.17 Rft × 46.75 Rft = 1,129.95 Sft
= 1,129.95 Sft x 0.50 Rft

= 564.97 Cft
= 3699.29 Cft
= 104.77 cum
For Principal Qtr
Pent House = 1 × 13.00 Rft × 16.00 Rft x 0.38 Rft = 79.04 Cft
= 2.24 cum
Main Slab Qty = 207.65 cum
For Hostel Bldg
1st Floor-Bed Room
Ver, Portion = 18 × 8.08 Rft × 3.58 Rft = 520.68 Sft x 0.38 Rft
= 197.86 Cft
False Slab = 5.60 cum
Academic Bldg
Toilet = 1 × 5.17 Rft × 8.25 Rft = 42.65 Sft
= 1 × 7.42 Rft × 5.50 Rft = 40.81 Sft
= 83.46 Sft x 0.25 = 20.87 Cft
= 0.59 Cum
Total Qty = 213.84 cum
Sch.Qty = 208.87 Cum
@Tk = 20,000.00 P/Cum Sch = 208.87 Tk= 4,177,400.00
iii). 2nd Floor
For Hostel Bldg
Same measuremnt at1st Floor Qty = 3134.31 Cft
Mid Portion = 1 × 24.67 Rft × 21.75 Rft = 536.57 Sft
= 1 × 17.50 Rft × 18.00 Rft = 315.00 Sft
= 851.57 Sft x 0.50 Rft
= 425.79 Cft
= 3560.10 Cft
= 100.82 cum
For Academic Bldg

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 101


Rf
Main Slab = 1 × 81.25 Rft × 45.42 x 0.42 Rft = 1549.96 Cft
t
Rf
= 2 × 21.25 Rft × 27.67 x 0.42 Rft = 493.91 Cft
t
Rf
= 1 × 19.67 Rft × 10.33 x 0.42 Rft = 85.34 Cft
t
Rf
= 2 × 10.33 Rft × 14.67 x 0.50 Rft = 151.54 Cft
t
= 2280.75 = 64.59 Cum
Total Qty = 165.42 cum
@Tk = 20,000.00 P/Cum Sch = 178.16 Tk= 3,308,325.78
iv). 3rd Floor
For Academic Bldg
Pent House = 1 × 22.17 Rft × 13.75 Rft x 0.38 Rft = 115.84 Cft
= 3.28 cum
@Tk = 20,000.00 P/Cum Sch = 110.03 Tk= 65,612.15
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF. Qty = 19238.63 Sft
= 1787.98 Sqm
False Slab
Academic Bldg
Toilet = 2 × 11.08 Rft × 7.50 Rft = 166.20 Sft
= 1 × 11.08 Rft × 8.50 Rft = 94.18 Sft
= 1 × 5.83 Rft × 8.92 Rft = 52.00 Sft
= 1 × 8.08 Rft × 5.50 Rft = 44.44 Sft
= 356.82 Sft = 33.16 Sqm
False Slab
Principal Qtr
M.Bed = 1 × 10.42 Rft × 6.33 Rft = 65.96 Sft
C.Bed = 1 × 5.58 Rft × 10.50 Rft = 58.59 Sft
F.Space = 1 × 5.92 Rft × 10.17 Rft = 60.21 Sft
Servent = 1 × 5.58 Rft × 5.50 Rft = 30.69 Sft
Lobby = 1 × 9.25 Rft × 6.33 Rft = 58.55 Sft
= 274.00 Sft = 25.46 Sqm
= 1846.60 Sqm
@Tk = 600.00 P/Sqm Sch = 2494.92 Tk= 1,107,962.06
ii).1st Floor
For Academic Bldg
Ref. from Floor Area = 5732.40 Sft
= 2292.18 Sft
Add,Slab out Side = 2 x 2 Nos x 130.00 Rft = 520.00 Rft
= 2 x 2 Nos x 45.67 Rft = 182.68 Rft
= 2 x 2 Nos x 37.17 Rft = 148.68 Rft
= 2 × 2 Nos × 81.00 Rft = 324.00 Rft
= 1 × 2 Nos × 9.00 Rft = 18.00 Rft
= 2 x 2 Nos x 8.00 Rft = 32.00 Rft
= 4 x 2 Nos x 49.50 Rft = 396.00 Rft
= 1621.36 Rft
x 0.42 Rft = 680.97 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 102


Total = 8705.55 Sft
= 809.07 Sqm

For Hostel Bldg


Ref. from Floor Area = 8248.20 Sft
" = 1129.95 Sft
Add,Slab out Side = 2 x 2 Nos x 36.83 Rft = 147.32 Rft
= 2 x 2 Nos x 87.33 Rft = 349.32 Rft
= 2 x 2 Nos x 25.67 Rft = 102.68 Rft
= 2 × 1 Nos × 20.00 Rft = 40.00 Rft
= 2 × 2 Nos × 13.33 Rft = 53.32 Rft
= 2 x 20 Nos x 3.50 Rft = 140.00 Rft
= 2 × 10 Nos × 1.67 Rft = 33.40 Rft
= 2 × 6 Nos × 1.67 Rft = 20.04 Rft
= 2 x 12 Nos x 0.83 Rft = 19.92 Rft
= 2 x 2 Nos x 12.00 Rft = 48.00 Rft
= 954.00 Rft
x 0.42 Rft = 400.68 Sft
Qty = 9778.82 Sft
Mid Portion = 1 × 24.17 Rft x 46.25 Rft = 1117.86 Sft
= 2 × 24.17 Rft x 0.50 Rft = 24.17 Sft
= 2 × 46.25 Rft x 0.50 Rft = 46.25 Sft
Qty = 1188.28 Sft
Total = 10967.11 Sft

= 1019.25 Sqm
Main Slab Qty = 1828.31 Sqm
For Hostel Bldg
Ver, Portion = 18 × 8.83 Rft × 4.33 Rft = 688.21 Sft = 63.96 Sqm
For Principal Qtr
Pent House = 1 × 13.75 Rft × 16.75 Rft = 230.31 Sft
= 21.40 Sqm
False Slab
Academic Bldg
Toilet = 1 × 5.17 Rft × 8.92 Rft = 46.12 Sft
= 1 × 8.08 Rft × 5.50 Rft = 44.44 Sft
= 90.56 Sft = 8.42 Sqm
= 1922.09 Sqm
@Tk = 500.00 P/Sqm Sch = 2506.44 Tk= 961,047.35
iii). 2nd Floor
For Hostel Bldg
Same measuremnt at1st Floor Qty = 9778.82 Sft
Mid Portion = 2 × 24.67 Rft x 21.75 Rft = 1073.15 Sft
= 2 × 46.42 Rft x 0.50 Rft = 46.42 Sft
= 2 × 21.75 Rft x 0.50 Rft = 21.75 Sft
Qty = 10920.14 Sft
For Academic Bldg = 1014.8828 Sqm

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 103


= 1 × 81.25 Rft x 45.25 Rft = 3676.56 Sft
= 2 × 21.25 Rft x 27.67 Rft = 1175.98 Sft
= 1 × 19.67 Rft x 10.33 Rft = 203.19 Sft
= 2 × 10.33 Rft x 14.67 Rft = 303.08 Sft
= 2 × 111.50 Rft x 0.42 Rft = 93.66 Sft
= 2 × 45.67 Rft x 0.42 Rft = 38.36 Sft
Qty = 5490.83 Sft
Total = 16410.97 Sft

Total Qty = 1525.18 Sqm


@Tk = 500.00 P/Sqm Sch = 2137.96 Tk= 762,591.65
iv). 3rd Floor
Academic Bldg
Pent House = 1 × 23.17 Rft × 14.75 Rft = 341.76 Sft = 31.76 Sqm
@Tk = 500.00 P/Sqm Sch = 1320.36 Tk= 15,880.92
G. Sunshade, drop wall, railing shelves, cornice, louver, fins, parapet etc.
a). Concrete.
i). Gr.Floor
Academic Bldg
Sunshade
L/D = 1 × 19 Nos × 9.00 Rft = 171.00 Rft

S/D = 1 × 1 Nos × 8.83 Rft = 8.83 Rft

= 1 × 1 Nos × 9.33 Rft = 9.33 Rft

= 1 × 1 Nos × 19.00 Rft = 19.00 Rft

= 2 × 4 Nos × 8.58 Rft = 68.64 Rft

= 276.80 Rft x 0.83 x 0.25


Principal Qtr = 57.44 Cft
Sunshade
W60 = 8 × 5.50 Rft × 1.00 Rft = 44.00 Sft
W37 = 1 × 4.25 Rft × 1.00 Rft = 4.25 Sft
HW24 = 2 × 2.58 Rft × 1.00 Rft = 5.16 Sft
HW20 = 1 × 2.17 Rft × 1.00 Rft = 2.17 Sft
HW18 = 1 × 2.00 Rft × 1.00 Rft = 2.00 Sft
Drop = 8 × 8.00 Rft × 0.50 Rft = 32.00 Sft
= 1 × 6.75 Rft × 0.50 Rft = 3.38 Sft
= 2 × 5.08 Rft × 0.50 Rft = 5.08 Sft
= 1 × 4.67 Rft × 0.50 Rft = 2.34 Sft
= 1 × 4.50 Rft × 0.50 Rft = 2.25 Sft
= 102.62 Sft x 0.25 = 25.66 Cft
Drop Wall
= 4 × 16.17 Nos × 2.62 Rft = 169.46 Sft
= 2 × 6.83 Nos × 2.62 Rft = 35.79 Sft
= 2 × 11.25 Nos × 2.62 Rft = 58.95 Sft
= 264.20 Sft x 0.25 = 66.05 Cft
Railing
= 2 × 16.17 Nos × 2.50 Rft = 80.85 Sft
= 1 × 6.83 Nos × 2.50 Rft = 17.08 Sft
= 1 × 11.25 Nos × 2.50 Rft = 28.13 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 104


= 126.05 Sft x 0.25 = 31.51 Cft
= 123.22 Cft
= 180.65 Cft
= 5.12 Cum
@Tk = 12,000.00 P/Cum Sch = 9.75 Tk= 61,394.63
ii). 1st.Floor
Academic Bldg
Sunshade
L/D = 1 × 20 Nos × 9.00 Rft = 180.00 Rft

S/D = 1 × 1 Nos × 8.83 Rft = 8.83 Rft

= 1 × 1 Nos × 9.33 Rft = 9.33 Rft

= 1 × 1 Nos × 19.00 Rft = 19.00 Rft

= 2 × 4 Nos × 8.58 Rft = 68.64 Rft

= 285.80 Rft x 0.83 x 0.25


= 59.30 Cft
Principal Qtr
Parapet
= 2 × 52.25 Rft × 2.50 Rft = 261.25 Sft
= 2 × 38.75 Rft × 2.50 Rft = 193.75 Sft
= 4 × 1.83 Rft × 2.50 Rft = 18.30 Sft
= 473.30 Sft x 0.25 = 118.33 Cft
= 177.63 Cft
= 5.03 Cum
@Tk = 12,000.00 P/Cum Sch = 13.60 Tk= 60,366.53
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
Academic Bldg
Sunshade
Rft Qty Same as,Qty = 276.80 Rft x 1.08 = 298.94 Sft
Principal Qtr
Sunshade
W60 = 8 × 6.50 Rft × 2.00 Rft = 104.00 Sft
W37 = 1 × 5.25 Rft × 2.00 Rft = 10.50 Sft
HW24 = 2 × 3.58 Rft × 2.00 Rft = 14.32 Sft
HW20 = 1 × 3.17 Rft × 2.00 Rft = 6.34 Sft
HW18 = 1 × 3.00 Rft × 2.00 Rft = 6.00 Sft
= 141.16 Sft
Drop Wall
= 4 × 16.17 Rft × 5.58 Rft = 360.91 Sft
= 2 × 6.83 Rft × 5.58 Rft = 76.22 Sft
= 2 × 11.25 Rft × 5.58 Rft = 125.55 Sft
Railing = 562.69 Sft
= 2 × 16.17 Rft × 5.00 Rft = 161.70 Sft
= 1 × 6.83 Rft × 5.00 Rft = 34.15 Sft
= 1 × 11.25 Rft × 5.00 Rft = 56.25 Sft
= 252.10 Sft
= 955.95 Sft = 1,254.89 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 105


= 116.63 Sqm
@Tk = 400.00 P/Sqm Sch = 117.00 Tk= 46,650.23
ii). 1st.Floor
Academic Bldg
Sunshade
Rft Qty Same as,Qty = 285.80 Rft x 1.08 = 308.66 Sft
Principal Qtr
Parapet
= 4 × 52.25 Rft × 2.50 Rft = 522.50 Sft
= 4 × 38.75 Rft × 2.50 Rft = 387.50 Sft
= 8 × 1.83 Rft × 2.50 Rft = 36.60 Sft
= 946.60 Sft = 946.60 Sft
= 1255.26 Sft
= 116.66 Sqm
@Tk = 400.00 P/Sqm Sch = 163.20 Tk= 46,664.09
H. In stair case, slab & steps, ramp etc
a). Concrete.
i). Gr.Floor
BF. Qty = 2.72 Cum
Academic Bldg
1st & 2nd Flight
Waist Slab = 2 × 11.50 Rft × 4.42 Rft × 0.54 Sft = 54.90 Cft
Step = 20 × 4.42 Rft × 0.92 Rft × 0.25 Sft = 20.33 Cft
Landing = 1 × 5.00 Rft × 9.00 Rft × 0.50 Sft = 22.50 Cft
= 2 × 0.83 Rft × 0.42 Rft × 0.50 Sft = 0.35 Cft
LB1 = 1 × 10.75 Rft × 1.00 Rft × 1.50 Sft = 16.13 Cft
= 114.20 Cft
= 3.23 Cum
Entry Step = 4 × 8.00 Rft × 1.00 Rft × 0.25 Sft = 8.00 Cft
= 4 × 20.50 Rft × 1.00 Rft × 0.25 Sft = 20.50 Cft
= 4 × 8.75 Rft × 0.83 Rft × 0.25 Sft = 7.26 Cft
= 4 × 2.50 Rft × 0.83 Rft × 0.25 Sft = 2.08 Cft
W.Slab = 1 × 8.00 Rft × 4.00 Rft × 0.54 Sft = 17.28 Cft
= 1 × 20.50 Rft × 4.00 Rft × 0.54 Sft = 44.28 Cft
= 2 × 8.75 Rft × 4.00 Rft × 0.54 Sft = 37.80 Cft
= 2 × 2.50 Rft × 4.00 Rft × 0.54 Sft = 10.80 Cft
= 148.00 Cft
= 4.19 Cum
Hostel Bldg
Stair-1 1st & 2nd Flight
Waist Slab = 4 × 11.50 Rft × 3.50 Rft × 0.54 Sft = 86.94 Cft
Step = 40 × 3.50 Rft × 0.92 Rft × 0.25 Sft = 32.20 Cft
Landing = 2 × 5.00 Rft × 8.33 Rft × 0.50 Sft = 41.65 Cft
= 4 × 0.83 Rft × 0.42 Rft × 0.50 Sft = 0.70 Cft
Beam = 2 × 10.00 Rft × 1.00 Rft × 1.50 Sft = 30.00 Cft
= 191.49 Cft
= 5.42 Cum

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 106


Entry Step = 8 × 7.50 Rft × 1.00 Rft × 0.25 Sft = 15.00 Cft
= 4 × 21.67 Rft × 1.00 Rft × 0.25 Sft = 21.67 Cft
W.Slab = 2 × 7.50 Rft × 4.00 Rft × 0.54 Sft = 32.40 Cft
= 1 × 20.50 Rft × 4.00 Rft × 0.54 Sft = 44.28 Cft
= 2 × 7.50 Rft × 0.83 Rft × 0.54 Sft = 6.72 Cft
= 1 × 21.67 Rft × 1.00 Rft × 0.83 Sft = 17.99 Cft
= 138.06 Cft
= 3.91 Cum
= 19.48 Cum
Sch Qty = 16.00 Cum
@Tk = 12,000.00 P/Cum Sch = 16.00 Tk= 192,000.00

ii). 1st.Floor
Academic Bldg
3rd & 4th Flight
Same Qty at Gr.For Qty = 3.23 Cum
Hostel Bldg
3rd & 4th Flight
Same Qty at Gr.For Qty = 5.42 Cum

Stair-2
Waist Slab = 2 × 12.50 Rft × 5.00 Rft × 0.54 Sft = 67.50 Cft
Step = 22 × 5.00 Rft × 0.92 Rft × 0.25 Sft = 25.30 Cft
Landing = 1 × 12.00 Rft × 8.33 Rft × 0.50 Sft = 49.98 Cft
= 2 × 0.83 Rft × 0.42 Rft × 0.50 Sft = 0.35 Cft
Beam = 1 × 11.50 Rft × 1.00 Rft × 1.50 Sft = 17.25 Cft
= 160.38 Cft
= 4.54 Cum
= 9.97 Cum
Qty = 13.20 Cum
Sch Qty = 12.40 Cum
@Tk = 12,000.00 P/Cum Sch = 12.40 Tk= 148,800.00
iii). 2nd.Floor
Academic Bldg
3rd & 4th Flight
Same Qty at Gr.For Qty = 3.23 Cum
Hostel Bldg
3rd & 4th Flight
Same Qty at Gr.For Qty = 9.97 Cum
= 13.20 Cum
Sch Qty = 12.15 Cum
@Tk = 12,000.00 P/Cum Sch = 12.15 Tk= 145,800.00
b) Formwork/Shuttering
i). Gr.Floor
= 17.72 sqm
For Academic Bldg
Waist Slab = 2 × 1 Nos × 11.50 Rft × 4.42 Rft = 101.66 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 107


Side = 4 × 1 Nos × 11.50 Rft × 1.00 Rft = 46.00 Sft
Step = 2 × 10 Nos × 4.42 Rft × 0.50 Rft = 44.20 Sft
Side = 2 × 20 Nos × 0.83 Rft × 0.25 Rft = 8.30 Sft
Landing = 1 × 1 Nos × 9.00 Rft × 4.00 Rft = 36.00 Sft
Side = 1 × 2 Nos × 4.00 Rft × 0.54 Rft = 4.32 Sft
= 1 × 1 Nos × 9.00 Rft × 0.54 Rft = 4.86 Sft
Beam = 1 × 1 Nos × 10.75 Rft × 1.67 Rft = 17.95 Sft
= 263.29 Sft
= 24.47 sqm
Entry Front = 1 × 1 Rft × 21.50 Rft × 4.50 Rft = 96.75 Sft
Step = 1 × 4 Rft × 21.50 Rft × 0.50 Rft = 43.00 Sft
Side = 2 × 4 Rft × 1.00 Rft × 0.25 Rft = 2.00 Sft
Entry Front = 2 × 1 Rft × 7.50 Rft × 4.00 Rft = 60.00 Sft
Step = 2 × 4 Rft × 7.50 Rft × 0.50 Rft = 30.00 Sft
Side = 4 × 4 Rft × 1.00 Rft × 0.25 Rft = 4.00 Sft
= 235.75 Sft
= 21.91 sqm
For Hostel Bldg
Stair-1
Waist Slab = 4 × 1 Nos × 11.50 Rft × 4.00 Rft = 184.00 Sft
Side = 8 × 1 Nos × 11.50 Rft × 1.00 Rft = 92.00 Sft
Step = 2 × 20 Nos × 3.50 Rft × 0.50 Rft = 70.00 Sft
Side = 2 × 20 Nos × 0.83 Rft × 0.25 Rft = 8.30 Sft
Landing = 2 × 1 Nos × 7.50 Rft × 4.58 Rft = 68.70 Sft
Side = 1 × 2 Nos × 4.00 Rft × 0.54 Rft = 4.32 Sft
= 1 × 1 Nos × 9.00 Rft × 0.54 Rft = 4.86 Sft
Beam = 2 × 1 Nos × 10.00 Rft × 1.67 Rft = 33.40 Sft
= 465.58 Sft
= 43.27 sqm
Stair-2
Waist Slab = 2 × 1 Nos × 12.50 Rft × 5.00 Rft = 125.00 Sft
Side = 4 × 1 Nos × 12.50 Rft × 1.00 Rft = 50.00 Sft
Step = 2 × 11 Nos × 5.00 Rft × 0.50 Rft = 55.00 Sft
Side = 2 × 22 Nos × 0.83 Rft × 0.25 Rft = 9.13 Sft
Landing = 1 × 1 Nos × 7.50 Rft × 4.50 Rft = 33.75 Sft
Side = 1 × 2 Nos × 4.00 Rft × 0.54 Rft = 4.32 Sft
= 1 × 1 Nos × 9.00 Rft × 0.54 Rft = 4.86 Sft
Beam = 1 × 1 Nos × 11.50 Rft × 1.67 Rft = 19.21 Sft
= 301.27 Sft
= 28.00 sqm
= 71.27 sqm
Entry Front = 1 × 1 Rft × 20.00 Rft × 4.50 Rft = 90.00 Sft
Step = 1 × 4 Rft × 20.00 Rft × 0.50 Rft = 40.00 Sft
Side = 2 × 4 Rft × 1.00 Rft × 0.25 Rft = 2.00 Sft
Entry Front = 2 × 1 Rft × 7.50 Rft × 3.75 Rft = 56.25 Sft
Step = 2 × 4 Rft × 7.50 Rft × 0.50 Rft = 30.00 Sft
Side = 4 × 4 Rft × 1.00 Rft × 0.25 Rft = 4.00 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 108


= 222.25 Sft
= 20.66 sqm
= 156.02 sqm
@Tk = 400.00 P/sqm Sch = 192.00 Tk= 62,408.34
ii). First Floor
For Academic Bldg
Same Qty at Gr.For Qty = 24.47 sqm
For Hostel Bldg
Same Qty at Gr.For Qty = 71.27 sqm
= 95.74 sqm
@Tk = 400.00 P/sqm Sch = 148.80 Tk= 38,295.07
iii). 2nd Floor
For Academic Bldg
Same Qty at Gr.For Qty = 24.47 sqm
For Hostel Bldg
Same Qty at Gr.For Qty = 71.27 sqm
= 95.74 sqm
@Tk = 400.00 P/sqm Sch = 145.80 Tk= 38,295.07
SL No-1.17 Supplying fabrication and fixing to details as per design deform bar
b).60 grade deformed bar
= 458,767.74 kg
Principal Qtr
Column - Pent house
20mmØ,C2 = 2 × 8 Nos = 16.00 Nos
C3 = 3 × 10 Nos = 30.00 Nos

= 46.00 Nos x 8.75 Rft = 402.50 Rft

Lapping = 46.00 Nos x 1 Nos x 2.67 Rft = 122.82 Rft


= 525.32 Rft

10mmØ stirup
C1 = 2 × 23 Nos × 4.00 Rft × = 184.00 Rft

C2 = 3 × 23 Nos × 4.00 Rft × = 276.00 Rft

= 3 × 23 Nos × 2.67 Rft × = 184.23 Rft


= 644.23 Rft
Column Summary
20mm Ø = 525.32 Rft = 395.59 Kg
10mm Ø = 644.23 Rft = 121.78 Kg
For Column = 517.37 kg
Hostel Bldg
Column - 2nd Floor
20mmØ,C1 = 24 × 14 Nos = 336.00 Nos
C2 = 34 × 14 Nos = 476.00 Nos
C3 = 9 × 12 Nos = 108.00 Nos

C4 = 9 × 8 Nos = 72.00 Nos

C5 = 4 × 6 Nos = 24.00 Nos


No
= 1,016.00 s x 10.00 Rft = 10160.00 Rft
No
Lapping = 1,016.00 Nos x 1 s x 2.67 Rft = 2712.72 Rft
= 12872.72 Rft

16mmØ,C4 = 9 × 4 Nos = 36.00 Nos

C5 = 4 × 6 Nos = 24.00 Nos


No
= 60.00 s x 10.00 Rft = 600.00 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 109


No
Lapping = 60.00 Nos x 1 s x 2.17 Rft = 130.20 Rft
= 730.20 Rft

10mmØ stirup
C1 = 24 × 29 Nos × 5.33 Rft × = 3709.68 Rft

= 24 × 29 Nos × 4.17 Rft × = 2902.32 Rft

= 24 × 29 Nos × 4.00 Rft × = 2784.00 Rft

C2 = 34 × 29 Nos × 4.83 Rft × = 4762.38 Rft

= 34 × 29 Nos × 2.67 Rft × = 2632.62 Rft

C3,C4,C5 = 22 × 29 Nos × 4.83 Rft × = 3081.54 Rft

= 22 × 29 Nos × 3.67 Rft × = 2341.46 Rft


= 22214.00 Rft
Column Summary
20mm Ø = 12872.72 Rft = 9693.79 Kg
16mm Ø = 730.20 Rft = 351.74 Kg
10mm Ø = 22,214.00 Rft = 4198.99 Kg
For Column = 14244.52 kg
Academic Bldg
Column - 2nd Floor
False Column
20mmØ,C1 = 3 × 14 Nos = 42.00 Nos
C2 = 1 × 12 Nos = 12.00 Nos
C4 = 2 × 14 Nos = 28.00 Nos

C5 = 2 × 12 Nos = 24.00 Nos

C6 = 5 × 10 Nos = 50.00 Nos

C7 = 1 × 6 Nos = 6.00 Nos

C9 = 1 × 20 Nos = 20.00 Nos


No
= 182.00 s x 2.67 Rft = 485.94 Rft
No
Lapping = 182.00 Nos x 1 s x 2.67 Rft = 485.94 Rft
= 971.88 Rft

25mmØ,C9 = 1 × 12 Nos = 12.00 Nos

= 12.00 Nos x 2.67 Rft = 32.04 Rft

Lapping = 12.00 Nos x 1 Nos x 3.33 Rft = 39.96 Rft


= 72.00 Rft

16mmØ,C7 = 1 × 4 Nos = 4.00 Nos


No
= 4.00 s x 2.67 Rft = 10.68 Rft
No
Lapping = 4.00 Nos x 1 s x 2.17 Rft = 8.68 Rft
= 19.36 Rft

10mmØ stirup
C1 = 3 × 7 Nos × 4.83 Rft × = 101.43 Rft

= 3 × 7 Nos × 2.67 Rft × = 56.07 Rft

C2 = 1 × 7 Nos × 4.83 Rft × = 33.81 Rft

= 1 × 7 Nos × 3.50 Rft × = 24.50 Rft

C4 = 2 × 6 Nos × 4.83 Rft × = 57.96 Rft

= 2 × 6 Nos × 3.17 Rft × = 38.04 Rft

= 2 × 6 Nos × 3.00 Rft × = 36.00 Rft

C6 = 5 × 7 Nos × 4.50 Rft × = 157.50 Rft

= 5 × 7 Nos × 3.00 Rft × = 105.00 Rft

C7 = 1 × 7 Nos × 4.50 Rft × = 31.50 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 110


= 1 × 7 Nos × 3.00 Rft × = 21.00 Rft

C9 = 1 × 6 Nos × 8.17 Rft × = 49.02 Rft

= 1 × 6 Nos × 7.17 Rft × = 43.02 Rft

= 1 × 6 Nos × 6.17 Rft × = 37.02 Rft

= 1 × 6 Nos × 6.17 Rft × = 37.02 Rft


= 828.89 Rft
Column Summary
25mm Ø = 72.00 Rft = 84.51 Kg
20mm Ø = 971.88 Rft = 731.87 Kg
16mm Ø = 19.36 Rft = 9.33 Kg
10mm Ø = 828.89 Rft = 156.68 Kg
For Column = 982.39 kg
Academic Bldg
Column - 3rd Floor
False Column
20mmØ,C2 = 2 × 12 Nos = 24.00 Nos
C2 = 2 × 12 Nos = 24.00 Nos
C4 = 16 × 8 Nos = 128.00 Nos

C6 = 1 × 6 Nos = 6.00 Nos

C9 = 1 × 20 Nos = 20.00 Nos


No
= 202.00 s x 2.67 Rft = 539.34 Rft
No
Lapping = 202.00 Nos x 1 s x 2.67 Rft = 539.34 Rft
= 1078.68 Rft

25mmØ,C9 = 1 × 12 Nos = 12.00 Nos


No
= 12.00 s x 2.67 Rft = 32.04 Rft
No
Lapping = 12.00 Nos x 1 s x 3.33 Rft = 39.96 Rft
= 72.00 Rft

16mmØ,C4 = 16 × 4 Nos = 64.00 Nos

C6 = 1 × 4 Nos = 4.00 Nos


No
= 68.00 s x 2.67 Rft = 181.56 Rft
No
Lapping = 68.00 Nos x 1 s x 2.17 Rft = 147.56 Rft
= 329.12 Rft

10mmØ stirup
C2 = 2 × 7 Nos × 4.83 Rft × = 67.62 Rft

= 2 × 7 Nos × 3.50 Rft × = 49.00 Rft

C2 = 2 × 7 Nos × 4.83 Rft × = 67.62 Rft

= 2 × 7 Nos × 3.50 Rft × = 49.00 Rft

C4 = 16 × 6 Nos × 4.83 Rft × = 463.68 Rft

= 16 × 6 Nos × 3.17 Rft × = 304.32 Rft

= 16 × 6 Nos × 3.00 Rft × = 288.00 Rft

C6 = 1 × 7 Nos × 4.50 Rft × = 31.50 Rft

= 1 × 7 Nos × 3.00 Rft × = 21.00 Rft

C9 = 1 × 6 Nos × 8.17 Rft × = 49.02 Rft

= 1 × 6 Nos × 7.17 Rft × = 43.02 Rft

= 1 × 6 Nos × 6.17 Rft × = 37.02 Rft

= 1 × 6 Nos × 6.17 Rft × = 37.02 Rft


= 1507.82 Rft
Column Summary
25mm Ø = 72.00 Rft = 84.51 Kg
20mm Ø = 1078.68 Rft = 812.30 Kg

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 111


16mm Ø = 329.12 Rft= 158.54 Kg
10mm Ø = 1,507.82 Rft = 285.01 Kg
For Column = 1340.37 kg
Academic Bldg
Column - 3rd Floor
Pent house
20mmØ,C3 = 4 × 14 Nos = 56.00 Nos
C5 = 2 × 8 Nos = 16.00 Nos
No
= 72.00 s x 11.00 Rft = 792.00 Rft
No
Lapping = 72.00 Nos x 1 s x 2.67 Rft = 192.24 Rft
= 984.24 Rft

16mmØ,C5 = 2 × 4 Nos = 8.00 Nos


No
= 8.00 s x 11.00 Rft = 88.00 Rft
No
Lapping = 8.00 Nos x 1 s x 2.17 Rft = 17.36 Rft
= 105.36 Rft

10mmØ stirup
C3 = 4 × 24 Nos × 5.33 Rft × = 511.68 Rft

= 4 × 24 Nos × 4.17 Rft × = 400.32 Rft

= 4 × 24 Nos × 4.00 Rft × = 384.00 Rft

C5 = 2 × 23 Nos × 4.83 Rft × = 222.18 Rft

= 2 × 23 Nos × 3.17 Rft × = 145.82 Rft

= 2 × 23 Nos × 3.00 Rft × = 138.00 Rft


= 1802.00 Rft
Column Summary
20mm Ø = 984.24 Rft = 741.18 Kg
16mm Ø = 105.36 Rft = 50.75 Kg
10mm Ø = 1,802.00 Rft = 340.62 Kg
For Column = 1132.56 kg
Acd.Column,Qty = 3455.31 Kg
Hostel Bldg
Column - 3rd Floor
Same measurement at 2nd Floor,Qty = 14244.52 Kg
Academic Bldg
Stair Reinforcement.
For Gr.Floor
12 mm Ø/ M = 1 × 2 Nos × 14 × 19.83 Rft = 555.24 Rft

Top = 1 × 1 Nos × 14 × 6.83 Rft = 95.62 Rft

" = 1 × 1 Nos × 14 × 8.75 Rft = 122.50 Rft

" = 1 × 2 Nos × 14 × 8.42 Rft = 235.76 Rft

" = 1 × 2 Nos × 2 × 5.00 Rft = 20.00 Rft

= 1,029.12 Rft

10mm Ø binder = 1 × 2 Nos × 38 × 4.25 Rft = 323.00 Rft

" = 1 × 4 Nos × 11 × 9.25 Rft = 407.00 Rft

= 730.00 Rft

20mm Ø -L.B = 1 × 1 Nos × 6 × 12.00 Rft = 72.00 Rft

10mm Ø Striup = 1 × 1 Nos × 20 × 3.67 Rft = 73.40 Rft

Stair Summary
10mm Ø = 803.40 = Rft 151.86 Kg
12mm Ø = 1,029.12 Rft = 279.24 Kg

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 112


20mm Ø = 72.00 Rft= 54.22 Kg
Gr. Floor Stair Qty = 485.32 Kg
For 1st.Floor
Same Measurement at Gr.Floor Qty = 485.32 Kg
For 2nd.Floor
Same Measurement at 1st.Floor Qty = 485.32 Kg
Stair Qty = 1455.97 kg
Hostel Bldg
Stair Reinforcement-E/W.
For Gr.Floor
12 mm Ø/ M = 2 × 2 Nos × 12 × 19.83 Rft = 951.84 Rft

Top = 2 × 1 Nos × 12 × 6.83 Rft = 163.92 Rft

" = 2 × 1 Nos × 12 × 8.75 Rft = 210.00 Rft

" = 2 × 2 Nos × 12 × 8.42 Rft = 404.16 Rft

" = 2 × 2 Nos × 2 × 5.00 Rft = 40.00 Rft

= 1,769.92 Rft
10mm Ø binder = 2 × 2 Nos × 38 × 3.33 Rft = 506.16 Rft

" = 2 × 4 Nos × 11 × 9.25 Rft = 814.00 Rft

= 1,320.16 Rft

20mm Ø -L.B = 2 × 1 Nos × 6 × 11.17 Rft = 134.04 Rft

10mm Ø Striup = 2 × 1 Nos × 20 × 3.67 Rft = 146.80 Rft

Stair Summary
10mm Ø = 1,466.96 Rft = 277.29 Kg
12mm Ø = 1,769.92 Rft= 480.25 Kg
20mm Ø = 134.04 Rft = 100.94 Kg
Qty = 858.48 Kg
Stair Reinforcement-Mid Portion.
12 mm Ø/ M = 1 × 2 Nos × 16 × 21.00 Rft = 672.00 Rft

Top = 1 × 1 Nos × 16 × 5.83 Rft = 93.28 Rft

" = 1 × 1 Nos × 16 × 11.00 Rft = 176.00 Rft

" = 1 × 2 Nos × 16 × 12.00 Rft = 384.00 Rft

" = 1 × 4 Nos × 2 × 8.00 Rft = 64.00 Rft

= 1,389.28 Rft
10mm Ø binder = 1 × 2 Nos × 42 × 5.00 Rft = 420.00 Rft

" = 1 × 4 Nos × 17 × 12.00 Rft = 816.00 Rft

= 1,236.00 Rft

20mm Ø -L.B = 1 × 1 Nos × 6 × 15.00 Rft = 90.00 Rft

= 1 × 2 Nos × 2 × 3.67 Rft = 14.68 Rft

= 2 × 1 Nos × 2 × 7.67 Rft = 30.68 Rft

= 135.36 Rft

10mm Ø Striup = 2 × 1 Nos × 26 × 4.50 Rft = 234.00 Rft

Stair Summary
10mm Ø = 1,470.00 Rft = 277.87 Kg
12mm Ø = 1,389.28 =
Rft 376.97 Kg
20mm Ø = 135.36 Rft = 101.93 Kg
Qty = 756.77 Kg
Gr. Floor Stair Qty = 1615.25 kg

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 113


For 1st.Floor
Same Measurement at Gr.Floor,Qty = 1615.25 Kg
For 2nd.Floor
Same Measurement at 1st.Floor,Qty = 1615.25 Kg
For 3rd.Floor
Same Measurement at 2nd.Floor,Qty = 1615.25 Kg
Stair Qty = 6461.00 kg
Principal Qtr
Pent house Slab
L/D,10 mm Ø/ ST = 1 × 10 Nos × 16.42 Rft = 164.20 Rft

Cut = 1 × 9 Nos × 10.33 Rft = 92.97 Rft

Ext.top = 1 × 19 Nos × 6.58 Rft = 125.02 Rft

" = 1 × 19 Nos × 9.17 Rft = 174.23 Rft

Binder = 2 × 3 Nos × 20.33 Rft = 121.98 Rft

S/D,10 mm Ø/ ST = 1 × 14 Nos × 9.00 Rft = 126.00 Rft

Cut = 1 × 13 Nos × 5.67 Rft = 73.71 Rft

Ext.top = 2 × 38 Nos × 4.75 Rft = 361.00 Rft

Binder = 2 × 6 Nos × 12.58 Rft = 150.96 Rft

= 1,390.07 Rft

Pent house Beam


B1,20mmØ ST = 2 × 6 Nos × 18.00 Rft = 216.00 Rft

10mm Ø Striup = 2 × 36 Nos × 3.67 Rft = 264.24 Rft

B2,16mmØ ST = 2 × 6 Nos × 10.42 Rft = 125.04 Rft

10mm Ø Striup = 2 × 19 Nos × 3.17 Rft = 120.46 Rft

Summary
10mm Ø = 1,774.77 Rft = 335.47 Kg
16mm Ø = 125.04 =
Rft 60.23 Kg
20mm Ø = 216.00 Rft = 162.66 Kg
Qty = 558.37 Kg
Female Hostel Bldg.
1st. Floor Slab
Long direction
10mm Ø St = 2 × 2 Nos × 13 Nos × 86.83 Rft = 4,515.16 Rft

" = 2 × 1 Nos × 7 Nos × 86.83 Rft = 1,215.62 Rft

Cut = 2 × 5 Nos × 30 Nos × 9.00 Rft = 2,700.00 Rft

"= 2 × 1 Nos × 22 Nos × 6.00 Rft = 264.00 Rft

"= 2 × 1 Nos × 30 Nos × 9.50 Rft = 570.00 Rft

Ext.top End = 2 × 1 Nos × 27 Nos × 4.00 Rft = 216.00 Rft

"= 2 × 1 Nos × 41 Nos × 8.33 Rft = 683.06 Rft

"= 2 × 1 Nos × 68 Nos × 5.00 Rft = 680.00 Rft

Ext.top Mid = 2 × 4 Nos × 80 Nos × 9.00 Rft = 5,760.00 Rft

"= 2 × 1 Nos × 80 Nos × 7.50 Rft = 1,200.00 Rft

"= 2 × 1 Nos × 80 Nos × 7.83 Rft = 1,252.80 Rft

Ver = 2 × 10 Nos × 11 Nos × 8.25 Rft = 1,815.00 Rft

"= 2 × 10 Nos × 6 Nos × 5.00 Rft = 600.00 Rft

"= 2 × 3 Nos × 6 Nos × 3.50 Rft = 126.00 Rft

"= 2 × 6 Nos × 4 Nos × 0.83 Rft = 39.84 Rft

Ext.top Binder = 2 × 5 Nos × 38 Nos × 12.00 Rft = 4,560.00 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 114


" = 2 × 1 Nos × 38 Nos × 8.00 Rft = 608.00 Rft

" = 2 × 1 Nos × 38 Nos × 12.33 Rft = 937.08 Rft

Laping = 2 × 26 Nos × 3 Nos × 1.33 Rft = 207.48 Rft

" = 2 × 7 Nos × 3 Nos × 1.33 Rft = 55.86 Rft


Gap 10Ø St = 2 × 13 Nos × 1 Nos × 6.00 Rft = 156.00 Rft
" = 2 × 13 Nos × 1 Nos × 7.00 Rft = 182.00 Rft
" = 2 × 8 Nos × 1 Nos × 15.00 Rft = 240.00 Rft
Cut = 2 × 13 Nos × 1 Nos × 5.00 Rft = 130.00 Rft
" = 2 × 13 Nos × 1 Nos × 5.25 Rft = 136.50 Rft
" = 2 × 7 Nos × 1 Nos × 10.00 Rft = 140.00 Rft
Ext.top Binder = 2 × 32 Nos × 1 Nos × 10.00 Rft = 640.00 Rft

= 29,630.40 Rft

Short direction
10mm Ø St = 2 × 5 Nos × 9 Nos × 42.83 Rft = 3,854.70 Rft

" = 2 × 5 Nos × 5 Nos × 39.17 Rft = 1,958.50 Rft

" = 2 × 1 Nos × 9 Nos × 22.67 Rft = 408.06 Rft

" = 2 × 1 Nos × 14 Nos × 35.58 Rft = 996.24 Rft

" = 2 × 3 Nos × 5 Nos × 1.67 Rft = 50.10 Rft

" = 2 × 6 Nos × 3 Nos × 3.00 Rft = 108.00 Rft

Alt. Cut = 2 × 9 Nos × 13 Nos × 9.42 Rft = 2,204.28 Rft

" = 2 × 5 Nos × 13 Nos × 6.75 Rft = 877.50 Rft

" = 2 × 1 Nos × 8 Nos × 6.75 Rft = 108.00 Rft

" = 2 × 1 Nos × 13 Nos × 6.75 Rft = 175.50 Rft

" = 2 × 2 Nos × 13 Nos × 9.42 Rft = 489.84 Rft

" = 2 × 1 Nos × 8 Nos × 9.42 Rft = 150.72 Rft

10mm Ø Ext.top = 2 × 10 Nos × 37 Nos × 8.17 Rft = 6,045.80 Rft

" = 2 × 2 Nos × 25 Nos × 8.17 Rft = 817.00 Rft

" = 2 × 2 Nos × 40 Nos × 8.17 Rft = 1,307.20 Rft

" = 2 × 2 Nos × 26 Nos × 5.17 Rft = 537.68 Rft

" = 2 × 1 Nos × 16 Nos × 5.17 Rft = 165.44 Rft

Ext.top Binder = 2 × 18 Nos × 6 Nos × 12.33 Rft = 2,663.28 Rft

" = 2 × 10 Nos × 6 Nos × 8.33 Rft = 999.60 Rft

" = 2 × 1 Nos × 32 Nos × 12.33 Rft = 789.12 Rft

" = 2 × 1 Nos × 20 Nos × 8.33 Rft = 333.20 Rft

Laping = 2 × 45 Nos × 1 Nos × 1.33 Rft = 119.70 Rft

" = 2 × 25 Nos × 1 Nos × 1.33 Rft = 66.50 Rft

" = 2 × 14 Nos × 1 Nos × 1.33 Rft = 37.24 Rft


Gap 10 Ø St = 2 × 35 Nos × 1 Nos × 12.00 Rft = 840.00 Rft
Cut = 2 × 25 Nos × 1 Nos × 12.00 Rft = 600.00 Rft
Ext.top " = 2 × 27 Nos × 1 Nos × 4.17 Rft = 225.18 Rft
" = 2 × 13 Nos × 1 Nos × 8.33 Rft = 216.58 Rft
" = 2 × 27 Nos × 1 Nos × 3.17 Rft = 171.18 Rft
" = 2 × 23 Nos × 1 Nos × 8.33 Rft = 383.18 Rft
" = 2 × 51 Nos × 1 Nos × 4.58 Rft = 467.16 Rft
Ext.top Binder = 2 × 4 Nos × 1 Nos × 35.00 Rft = 280.00 Rft
" = 2 × 4 Nos × 1 Nos × 8.00 Rft = 64.00 Rft
" = 2 × 15 Nos × 1 Nos × 24.83 Rft = 744.90 Rft

= 29,255.38 Rft

= 58,885.78 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 115


Qty = 11130.85 kg

12mm Ø Ext.top = 2 × 10 Nos × 25 Nos × 8.67 Rft = 4,335.00 Rft

" = 2 × 10 Nos × 16 Nos × 6.83 Rft = 2,185.60 Rft

" = 2 × 2 Nos × 37 Nos × 9.33 Rft = 1,380.84 Rft

" = 2 × 1 Nos × 25 Nos × 8.83 Rft = 441.50 Rft

= 8,342.94 Rft
= 2263.7855 kg
Mid Portion
Long direction
10mm Ø St = 1 × 1 Nos × 17 Nos × 23.50 Rft = 399.50 Rft

" = 1 × 1 Nos × 23 Nos × 29.17 Rft = 670.91 Rft

Cut = 2 × 1 Nos × 16 Nos × 8.25 Rft = 264.00 Rft

"= 2 × 1 Nos × 16 Nos × 4.17 Rft = 133.44 Rft

"= 1 × 1 Nos × 22 Nos × 14.67 Rft = 322.74 Rft

"= 1 × 1 Nos × 22 Nos × 6.58 Rft = 144.76 Rft

Ext.top = 2 × 1 Nos × 33 Nos × 3.00 Rft = 198.00 Rft

" = 2 × 1 Nos × 33 Nos × 6.50 Rft = 429.00 Rft

" = 1 × 1 Nos × 67 Nos × 19.50 Rft = 1,306.50 Rft

" = 1 × 1 Nos × 53 Nos × 7.33 Rft = 388.49 Rft

Binder = 2 × 1 Nos × 8 Nos × 20.33 Rft = 325.28 Rft

" = 2 × 1 Nos × 11 Nos × 26.67 Rft = 586.74 Rft

Short direction
10mm Ø St = 1 × 1 Nos × 24 Nos × 16.25 Rft = 390.00 Rft

" = 1 × 1 Nos × 20 Nos × 24.33 Rft = 486.60 Rft

" = 2 × 1 Nos × 9 Nos × 23.42 Rft = 421.56 Rft

Cut = 1 × 1 Nos × 23 Nos × 12.00 Rft = 276.00 Rft

" = 1 × 1 Nos × 27 Nos × 16.50 Rft = 445.50 Rft

Ext.top = 2 × 1 Nos × 64 Nos × 6.25 Rft = 800.00 Rft

" = 2 × 1 Nos × 46 Nos × 8.92 Rft = 820.64 Rft

" = 2 × 1 Nos × 20 Nos × 8.08 Rft = 323.20 Rft

Binder = 2 × 1 Nos × 22 Nos × 15.42 Rft = 678.48 Rft

" = 2 × 1 Nos × 9 Nos × 21.75 Rft = 391.50 Rft

" = 2 × 1 Nos × 4 Nos × 21.75 Rft = 174.00 Rft

= 10,376.84 Rft
= 1961.48 kg
Slab,Qty = 15356.11 kg
Female Hostel Bldg.
1st. Floor Slab Beam
FB-1
20 mm Ø St = 2 × 1 Nos × 4 Nos × 66.83 Rft = 534.64 Rft

" Laping = 2 × 4 Nos × 2 Nos × 2.67 Rft = 42.72 Rft

20mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 5.00 Rft = 40.00 Rft

20mm Ø Ext/Mid = 2 × 4 Nos × 2 Nos × 9.33 Rft = 149.28 Rft

16mmØ,Ext/Bott = 2 × 5 Nos × 2 Nos × 9.58 Rft = 191.60 Rft

25mm Ø Separor = 2 × 5 Nos × 3 Nos × 0.58 Rft = 17.40 Rft

10mmØ,Strriup = 2 × 1 Nos × 119 Nos × 4.17 Rft = 992.46 Rft

FB-1

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 116


20 mm Ø St = 2 × 1 Nos × 4 Nos × 50.25 Rft = 402.00 Rft

" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

20mmØ,Ext t/End = 2 × 1 Nos × 2 Nos × 5.00 Rft = 20.00 Rft

16mmØ,Ext/End = 2 × 1 Nos × 2 Nos × 5.25 Rft = 21.00 Rft

20mm Ø Ext/Mid = 2 × 1 Nos × 4 Nos × 9.33 Rft = 74.64 Rft

" = 2 × 1 Nos × 2 Nos × 8.00 Rft = 32.00 Rft

" = 2 × 1 Nos × 2 Nos × 8.17 Rft = 32.68 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 2 Nos × 9.58 Rft = 76.64 Rft

" = 2 × 1 Nos × 2 Nos × 6.58 Rft = 26.32 Rft

" = 2 × 1 Nos × 2 Nos × 9.75 Rft = 39.00 Rft

25mm Ø Separor = 2 × 2 Nos × 6 Nos × 0.58 Rft = 13.92 Rft

10mmØ,Strriup = 2 × 1 Nos × 89 Nos × 4.17 Rft = 742.26 Rft

FB-1
20 mm Ø St = 2 × 1 Nos × 4 Nos × 28.33 Rft = 226.64 Rft

" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

16mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 5.00 Rft = 40.00 Rft

20mm Ø Ext/Mid = 2 × 4 Nos × 1 Nos × 9.33 Rft = 74.64 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 2 Nos × 9.58 Rft = 76.64 Rft

25mm Ø Separor = 2 × 2 Nos × 3 Nos × 0.58 Rft = 6.96 Rft

10mmØ,Strriup = 2 × 1 Nos × 49 Nos × 4.17 Rft = 408.66 Rft

FB-2
20 mm Ø St = 2 × 2 Nos × 4 Nos × 88.75 Rft = 1,420.00 Rft

" Laping = 2 × 2 Nos × 12 Nos × 2.67 Rft = 128.16 Rft

16mmØ,Ext.t/End = 2 × 2 Nos × 2 Nos × 5.17 Rft = 41.36 Rft

20mm Ø Ext/Mid = 2 × 2 Nos × 4 Nos × 9.33 Rft = 149.28 Rft

" = 2 × 2 Nos × 1 Nos × 8.00 Rft = 32.00 Rft

" = 2 × 2 Nos × 1 Nos × 8.17 Rft = 32.68 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 5 Nos × 9.58 Rft = 191.60 Rft

" = 2 × 2 Nos × 1 Nos × 6.58 Rft = 26.32 Rft

" = 2 × 2 Nos × 1 Nos × 9.75 Rft = 39.00 Rft

10mmØ,Strriup = 2 × 2 Nos × 159 Nos × 4.17 Rft = 2,652.12 Rft

FB-3
20mm Ø St = 2 × 3 Nos × 4 Nos × 40.17 Rft = 964.08 Rft

" Laping = 2 × 3 Nos × 4 Nos × 2.67 Rft = 64.08 Rft

20mm Ø Ext/End = 2 × 3 Nos × 2 Nos × 6.50 Rft = 78.00 Rft

20mm Ø Ext/Mid = 2 × 3 Nos × 4 Nos × 8.33 Rft = 199.92 Rft

16mmØ,Ext/Bott = 2 × 3 Nos × 4 Nos × 10.00 Rft = 240.00 Rft

25mm Ø Separor = 2 × 3 Nos × 6 Nos × 0.58 Rft = 20.88 Rft

10mmØ,Strriup = 2 × 3 Nos × 71 Nos × 4.17 Rft = 1,776.42 Rft

FB-4
20mm Ø St = 2 × 5 Nos × 4 Nos × 43.50 Rft = 1,740.00 Rft

" Laping = 2 × 5 Nos × 4 Nos × 2.67 Rft = 106.80 Rft

20mm Ø Ext/End = 2 × 5 Nos × 4 Nos × 9.83 Rft = 393.20 Rft

20mm Ø Ext/Mid = 2 × 5 Nos × 4 Nos × 8.33 Rft = 333.20 Rft

16mmØ,Ext/Bott = 2 × 5 Nos × 4 Nos × 10.00 Rft = 400.00 Rft

25mm Ø Separor = 2 × 5 Nos × 6 Nos × 0.58 Rft = 34.80 Rft

10mmØ,Strriup = 2 × 5 Nos × 77 Nos × 4.17 Rft = 3,210.90 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 117


FB-6
20mm Ø St = 2 × 1 Nos × 6 Nos × 10.42 Rft = 125.04 Rft

20mm Ø Ext/Mid = 2 × 1 Nos × 3 Nos × 16.00 Rft = 96.00 Rft

10mmØ,Strriup = 2 × 1 Nos × 17 Nos × 4.17 Rft = 141.78 Rft

FB-7 =
16mm Ø St = 2 × 1 Nos × 6 Nos × 28.00 Rft = 336.00 Rft

" Laping = 2 × 6 Nos × 1 Nos × 2.17 Rft = 26.04 Rft

10mmØ,Strriup = 2 × 1 Nos × 49 Nos × 4.17 Rft = 408.66 Rft

FB-7 =
16mm Ø St = 2 × 1 Nos × 6 Nos × 19.33 Rft = 231.96 Rft

10mmØ,Strriup = 2 × 1 Nos × 34 Nos × 4.17 Rft = 283.56 Rft

FB-8
20 mm Ø St = 2 × 1 Nos × 4 Nos × 32.17 Rft = 257.36 Rft

" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

16mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 7.00 Rft = 56.00 Rft

" = 2 × 2 Nos × 2 Nos × 5.92 Rft = 47.36 Rft

20mm Ø Ext/Mid = 2 × 2 Nos × 1 Nos × 10.42 Rft = 41.68 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 1 Nos × 12.00 Rft = 48.00 Rft

" = 2 × 2 Nos × 1 Nos × 9.50 Rft = 38.00 Rft

25mm Ø Separor = 2 × 7 Nos × 1 Nos × 0.58 Rft = 8.12 Rft

10mmØ,Strriup = 2 × 1 Nos × 56 Nos × 4.17 Rft = 467.04 Rft

FB-9
20 mm Ø St = 2 × 1 Nos × 4 Nos × 26.17 Rft = 209.36 Rft

" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

20mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 10.33 Rft = 82.64 Rft

16mmØ,Ext/Bott = 2 × 1 Nos × 2 Nos × 8.75 Rft = 35.00 Rft

25mm Ø Separor = 2 × 1 Nos × 3 Nos × 0.58 Rft = 3.48 Rft

10mmØ,Strriup = 2 × 1 Nos × 46 Nos × 4.17 Rft = 383.64 Rft

FB-10 =
16mm Ø St = 2 × 1 Nos × 4 Nos × 11.50 Rft = 92.00 Rft

10mmØ,Strriup = 2 × 1 Nos × 19 Nos × 3.67 Rft = 139.46 Rft

FB-11 =
20mm Ø St = 2 × 1 Nos × 6 Nos × 19.83 Rft = 237.96 Rft

10mmØ,Strriup = 2 × 1 Nos × 34 Nos × 4.17 Rft = 283.56 Rft

FB-12
25 mm Ø St = 2 × 1 Nos × 6 Nos × 26.08 Rft = 312.96 Rft

" Laping = 2 × 1 Nos × 6 Nos × 3.33 Rft = 39.96 Rft

25mmØ,Ext t/End = 2 × 2 Nos × 3 Nos × 9.33 Rft = 111.96 Rft

25mmØ,Ext/Bott = 2 × 1 Nos × 3 Nos × 17.00 Rft = 102.00 Rft

25mm Ø Separor = 2 × 1 Nos × 6 Nos × 0.58 Rft = 6.96 Rft

10mmØ,Strriup = 2 × 1 Nos × 45 Nos × 5.50 Rft = 495.00 Rft

FB-13
20mm Ø St = 2 × 2 Nos × 6 Nos × 22.08 Rft = 529.92 Rft

16mmØ,Ext/End = 2 × 2 Nos × 2 Nos × 6.50 Rft = 52.00 Rft

16mm Ø Ext/Mid = 2 × 2 Nos × 4 Nos × 14.50 Rft = 232.00 Rft

10mmØ,Strriup = 2 × 2 Nos × 38 Nos × 4.17 Rft = 633.84 Rft

FB-14

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 118


25 mm Ø St = 2 × 2 Nos × 6 Nos × 22.08 Rft = 529.92 Rft

20mmØ,Ext/End = 2 × 1 Nos × 2 Nos × 6.50 Rft = 26.00 Rft

20mm Ø Ext/Mid = 2 × 2 Nos × 4 Nos × 14.50 Rft = 232.00 Rft

10mmØ,Strriup = 2 × 1 Nos × 38 Nos × 4.17 Rft = 316.92 Rft

Beam Summary
10mm Ø = 13,336.28 =
Rft @ 0.62 kg/m = 2520.88 Kg

16mm Ø = 2,577.80 Rft = @ 1.58 kg/m = 1241.75 Kg

20mm Ø = 8,860.84 Rft = @ 2.47 kg/m = 6672.64 Kg

25mm Ø = 1,209.32 Rft = @ 3.85 kg/m = 1419.48 Kg

Beam = 11854.75 kg
Slab & Beam = 27,210.86 kg
Female Hostel Bldg.
2nd. Floor Slab
Long direction
10mm Ø St = 2 × 2 Nos × 13 Nos × 86.83 Rft = 4,515.16 Rft

" = 2 × 1 Nos × 7 Nos × 86.83 Rft = 1,215.62 Rft

Cut = 2 × 5 Nos × 30 Nos × 9.00 Rft = 2,700.00 Rft

"= 2 × 1 Nos × 22 Nos × 6.00 Rft = 264.00 Rft

"= 2 × 1 Nos × 30 Nos × 9.50 Rft = 570.00 Rft

Ext.top End = 2 × 1 Nos × 27 Nos × 4.00 Rft = 216.00 Rft

"= 2 × 1 Nos × 41 Nos × 8.33 Rft = 683.06 Rft

"= 2 × 1 Nos × 68 Nos × 5.00 Rft = 680.00 Rft

Ext.top Mid = 2 × 4 Nos × 80 Nos × 9.00 Rft = 5,760.00 Rft

" = 2 × 1 Nos × 80 Nos × 7.50 Rft = 1,200.00 Rft

" = 2 × 1 Nos × 80 Nos × 7.83 Rft = 1,252.80 Rft

Ver = 2 × 10 Nos × 11 Nos × 8.25 Rft = 1,815.00 Rft

"= 2 × 10 Nos × 6 Nos × 5.00 Rft = 600.00 Rft

"= 2 × 3 Nos × 6 Nos × 3.50 Rft = 126.00 Rft

"= 2 × 6 Nos × 4 Nos × 0.83 Rft = 39.84 Rft

Ext.top Binder = 2 × 5 Nos × 38 Nos × 12.00 Rft = 4,560.00 Rft

" = 2 × 1 Nos × 38 Nos × 8.00 Rft = 608.00 Rft

" = 2 × 1 Nos × 38 Nos × 12.33 Rft = 937.08 Rft

Laping = 2 × 26 Nos × 3 Nos × 1.33 Rft = 207.48 Rft

" = 2 × 7 Nos × 3 Nos × 1.33 Rft = 55.86 Rft


Gap 10Ø St = 2 × 13 Nos × 1 Nos × 6.00 Rft = 156.00 Rft
" = 2 × 13 Nos × 1 Nos × 7.00 Rft = 182.00 Rft
" = 2 × 8 Nos × 1 Nos × 15.00 Rft = 240.00 Rft
Cut = 2 × 13 Nos × 1 Nos × 5.00 Rft = 130.00 Rft
" = 2 × 13 Nos × 1 Nos × 5.25 Rft = 136.50 Rft
" = 2 × 7 Nos × 1 Nos × 10.00 Rft = 140.00 Rft
Ext.top Binder = 2 × 32 Nos × 1 Nos × 10.00 Rft = 640.00 Rft

= 29,630.40 Rft

Short direction
10mm Ø St = 2 × 5 Nos × 9 Nos × 42.83 Rft = 3,854.70 Rft

" = 2 × 5 Nos × 5 Nos × 39.17 Rft = 1,958.50 Rft

" = 2 × 1 Nos × 9 Nos × 22.67 Rft = 408.06 Rft

" = 2 × 1 Nos × 14 Nos × 35.58 Rft = 996.24 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 119


" = 2 × 3 Nos × 5 Nos × 1.67 Rft = 50.10 Rft

" = 2 × 6 Nos × 3 Nos × 3.00 Rft = 108.00 Rft

Alt. Cut = 2 × 9 Nos × 13 Nos × 9.42 Rft = 2,204.28 Rft

" = 2 × 5 Nos × 13 Nos × 6.75 Rft = 877.50 Rft

" = 2 × 1 Nos × 8 Nos × 6.75 Rft = 108.00 Rft

" = 2 × 1 Nos × 13 Nos × 6.75 Rft = 175.50 Rft

" = 2 × 2 Nos × 13 Nos × 9.42 Rft = 489.84 Rft

" = 2 × 1 Nos × 8 Nos × 9.42 Rft = 150.72 Rft

10mm Ø Ext.top = 2 × 10 Nos × 37 Nos × 8.17 Rft = 6,045.80 Rft

" = 2 × 2 Nos × 25 Nos × 8.17 Rft = 817.00 Rft

" = 2 × 2 Nos × 40 Nos × 8.17 Rft = 1,307.20 Rft

" = 2 × 2 Nos × 26 Nos × 5.17 Rft = 537.68 Rft

" = 2 × 1 Nos × 16 Nos × 5.17 Rft = 165.44 Rft

Ext.top Binder = 2 × 18 Nos × 6 Nos × 12.33 Rft = 2,663.28 Rft

" = 2 × 10 Nos × 6 Nos × 8.33 Rft = 999.60 Rft

" = 2 × 1 Nos × 32 Nos × 12.33 Rft = 789.12 Rft

" = 2 × 1 Nos × 20 Nos × 8.33 Rft = 333.20 Rft

Laping = 2 × 45 Nos × 1 Nos × 1.33 Rft = 119.70 Rft

" = 2 × 25 Nos × 1 Nos × 1.33 Rft = 66.50 Rft

" = 2 × 14 Nos × 1 Nos × 1.33 Rft = 37.24 Rft


Gap 10Ø St = 2 × 35 Nos × 1 Nos × 12.00 Rft = 840.00 Rft
Cut = 2 × 25 Nos × 1 Nos × 12.00 Rft = 600.00 Rft
Ext.top = 2 × 27 Nos × 1 Nos × 4.17 Rft = 225.18 Rft
" = 2 × 13 Nos × 1 Nos × 8.33 Rft = 216.58 Rft
" = 2 × 27 Nos × 1 Nos × 3.17 Rft = 171.18 Rft
" = 2 × 23 Nos × 1 Nos × 8.33 Rft = 383.18 Rft
" = 2 × 51 Nos × 1 Nos × 4.58 Rft = 467.16 Rft
Ext.top Binder = 2 × 4 Nos × 1 Nos × 35.00 Rft = 280.00 Rft
" = 2 × 4 Nos × 1 Nos × 8.00 Rft = 64.00 Rft
" = 2 × 5 Nos × 1 Nos × 24.83 Rft = 248.30 Rft

= 29,255.38 Rft

= 58,885.78 Rft

Qty = 11130.85 kg
12mm Ø Ext.top = 2 × 10 Nos × 25 Nos × 8.67 Rft = 4,335.00 Rft

= 2 × 10 Nos × 16 Nos × 6.83 Rft = 2,185.60 Rft

= 2 × 1 Nos × 37 Nos × 9.33 Rft = 690.42 Rft

= 2 × 1 Nos × 25 Nos × 8.83 Rft = 441.50 Rft

= 8,342.94 Rft

= 2263.7855 kg
Mid Portion
Long direction
10mm Ø St = 1 × 1 Nos × 17 Nos × 23.50 Rft = 399.50 Rft

= 1 × 1 Nos × 16 Nos × 8.25 Rft = 132.00 Rft

= 2 × 1 Nos × 16 Nos × 4.17 Rft = 133.44 Rft

= 2 × 1 Nos × 33 Nos × 3.00 Rft = 198.00 Rft

= 2 × 1 Nos × 33 Nos × 6.50 Rft = 429.00 Rft

= 2 × 1 Nos × 8 Nos × 20.33 Rft = 325.28 Rft

Short direction

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 120


10mm Ø St = 1 × 1 Nos × 24 Nos × 16.25 Rft = 390.00 Rft

= 1 × 1 Nos × 23 Nos × 12.00 Rft = 276.00 Rft

= 2 × 1 Nos × 64 Nos × 6.25 Rft = 800.00 Rft

= 1 × 1 Nos × 22 Nos × 15.42 Rft = 339.24 Rft

= 3,422.46 Rft
= 646.93 kg
Slab,Qty = 14041.56 kg
Female Hostel Bldg.
2nd. Floor Slab Beam
FB-1
20 mm Ø St = 2 × 1 Nos × 4 Nos × 66.83 Rft = 534.64 Rft

" Laping = 2 × 4 Nos × 2 Nos × 2.67 Rft = 42.72 Rft

20mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 5.00 Rft = 40.00 Rft

20mm Ø Ext/Mid = 2 × 4 Nos × 2 Nos × 9.33 Rft = 149.28 Rft

16mmØ,Ext/Bott = 2 × 5 Nos × 2 Nos × 9.58 Rft = 191.60 Rft

25mm Ø Separor = 2 × 5 Nos × 3 Nos × 0.58 Rft = 17.40 Rft

10mmØ,Strriup = 2 × 1 Nos × 119 Nos × 4.17 Rft = 992.46 Rft

FB-1
20 mm Ø St = 2 × 1 Nos × 4 Nos × 50.25 Rft = 402.00 Rft

" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

20mmØ,Ext t/End = 2 × 1 Nos × 2 Nos × 5.00 Rft = 20.00 Rft

16mmØ,Ext/End = 2 × 1 Nos × 2 Nos × 5.25 Rft = 21.00 Rft

20mm Ø Ext/Mid = 2 × 1 Nos × 2 Nos × 9.33 Rft = 37.32 Rft

" = 2 × 1 Nos × 2 Nos × 8.00 Rft = 32.00 Rft

" = 2 × 1 Nos × 2 Nos × 8.17 Rft = 32.68 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 2 Nos × 9.58 Rft = 76.64 Rft

" = 2 × 1 Nos × 2 Nos × 6.58 Rft = 26.32 Rft

" = 2 × 1 Nos × 2 Nos × 9.75 Rft = 39.00 Rft

25mm Ø Separor = 2 × 2 Nos × 6 Nos × 0.58 Rft = 13.92 Rft

10mmØ,Strriup = 2 × 1 Nos × 89 Nos × 4.17 Rft = 742.26 Rft

FB-1
20 mm Ø St = 2 × 1 Nos × 4 Nos × 28.33 Rft = 226.64 Rft

" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

16mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 5.00 Rft = 40.00 Rft

20mm Ø Ext/Mid = 2 × 2 Nos × 1 Nos × 9.33 Rft = 37.32 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 2 Nos × 9.58 Rft = 76.64 Rft

25mm Ø Separor = 2 × 2 Nos × 3 Nos × 0.58 Rft = 6.96 Rft

10mmØ,Strriup = 2 × 1 Nos × 49 Nos × 4.17 Rft = 408.66 Rft

FB-2
20 mm Ø St = 2 × 2 Nos × 4 Nos × 88.75 Rft = 1,420.00 Rft

" Laping = 2 × 2 Nos × 12 Nos × 2.67 Rft = 128.16 Rft

16mmØ,Ext.t/End = 2 × 2 Nos × 2 Nos × 5.17 Rft = 41.36 Rft

20mm Ø Ext/Mid = 2 × 2 Nos × 4 Nos × 9.33 Rft = 149.28 Rft

" = 2 × 2 Nos × 1 Nos × 8.00 Rft = 32.00 Rft

" = 2 × 2 Nos × 1 Nos × 8.17 Rft = 32.68 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 5 Nos × 9.58 Rft = 191.60 Rft

" = 2 × 2 Nos × 1 Nos × 6.58 Rft = 26.32 Rft

" = 2 × 2 Nos × 1 Nos × 9.75 Rft = 39.00 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 121


10mmØ,Strriup = 2 × 2 Nos × 159 Nos × 4.17 Rft = 2,652.12 Rft

FB-3
20mm Ø St = 2 × 3 Nos × 4 Nos × 40.17 Rft = 964.08 Rft

" Laping = 2 × 3 Nos × 4 Nos × 2.67 Rft = 64.08 Rft

20mm Ø Ext/End = 2 × 3 Nos × 2 Nos × 6.50 Rft = 78.00 Rft

20mm Ø Ext/Mid = 2 × 3 Nos × 4 Nos × 8.33 Rft = 199.92 Rft

16mmØ,Ext/Bott = 2 × 3 Nos × 4 Nos × 10.00 Rft = 240.00 Rft

25mm Ø Separor = 2 × 3 Nos × 6 Nos × 0.58 Rft = 20.88 Rft

10mmØ,Strriup = 2 × 3 Nos × 71 Nos × 4.17 Rft = 1,776.42 Rft

FB-4
20mm Ø St = 2 × 5 Nos × 4 Nos × 43.50 Rft = 1,740.00 Rft

" Laping = 2 × 5 Nos × 4 Nos × 2.67 Rft = 106.80 Rft

20mm Ø Ext/End = 4 × 5 Nos × 4 Nos × 9.83 Rft = 786.40 Rft

20mm Ø Ext/Mid = 4 × 5 Nos × 4 Nos × 8.33 Rft = 666.40 Rft

16mmØ,Ext/Bott = 4 × 5 Nos × 2 Nos × 10.00 Rft = 400.00 Rft

25mm Ø Separor = 4 × 5 Nos × 6 Nos × 0.58 Rft = 69.60 Rft

10mmØ,Strriup = 4 × 5 Nos × 77 Nos × 4.17 Rft = 6,421.80 Rft

FB-7 =
16mm Ø St = 2 × 1 Nos × 6 Nos × 28.00 Rft = 336.00 Rft

" Laping = 2 × 6 Nos × 1 Nos × 2.17 Rft = 26.04 Rft

10mmØ,Strriup = 2 × 1 Nos × 49 Nos × 4.17 Rft = 408.66 Rft

FB-7 =
16mm Ø St = 2 × 1 Nos × 6 Nos × 19.33 Rft = 231.96 Rft

10mmØ,Strriup = 2 × 1 Nos × 34 Nos × 4.17 Rft = 283.56 Rft

FB-8
20 mm Ø St = 2 × 1 Nos × 4 Nos × 32.17 Rft = 257.36 Rft

" Laping = 2 × 4 Nos × 1 Nos × 2.67 Rft = 21.36 Rft

16mmØ,Ext t/End = 2 × 2 Nos × 2 Nos × 7.00 Rft = 56.00 Rft

" = 2 × 2 Nos × 2 Nos × 5.92 Rft = 47.36 Rft

20mm Ø Ext/Mid = 2 × 2 Nos × 1 Nos × 10.42 Rft = 41.68 Rft

16mmØ,Ext/Bott = 2 × 2 Nos × 1 Nos × 12.00 Rft = 48.00 Rft

" = 2 × 2 Nos × 1 Nos × 9.50 Rft = 38.00 Rft

25mm Ø Separor = 2 × 7 Nos × 1 Nos × 0.58 Rft = 8.12 Rft

10mmØ,Strriup = 2 × 1 Nos × 56 Nos × 4.17 Rft = 467.04 Rft

FB-9
20 mm Ø St = 2 × 2 Nos × 4 Nos × 26.17 Rft = 418.72 Rft

" Laping = 2 × 2 Nos × 1 Nos × 2.67 Rft = 10.68 Rft

20mmØ,Ext t/End = 2 × 4 Nos × 2 Nos × 10.33 Rft = 165.28 Rft

16mmØ,Ext/Bott = 2 × 4 Nos × 2 Nos × 8.75 Rft = 140.00 Rft

25mm Ø Separor = 2 × 4 Nos × 6 Nos × 0.58 Rft = 27.84 Rft

10mmØ,Strriup = 2 × 4 Nos × 66 Nos × 4.17 Rft = 2,201.76 Rft

FB-10 =
16mm Ø St = 2 × 1 Nos × 4 Nos × 11.50 Rft = 92.00 Rft

10mmØ,Strriup = 2 × 1 Nos × 19 Nos × 3.67 Rft = 139.46 Rft

FB-11 =
20mm Ø St = 2 × 1 Nos × 6 Nos × 19.83 Rft = 237.96 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 122


10mmØ,Strriup = 2 × 1 Nos × 34 Nos × 4.17 Rft = 283.56 Rft

Beam Summary
10mm Ø = 16,777.76 =
Rft @ 0.62 kg/m = 3171.41 Kg

16mm Ø = 2,398.80 Rft = @ 1.58 kg/m = 1155.52 Kg

20mm Ø = 8,451.76 Rft = @ 2.47 kg/m = 6364.59 Kg

25mm Ø = 164.72 Rft = @ 3.85 kg/m = 193.35 Kg

Beam = 10884.86 kg
Slab & Beam = 24,926.42 kg

Academic Bldg
2nd. Floor Slab Beam
FB-1
16mm Ø St = 1 × 5 Nos × 82.08 Rft = 410.40 Rft
" Laping = 5 × 3 Nos × 2.17 Rft = 32.55 Rft
10mmØ,Strriup = 1 × 173 Nos × 3.67 Rft = 634.91 Rft
FB-1
16mm Ø St = 1 × 5 Nos × 92.08 Rft = 460.40 Rft
" Laping = 5 × 3 Nos × 2.17 Rft = 32.55 Rft
10mmØ,Strriup = 1 × 194 Nos × 3.67 Rft = 711.98 Rft
FB-2
16mm Ø St = 2 × 6 Nos × 101.58 Rft = 1,218.96 Rft
" Laping = 12 × 4 Nos × 2.17 Rft = 104.16 Rft
10mmØ,Strriup = 2 × 214 Nos × 3.67 Rft = 1,570.76 Rft
FB-3
20 mm Ø St = 1 × 4 Nos × 47.08 Rft = 188.32 Rft
20 mm Ø Laping = 1 × 4 Nos × 2.67 Rft = 10.68 Rft
" Ext/End = 1 × 2 Nos × 6.83 Rft = 13.66 Rft
" Ext/Mid = 1 × 3 Nos × 20.50 Rft = 61.50 Rft
" Ext/Bott = 1 × 4 Nos × 12.25 Rft = 49.00 Rft
25mm Ø Seprt = 1 × 6 Nos × 0.58 Rft = 3.48 Rft
10 mmØ,Strriup = 1 × 84 Nos × 4.67 Rft = 392.28 Rft
FB-4
20 mm Ø St = 8 × 6 Nos × 47.08 Rft = 2,259.84 Rft
20 mm Ø Laping = 8 × 6 Nos × 2.67 Rft = 128.16 Rft
16 mm Ø Ext/End = 8 × 4 Nos × 7.42 Rft = 237.44 Rft
20 mm Ø Ext/Mid = 8 × 2 Nos × 20.50 Rft = 328.00 Rft
16 mm Ø Ext/Bott = 8 × 4 Nos × 12.25 Rft = 392.00 Rft
25mm Ø Seprt = 8 × 6 Nos × 0.75 Rft = 36.00 Rft
10 mmØ,Strriup = 8 × 84 Nos × 5.00 Rft = 3,360.00 Rft
FB-5
20 mm Ø St = 2 × 4 Nos × 29.33 Rft = 234.64 Rft
20 mm Ø Laping = 2 × 4 Nos × 2.67 Rft = 21.36 Rft
16 mm Ø Ext/End = 2 × 2 Nos × 7.42 Rft = 29.68 Rft
20 mm Ø Ext/Mid = 2 × 3 Nos × 15.00 Rft = 90.00 Rft
20 mm Ø Ext/Bott = 2 × 2 Nos × 12.25 Rft = 49.00 Rft
25mm Ø Seprt = 2 × 6 Nos × 0.58 Rft = 6.96 Rft
10 mmØ,Strriup = 2 × 51 Nos × 4.67 Rft = 476.34 Rft
Beam Summary
10mm Ø = 7,146.27 Rft = 1350.82 Kg

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 123


16mm Ø = 2,918.14 =
Rft 1405.69 Kg
20mm Ø = 3,434.16 Rft = 2586.09 Kg
25mm Ø = 46.44 Rft = 54.51 Kg
Slab Beam = 5397.11 kg
Academic Bldg
2nd. Floor Slab
N/S Direction
10mm Ø St = 1 × 17 Nos × 80.75 Rft = 1,372.75 Rft
" = 1 × 7 Nos × 100.25 Rft = 701.75 Rft
" = 1 × 17 Nos × 90.75 Rft = 1,542.75 Rft
" = 1 × 5 Nos × 9.50 Rft = 47.50 Rft
Cut = 8 × 41 Nos × 6.83 Rft = 2,240.24 Rft
"= 1 × 24 Nos × 6.83 Rft = 163.92 Rft
"= 1 × 12 Nos × 7.33 Rft = 87.96 Rft
Ext Top End = 1 × 75 Nos × 3.33 Rft = 249.75 Rft
Mid = 7 × 113 Nos × 7.50 Rft = 5,932.50 Rft
"= 1 × 65 Nos × 7.50 Rft = 487.50 Rft
"= 1 × 28 Nos × 7.00 Rft = 196.00 Rft
End = 2 × 48 Nos × 3.33 Rft = 319.68 Rft
"= 1 × 25 Nos × 3.33 Rft = 83.25 Rft
Laping = 1 × 147 Nos × 1.33 Rft = 195.51 Rft
Ext top Binder = 8 × 36 Nos × 9.00 Rft = 2,592.00 Rft
"= 1 × 22 Nos × 9.00 Rft = 198.00 Rft
"= 2 × 8 Nos × 8.50 Rft = 136.00 Rft
E/W Direction
10mm Ø St = 8 × 7 Nos × 43.75 Rft = 2,450.00 Rft
"= 1 × 7 Nos × 26.42 Rft = 184.94 Rft
"= 1 × 7 Nos × 13.83 Rft = 96.81 Rft
Cut = 17 × 6 Nos × 12.25 Rft = 1,249.50 Rft
" = 10 × 6 Nos × 6.00 Rft = 360.00 Rft
"= 1 × 6 Nos × 3.75 Rft = 22.50 Rft
Ext top End = 17 × 17 Nos × 5.00 Rft = 1,445.00 Rft
Mid = 8 × 19 Nos × 20.50 Rft = 3,116.00 Rft
"= 1 × 19 Nos × 15.00 Rft = 285.00 Rft
"= 1 × 27 Nos × 14.67 Rft = 396.09 Rft
Ext top Binder = 17 × 10 Nos × 16.33 Rft = 2,776.10 Rft
" = 10 × 10 Nos × 8.00 Rft = 800.00 Rft
" = 1 × 10 Nos × 5.00 Rft = 50.00 Rft
Laping = 1 × 56 Nos × 1.33 Rft = 74.48 Rft
= = 5643.03585 Kg
29,853.48 Rft
Slab & Beam = 11040.14 Kg
Academic Bldg
Pent house Slab-3rd Floor
L/D,10 mm Ø/ ST = 1 × 8 Nos × 17.42 Rft = 139.36 Rft

Cut = 1 × 8 Nos × 13.00 Rft = 104.00 Rft

Ext.top = 2 × 21 Nos × 7.33 Rft = 307.86 Rft

Binder = 2 × 3 Nos × 20.75 Rft = 124.50 Rft

S/D,10 mm Ø/ ST = 1 × 20 Nos × 9.92 Rft = 198.40 Rft

Cut = 1 × 20 Nos × 6.42 Rft = 128.40 Rft

Ext.top = 2 × 40 Nos × 5.17 Rft = 413.60 Rft

Binder = 2 × 3 Nos × 13.33 Rft = 79.98 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 124


= 1,496.10 Rft

Pent house Beam


B1,16mmØ ST = 2 × 6 Nos × 20.50 Rft = 246.00 Rft

20mm Ø Ext.top = 2 × 4 Nos × 7.00 Rft = 56.00 Rft

16mm Ø Ext.Bott = 2 × 2 Nos × 12.00 Rft = 48.00 Rft

10mm Ø Striup = 2 × 40 Nos × 4.17 Rft = 333.60 Rft

B2,16mmØ ST = 2 × 6 Nos × 11.67 Rft = 140.04 Rft

10mm Ø Striup = 2 × 22 Nos × 3.67 Rft = 161.48 Rft

Summary
10mm Ø = 1,991.18 Rft = 376.38 Kg
16mm Ø = 434.04 =
Rft 209.08 Kg
20mm Ø = 56.00 Rft = 42.17 Kg
Qty = 627.63 Kg
Lintel
For Gr.Floor
Academic Bldg
On 10" Wall with Sunshade
12 mm Ø/ M = 1 × 1 Nos × 6 × 90.75 Rft = 544.50 Rft

" = 1 × 2 Nos × 6 × 10.75 Rft = 129.00 Rft

" = 1 × 1 Nos × 6 × 80.75 Rft = 484.50 Rft

" = 1 × 2 Nos × 6 × 18.83 Rft = 225.96 Rft

" = 1 × 2 Nos × 6 × 42.00 Rft = 504.00 Rft

= 1,887.96 Rft

= 512.28 kg
10mm Ø Strp = 1 × 1 Nos × 216 × 4.50 Rft = 972.00 Rft
" = 1 × 2 Nos × 27 × 4.50 Rft = 243.00 Rft

" = 1 × 1 Nos × 193 × 4.50 Rft = 868.50 Rft

" = 1 × 2 Nos × 46 × 4.50 Rft = 414.00 Rft

" = 1 × 2 Nos × 101 × 4.50 Rft = 909.00 Rft

10mm Ø binder = 1 × 1 Nos × 2 × 90.75 Rft = 181.50 Rft

" = 1 × 2 Nos × 2 × 10.75 Rft = 43.00 Rft

" = 1 × 1 Nos × 2 × 80.75 Rft = 161.50 Rft

" = 1 × 2 Nos × 2 × 18.75 Rft = 75.00 Rft

" = 1 × 2 Nos × 2 × 42.00 Rft = 168.00 Rft

= 4,035.50 Rft
= 762.81 kg
On 10" Wall without Sunshade
12 mm Ø/ M = 1 × 1 Nos × 6 × 20.42 Rft = 122.52 Rft

" = 1 × 2 Nos × 6 × 9.33 Rft = 111.96 Rft

" = 1 × 1 Nos × 6 × 11.08 Rft = 66.48 Rft

= 300.96 Rft
= 81.66 kg
10mm Ø Strp = 1 × 1 Nos × 50 × 3.00 Rft = 150.00 Rft

" = 1 × 2 Nos × 23 × 3.00 Rft = 138.00 Rft

" = 1 × 1 Nos × 27 × 3.00 Rft = 81.00 Rft


= 369.00 Rft

= 69.75 kg

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 125


On 5" Wall without Sunshade
12 mm Ø/ M = 1 × 17 Nos × 4 × 10.00 Rft = 680.00 Rft

" = 1 × 11 Nos × 4 × 18.83 Rft = 828.52 Rft

= 1,508.52 Rft

= 409.32 kg
10mm Ø Strp = 1 × 17 Nos × 25 × 1.67 Rft = 709.75 Rft

" = 1 × 11 Nos × 46 × 1.67 Rft = 845.02 Rft

= 1,554.77 Rft

= 293.89 kg
= 2129.72 kg
For 1st.Floor
Academic Bldg
On 10" Wall with Sunshade
12 mm Ø/ M = 1 × 1 Nos × 6 × 129.58 Rft = 777.48 Rft

" = 1 × 1 Nos × 6 × 80.75 Rft = 484.50 Rft

" = 1 × 1 Nos × 6 × 20.75 Rft = 124.50 Rft

" = 1 × 1 Nos × 6 × 19.25 Rft = 115.50 Rft

" = 1 × 1 Nos × 6 × 27.67 Rft = 166.02 Rft

" = 1 × 2 Nos × 6 × 42.00 Rft = 504.00 Rft

= 2,172.00 Rft

= 589.35 kg
10mm Ø Strp = 1 × 1 Nos × 310 × 4.50 Rft = 1,395.00 Rft
" = 1 × 1 Nos × 193 × 4.50 Rft = 868.50 Rft

" = 1 × 1 Nos × 50 × 4.50 Rft = 225.00 Rft

" = 1 × 1 Nos × 47 × 4.50 Rft = 211.50 Rft

" = 1 × 1 Nos × 67 × 4.50 Rft = 301.50 Rft

" = 1 × 2 Nos × 101 × 4.50 Rft = 909.00 Rft

10mm Ø binder = 1 × 1 Nos × 2 × 129.58 Rft = 259.16 Rft

" = 1 × 1 Nos × 2 × 80.75 Rft = 161.50 Rft

" = 1 × 1 Nos × 2 × 20.75 Rft = 41.50 Rft

" = 1 × 1 Nos × 2 × 19.25 Rft = 38.50 Rft

" = 1 × 1 Nos × 2 × 27.67 Rft = 55.34 Rft

" = 1 × 2 Nos × 2 × 42.00 Rft = 168.00 Rft

= 4,634.50 Rft
= 876.03 kg
On 10" Wall without Sunshade
12 mm Ø/ M = 1 × 1 Nos × 6 × 20.42 Rft = 122.52 Rft

" = 1 × 2 Nos × 6 × 9.33 Rft = 111.96 Rft

" = 1 × 1 Nos × 6 × 11.08 Rft = 66.48 Rft

= 300.96 Rft

= 81.66 kg
10mm Ø Strp = 1 × 1 Nos × 50 × 3.00 Rft = 150.00 Rft

" = 1 × 2 Nos × 23 × 3.00 Rft = 138.00 Rft

" = 1 × 1 Nos × 27 × 3.00 Rft = 81.00 Rft


= 369.00 Rft
= 69.75 kg
On 5" Wall without Sunshade

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 126


12 mm Ø/ M = 1 × 20 Nos × 4 × 10.00 Rft = 800.00 Rft

" = 1 × 1 Nos × 4 × 7.50 Rft = 30.00 Rft

" = 1 × 1 Nos × 4 × 9.17 Rft = 36.68 Rft

" = 1 × 1 Nos × 4 × 10.25 Rft = 41.00 Rft

" = 1 × 6 Nos × 4 × 18.75 Rft = 450.00 Rft

= 1,357.68 Rft

= 368.39 kg
10mm Ø Strp = 1 × 20 Nos × 21 × 1.67 Rft = 701.40 Rft

" = 1 × 1 Nos × 16 × 1.67 Rft = 26.72 Rft

" = 1 × 1 Nos × 19 × 1.67 Rft = 31.73 Rft

" = 1 × 1 Nos × 21 × 1.67 Rft = 35.07 Rft

" = 1 × 1 Nos × 39 × 1.67 Rft = 65.13 Rft

= 860.05 Rft
= 162.57 kg
= 2147.77 kg
Lintel Qty = 4277.48 kg
Sunshade
Hostel Bldg
Gr.Floor
10mmØ W80 = 18 × 3 Nos × 6.75 Rft = 364.50 Rft

= 18 × 15 Nos × 2.33 Rft = 629.10 Rft

W50 = 4 × 3 Nos × 4.00 Rft = 48.00 Rft

= 4 × 9 Nos × 2.33 Rft = 83.88 Rft


W48 = 2 × 3 Nos × 3.83 Rft = 22.98 Rft
= 2 × 9 Nos × 2.33 Rft = 41.94 Rft
W90 = 2 × 3 Nos × 7.33 Rft = 43.98 Rft
= 2 × 16 Nos × 2.33 Rft = 74.56 Rft
HW24 = 10 × 3 Nos × 1.83 Rft = 54.90 Rft
= 10 × 5 Nos × 2.33 Rft = 116.50 Rft
Gap = 2 × 3 Nos × 4.17 Rft = 25.02 Rft
= 2 × 9 Nos × 2.33 Rft = 41.94 Rft
Mid = 10 × 3 Nos × 13.08 Rft = 392.40 Rft
= 10 × 28 Nos × 2.33 Rft = 652.40 Rft
= 2,592.10 Rft = 489.97 kg
On Cup Board
Hostel Bldg
Gr.Floor
10mmØ = 18 × 11 Nos × 2.00 Rft = 396.00 Rft

= 18 × 5 Nos × 5.00 Rft = 450.00 Rft


= 846.00 Rft
= 159.91 kg
Lintel
Hostel Bldg
Gr.Floor
12mmØ 10" Wall = 18 × 4 Nos × 9.08 Rft = 653.76 Rft
= 4 × 4 Nos × 13.75 Rft = 220.00 Rft
= 2 × 4 Nos × 7.25 Rft = 58.00 Rft
= 6 × 4 Nos × 8.00 Rft = 192.00 Rft
= 4 × 4 Nos × 3.00 Rft = 48.00 Rft
= 2 × 4 Nos × 12.50 Rft = 100.00 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 127


= 4 × 4 Nos × 5.00 Rft = 80.00 Rft
= 2 × 4 Nos × 14.00 Rft = 112.00 Rft
= 2 × 4 Nos × 12.00 Rft = 96.00 Rft
= 1,559.76 Rft = 423.23 kg
10mmØ Binder = 18 × 19 Nos × 2.50 Rft = 855.00 Rft
= 4 × 29 Nos × 2.50 Rft = 290.00 Rft
= 2 × 16 Nos × 2.50 Rft = 80.00 Rft
= 6 × 17 Nos × 2.50 Rft = 255.00 Rft
= 4 × 7 Nos × 2.50 Rft = 70.00 Rft
= 2 × 26 Nos × 2.50 Rft = 130.00 Rft
= 4 × 11 Nos × 2.50 Rft = 110.00 Rft
= 2 × 29 Nos × 2.50 Rft = 145.00 Rft
= 2 × 25 Nos × 2.50 Rft = 125.00 Rft
= 2,060.00 Rft = 389.39 kg
10mmØ 5" Wall
West TLT = 2 × 4 Nos × 11.58 Rft = 92.64 Rft
= 2 × 4 Nos × 4.00 Rft = 32.00 Rft
Wash = 2 × 4 Nos × 11.50 Rft = 92.00 Rft
C.S Room = 2 × 4 Nos × 7.33 Rft = 58.64 Rft
= 2 × 4 Nos × 11.50 Rft = 92.00 Rft
= 2 × 4 Nos × 10.25 Rft = 82.00 Rft
= 2 × 4 Nos × 4.58 Rft = 36.64 Rft
Kitchen = 2 × 4 Nos × 11.67 Rft = 93.36 Rft
Pantry = 2 × 4 Nos × 11.33 Rft = 90.64 Rft
Entry = 2 × 4 Nos × 11.50 Rft = 92.00 Rft
East Portin Bulk.St = 3 × 4 Nos × 12.00 Rft = 144.00 Rft
Corridor = 10 × 4 Nos × 11.67 Rft = 466.80 Rft
TLT = 2 × 4 Nos × 7.33 Rft = 58.64 Rft
= 1 × 4 Nos × 8.08 Rft = 32.32 Rft
C.TLT = 1 × 4 Nos × 11.50 Rft = 46.00 Rft
Stair = 4 × 4 Nos × 11.50 Rft = 184.00 Rft
Round.St = 1 × 4 Nos × 19.33 Rft = 77.32 Rft
10mmØ Binder = 2 × 24 Nos × 1.67 Rft = 80.16 Rft
= 2 × 9 Nos × 1.67 Rft = 30.06 Rft
= 2 × 24 Nos × 1.67 Rft = 80.16 Rft
= 2 × 15 Nos × 1.67 Rft = 50.10 Rft
= 2 × 24 Nos × 1.67 Rft = 80.16 Rft
= 2 × 21 Nos × 1.67 Rft = 70.14 Rft
= 2 × 11 Nos × 1.67 Rft = 36.74 Rft
= 2 × 25 Nos × 1.67 Rft = 83.50 Rft
= 2 × 23 Nos × 1.67 Rft = 76.82 Rft
= 2 × 24 Nos × 1.67 Rft = 80.16 Rft
= 3 × 25 Nos × 1.67 Rft = 125.25 Rft
= 10 × 5 Nos × 1.67 Rft = 83.50 Rft
= 2 × 15 Nos × 1.67 Rft = 50.10 Rft
= 1 × 17 Nos × 1.67 Rft = 28.39 Rft
= 1 × 23 Nos × 1.67 Rft = 38.41 Rft
= 4 × 23 Nos × 1.67 Rft = 153.64 Rft
= 1 × 39 Nos × 1.67 Rft = 65.13 Rft
= 2,983.42 Rft = 563.94 kg
Qty = 2026.44 kg
Hostel Bldg
1st.Floor
Verandah Slab

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 128


10mmØ = 18 × 5 Nos × 7.83 Rft = 704.70 Rft

= 18 × 20 Nos × 5.00 Rft =1,800.00 Rft


= 2,504.70 Rft = 473.45 kg
Railing
1st.Floor
10mmØ = 18 × 18 Nos × 3.67 Rft = 1,189.08 Rft

= 18 × 5 Nos × 8.50 Rft =765.00 Rft


= 1,954.08 Rft = 369.37 kg
Sunshade
1st.Floor
Hostel Bldg
10mmØ Gap = 2 × 25 Nos × 2.33 Rft = 116.50 Rft

= 2 × 3 Nos × 11.83 Rft = 70.98 Rft

W50 = 8 × 3 Nos × 4.00 Rft = 96.00 Rft

= 8 × 9 Nos × 2.33 Rft = 167.76 Rft


W48 = 2 × 3 Nos × 3.83 Rft = 22.98 Rft
= 2 × 9 Nos × 2.33 Rft = 41.94 Rft
W90 = 8 × 3 Nos × 7.33 Rft = 175.92 Rft
= 8 × 16 Nos × 2.33 Rft = 298.24 Rft
HW24 = 10 × 3 Nos × 1.83 Rft = 54.90 Rft
= 10 × 5 Nos × 2.33 Rft = 116.50 Rft
Gap = 2 × 3 Nos × 4.17 Rft = 25.02 Rft
= 2 × 9 Nos × 2.33 Rft = 41.94 Rft
TV = 2 × 3 Nos × 19.00 Rft = 114.00 Rft
= 2 × 39 Nos × 2.33 Rft = 181.74 Rft
Mid = 10 × 3 Nos × 13.08 Rft = 392.40 Rft
= 10 × 28 Nos × 2.33 Rft = 652.40 Rft
= 2,569.22 Rft = 485.65 kg
On Cup Board
1st.Floor
Hostel Bldg
10mmØ = 18 × 11 Nos × 2.00 Rft = 396.00 Rft

= 18 × 5 Nos × 5.00 Rft =450.00 Rft


= 846.00 Rft = 159.91 kg
Lintel
Hostel Bldg
1st.Floor
12mmØ 10" Wall = 18 × 4 Nos × 8.08 Rft = 581.76 Rft
= 4 × 4 Nos × 12.25 Rft = 196.00 Rft
= 2 × 4 Nos × 7.75 Rft = 62.00 Rft
W45 = 2 × 4 Nos × 4.00 Rft = 32.00 Rft
W50 = 2 × 4 Nos × 5.00 Rft = 40.00 Rft
HW24 = 4 × 4 Nos × 2.25 Rft = 36.00 Rft
TV = 2 × 4 Nos × 19.25 Rft = 154.00 Rft
Stair = 2 × 4 Nos × 11.25 Rft = 90.00 Rft
Mid = 4 × 4 Nos × 4.58 Rft = 73.28 Rft
= 2 × 4 Nos × 13.58 Rft = 108.64 Rft
= 1 × 4 Nos × 12.00 Rft = 48.00 Rft
Gap = 2 × 4 Nos × 13.08 Rft = 104.64 Rft
= 1,526.32 Rft = 414.15 kg

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 129


10mmØ Binder = 18 × 17 Nos × 3.00 Rft = 918.00 Rft
= 4 × 25 Nos × 2.50 Rft = 250.00 Rft
= 2 × 16 Nos × 2.50 Rft = 80.00 Rft
W45 = 2 × 9 Nos × 2.50 Rft = 45.00 Rft
W50 = 2 × 11 Nos × 2.50 Rft = 55.00 Rft
HW24 = 4 × 5 Nos × 2.50 Rft = 50.00 Rft
TV = 2 × 39 Nos × 2.50 Rft = 195.00 Rft
Stair = 2 × 23 Nos × 2.50 Rft = 115.00 Rft
Mid = 4 × 10 Nos × 2.50 Rft = 100.00 Rft
= 2 × 28 Nos × 2.50 Rft = 140.00 Rft
= 1 × 25 Nos × 2.50 Rft = 62.50 Rft
Gap = 2 × 27 Nos × 2.50 Rft = 135.00 Rft
= 2,145.50 Rft = 405.55 kg
10mmØ 5" Wall
Corridor = 18 × 4 Nos × 12.17 Rft = 876.24 Rft
= 2 × 4 Nos × 7.75 Rft = 62.00 Rft
Ver = 18 × 4 Nos × 8.00 Rft = 576.00 Rft
Gap = 2 × 4 Nos × 12.67 Rft = 101.36 Rft
Wash = 2 × 4 Nos × 12.50 Rft = 100.00 Rft
TLT = 12 × 4 Nos × 4.00 Rft = 192.00 Rft
= 4 × 4 Nos × 16.50 Rft = 264.00 Rft
Stair = 4 × 4 Nos × 11.50 Rft = 184.00 Rft
Store = 4 × 4 Nos × 8.75 Rft = 140.00 Rft
Round.St = 1 × 4 Nos × 19.75 Rft = 79.00 Rft
Gap = 2 × 4 Nos × 6.25 Rft = 50.00 Rft
10mmØ Binder = 18 × 25 Nos × 1.67 Rft = 751.50 Rft
= 2 × 15 Nos × 1.67 Rft = 50.10 Rft
= 18 × 17 Nos × 1.67 Rft = 511.02 Rft
= 2 × 26 Nos × 1.67 Rft = 86.84 Rft
= 2 × 26 Nos × 1.67 Rft = 86.84 Rft
= 12 × 9 Nos × 1.67 Rft = 180.36 Rft
= 4 × 34 Nos × 1.67 Rft = 227.12 Rft
= 4 × 24 Nos × 1.67 Rft = 160.32 Rft
= 4 × 18 Nos × 1.67 Rft = 120.24 Rft
= 1 × 40 Nos × 1.67 Rft = 66.80 Rft
= 2 × 13 Nos × 1.67 Rft = 43.42 Rft
= 4,909.16 Rft = 927.95 kg
Qty = 3236.03 kg
Principal Qtr
Gr.Floor-Sunshade
10mmØ W60 = 8 × 13 Nos × 3.58 Rft = 372.32 Rft

= 8 × 3 Nos × 6.33 Rft = 151.92 Rft

W37 = 1 × 10 Nos × 3.58 Rft = 35.80 Rft

= 1 × 3 Nos × 5.00 Rft = 15.00 Rft


HW24 = 2 × 6 Nos × 3.58 Rft = 42.96 Rft
= 2 × 3 Nos × 3.17 Rft = 19.02 Rft
HW20 = 1 × 6 Nos × 3.58 Rft = 21.48 Rft
= 1 × 3 Nos × 3.17 Rft = 9.51 Rft
HW18 = 1 × 6 Nos × 3.58 Rft = 21.48 Rft
= 1 × 3 Nos × 3.00 Rft = 9.00 Rft
= 698.49 Rft = 132.03 kg
Principal Qtr
Drop Wall
10mmØ = 4 × 25 Nos × 4.00 Rft = 400.00 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 130


= 4 × 6 Nos × 16.00 Rft = 384.00 Rft
= 2 × 11 Nos × 4.00 Rft = 88.00 Rft
= 2 × 6 Nos × 6.83 Rft = 81.96 Rft
= 2 × 18 Nos × 4.00 Rft = 144.00 Rft
= 2 × 6 Nos × 11.25 Rft = 135.00 Rft
= 1,232.96 Rft = 233.06 kg
Railling
10mmØ = 2 × 33 Nos × 3.83 Rft = 252.78 Rft
= 2 × 5 Nos × 16.00 Rft = 160.00 Rft
= 1 × 15 Nos × 3.83 Rft = 57.45 Rft
= 1 × 5 Nos × 6.83 Rft = 34.15 Rft
= 1 × 23 Nos × 3.83 Rft = 88.09 Rft
= 1 × 5 Nos × 11.25 Rft = 56.25 Rft
= 648.72 Rft = 122.62 kg

Parapet
10mmØ = 2 × 105 Nos × 5.00 Rft = 1,050.00 Rft
= 2 × 79 Nos × 5.00 Rft = 790.00 Rft
= 4 × 5 Nos × 5.00 Rft = 100.00 Rft
= 2 × 4 Nos × 54.25 Rft = 434.00 Rft
= 2 × 4 Nos × 40.75 Rft = 326.00 Rft
= 4 × 4 Nos × 1.83 Rft = 29.28 Rft
= 2,729.28 Rft = 515.90 kg
False Slab
10mmØ M.Bed = 1 × 27 Nos × 5.67 Rft = 153.09 Rft
= 1 × 13 Nos × 12.83 Rft = 166.79 Rft
C.Bed = 1 × 21 Nos × 4.83 Rft = 101.43 Rft
= 1 × 11 Nos × 9.83 Rft = 108.13 Rft
F.Space = 1 × 21 Nos × 5.17 Rft = 108.57 Rft
= 1 × 11 Nos × 9.50 Rft = 104.50 Rft
Servent = 2 × 11 Nos × 4.83 Rft = 106.26 Rft
Lobby = 1 × 11 Nos × 8.50 Rft = 93.50 Rft
= 1 × 18 Nos × 5.58 Rft = 100.44 Rft
= 1,042.71 Rft = 197.10 kg
Lintel
12mmØ 10" Wall = 2 × 4 Nos × 12.50 Rft = 100.00 Rft
= 1 × 4 Nos × 9.50 Rft = 38.00 Rft
= 2 × 4 Nos × 10.75 Rft = 86.00 Rft
= 1 × 4 Nos × 11.75 Rft = 47.00 Rft
= 1 × 4 Nos × 4.67 Rft = 18.68 Rft
= 1 × 4 Nos × 12.67 Rft = 50.68 Rft
= 1 × 4 Nos × 7.75 Rft = 31.00 Rft
= 1 × 4 Nos × 15.33 Rft = 61.32 Rft
= 432.68 Rft = 117.40 kg
10mmØ Binder = 2 × 26 Nos × 2.50 Rft = 130.00 Rft
= 1 × 20 Nos × 2.50 Rft = 50.00 Rft
= 2 × 23 Nos × 2.50 Rft = 115.00 Rft
= 1 × 11 Nos × 2.50 Rft = 27.50 Rft
= 1 × 26 Nos × 2.50 Rft = 65.00 Rft
= 1 × 17 Nos × 2.50 Rft = 42.50 Rft
= 1 × 31 Nos × 2.50 Rft = 77.50 Rft
= 507.50 Rft = 95.93 kg
10mmØ 5" Wall = 6 × 4 Nos × 13.50 Rft = 324.00 Rft
= 2 × 4 Nos × 5.50 Rft = 44.00 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 131


= 1 × 4 Nos × 5.08 Rft = 20.32 Rft
= 1 × 4 Nos × 12.50 Rft = 50.00 Rft
= 2 × 4 Nos × 9.00 Rft = 72.00 Rft
= 2 × 4 Nos × 10.50 Rft = 84.00 Rft
= 2 × 4 Nos × 8.00 Rft = 64.00 Rft
10mmØ 10" Wall = 6 × 28 Nos × 1.67 Rft = 280.56 Rft
= 2 × 12 Nos × 1.67 Rft = 40.08 Rft
= 1 × 11 Nos × 1.67 Rft = 18.37 Rft
= 1 × 26 Nos × 1.67 Rft = 43.42 Rft
= 2 × 19 Nos × 1.67 Rft = 63.46 Rft
= 2 × 22 Nos × 1.67 Rft = 73.48 Rft
= 2 × 17 Nos × 1.67 Rft = 56.78 Rft
= 1,234.47 Rft = 233.34 kg
Qty = 1647.39 kg

False Slab
Academic Bldg
Gr.Floor
Toilet
10 mm Ø/ M = 2 × 26 Nos × 6.67 Rft = 346.84 Rft
= 2 × 17 Nos × 10.25 Rft = 348.50 Rft
= 1 × 26 Nos × 7.67 Rft = 199.42 Rft
= 1 × 20 Nos × 10.25 Rft = 205.00 Rft
= 1 × 13 Nos × 8.08 Rft = 105.04 Rft
= 1 × 21 Nos × 5.00 Rft = 105.00 Rft
= 1 × 19 Nos × 4.67 Rft = 88.73 Rft
= 1 × 13 Nos × 7.25 Rft = 94.25 Rft
= 1,492.78 Rft = 282.17 kg
1st.Floor
Toilet
10 mm Ø/ M = 1 × 13 Nos × 8.08 Rft = 105.04 Rft
= 1 × 21 Nos × 5.00 Rft = 105.00 Rft
= 1 × 19 Nos × 4.67 Rft = 88.73 Rft
= 1 × 13 Nos × 7.25 Rft = 94.25 Rft
= 393.02 Rft = 74.29 kg
Qty = 356.46 kg

Total Qty = 120,714.23 kg


G.Total Qty = 579,481.97 kg
@Tk = 90.00 P/Kg Sch = 616804.75 Tk= 52,153,377.32
SL No-1.19 Brick work in super structure 250mm thick wall
a. Exposed brick work in superstructure in (1:4) with special quality sorted out 1st class brick

i. Ground Floor
For Principal Qtr
Front Side = 2 × 2.33 Rft x 9.25 Rft = 43.11 Sft
Lin.top = 1 × 5.00 Rft x 1.75 Rft = 8.75 Sft
TLT = 1 × 2.00 Rft x 9.25 Rft = 18.50 Sft
= 1 × 7.08 Rft x 1.75 Rft = 12.39 Sft
Living = 2 × 2.75 Rft x 9.25 Rft = 50.88 Sft
= 1 × 5.00 Rft x 1.75 Rft = 8.75 Sft
Rear Side Kitchen = 1 × 5.08 Rft x 9.25 Rft = 46.99 Sft
= 1 × 1.75 Rft x 9.25 Rft = 16.19 Sft
Bath = 1 × 3.33 Rft x 9.25 Rft = 30.80 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 132


G.Bed = 1 × 1.67 Rft x 9.25 Rft = 15.45 Sft
= 1 × 4.75 Rft x 9.25 Rft = 43.94 Sft
HW18 = 1 × 1.50 Rft x 1.75 Rft = 2.63 Sft
W60 = 2 × 5.00 Rft x 1.75 Rft = 17.50 Sft
HW24 = 1 × 2.00 Rft x 1.75 Rft = 3.50 Sft
F.Space = 1 × 2.42 Rft x 1.75 Rft = 4.24 Sft
East Side M.Bed = 1 × 4.33 Rft x 9.25 Rft = 40.05 Sft
= 1 × 3.17 Rft x 9.25 Rft = 29.32 Sft
TLT = 1 × 3.67 Rft x 9.25 Rft = 33.95 Sft
Sevent = 1 × 2.25 Rft x 9.25 Rft = 20.81 Sft
Kitchen = 1 × 14.17 Rft x 9.25 Rft = 131.07 Sft
W60 = 1 × 5.00 Rft x 1.75 Rft = 8.75 Sft
HW24 = 1 × 2.00 Rft x 1.75 Rft = 3.50 Sft
W37 = 1 × 3.08 Rft x 1.75 Rft = 5.39 Sft
West Side G.Bed = 1 × 13.00 Rft x 9.25 Rft = 120.25 Sft
Living = 2 × 11.67 Rft x 9.25 Rft = 215.90 Sft
= 1 × 10.50 Rft x 9.25 Rft = 97.13 Sft
W60 = 3 × 5.00 Rft x 1.75 Rft = 26.25 Sft
Stair = 1 × 7.00 Rft x 9.25 Rft = 64.75 Sft
= 2 × 2.00 Rft x 9.25 Rft = 37.00 Sft
= 1,157.71 Sft x 0.83 = 960.90 Cft
For Academic Bldg
Out side = 20 × 9.00 Rft x 9.00 Rft = 1,620.00 Sft
Stair = 1 × 8.50 Rft x 9.95 Rft = 84.58 Sft
Side = 3 × 16.50 Rft x 8.50 Rft = 420.75 Sft
= 2 × 17.58 Rft x 8.50 Rft = 298.86 Sft
= 3 × 7.83 Rft x 8.50 Rft = 199.67 Sft
Lect.Hall = 9 × 8.58 Rft x 8.75 Rft = 675.68 Sft
= 1 × 16.75 Rft x 9.50 Rft = 159.13 Sft
= 4 × 11.50 Rft x 9.50 Rft = 437.00 Sft
= 3,895.65 Sft x 0.83 = 3,233.39 Cft
Deduction
W/88 = 13 × 7.33 Rft x 4.50 Rft = 428.81 Sft
HW/24 = 10 × 2.00 Rft x 2.00 Rft = 40.00 Sft
W/69 = 1 × 5.75 Rft x 4.50 Rft = 25.88 Sft
W/51 = 1 × 4.08 Rft x 4.50 Rft = 18.36 Sft
W/45 = 1 × 3.75 Rft x 4.50 Rft = 16.88 Sft
W/20 = 2 × 1.67 Rft x 2.00 Rft = 6.68 Sft
W/50 = 1 × 4.17 Rft x 4.50 Rft = 18.77 Sft
= 555.36 Sft x 0.83 = -460.95 Cft
= 2,772.44 Cft
For Hostel Bldg
W50 = 4 × 4.17 Rft x 9.00 Rft = 150.12 Sft
Cup Board = 16 × 6.83 Rft x 10.25 Rft = 1,120.12 Sft
= 4 × 17.00 Rft x 10.25 Rft = 697.00 Sft
W80 = 18 × 6.67 Rft x 9.00 Rft = 1,080.54 Sft
HW/24 = 8 × 2.00 Rft x 9.00 Rft = 144.00 Sft
W48 = 2 × 4.00 Rft x 9.00 Rft = 72.00 Sft
Gap = 2 × 16.25 Rft x 10.25 Rft = 333.13 Sft
Side = 4 × 12.17 Rft x 10.25 Rft = 498.97 Sft
W90 = 2 × 8.25 Rft x 9.00 Rft = 148.50 Sft
= 12 × 10.83 Rft x 10.58 Rft = 1,374.98 Sft
= 5,619.35 Sft x 0.83 = 4,664.06 Cft
Deduction
W50 = 4 × 4.17 Rft x 4.50 Rft = 75.06 Sft
W80 = 10 × 6.67 Rft x 4.50 Rft = 300.15 Sft
HW24 = 8 × 2.00 Rft x 2.00 Rft = 32.00 Sft
W48 = 2 × 4.00 Rft x 4.50 Rft = 36.00 Sft
W90 = 2 × 8.25 Rft x 4.50 Rft = 74.25 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 133


= 517.46 Sft x 0.83 = -429.49 Cft
A = 9,599.89 Sft = 4,234.57 Cft
Qty = 7,967.91 Cft
= 225.66 Cum
@Tk = 7,200.00 P/cum Sch = 278.00 Tk= 1,624,722.98
ii. 1st Floor
For Academic Bldg
Out side = 20 × 9.00 Rft x 9.00 Rft = 1,620.00 Sft
Side = 1 × 8.50 Rft x 9.95 Rft = 84.58 Sft
= 3 × 16.50 Rft x 8.50 Rft = 420.75 Sft
= 2 × 7.58 Rft x 8.50 Rft = 128.86 Sft
= 3 × 7.83 Rft x 8.50 Rft = 199.67 Sft
Lect.Hall = 9 × 8.58 Rft x 8.75 Rft = 675.68 Sft
= 1 × 6.75 Rft x 9.50 Rft = 64.13 Sft
= 4 × 11.50 Rft x 9.50 Rft = 437.00 Sft
= 3,630.65 Sft x 0.83 = 3,013.44 Cft
Deduction
W/88 = 8 × 7.33 Rft x 4.50 Rft = 263.88 Sft
HW/24 = 5 × 2.00 Rft x 2.00 Rft = 20.00 Sft
W/30 = 1 × 2.50 Rft x 4.50 Rft = 11.25 Sft
W/91 = 2 × 5.75 Rft x 4.50 Rft = 51.75 Sft
W/45 = 1 × 3.75 Rft x 4.50 Rft = 16.88 Sft
W/82 = 1 × 6.83 Rft x 4.50 Rft = 30.74 Sft
W/50 = 1 × 4.17 Rft x 4.50 Rft = 18.77 Sft
= 413.26 Sft x 0.83 = -343.00 Cft
= 2,670.44 Cft
For Hostel Bldg
W50 = 4 × 4.17 Rft x 8.00 Rft = 133.44 Sft
W90 = 2 × 7.50 Rft x 8.00 Rft = 120.00 Sft
Cup Board = 10 × 7.75 Rft x 9.50 Rft = 736.25 Sft
= 14 × 16.67 Rft x 9.50 Rft = 2,217.11 Sft
= 18 × 3.33 Rft x 9.50 Rft = 569.43 Sft
HW24 = 8 × 2.00 Rft x 8.00 Rft = 128.00 Sft
W48 = 2 × 4.00 Rft x 8.00 Rft = 64.00 Sft
= 12 × 1.83 Rft x 9.58 Rft = 210.38 Sft
= 4,178.61 Sft x 0.83 = 3,468.24 Cft
Deduction
W50 = 4 × 4.17 Rft x 4.50 Rft = 75.06 Sft
W90 = 2 × 7.50 Rft x 4.50 Rft = 67.50 Sft
HW24 = 4 × 2.00 Rft x 2.00 Rft = 16.00 Sft
W48 = 2 × 4.00 Rft x 4.50 Rft = 36.00 Sft
= 194.56 Sft x 0.83 = -161.48 Cft
A = 7,201.44 Sft = 3,306.76 Cft
Qty = 5,977.20 Cft
= 169.28 Cum
@Tk = 7,200.00 P/cum Sch = 188.00 Tk= 1,218,799.67
b In (1:6) proportion for non exposed brick wall.
i. Ground Floor
For Principal Qtr
= 2 × 1.67 Rft x 9.00 Rft = 30.06 Sft
= 1 × 1.25 Rft x 9.00 Rft = 11.25 Sft
= 1 × 5.00 Rft x 9.00 Rft = 45.00 Sft
= 86.31 Sft x 0.83 = 71.64 Cft
For Academic Bldg
= 2 × 8.50 Rft x 9.75 Rft = 165.75 Sft
= 4 × 7.58 Rft x 9.25 Rft = 280.46 Sft
= 1 × 6.75 Rft x 9.25 Rft = 62.44 Sft
= 2 × 7.50 Rft x 11.25 Rft = 168.75 Sft
Deduct,D/60 = 2 × 5.00 Rft x 7.00 Rft = -70.00 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 134


= 607.40 Sft x 0.83 = 504.14 Cft
For Hostel Bldg
= 2 × 9.50 Rft x 9.50 Rft = 180.50 Sft
= 2 × 17.75 Rft x 9.50 Rft = 337.25 Sft
= 2 × 13.33 Rft x 9.50 Rft = 253.27 Sft
= 4 × 4.33 Rft x 9.50 Rft = 164.54 Sft
= 2 × 11.25 Rft x 9.50 Rft = 213.75 Sft
= 1 × 10.67 Rft x 9.50 Rft = 101.37 Sft
= 4 × 7.50 Rft x 9.50 Rft = 285.00 Sft
= 2 × 12.83 Rft x 9.50 Rft = 243.77 Sft
= 5 × 0.83 Rft x 1.50 Rft = 6.23 Sft
= 2 × 9.17 Rft x 9.50 Rft = 174.23 Sft
= 2 × 7.50 Rft x 4.50 Rft = 67.50 Sft
Deduct,Gap = 2 × 13.33 Rft x 4.50 Rft = -119.97 Sft
= 2 × 4.33 Rft x 4.50 Rft = -38.97 Sft
D60 = 2 × 5.00 Rft x 7.00 Rft = -70.00 Sft
= 1,798.46 Sft x 0.83 = 1,492.72 Cft
A = 2,492.17 Sft = 2,068.50 Cft
= 58.58 Cum
Sch.Qty = 88.50 Cum
@Tk = 6,800.00 P/cum Sch = 88.50 Tk= 601,800.00
ii. 1st Floor
For Academic Bldg
= 2 × 8.50 Rft x 9.75 Rft = 165.75 Sft
= 3 × 7.58 Rft x 9.25 Rft = 210.35 Sft
= 2 × 7.50 Rft x 9.25 Rft = 138.75 Sft
= 1 × 6.75 Rft x 11.25 Rft = 75.94 Sft
Deduct,W/40 = 1 × 3.33 Rft x 4.50 Rft = -14.99 Sft
= 575.80 Sft x 0.83 = 477.91 Cft
For Hostel Bldg
= 2 × 9.50 Rft x 8.50 Rft = 161.50 Sft
= 2 × 17.75 Rft x 8.50 Rft = 301.75 Sft
= 2 × 13.33 Rft x 8.50 Rft = 226.61 Sft
= 4 × 4.33 Rft x 8.50 Rft = 147.22 Sft
= 2 × 11.25 Rft x 8.50 Rft = 191.25 Sft
= 1 × 10.67 Rft x 8.50 Rft = 90.70 Sft
= 4 × 7.50 Rft x 8.50 Rft = 255.00 Sft
= 2 × 18.08 Rft x 8.50 Rft = 307.36 Sft
= 1 × 21.17 Rft x 8.50 Rft = 179.95 Sft
Deduct,Gap = 2 × 13.33 Rft x 4.50 Rft = -119.97 Sft
= 2 × 4.33 Rft x 4.50 Rft = -38.97 Sft
D60 = 2 × 5.00 Rft x 7.00 Rft = -70.00 Sft
= 1,632.39 Sft x 0.83 = 1,354.88 Cft
= 2,208.19 Sft = 1,832.80 Cft
= 51.91 Cum
Sch.Qty = 44.00 Cum
@Tk = 6,800.00 P/cum Sch = 44.00 Tk= 299,200.00
SL No-1.20 125mm thick brick work in (1:4)
b On-Exposed brick work 125mm thick in (1:4)
i. Ground Floor
For Principal Qtr
W60 = 9 × 5.00 Rft x 2.50 Rft = 112.50 Sft
HW24 = 2 × 2.00 Rft x 5.00 Rft = 20.00 Sft
HW18 = 1 × 1.50 Rft x 5.00 Rft = 7.50 Sft
HW20 = 1 × 1.67 Rft x 5.00 Rft = 8.35 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 135


W37 = 1 × 3.08 Rft x 2.50 Rft = 7.70 Sft
Ver = 1 × 5.83 Rft x 9.25 Rft = 53.93 Sft
D30 = 1 × 2.50 Rft x 1.75 Rft = 4.38 Sft
M.Bed = 1 × 12.50 Rft x 9.25 Rft = 115.63 Sft
" = 1 × 12.00 Rft x 9.25 Rft = 111.00 Sft
TLT = 1 × 5.00 Rft x 10.12 Rft = 50.60 Sft
Servent = 2 × 12.00 Rft x 10.12 Rft = 242.88 Sft
" = 1 × 5.67 Rft x 10.12 Rft = 57.38 Sft
" = 1 × 5.67 Rft x 9.25 Rft = 52.45 Sft
Kitchen = 1 × 8.25 Rft x 9.25 Rft = 76.31 Sft
" = 1 × 8.25 Rft x 10.12 Rft = 83.49 Sft
TLT = 1 × 3.83 Rft x 10.12 Rft = 38.76 Sft
C.Bed = 1 × 10.50 Rft x 9.25 Rft = 97.13 Sft
" = 1 × 12.67 Rft x 10.12 Rft = 128.22 Sft
Wash = 1 × 4.25 Rft x 10.12 Rft = 43.01 Sft
Stair = 1 × 12.08 Rft x 9.25 Rft = 111.74 Sft
" = 2 × 3.00 Rft x 9.25 Rft = 55.50 Sft
" = 2 × 1.75 Rft x 10.12 Rft = 35.42 Sft
Living = 1 × 6.83 Rft x 9.25 Rft = 63.18 Sft
" = 1 × 5.00 Rft x 9.25 Rft = 46.25 Sft
G.Bed = 1 × 11.67 Rft x 9.25 Rft = 107.95 Sft
" = 1 × 11.08 Rft x 9.25 Rft = 102.49 Sft
Bath = 1 × 8.42 Rft x 10.12 Rft = 85.21 Sft
" = 1 × 4.58 Rft x 10.12 Rft = 46.35 Sft
Stair = 1 × 7.42 Rft x 8.75 Rft = 64.93 Sft
" = 1 × 17.75 Rft x 8.75 Rft = 155.31 Sft
Deduct D40 = 4 × 3.33 Rft x 7.00 Rft = -93.24 Sft
D35 = 1 × 2.92 Rft x 7.00 Rft = -20.44 Sft
D30 = 7 × 2.50 Rft x 7.00 Rft = -122.50 Sft
= 1,949.35 Sft
For Academic Bldg
Inner Wall = 17 × 9.00 Rft x 9.25 Rft = 1,415.25 Sft
TLT = 3 × 9.00 Rft x 10.75 Rft = 290.25 Sft
"= 2 × 8.75 Rft x 10.25 Rft = 179.38 Sft
Urinal = 2 × 3.50 Rft x 7.00 Rft = 49.00 Sft
" = 2 × 7.00 Rft x 10.50 Rft = 147.00 Sft
C.TLT = 2 × 4.00 Rft x 10.50 Rft = 84.00 Sft
Partition = 11 × 16.50 Rft x 9.25 Rft = 1,678.88 Sft
TLT = 2 × 6.00 Rft x 7.00 Rft = 84.00 Sft
"= 1 × 7.00 Rft x 7.00 Rft = 49.00 Sft
= 3,976.75 Sft
Deduction
W/84 = 8 × 7.00 Rft x 4.50 Rft = -252.00 Sft
W/50 = 6 × 4.17 Rft x 4.50 Rft = -112.59 Sft
W/45 = 2 × 3.75 Rft x 4.50 Rft = -33.75 Sft
D/40 = 9 × 3.33 Rft x 7.00 Rft = -209.79 Sft
D/36 = 1 × 3.00 Rft x 7.00 Rft = -21.00 Sft
D/30 = 11 × 2.50 Rft x 7.00 Rft = -192.50 Sft
= -821.63 Sft
Qty = 3,155.12 Sft
For Hostel Bldg
West Unit
Stair side = 4 × 11.83 Rft x 9.75 Rft = 461.37 Sft
TLT = 2 × 8.50 Rft x 10.58 Rft = 179.86 Sft
"= 4 × 4.17 Rft x 10.58 Rft = 176.47 Sft
Duct = 1 × 10.17 Rft x 10.58 Rft = 107.60 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 136


Store = 2 × 17.92 Rft x 9.50 Rft = 340.48 Sft
= 3 × 10.42 Rft x 10.58 Rft = 330.73 Sft
S.Tlt = 1 × 6.42 Rft x 10.33 Rft = 66.32 Sft
Kitchen = 2 × 11.83 Rft x 9.50 Rft = 224.77 Sft
= 1 × 6.00 Rft x 9.50 Rft = 57.00 Sft
= 1 × 11.50 Rft x 10.58 Rft = 121.67 Sft
= 2 × 7.50 Rft x 9.50 Rft = 142.50 Sft
= 1 × 2.50 Rft x 10.57 Rft = 26.43 Sft
= 2,235.20 Sft
Deduction
D/40 = 2 × 3.33 Rft x 7.00 Rft = -46.62 Sft
D/30 = 7 × 2.50 Rft x 7.00 Rft = -122.50 Sft
W/40 = 1 × 3.33 Rft x 4.50 Rft = -14.99 Sft
= -184.11 Sft
= 2,051.09 Sft

East Unit
= 10 × 12.58 Rft x 9.50 Rft = 1,195.10 Sft
= 3 × 12.17 Rft x 9.50 Rft = 346.85 Sft
= 2 × 5.75 Rft x 9.50 Rft = 109.25 Sft
= 2 × 7.50 Rft x 9.50 Rft = 142.50 Sft
Partition = 11 × 11.67 Rft x 9.50 Rft = 1,219.52 Sft
= 2 × 7.50 Rft x 9.50 Rft = 142.50 Sft
TLT = 1 × 8.25 Rft x 10.33 Rft = 85.22 Sft
= 1 × 7.50 Rft x 10.33 Rft = 77.48 Sft
Ablution = 1 × 17.08 Rft x 1.50 Rft = 25.62 Sft
Round = 1 × 19.50 Rft x 10.58 Rft = 206.31 Sft
= 3,550.34 Sft
Deduction
D/40 = 9 × 3.33 Rft x 7.00 Rft =-209.79 Sft
D/60 = 1 × 5.00 Rft x 7.00 Rft =-35.00 Sft
D/30 = 5 × 2.50 Rft x 7.00 Rft = -87.50 Sft
W/60 = 9 × 5.00 Rft x 4.50 Rft = -202.50 Sft
W/80 = 1 × 6.67 Rft x 4.50 Rft = -30.02 Sft
= -564.81 Sft
= 2,985.53 Sft
Qty = 5,036.62 Sft
Total Qty = 10,141.09 Sft = 942.48 Sqm
Sch.Qty= 707.00 Sqm
@Tk = 850.00 P/sqm Sch = 707.00 Tk= 600,950.00
ii. 1st Floor
For Academic Bldg
Inner Wall = 20 × 9.00 Rft x 9.25 Rft = 1,665.00 Sft
TLT = 1 × 7.00 Rft x 10.50 Rft = 73.50 Sft
"= 1 × 11.00 Rft x 10.50 Rft = 115.50 Sft
"= 2 × 8.42 Rft x 10.50 Rft = 176.82 Sft
Partition = 6 × 16.50 Rft x 9.25 Rft = 915.75 Sft
TLT = 1 × 7.58 Rft x 9.25 Rft = 70.12 Sft
Urinal = 2 × 3.50 Rft x 7.00 Rft = 49.00 Sft
= 3,065.69 Sft
Deduction
W/84 = 8 × 7.00 Rft x 4.50 Rft = -252.00 Sft
W/50 = 8 × 4.17 Rft x 4.50 Rft = -150.12 Sft
D/40 = 10 × 3.33 Rft x 7.00 Rft = -233.10 Sft
D/36 = 1 × 3.00 Rft x 7.00 Rft = -21.00 Sft
D/30 = 5 × 2.50 Rft x 7.00 Rft = -87.50 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 137


= -743.72 Sft
Qty = 2,321.97 Sft
For Hostel Bldg
Room = 28 × 12.50 Rft x 8.50 Rft = 2,975.00 Sft
= 18 × 12.67 Rft x 8.50 Rft = 1,938.51 Sft
= 2 × 8.33 Rft x 8.50 Rft = 141.61 Sft
Ver = 18 × 7.83 Rft x 8.50 Rft = 1,197.99 Sft
= 2 × 12.00 Rft x 9.58 Rft = 229.92 Sft
Wash = 2 × 12.50 Rft x 9.58 Rft = 239.50 Sft
SH,WC = 12 × 5.00 Rft x 9.58 Rft = 574.80 Sft
Kitchen = 12 × 4.58 Rft x 9.58 Rft = 526.52 Sft
= 2 × 7.50 Rft x 8.50 Rft = 127.50 Sft
SW90 = 2 × 7.50 Rft x 1.50 Rft = 22.50 Sft
Store = 2 × 8.50 Rft x 8.50 Rft = 144.50 Sft
= 2 × 7.50 Rft x 8.50 Rft = 127.50 Sft
= 2 × 6.00 Rft x 8.50 Rft = 102.00 Sft
Round = 1 × 19.50 Rft x 10.57 Rft = 206.12 Sft
= 8,553.96 Sft
Deduction
D/40 = 20 × 3.33 Rft x 7.00 Rft =-466.20 Sft
D/30 = 32 × 2.50 Rft x 7.00 Rft =-560.00 Sft
W/144 = 2 × 12.00 Rft x 4.50 Rft = -108.00 Sft
W/42 = 18 × 3.50 Rft x 4.50 Rft = -283.50 Sft
= -1,417.70 Sft
Qty = 7,136.26 Sft
Total Qty = 9,458.23 Sft = 879.02 Sqm
Sch.Qty = 502.00 Sqm
@Tk = 850.00 P/sqm Sch = 502.00 Tk= 426,700.00
SL No-1.35 Plastering work
C. On R.C.C. surface 6mm & above thick in (1:4)
i. Ground Floor
For Academic Bldg
Ceiling = 2 × 81.00 Rft x 44.00 Rft = 7,128.00 Sft
= 2 × 49.83 Rft x 36.42 Rft = 3,629.62 Sft
= 1 × 49.08 Rft x 45.00 Rft = 2,208.60 Sft
Beam = 3 × 116.00 Rft x 1.75 Rft = 609.00 Sft
= 1 × 73.00 Rft x 1.75 Rft = 127.75 Sft
= 9 × 39.67 Rft x 2.75 Rft = 981.83 Sft
= 5 × 29.67 Rft x 2.75 Rft = 407.96 Sft
= 8 × 8.58 Rft x 2.17 Rft = 148.95 Sft
= 1 × 50.00 Rft x 1.75 Rft = 87.50 Sft
Col = 28 ×
n
5.33 Rft x 9.75 Rft = 1,455.09 Sft
= 4 × 5.83 Rft x 9.75 Rft = 227.37 Sft
= 22 × 5.33 Rft x 9.75 Rft = 1,143.29 Sft
= 7 × 5.00 Rft x 9.75 Rft = 341.25 Sft
= 8 × 8.67 Rft x 9.75 Rft = 676.26 Sft
= 2 × 4.00 Rft x 9.75 Rft = 78.00 Sft
TLT = 4 × 4.58 Rft x 6.00 Rft = 109.92 Sft
= 2 × 4.58 Rft x 7.00 Rft = 64.12 Sft
= 2 × 3.08 Rft x 4.00 Rft = 24.64 Sft
= 2 × 4.50 Rft x 4.00 Rft = 36.00 Sft
= 19,485.15 Sft
Porch = 1 × 9.60 Rft x 7.00 Rft = 67.20 Sft
TLT = 2 × 7.00 Rft x 1.75 Rft = 24.50 Sft
= 1 × 20.58 Rft x 16.00 Rft = 329.28 Sft
= 2 × 16.00 Rft x 1.70 Rft = 54.40 Sft
= 1 × 20.58 Rft x 1.75 Rft = 36.02 Sft
= 511.40 Sft
= 19,996.54 Sft = 1858.41 Sqm

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 138


@Tk = 170.00 P/sqm Sch = 4604.78 Tk= 315,930.48
ii. 1st Floor
For Academic Bldg
Same measurement at Gr.Floor,Qty = 19,485.15 Sft
Lect.Hall = 1 × 9.60 Rft x 7.00 Rft = 67.20 Sft
= 19,552.35 Sft = 1817.13 Sqm
@Tk = 170.00 P/sqm Sch = 4398.05 Tk= 308,912.53
Civil Work Tk= 144,261,189.31
B. External Work
B.1. External Civil Work
B.1.a Site Development
Qty BF from 1st R/A Bill Page No-8 of TMB = 41317.71 Cum
@Tk = 175.00 P/Cum Sch = 51100.00 Tk= 7,230,599.25
Tk= 151,491,788.56
Less Tk. - 14.15% Tk= -21,436,088.08
Total Tk= 130,055,700.48
Deduction upto 5th R/A Bill Tk= -104,291,741.64
Payable Amount Tk= 25,763,958.84

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 139


Name of Work : Construction of Medical Assistant Training School (MATS) at Sadar Upazila in Gazipur
District.
Package No : WP-599/SDP(GOB)-HED.
Name of Contrctor : BBL & Essen Engineering & Co.Ltd.
7th R/A Bill
Part-A (Civil works)
Sl No-1.01 a. Layout and marking for earthwork in Excavation in foundation
= 1,889.81 Sqm
Schedule Qty = 1,745.00 Sqm
@Tk = 15.00 /= P/Sqm Tk= 26,175.00
Sl No-1.02 Earth Work in excavation in Foundation
a). Upto 1.5m depth
= 562.89 cum
@Tk = 175.00 /= P/Cum Sch = 576.80 Tk= 98,505.25
Sl No-1.03 Brick flat Soling
a In Foundation
= 568.36 Sqm
@Tk = 325.00 P/Sqm Sch = 606.16 Tk= 184,716.97
Sl No-1.07 a.Exposed Brick work in foundation & Plinth (1:6)
For Academic Bldg
Front Side = 1 × 117.00 Rft = 117.00 Rft

Rear Side = 1 × 87.83 Rft = 87.83 Rft

= 4 × 39.67 Rft = 158.68 Rft

Side = 1 × 48.50 Rft = 48.50 Rft

= 412.01 Rft x 2.25 Rft x 0.83 = 769.43 Cft


Lect.Hall = 2 × 38.83 rft = 77.66 Rft x 3.00 Rft x 0.83 = 193.37 Cft
Back Side = 1 × 46.00 rft = 46.00 Rft x 4.25 Rft x 0.83 = 162.27 Cft
= 1,125.07 Cft
For Hostel Bldg
Front = 4 × 77.58 Rft = 310.32 Rft

Side = 2 × 30.83 Rft = 61.66 Rft

= 2 × 15.00 Rft = 30.00 Rft

= 2 × 10.58 Rft = 21.16 Rft

= 2 × 27.75 Rft = 55.50 Rft

= 1 × 22.67 Rft = 22.67 Rft

= 501.31 Rft x 1.83 Rft x 0.83 = 761.44 Cft


For Principal Qtr
= 2 × 43.92 Rft = 87.84 Rft

= 2 × 37.42 Rft = 74.84 Rft

= 2 × 1.58 Rft = 3.16 Rft

= 1 × 18.21 Rft = 18.21 Rft

= 184.05 Rft x 1.83 Rft x 0.83 = 279.55 Cft


= 2,166.06 Cft
= 61.34 Cum
@Tk = 6,800.00 P/cum Sch = 82.87
Boring/drilling for cast in situ Pile upto require depth and diameter with mim 6m long temporary steel
Tk= 417,139.92
Sl No-1.09 casting,true to vertical,providing ventonite slurry and maintaining water level in the hole (450mm dia
upto 20m depth)

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 140


(450mm dia upto 20m depth)
= 492 Nos × 70.00 Rft = 34,440.0 Rft = 10,500.00 Rm
@Tk = 1,250.00 /= P/Rm Sch = 11227.13 Tk= 13,125,000.00
Sl No-1.10 Casting of Cast in Situ bored pile R.C.C work of 1:1.5:3
= 492 × 4 70.00 Rft = 1,726.39 cum
@Tk = 13,000.00 /= P/Cum Sch = 1772.11 Tk= 22,443,058.62

Sl No-1.11 Providing and making point welding


= 492 × 6.00 × 138.00 Point = 407,376.00 Point
@Tk = 0.50 P/point Sch = 371196.00 Tk= 185,598.00
Sl No-1.12 Providing and making joint welding
= 492 × 6.00 × 1.33 = 3,926.16 Rft = 1,197.00 Rm
@Tk = 1.00 P/Rm Sch = 2095.73 Tk= 1,197.00
Sl No-1.13 Labour for breaking of pile head
4 = 73.54 Cum
@Tk = 2,000.00 P/Cum Sch = 73.84 Tk= 147,073.92
Sl No-1.14 a. Conducting static load test for the cast-in-situ pile providing required
= 1 × 3.00 Test = 3.00 Test
@Tk = 80,000.00 P/Test Sch = 3.00 Tk= 240,000.00
b. For Intermediate Loading from 75-125 tonne for each additional tonne
= 3 × 45.00 Ton = 135.00 Test
@Tk = 800.00 P/Ton Sch = 75.00 Tk= 60,000.00
SL No-1.16 Reinforced cement concrete works using steel shutter with mim cement concrete to mix ratio(1:1.5:3)
A. In Foundation (Footing,Raft,Pile cap etc)
i. Concrete
Total Qty = 18,016.49 Cft
= 510.24 cum
@Tk = 11,000.00 P/Cum Sch = 522.01 Tk= 5,612,613.62
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 1,191.55 Sqm
@Tk = 400.00 P/Sqm Sch = 1204.23 Tk= 476,619.42
B. In Foundation Beam/Grade Beam
i. Concrete
= 112.49 cum
@Tk = 17,000.00 P/Cum Sch = 112.78 Tk= 1,912,283.35
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 1075.10 Sqm
@Tk = 700.00 P/Sqm Sch = 1127.75 Tk= 752,567.66
B. In Floor Slab at plinth level
i) Concrete
= 241.22 Cum
@Tk = 18,000.00 P/Cum Sch = 241.73 Tk= 4,341,964.86
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
BF Qty = 2,521.84
@Tk = 800.00 P/Sqm Sch = 2568.19 Sqm Tk= 2,017,468.87
C. Beam at Plinth level
a). Concrete.

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 141


i) Gr.Floor/Plinth level
= 111.81
@Tk = 18,000.00 P/Cum Sch = 112.45 Tk= 2,012,514.01
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF Qty = 1292.34 Sqm
Sch.Qty = 1244.48 Sqm
@Tk = 500.00 P/Sqm Sch = 1244.48 Tk= 622,240.00
C. In Pedestal Column,Column,Column capital ,lift wall etc.
a. Concrete
i). Below PL level and in Ground Floor.
BF Qty = 213.95 Cum
Concrete Presigm
Academic Bldg
Ground Floor
D40 = 9 × 8.00 Nos = 72.00 Nos

D36 = 2 × 8.00 Nos = 16.00 Nos

D60 = 2 × 8.00 Nos = 16.00 Nos

D30 = 10 × 8.00 Nos = 80.00 Nos

Cat door = 5 × 4.00 Nos = 20.00 Nos

= 204.00 Nos

Qty = 204.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 14.14 Cft
For Hostel Bldg
Ground Floor
D40 = 11 × 8.00 Nos = 88.00 Nos

D36 = 1 × 8.00 Nos = 8.00 Nos

D60 = 6 × 8.00 Nos = 48.00 Nos

D30 = 12 × 8.00 Nos = 96.00 Nos

Cat door = 5 × 4.00 Nos = 20.00 Nos

= 260.00 Nos

Qty = 260.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 18.02 Cft
Principal Qtr
D40 = 4 × 8.00 Nos = 32.00 Nos

D36 = 1 × 8.00 Nos = 8.00 Nos

D56 = 1 × 8.00 Nos = 8.00 Nos

D30 = 8 × 8.00 Nos = 64.00 Nos

Cat door = 4 × 4.00 Nos = 16.00 Nos

= 128.00 Nos

Qty = 128.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 8.87 Cft
= 41.03 Cft
= 1.16 Cum
= 215.12 Cum
@Tk = 17,000.00 P/Cum Sch = 219.67 cum Tk= 3,656,971.92

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 142


ii).1st Floor.
BF Qty = 88.44 Cum
Concrete Presigm
Academic Bldg
Frist Floor
D40 = 10 × 8.00 Nos = 80.00 Nos

D36 = 2 × 8.00 Nos = 16.00 Nos

D30 = 5 × 8.00 Nos = 40.00 Nos

Cat door = 2 × 4.00 Nos = 8.00 Nos

= 144.00 Nos

Qty = 144.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 9.98 Cft
For Hostel Bldg
Frist Floor
D40 = 22 × 8.00 Nos = 176.00 Nos

D60 = 2 × 8.00 Nos = 16.00 Nos

D30 = 32 × 8.00 Nos = 256.00 Nos

Cat door = 4 × 4.00 Nos = 16.00 Nos

= 464.00 Nos

Qty = 464.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 32.16 Cft
= 42.13 Cft
= 1.19 Cum
= 89.64 Cum
@Tk = 17,000.00 P/Cum Sch = 105.89 cum Tk= 1,523,802.68
iii). 2nd Floor.
BF Qty from 5th R/A Bill = 24.73 Cum
BF Qty from 6th R/A Bill = 41.08 Cum
Academic Bldg
C1 = 5 × 1.00 Rft × 1.67 Rft × 3.00 Rft = 25.05 Cft
C8 = 6 × 2.79 Rft × 1.67 Rft × 3.00 Rft = 83.87 Cft
C9 = 1 × 2.67 Rft × 1.67 Rft × 3.00 Rft = 13.38 Cft
= 122.29 Cft
= 3.46 Cum
BF Qty = 95.27 Cum
Hostel Bldg
C1 = 20 × 1.67 Rft × 1.25 Rft × 3.00 Rft = 125.25 Cft
4 × 1.67 Rft × 1.00 Rft × 10.00 Rft = 66.80 Cft
C2 30 × 1.67 Rft × 1.00 Rft × 3.00 Rft = 150.30 Cft
= 8 × 1.67 Rft × 1.00 Rft × 10.00 Rft = 133.60 Cft
C3 = 6 × 1.67 Rft × 1.00 Rft × 3.00 Rft = 30.06 Cft
C4 10 × 1.33 Rft × 1.00 Rft × 3.00 Rft = 39.90 Cft
C5 = 4 × 1.33 Rft × 1.00 Rft × 3.00 Rft = 15.96 Cft
= 561.87 Cft
= 15.91 Cum
= 111.18 Cum

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 143


Concrete Presigm
Academic Bldg
Second Floor
D40 = 8 × 8.00 Nos = 64.00 Nos

D36 = 1 × 8.00 Nos = 8.00 Nos

D30 = 3 × 8.00 Nos = 24.00 Nos

Cat door = 2 × 4.00 Nos = 8.00 Nos

= 104.00 Nos

Qty = 104.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 7.21 Cft
For Hostel Bldg
Second Floor
D40 = 22 × 8.00 Nos = 176.00 Nos

D30 = 32 × 8.00 Nos = 256.00 Nos

Cat door = 4 × 4.00 Nos = 16.00 Nos

= 448.00 Nos

Qty = 448.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 31.05 Cft
= 38.25 Cft
= 1.08 Cum
= 112.26 Cum
@Tk = 17,000.00 P/Cum Sch = 119.97 cum Tk= 1,908,490.87
iv). 3rd Floor.
BF Qty from 6th R/A Bill = 41.08 Cum
Academic Bldg
C1 = 20 × 1.67 Rft × 1.00 Rft × 3.00 Rft = 100.20 Cft
1 × 1.67 Rft × 1.00 Rft × 11.00 Rft = 18.37 Cft
C2 3 × 1.67 Rft × 1.00 Rft × 3.00 Rft = 15.03 Cft
C3 = 4 × 1.67 Rft × 1.25 Rft × 3.00 Rft = 25.05 Cft
= 2 × 1.67 Rft × 1.25 Rft × 11.00 Rft = 45.93 Cft
C4 18 × 1.33 Rft × 1.33 Rft × 3.00 Rft = 95.52 Cft
1 × 1.33 Rft × 1.33 Rft × 11.00 Rft = 19.46 Cft
C5 = 4 × 1.33 Rft × 1.33 Rft × 3.00 Rft = 21.23 Cft
C6 6 × 1.50 Rft × 1.00 Rft × 3.00 Rft = 27.00 Cft
C7 = 1 × 1.50 Rft × 1.00 Rft × 3.00 Rft = 4.50 Cft
C9 1 × 1.67 Rft × 2.67 Rft × 3.00 Rft = 13.38 Cft
= 385.66 Cft
= 10.92 Cum
BF Qty = 52.00 Cum
@Tk = 17,000.00 P/Cum Sch = 57.50 cum Tk= 883,969.67
v). 4th Floor.
Hostel Bldg
False Column
C1 = 20 × 1.67 Rft × 1.25 Rft × 3.00 Rft = 125.25 Cft
4 × 1.67 Rft × 1.00 Rft × 10.00 Rft = 66.80 Cft
C2 30 × 1.67 Rft × 1.00 Rft × 3.00 Rft = 150.30 Cft
= 8 × 1.67 Rft × 1.00 Rft × 10.00 Rft = 133.60 Cft
C3 = 6 × 1.67 Rft × 1.00 Rft × 3.00 Rft = 30.06 Cft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 144


C4 10 × 1.33 Rft × 1.00 Rft × 3.00 Rft = 39.90 Cft
C5 = 4 × 1.33 Rft × 1.00 Rft × 3.00 Rft = 15.96 Cft
= 561.87 Cft
= 15.91 Cum
Sch.Qty = 1.50 Cum
@Tk = 17,000.00 P/Cum Sch = 1.50 cum Tk= 25,500.00
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Below PL level and in Ground Floor.
= 1956.82 Sqm
@Tk = 450.00 P/Sqm Sch = 2636.00 cum Tk= 880,568.03
ii). 1st Floor.
BF Qty = 898.52 Sqm
@Tk = 450.00 P/Sqm Sch = 1270.72 sqm Tk= 404,333.36
iii). 2nd Floor.
BF Qty from 5th R/A Bill = 244.54 Sqm
BF Qty from 6th R/A Bill = 417.73 Sqm
Academic Bldg
C1 = 5 × 5.33 Rft × 3.00 Rft = 79.95 Sft
C8 = 6 × 8.92 Rft × 3.00 Rft = 160.56 Sft
C9 = 1 × 8.67 Rft × 3.00 Rft = 26.01 Sft
= 266.52 Sft
= 24.77 Sqm
BF Qty = 987.04 Sqm
@Tk = 450.00 P/Sqm Sch = 1439.68 Tk= 444,166.73
iv). 3rd Floor.
BF Qty from 6th R/A Bill = 417.73 Sqm
Academic Bldg
C1 = 20 × 5.33 Rft × 3.00 Rft = 319.80 Sft
1 × 5.33 Rft × 11.00 Rft = 58.63 Sft
C2 3 × 5.33 Rft × 3.00 Rft = 47.97 Sft
C3 = 4 × 5.83 Rft × 3.00 Rft = 69.96 Sft
= 2 × 5.83 Rft × 11.00 Rft = 128.26 Sft
C4 18 × 5.33 Rft × 3.00 Rft = 287.82 Sft
1 × 5.33 Rft × 11.00 Rft = 58.63 Sft
C5 = 4 × 5.33 Rft × 3.00 Rft = 63.96 Sft
C6 6 × 5.00 Rft × 3.00 Rft = 90.00 Sft
C7 = 1 × 5.00 Rft × 3.00 Rft = 15.00 Sft
C9 1 × 8.67 Rft × 3.00 Rft = 26.01 Sft
= 1166.04 Sft
= 108.37 Sqm
BF Qty = 626.10 Sqm
@Tk = 450.00 P/Sqm Sch = 690.00 Tk= 281,745.17
v). 4th Floor.
Hostel Bldg
False Column

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 145


C1 = 20 × 5.83 Rft × 3.00 Rft = 349.80 Sft
P. house 4 × 5.33 Rft × 10.00 Rft = 213.20 Sft
C2 30 × 5.33 Rft × 3.00 Rft = 479.70 Sft
P. house = 8 × 5.33 Rft × 10.00 Rft = 426.40 Sft
C3 = 6 × 5.33 Rft × 3.00 Rft = 95.94 Sft
C4 10 × 4.67 Rft × 3.00 Rft = 140.10 Sft
C5 = 4 × 4.67 Rft × 3.00 Rft = 56.04 Sft
= 1761.18 Sft = 163.68 sqm
Sch.Qty = 18.00 sqm
@Tk = 450.00 P/Sqm Sch = 18.00 Tk= 8,100.00
D. Beam: (Tee-beam, Ell beam, Rib-beam rectangular beam)
a). Concrete.
i) Gr.Floor
= 95.51 Cum
@Tk = 18,000.00 P/Cum Sch = 97.64 Tk= 1,719,263.37
ii) 1st. Floor
BF Qty = 102.39 cum
Sch.Qty = 94.12 cum
@Tk = 18,000.00 P/Cum Sch = 94.12 Tk= 1,694,160.00
iii) 2nd. Floor
BF Qty = 93.50 cum
@Tk = 18,000.00 P/Cum Sch = 94.12 Tk= 1,683,016.23
iv). 3rd Floor
BF Qty = 1.37 cum
Hostel Bldg
Same measurement at 2nd Floor Qty = 54.01 Cum
= 55.38 Cum
Sch.Qty = 43.85 cum
@Tk = 18,000.00 P/Cum Sch = 43.85 cum Tk= 789,300.00
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF. Qty = 1166.09 Sqm
@Tk = 500.00 P/Sqm Sch = 1171.71 Tk= 583,047.28
ii). 1st. Floor
BF Qty = 1117.85 Sqm
@Tk = 500.00 P/Sqm Sch = 1129.42 Tk= 558,926.86
iv). 2nd. Floor
BF Qty = 956.67 Sqm
@Tk = 500.00 P/Sqm Sch = 1129.42 Tk= 478,334.63
iv). 3rd Floor
= 166.27 Sft BF Qty = 15.45 Sqm
Hostel Bldg
Same measurement at 2nd Floor Qty = 545.12 Sqm
= 560.57 Sqm
Sch.Qty = 526.20 Sqm
@Tk = 500.00 P/Sqm Sch = 526.20 Tk= 263,100.00
E. Lintel & Tie Beam

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 146


a). Concrete.
i). Gr. Floor
BF Qty = 22.66 Cum
@Tk = 12,000.00 P/Cum Sch = 24.00 Tk= 271,929.35
ii). 1st Floor
BF Qty = 17.87 Cum
@Tk = 12,000.00 P/Cum Sch = 18.75 Tk= 214,413.71
iii).2nd Floor
Academic Bldg
On 10'' Wall = 1 × 18 Nos × 9.00 Rft = 162.00 Rft

= 1 × 3 Nos × 8.50 Rft = 25.50 Rft

= 1 × 4 Nos × 7.50 Rft = 30.00 Rft

= 1 × 3 Nos × 7.58 Rft = 22.74 Rft

= 1 × 2 Nos × 16.08 Rft = 32.16 Rft

= 1 × 4 Nos × 8.58 Rft = 34.32 Rft

= 306.72 Rft x 0.83 x 0.75


= 190.93 Cft
On 5'' Wall = 1 × 5 Nos × 9.00 Rft = 45.00 Rft

= 1 × 2 Nos × 7.50 Rft = 15.00 Rft

= 1 × 1 Nos × 10.25 Rft = 10.25 Rft

= 1 × 6 Nos × 16.17 Rft = 97.02 Rft

= 167.27 Rft x 0.42 x 0.50


= 35.13 Cft
= 226.06 Cft
Hostel Bldg
Same measurement at 1st. Floor Qty = 343.93 Cft
= 569.99 Cft
= 16.14 Cum
@Tk = 12,000.00 P/Cum Sch = 16.50 Tk= 193,709.40
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF Qty = 377.57 Sqm
Sch.Qty = 288.00 Sqm
@Tk = 400.00 P/Sqm Sch = 288.00 Tk= 115,200.00
ii). 1st Floor
BF Qty = 249.39 Sqm
Sch.Qty = 225.00 Sqm
@Tk = 400.00 P/Sqm Sch = 225.00 Tk= 90,000.00
iii).2nd Floor
Academic Bldg
On 10'' Wall = Rft Qty Same as,Qty = 306.72 Rft x 2.33 = 714.66 Sft
On 5'' Wall = Rft Qty Same as,Qty = 167.27 Rft x 1.42 = 237.52 Sft
= 952.18 Sft
Hostel Bldg
Same measurement at 1st. Floor/6th R/A Bill = 1417.61 Sft
= 2369.79 Sft
BF Qty = 220.24 Sqm

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 147


Sch.Qty = 198.00 Sqm
@Tk = 400.00 P/Sqm Sch = 198.00 Tk= 79,200.00
F. Floor & Roof slab
a). Concrete.
i). Gr.Floor
BF Qty = 209.39 Cum
Sch.Qty = 207.91 Cum
@Tk = 20,000.00 P/Cum Sch = 207.91 Tk= 4,158,200.00
ii). 1st Floor
BF Qty = 213.84 cum
Sch.Qty = 208.87 Cum
@Tk = 20,000.00 P/Cum Sch = 208.87 Tk= 4,177,400.00
iii). 2nd Floor
BF Qty = 165.42 cum
For Hostel Bldg
2nd Floor-Bed Room
Ver, Portion = 18 × 8.08 Rft × 3.58 Rft = 520.68 Sft x 0.38 Rft

= 197.86 Cft
False Slab = 5.60 cum
Academic Bldg
Toilet = 1 × 5.17 Rft × 8.25 Rft = 42.65 Sft
= 2 × 7.42 Rft × 5.50 Rft = 81.62 Sft
= 124.27 Sft x 0.25 = 31.07 Cft
= 0.88 Cum
= 171.90 cum
@Tk = 20,000.00 P/Cum Sch = 178.16 Tk= 3,437,991.43
iv). 3rd Floor
For Academic Bldg
BF Qty/6th R/A Bill = 3.28 Cum
Hostel Bldg
Same measurement at 2nd. Floor/6th R/A Bill Qty = 100.82 Cum
For Hostel Bldg = 104.10 cum
3rd Floor-Bed Room
Ver, Portion = 18 × 8.08 Rft × 3.58 Rft = 520.68 Sft x 0.38 Rft
= 197.86 Cft
= 5.60 cum
= 109.70 Cum
@Tk = 20,000.00 P/Cum Sch = 110.03 Tk= 2,194,080.45
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF Qty = 1846.60 Sqm
@Tk = 600.00 P/Sqm Sch = 2494.92 Tk= 1,107,962.06
ii).1st Floor
BF Qty = 1922.09 Sqm
@Tk = 500.00 P/Sqm Sch = 2506.44 Tk= 961,047.35
iii). 2nd Floor

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 148


BF Qty/6th R/A Bill = 1525.18 Sqm
For Hostel Bldg
Ver, Portion = 18 × 8.83 Rft × 4.33 Rft = 688.21 Sft = 63.96 Sqm
False Slab
Academic Bldg
Toilet = 1 × 5.17 Rft × 8.92 Rft = 46.12 Sft
= 1 × 8.08 Rft × 5.50 Rft = 44.44 Sft
= 90.56 Sft = 8.42 Sqm
= 1597.56 Sqm
@Tk = 500.00 P/Sqm Sch = 2137.96 Tk= 798,779.69
iv). 3rd Floor
Academic Bldg
Pent House = 1 × 23.17 Rft × 14.75 Rft = 341.76 Sft = 31.76 Sqm
Hostel Bldg
Same measurement at 2nd Floor/6th R/A Bill = 10920.14 Sft = 1014.88 Sqm
Ver, Portion = 18 × 8.83 Rft × 4.33 Rft = 688.21 Sft = 63.96 Sqm
= 1110.60 Sqm
@Tk = 500.00 P/sqm Sch = 1320.36 Tk= 555,302.34
G. Sunshade, drop wall, railing shelves, cornice, louver, fins, parapet etc.
a). Concrete.
i). Gr.Floor
BF Qty = 5.12 Cum
Hostel Bldg
Sunshade
W80 = 18 × 6.92 Rft = 124.56 Rft

W50 = 4 × 4.17 Rft = 16.68 Rft

W60 = 2 × 5.00 Rft = 10.00 Rft

W48 = 2 × 4.00 Rft = 8.00 Rft

W90 = 2 × 7.50 Rft = 15.00 Rft

HW24 = 10 × 2.00 Rft = 20.00 Rft

= 2 × 4.33 Rft = 8.66 Rft

= 2 × 13.25 Rft = 26.50 Rft

= 229.40 Rft x 1.67 Sft x 0.25 = 95.77 Cft


Shelves
Accounts = 4 × 5.83 Rft = 23.32 Rft

Kitchen = 1 × 10.83 Rft = 10.83 Rft

Pantry = 3 × 10.50 Rft = 31.50 Rft

= 365.21 Rft x 2.08 Sft x 0.25 = 189.91 Cft


Cup Board
= 18 × 5.17 Rft = 93.06 Rft x 2.08 Sft x 0.25 = 48.39 Cft
= 334.07 Cft
= 9.46 Cum
= 14.58 Cum
Sch.Qty = 9.75 Cum
@Tk = 12,000.00 P/Cum Sch = 9.75 Tk= 117,000.00
ii). 1st.Floor

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 149


BF Qty = 5.03 Cum
Hostel Bldg
Sunshade Qty Same as Gr.Floor Qty = 95.77 Cft
Cup Board Qty Same as Gr.Floor Qty = 48.39 Cft
Drop Wall
= 18 × 8.67 Rft = 156.06 Rft x 3.00 Rft x 0.25 = 117.05 Cft
Railing
= 18 × 8.67 Rft = 156.06 Rft x 2.50 Rft x 0.25 = 97.54 Cft
= 358.74 Cft
= 10.16 Cum
= 15.19 Cum
Sch.Qty = 13.60 Cum
@Tk = 12,000.00 P/Cum Sch = 13.60 Tk= 163,200.00
iii). 2nd.Floor
Academic Bldg
Sunshade
L/D = 1 × 19 Nos × 9.00 Rft = 171.00 Rft
S/D = 1 × 1 Nos × 8.83 Rft = 8.83 Rft
= 1 × 1 Nos × 9.33 Rft = 9.33 Rft
= 1 × 1 Nos × 19.00 Rft = 19.00 Rft
= 2 × 4 Nos × 8.58 Rft = 68.64 Rft
= 276.80 Rft x 0.83 x 0.25
= 57.44 Cft
Hostel Bldg
Qty Same as 1st. Floor Qty = 358.74 Cft
= 416.18 Cft
= 11.79 Cum
@Tk = 12,000.00 P/Cum Sch = 12.50 Tk= 141,437.04
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
Academic Bldg
BF Qty/6th = 116.63 Sqm
Hostel Bldg
Sunshade
Qty Same as Gr.Floor Qty = 229.40 Rft x 1.92 = 440.45 Sft
Shelves
Qty Same as Gr.Floor Qty = 65.65 Rft x 2.17 = 142.46 Sft
Cup Board
Qty Same as Gr.Floor Qty = 93.06 Rft x 2.33 = 216.83 Sft
= 799.74 Sft
= 74.33 Sqm
= 190.95 Sqm
Sch.Qty = 117.00 Sqm
@Tk = 400.00 P/Sqm Sch = 117.00 Tk= 46,800.00
ii). 1st.Floor
BF Qty/6th = 116.66 Sqm
Hostel Bldg

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 150


Sunshade
Qty Same as Gr.Floor Qty = 229.40 Rft x 1.92 = 440.45 Sft
Drop Wall
Qty Same as Gr.Floor Qty = 156.06 Rft x 6.25 = 975.38 Sft
Railing
Qty Same as Gr.Floor Qty = 156.06 Rft x 5.00 = 780.30 Sft
Cup Board
Qty Same as Gr.Floor Qty = 93.06 Rft x 2.33 = 216.83 Sft
= 2,412.95 Sft
= 224.25 Sqm
= 340.91 Sqm
Sch.Qty = 163.20 Sqm
@Tk = 400.00 P/Sqm Sch = 163.20 Tk= 65,280.00
iii). 2nd.Floor
Academic Bldg
Rft Qty Same as 2nd.Floor Qty = 276.80 Rft x 1.92 = 531.46 Sft
Hostel Bldg
Qty Same as 1st.Floor Qty = 2,412.95 Sft
= 2,944.41 Sft
= 273.64 Sqm
Sch.Qty = 150.00 Sqm
@Tk = 400.00 P/Sqm Sch = 150.00 Tk= 60,000.00
H. In stair case, slab & steps, ramp etc
a). Concrete.
i). Gr.Floor
BF Qty = 19.48 Cum
Sch Qty = 16.00 Cum
@Tk = 12,000.00 P/Cum Sch = 16.00 Tk= 192,000.00

ii). 1st.Floor
Academic Bldg
BF Qty = 13.20 Cum
Sch Qty = 12.40 Cum
@Tk = 12,000.00 P/Cum Sch = 12.40 Tk= 148,800.00
iii). 2nd.Floor
BF Qty = 13.20 Cum
Sch Qty = 12.15 Cum
@Tk = 12,000.00 P/Cum Sch = 12.15 Tk= 145,800.00
b) Formwork/Shuttering
i). Gr.Floor
BF Qty = 156.02 sqm
@Tk = 400.00 P/sqm Sch = 192.00 Tk= 62,408.34
ii). First Floor
BF Qty = 95.74 sqm
@Tk = 400.00 P/sqm Sch = 148.80 Tk= 38,295.07
iii). 2nd Floor

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 151


BF Qty = 95.74 sqm
@Tk = 400.00 P/sqm Sch = 145.80 Tk= 38,295.07
SL No-1.17 Supplying fabrication and fixing to details as per design deform bar
b).60 grade deformed bar
BF Qty = 579,481.97 kg

Hostel Bldg
Slab & Slab Beam Same measurement at 2nd Floor Qty = 24926.42 kg
Hostel Bldg
Column - 4th Floor
20mmØ,C1 = 20 × 8 Nos = 160.00 Nos

C2 = 30 × 8 Nos = 240.00 Nos

C3 = 6 × 8 Nos = 48.00 Nos

C4 = 10 × 6 Nos = 60.00 Nos

C5 = 4 × 4 Nos = 16.00 Nos

= 524.00 Nos x 2.67 Rft = 1399.08 Rft

Lapping = 524.00 Nos x 1 Nos x 2.67 Rft = 1399.08 Rft


= 2798.16 Rft

20mmØ,C1 = 4 × 8 Nos = 32.00 Nos

C2 = 8 × 8 Nos = 64.00 Nos


No
= 96.00 s x 10.00 Rft = 960.00 Rft
No
Lapping = 96.00 Nos x 1 s x 2.67 Rft = 256.32 Rft
= 1216.32 Rft

16 mmØ,C1 = 20 × 6 Nos = 120.00 Nos

C2 = 30 × 4 Nos = 120.00 Nos

C3 = 6 × 4 Nos = 24.00 Nos

C4 = 10 × 6 Nos = 60.00 Nos

C5 = 4 × 8 Nos = 32.00 Nos


No
= 356.00 s x 2.67 Rft = 950.52 Rft
No
Lapping = 356.00 Nos x 1 s x 2.17 Rft = 772.52 Rft
= 1723.04 Rft

16 mmØ,C1 = 4 × 6 Nos = 24.00 Nos

C2 = 8 × 4 Nos = 32.00 Nos


No
= 56.00 s x 10.00 Rft = 560.00 Rft
No
Lapping = 56.00 Nos x 1 s x 2.67 Rft = 149.52 Rft
= 709.52 Rft

10mmØ stirup
C1 = 20 × 8 Nos × 5.33 Rft × = 852.80 Rft

= 20 × 8 Nos × 4.17 Rft × = 667.20 Rft

= 20 × 8 Nos × 4.00 Rft × = 640.00 Rft

C1 = 4 × 25 Nos × 5.33 Rft × = 533.00 Rft

= 4 × 25 Nos × 4.17 Rft × = 417.00 Rft

= 4 × 25 Nos × 4.00 Rft × = 400.00 Rft

C2 = 30 × 8 Nos × 4.83 Rft × = 1159.20 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 152


= 30 × 8 Nos × 3.67 Rft × = 880.80 Rft

C2 = 8 × 25 Nos × 4.83 Rft × = 966.00 Rft

= 8 × 25 Nos × 3.67 Rft × = 734.00 Rft

C3,C4,C5 = 20 × 8 Nos × 4.83 Rft × = 772.80 Rft

= 20 × 8 Nos × 3.67 Rft × = 587.20 Rft


= 8610.00 Rft

Column Summary
20mm Ø = 4014.48 Rft = 3023.10 Kg
16mm Ø = 2,432.56 Rft = 1171.78 Kg
10mm Ø = 8,610.00 Rft = 1627.50 Kg
For Column = 5822.38 kg
Academic Bldg
Lintel
2nd. Floor
On 10" Wall with Sunshade
12 mm Ø/ M = 1 × 1 Nos × 6 × 99.25 Rft = 595.50 Rft

" = 1 × 1 Nos × 6 × 1.58 Rft = 9.48 Rft

" = 1 × 1 Nos × 6 × 80.75 Rft = 484.50 Rft

" = 1 × 1 Nos × 6 × 19.50 Rft = 117.00 Rft

" = 1 × 2 Nos × 6 × 18.83 Rft = 225.96 Rft

= 1,432.44 Rft

= 388.68 kg
10mm Ø Strp = 1 × 1 Nos × 236 × 4.50 Rft = 1,062.00 Rft
" = 1 × 1 Nos × 46 × 4.50 Rft = 207.00 Rft

" = 1 × 1 Nos × 193 × 4.50 Rft = 868.50 Rft

" = 1 × 2 Nos × 46 × 4.50 Rft = 414.00 Rft

" = 1 × 2 Nos × 101 × 4.50 Rft = 909.00 Rft

10mm Ø binder = 1 × 1 Nos × 2 × 99.25 Rft = 198.50 Rft

" = 1 × 2 Nos × 2 × 19.50 Rft = 78.00 Rft

" = 1 × 1 Nos × 2 × 80.75 Rft = 161.50 Rft

" = 1 × 2 Nos × 2 × 18.75 Rft = 75.00 Rft

" = 1 × 2 Nos × 2 × 42.00 Rft = 168.00 Rft

= 4,141.50 Rft

= 782.84 kg
On 10" Wall without Sunshade
12 mm Ø/ M = 1 × 1 Nos × 6 × 20.42 Rft = 122.52 Rft

" = 1 × 2 Nos × 6 × 9.33 Rft = 111.96 Rft

" = 1 × 1 Nos × 6 × 11.08 Rft = 66.48 Rft

= 300.96 Rft

= 81.66 kg
10mm Ø Strp = 1 × 1 Nos × 50 × 3.00 Rft = 150.00 Rft

" = 1 × 2 Nos × 23 × 3.00 Rft = 138.00 Rft

" = 1 × 1 Nos × 27 × 3.00 Rft = 81.00 Rft


= 369.00 Rft
= 69.75 kg
On 5" Wall without Sunshade
12 mm Ø/ M = 1 × 17 Nos × 4 × 10.00 Rft = 680.00 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 153


" = 1 × 6 Nos × 4 × 18.83 Rft = 451.92 Rft

= 1,131.92 Rft
= 307.14 kg
10mm Ø Strp = 1 × 17 Nos × 25 × 1.67 Rft = 709.75 Rft

" = 1 × 6 Nos × 46 × 1.67 Rft = 460.92 Rft

= 1,170.67 Rft

= 221.29 kg
= 1851.36 kg
Hostel Bldg
2nd. Floor
Verandah Slab = Same Measurement at 1st. Floor Qty = 473.45 kg
Railing = Same Measurement at 1st. Floor Qty = 369.37 kg
Sunshade = Same Measurement at 1st. Floor Qty = 485.65 kg
Cup Board = Same Measurement at 1st. Floor Qty = 159.91 kg
Lintel = Same Measurement at 1st. Floor Qty = 1747.66 kg
= 3236.04 kg
= 615,318.17 kg

@Tk = 90.00 P/Kg Sch = 616804.75 Tk= 55,378,635.48


SL No-1.18 Casting and Testing work of Concrete cylinder (size 150 x 300 mm)
For Academic Bldg
Pile = 1.00 Nos
Pile Cap = 1.00 Nos
Plinth Beam & Slab = 2.00 Nos
Column-Gr.Flr to 2nd Flr = 3.00 Nos
Gr.Floor Beam & Slab = 2.00 Nos
1st.Floor Beam & Slab = 2.00 Nos
2nd.Floor Beam & Slab = 2.00 Nos
= 13.00 Nos x 3.00 Set = 39.00 Set
For Hostel Bldg
Pile = 1.00 Nos
Pile Cap = 1.00 Nos
Plinth Beam & Slab = 2.00 Nos
Column-Gr.Flr to 2nd Flr = 4.00 Nos
Gr.Floor Beam & Slab = 2.00 Nos
1st.Floor Beam & Slab = 2.00 Nos
2nd.Floor Beam & Slab = 2.00 Nos
3rd.Floor Beam & Slab = 2.00 Nos
= 16.00 Nos x 3.00 Set = 48.00 Set
For Principal Qtr
Pile = 1.00 Nos
Pile Cap = 1.00 Nos
Plinth Beam & Slab = 2.00 Nos
Column-Gr.Floor = 1.00 Nos
Gr.Floor Beam & Slab = 2.00 Nos
= 7.00 Nos x 3.00 Set = 21.00 Set

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 154


= 108.00 Set
Sch.Qty = 72.00 Set
@Tk = 1,000.00 P/Each Sch = 72.00 Tk= 72,000.00
SL No-1.19 Brick work in super structure 250mm thick wall
a. Exposed brick work in superstructure in (1:4) with special quality sorted out 1st class brick

i. Ground Floor
BF Qty = 225.66 Cum
@Tk = 7,200.00 P/cum Sch = 278.00 Tk= 1,624,722.98
ii. 1st Floor
Add, BF Qty = 169.28 Cum
Rf
Hostel Side = 2 × 7.92 Rft x 8.00 = 126.72 Sft
t
Rf
= 2 × 4.58 Rft x 8.00 = 73.28 Sft
t
Rf
= 2 × 7.58 Rft x 8.00 = 121.28 Sft
t
= 321.28 Sft x 0.83 = 266.66 Cft
= 7.55 Cum
= 176.83 Cum
@Tk = 7,200.00 P/cum Sch = 188.00 Tk= 1,273,174.33
iii. 2nd Floor
For Academic Bldg
Out side = 16 × 9.00 Rft x 9.00 Rft = 1,296.00 Sft
Side = 4 × 16.50 Rft x 9.25 Rft = 610.50 Sft
= 2 × 7.58 Rft x 9.25 Rft = 140.23 Sft
Stair = 1 × 8.50 Rft x 9.75 Rft = 82.88 Sft
W88 = 1 × 1.33 Rft x 9.00 Rft = 11.97 Sft
= 2,141.58 Sft x 0.83 = 1,777.51 Cft
Deduction
W/108 = 8 × 7.33 Rft x 4.50 Rft = 263.88 Sft
HW/24 = 2 × 2.00 Rft x 2.00 Rft = 8.00 Sft
W/88 = 1 × 5.50 Rft x 4.50 Rft = 24.75 Sft
W/91 = 1 × 5.75 Rft x 4.50 Rft = 25.88 Sft
W/45 = 1 × 3.75 Rft x 4.50 Rft = 16.88 Sft
W/50 = 1 × 4.17 Rft x 4.50 Rft = 18.77 Sft
= 358.15 Sft x 0.83 = -297.26 Cft
= 1,480.25 Cft
For Hostel Bldg
Same measurement at First.Floor,Qty - 6th R/A Bill Qty = 3,306.76 Cft
Same measurement at First.Floor,Qty 7th R/A Bill Qty = 266.66 Cft
Qty = 3,573.42 Cft
Qty = 5,053.67 Cft
= 143.12 Cum
Sch.Qty = 132.00 Cum
@Tk = 7,200.00 P/cum Sch = 132.00 Tk= 950,400.00
iv. 3rd Floor
For Hostel Bldg
Same measurement at 2nd.Floor,Qty Qty = 3,573.42 Cft
= 101.20 Cum
@Tk = 7,200.00 P/cum Sch = 102.00 Tk= 728,650.04

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 155


b. In (1:6) proportion for non exposed brick wall.
i. Ground Floor
BF Qty = 118.14 Cum
Sch.Qty = 88.50 Cum
@Tk = 6,800.00 P/cum Sch = 88.50 Tk= 601,800.00
ii. 1st Floor
BF Qty = 51.91 Cum
Sch.Qty = 44.00 Cum
@Tk = 6,800.00 P/cum Sch = 44.00 Tk= 299,200.00
iii. 2nd Floor
For Academic Bldg
= 2 × 16.50 Rft x 9.25 Rft = 305.25 Sft
= 3 × 7.58 Rft x 9.25 Rft = 210.35 Sft
= 2 × 7.50 Rft x 9.25 Rft = 138.75 Sft
= 1 × 6.75 Rft x 11.25 Rft = 75.94 Sft
= 730.28 Sft x 0.83 = 606.13 Cft
For Hostel Bldg
= 2 × 9.50 Rft x 8.50 Rft = 161.50 Sft
= 2 × 17.75 Rft x 8.50 Rft = 301.75 Sft
= 2 × 13.33 Rft x 8.50 Rft = 226.61 Sft
= 4 × 4.33 Rft x 8.50 Rft = 147.22 Sft
= 2 × 11.25 Rft x 8.50 Rft = 191.25 Sft
= 1 × 10.67 Rft x 8.50 Rft = 90.70 Sft
= 4 × 7.50 Rft x 8.50 Rft = 255.00 Sft
= 2 × 18.08 Rft x 8.50 Rft = 307.36 Sft
= 1 × 21.17 Rft x 8.50 Rft = 179.95 Sft
Deduct,Gap = 2 × 13.33 Rft x 4.50 Rft = -119.97 Sft
= 2 × 4.33 Rft x 4.50 Rft = -38.97 Sft
D60 = 2 × 5.00 Rft x 7.00 Rft = -70.00 Sft
= 1,632.39 Sft x 0.83 = 1,354.88 Cft
= 1,961.02 Cft
= 55.54 Cum

Sch.Qty = 44.00 Cum

@Tk = 6,800.00 P/cum Sch = 44.00 Tk= 299,200.00


iv. 3rd Floor
For Academic Bldg
Pent house = 2 × 16.50 Rft x 9.50 Rft = 313.50 Sft
= 2 × 8.50 Rft x 9.50 Rft = 161.50 Sft
Deduct,W/40 = 1 × 3.33 Rft x 4.50 Rft = -14.99 Sft
= 460.02 Sft x 0.83 = 381.81 Cft
For Hostel Bldg
Same measurement at First.Floor,Qty Qty = 1,354.88 Cft
= 1,736.70 Cft
= 49.18 Cum

Sch.Qty = 26.00 Cum

@Tk = 6,800.00 P/cum Sch = 26.00 Tk= 176,800.00


SL No-1.20 125mm thick brick work in (1:4)

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 156


b On-Exposed brick work 125mm thick in (1:4)
i. Ground Floor
Total Qty = 10,141.09 Sft = 942.48 Sqm
Sch.Qty= 707.00 Sqm
@Tk = 850.00 P/sqm Sch = 707.00 Tk= 600,950.00
ii. 1st Floor
Total Qty = 9,458.23 Sft = 879.02 Sqm
Sch.Qty = 502.00 Sqm
@Tk = 850.00 P/sqm Sch = 502.00 Tk= 426,700.00
iii. 2nd Floor
For Academic Bldg
General Store = 3 × 9.00 Rft x 8.75 Rft = 236.25 Sft
" = 1 × 16.50 Rft x 9.25 Rft = 152.63 Sft
Library = 5 × 9.00 Rft x 8.75 Rft = 393.75 Sft
Store = 2 × 16.50 Rft x 9.25 Rft = 305.25 Sft
Conference= 3 × 9.00 Rft x 8.75 Rft = 236.25 Sft
Guest = 3 × 9.00 Rft x 8.75 Rft = 236.25 Sft
Partition = 3 × 16.50 Rft x 9.25 Rft = 457.88 Sft
Corridor = 1 × 17.50 Rft x 8.75 Rft = 153.13 Sft
Dress = 1 × 9.58 Rft x 10.33 Rft = 98.96 Sft
Toilet = 2 × 8.42 Rft x 10.33 Rft = 173.96 Sft
Urinal = 2 × 3.50 Rft x 7.00 Rft = 49.00 Sft
Parapet = 1 × 87.83 Rft x 3.00 Rft = 263.49 Sft
Lect.Hall = 1 × 133.00 Rft x 3.00 Rft = 399.00 Sft
= 3,155.78 Sft
Deduction
W/105 = 10 × 7.33 Rft x 4.50 Rft = -329.85 Sft
W/50 = 6 × 4.17 Rft x 4.50 Rft = -112.59 Sft
W/43 = 1 × 3.58 Rft x 4.50 Rft = -16.11 Sft
D/40 = 7 × 3.33 Rft x 7.00 Rft = -163.17 Sft
D/36 = 1 × 3.00 Rft x 7.00 Rft = -21.00 Sft
D/30 = 4 × 2.50 Rft x 7.00 Rft = -70.00 Sft
= -712.72 Sft
Qty = 2,443.06 Sft
For Hostel Bldg
Same measurement at First.Floor,Qty = 7,136.26 Sft
= 9,579.32 Sft = 890.27171Sqm
Sch.Qty = 469.00 Sqm
@Tk = 850.00 P/sqm Sch = 469.00 Tk= 398,650.00
iv. 3rd Floor
For Academic Bldg
Parapet = 2 × 99.58 Rft x 3.00 Rft = 597.48 Sft
= 2 × 45.67 Rft x 3.00 Rft = 274.02 Sft
= 871.50 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 157


For Hostel Bldg
Same measurement at 2nd.Floor,Qty = 7,136.26 Sft
= 8,007.76 Sft = 744.215613Sqm
Sch.Qty = 392.00 Sqm
@Tk = 850.00 P/sqm Sch = 392.00 Tk= 333,200.00
SL No-1.25 Wood work in chowkat of door & window with Silkarai wood
For Academic Bldg
Ground Floor
D40 = 9 × 17.33 Rft = 155.97 Rft

D36 = 2 × 17.00 Rft = 34.00 Rft

D30 = 10 × 16.50 Rft = 165.00 Rft

D60 = 2 × 19.00 Rft = 38.00 Rft

Cat door = 5 × 11.67 Rft = 58.35 Rft

= 451.32 Rft x 0.50 Rft x 0.21 = 47.39 Cft


Frist Floor
D40 = 10 × 17.33 Rft = 173.30 Rft

D36 = 2 × 17.00 Rft = 34.00 Rft

D30 = 5 × 16.50 Rft = 82.50 Rft

Cat door = 2 × 11.67 Rft = 23.34 Rft

= 313.14 Rft x 0.50 Rft x 0.21 = 32.88 Cft


Second Floor
D40 = 8 × 17.33 Rft = 138.64 Rft

D36 = 1 × 17.00 Rft = 17.00 Rft

D30 = 3 × 16.50 Rft = 49.50 Rft

Cat door = 2 × 11.67 Rft = 23.34 Rft

= 228.48 Rft x 0.50 Rft x 0.21 = 23.99 Cft


= 104.26 Cft
For Hostel Bldg
Ground Floor
D40 = 11 × 17.33 Rft = 190.63 Rft

D36 = 1 × 17.00 Rft = 17.00 Rft

D30 = 12 × 16.50 Rft = 198.00 Rft

D60 = 6 × 19.00 Rft = 114.00 Rft

Cat door = 5 × 11.25 Rft = 56.25 Rft

= 575.88 Rft x 0.50 Rft x 0.21 = 60.47 Cft


Frist Floor
D40 = 22 × 17.33 Rft = 381.26 Rft

D30 = 32 × 16.50 Rft = 528.00 Rft

D60 = 2 × 19.00 Rft = 38.00 Rft

Cat door = 4 × 9.25 Rft = 37.00 Rft

= 984.26 Rft x 0.50 Rft x 0.21 = 103.35 Cft


Second Floor
D40 = 22 × 17.33 Rft = 381.26 Rft

D30 = 32 × 16.50 Rft = 528.00 Rft

Cat door = 4 × 9.25 Rft = 37.00 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 158


= 946.26 Rft x 0.50 Rft x 0.21 = 99.36 Cft
= 263.17 Cft

Principal Qtr
D40 = 4 × 17.33 Rft = 69.32 Rft

D36 = 1 × 17.00 Rft = 17.00 Rft

D56 = 1 × 18.67 Rft = 18.67 Rft

D30 = 8 × 16.50 Rft = 132.00 Rft

Cat door = 4 × 10.25 Rft = 41.00 Rft

= 277.99 Rft x 0.50 Rft x 0.21 = 29.19 Cft


= 396.62 Cft
= 11.23 Cum
@Tk = 195,000.00 P/cum Sch = 13.98 cum Tk= 2,190,337.91
SL No-1.26 Supplying fitting and fixing M.S. flat bar clamp 150 x 38 x 6mm size etc. all complete
and accepted by the Engineer.

For Academic Bldg


Gr. Floor-2nd Floor
D40 = 27 × 8.00 Nos = 216.00 Nos

D36 = 5 × 8.00 Nos = 40.00 Nos

D60 = 2 × 8.00 Nos = 16.00 Nos

D30 = 18 × 8.00 Nos = 144.00 Nos

Cat door = 9 × 4.00 Nos = 36.00 Nos

= 452.00 Nos

For Hostel Bldg


Gr. Floor-3rd Floor
D40 = 77 × 8.00 Nos = 616.00 Nos

D36 = 1 × 8.00 Nos = 8.00 Nos

D60 = 8 × 8.00 Nos = 64.00 Nos

D30 = 108 × 8.00 Nos = 864.00 Nos

Cat door = 17 × 4.00 Nos = 68.00 Nos

= 1,620.00 Nos

Principal Qtr
D40 = 4 × 8.00 Nos = 32.00 Nos

D36 = 1 × 8.00 Nos = 8.00 Nos

D56 = 1 × 8.00 Nos = 8.00 Nos

D30 = 8 × 8.00 Nos = 64.00 Nos

Cat door = 4 × 4.00 Nos = 16.00 Nos

= 128.00 Nos

= 2,200.00 Nos

Sch.Qty = 1,213.00 Nos


@Tk = 60.00 P/Each Sch = 1213.00 Tk= 72,780.00
SL No-1.32 a. S.F.F. of M.S. window grill with 20mmx5mm F.I. Bar as per design & drawing.
For Academic Bldg
Ground Floor
W108 = 18 × 9.00 Rft x 4.50 Rft = 729.00 Sft
W88 = 1 × 7.33 Rft x 4.50 Rft = 32.99 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 159


W105 = 8 × 8.75 Rft x 4.50 Rft = 315.00 Sft
W50 = 7 × 4.17 Rft x 4.50 Rft = 131.36 Sft
W45 = 4 × 3.75 Rft x 4.50 Rft = 67.50 Sft
W89 = 1 × 7.42 Rft x 4.50 Rft = 33.39 Sft
W20 = 12 × 1.67 Rft x 4.50 Rft = 90.18 Sft
SW40 = 1 × 3.33 Rft x 9.33 Rft = 31.07 Sft
HW24 = 11 × 2.00 Rft x 2.00 Rft = 44.00 Sft
= 1,474.48 Sft
First Floor
W108 = 18 × 9.00 Rft x 4.50 Rft = 729.00 Sft
W88 = 1 × 7.33 Rft x 4.50 Rft = 32.99 Sft
W105 = 12 × 8.75 Rft x 4.50 Rft = 472.50 Sft
W50 = 9 × 4.17 Rft x 4.50 Rft = 168.89 Sft
W45 = 3 × 3.75 Rft x 4.50 Rft = 50.63 Sft
W89 = 2 × 7.42 Rft x 4.50 Rft = 66.78 Sft
W20 = 12 × 1.67 Rft x 4.50 Rft = 90.18 Sft
SW40 = 1 × 3.33 Rft x 9.33 Rft = 31.07 Sft
HW24 = 5 × 2.00 Rft x 2.00 Rft = 20.00 Sft
= 1,662.02 Sft
Second Floor
W108 = 14 × 9.00 Rft x 4.50 Rft = 567.00 Sft
W88 = 1 × 7.33 Rft x 4.50 Rft = 32.99 Sft
W105 = 14 × 8.75 Rft x 4.50 Rft = 551.25 Sft
W50 = 8 × 4.17 Rft x 4.50 Rft = 150.12 Sft
W45 = 2 × 3.75 Rft x 4.50 Rft = 33.75 Sft
W91 = 2 × 7.58 Rft x 4.50 Rft = 68.22 Sft
SW40 = 1 × 3.33 Rft x 9.33 Rft = 31.07 Sft
HW24 = 5 × 2.00 Rft x 2.00 Rft = 20.00 Sft
= 1,454.39 Sft

S/T = 4,590.90 Sft


For Hostel Bldg
Ground Floor
W50 = 4 × 4.17 Rft x 4.50 Rft = 75.06 Sft
W80 = 20 × 6.67 Rft x 4.50 Rft = 600.30 Sft
W48 = 2 × 4.00 Rft x 4.50 Rft = 36.00 Sft
SW90 = 2 × 7.50 Rft x 9.33 Rft = 139.95 Sft
W90 = 2 × 7.50 Rft x 4.50 Rft = 67.50 Sft
W24 = 2 × 2.00 Rft x 4.50 Rft = 18.00 Sft
HW24 = 6 × 2.00 Rft x 2.00 Rft = 24.00 Sft
W60 = 9 × 5.00 Rft x 4.50 Rft = 202.50 Sft
W52 = 2 × 4.33 Rft x 4.50 Rft = 38.97 Sft
Lobby = 2 × 4.33 Rft x 9.50 Rft = 82.27 Sft
"= 2 × 13.25 Rft x 9.50 Rft = 251.75 Sft
Stair = 2 × 5.00 Rft x 4.50 Rft = 45.00 Sft
Ablution = 2 × 12.00 Rft x 4.50 Rft = 108.00 Sft
Store,W40 = 2 × 3.33 Rft x 4.50 Rft = 29.97 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 160


HW = 2 × 10.42 Rft x 2.00 Rft = 41.68 Sft
Kitchen = 1 × 7.00 Rft x 7.00 Rft = 49.00 Sft
" = 2 × 3.08 Rft x 7.00 Rft = 43.12 Sft
Stair,Front = 4 × 7.50 Rft x 7.00 Rft = 210.00 Sft
= 2,063.07 Sft
First Floor
W50 = 4 × 4.17 Rft x 4.50 Rft = 75.06 Sft
W36 = 38 × 3.00 Rft x 4.50 Rft = 513.00 Sft
W48 = 20 × 4.00 Rft x 4.50 Rft = 360.00 Sft
W45 = 2 × 3.75 Rft x 4.50 Rft = 33.75 Sft
W59 = 2 × 4.92 Rft x 4.50 Rft = 44.28 Sft
W90 = 2 × 7.50 Rft x 4.50 Rft = 67.50 Sft
HW24 = 8 × 2.00 Rft x 2.00 Rft = 32.00 Sft
Store = 2 × 9.60 Rft x 4.50 Rft = 86.40 Sft
Lobby = 2 × 14.33 Rft x 8.50 Rft = 243.61 Sft
" = 2 × 13.25 Rft x 8.50 Rft = 225.25 Sft
Stair = 2 × 5.00 Rft x 4.50 Rft = 45.00 Sft
Open Space = 6 × 5.00 Rft x 8.50 Rft = 255.00 Sft
" = 2 × 12.00 Rft x 4.50 Rft = 108.00 Sft
SW90 = 2 × 7.50 Rft x 9.17 Rft = 137.55 Sft
= 2,226.40 Sft

TV Room = 2 × 12.50 Rft x 4.50 Rft = 112.50 Sft


= 2 × 4.33 Rft x 4.50 Rft = 38.97 Sft
= 2,377.87 Sft
Second Floor
Same measurement at First.Floor,Qty Rft = 2,226.40 Sft
TV Room = 2 × 10.67 Rft x 4.50 Rft = 96.03 Sft
= 2 × 4.33 Rft x 4.50 Rft = 38.97 Sft
= 2,361.40 Sft
Third Floor
Same measurement at Second.Floor,Qty Rft = 2,361.40 Sft
S/T = 9,163.74 Sft
Principal Qtr
W60 = 10 × 5.00 Rft x 4.50 Rft = 225.00 Sft
W37 = 1 × 3.08 Rft x 4.50 Rft = 13.86 Sft
HW24 = 2 × 2.00 Rft x 2.00 Rft = 8.00 Sft
HW20 = 1 × 1.67 Rft x 2.00 Rft = 3.34 Sft
HW18 = 1 × 1.50 Rft x 2.00 Rft = 3.00 Sft
HW60 = 1 × 5.00 Rft x 1.67 Rft = 8.35 Sft
Kitchen = 1 × 1.67 Rft x 4.50 Rft = 7.52 Sft
Store = 1 × 4.67 Rft x 1.67 Rft = 7.80 Sft
Living = 2 × 5.00 Rft x 1.67 Rft = 16.70 Sft
" = 1 × 7.50 Rft x 1.67 Rft = 12.53 Sft
" = 1 × 1.67 Rft x 6.50 Rft = 10.86 Sft
Stair = 1 × 4.00 Rft x 4.50 Rft = 18.00 Sft
S/T = 334.94 Sft
Total Qty = 14,089.58 Sft = 1309.44 Sqm

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 161


@Tk = 2,500.00 P/sqm Sch = 1465.25 Tk= 3,273,601.44
SL No-1.35 Plastering work
B. On masonry surface 10mm to 20mm thick in proportion (1:6)
i. Ground Floor
For Academic Bldg
Inside Plaster
Prof. = 1 × 2 Nos x 35.83 Rft = 71.66 Rft
Passege = 1 × 2 Nos x 10.08 Rft = 20.16 Rft
"= 1 × 1 Nos x 9.58 Rft = 9.58 Rft
Demonst = 1 × 2 Nos x 36.08 Rft = 72.16 Rft
Asmin = 1 × 2 Nos x 36.08 Rft = 72.16 Rft
Asmin = 1 × 2 Nos x 36.17 Rft = 72.34 Rft
C.TLT = 1 × 2 Nos x 25.83 Rft = 51.66 Rft
Suptd = 2 × 2 Nos x 31.08 Rft = 124.32 Rft
Accounts = 1 × 2 Nos x 26.08 Rft = 52.16 Rft
Office = 1 × 2 Nos x 26.08 Rft = 52.16 Rft
"= 1 × 2 Nos x 35.83 Rft = 71.66 Rft
Corridor = 1 × 2 Nos x 129.00 Rft = 258.00 Rft
Entrance Hall = 1 × 1 Nos x 25.17 Rft = 25.17 Rft
"= 1 × 1 Nos x 17.33 Rft = 17.33 Rft
Stair = 1 × 2 Nos x 17.33 Rft = 34.66 Rft
C.TLT = 1 × 2 Nos x 19.58 Rft = 39.16 Rft
= 1,044.34 Rft x 10.08 = 10526.95 Sft
Stage = 1 × 1 Nos x 18.92 Rft x 11.00 Rft = 208.12 Sft
= 1 × 2 Nos x 10.00 Rft x 11.00 Rft = 220.00 Sft
Lect.Hall Entrance = 2 × 2 Nos x 10.00 Rft x 12.50 Rft = 500.00 Sft
= 2 × 2 Nos x 8.50 Rft x 12.50 Rft = 425.00 Sft
Lect.Hall = 1 × 1 Nos x 47.42 Rft x 11.00 Rft = 521.62 Sft
= 1 × 1 Nos x 50.00 Rft x 8.50 Rft = 425.00 Sft
TLT-F.Slab = 2 × 2 Nos x 11.58 Rft x 3.08 Rft = 142.67 Sft
= 2 × 4 Nos x 10.58 Rft x 17.08 Rft = 1445.65 Sft
= 2 × 2 Nos x 8.00 Rft x 17.08 Rft = 546.56 Sft
TLT = 2 × 2 Nos x 6.83 Rft x 16.08 Rft = 439.31 Sft
Cobla W108 = 13 × 1 Nos x 23.67 Rft x 0.83 Rft = 255.40 Sft
W88 = 1 × 1 Nos x 20.33 Rft x 0.83 Rft = 16.87 Sft
W105 = 8 × 1 Nos x 23.17 Rft x 0.42 Rft = 77.85 Sft
W50 = 7 × 1 Nos x 17.33 Rft x 0.42 Rft = 50.95 Sft
W45 = 2 × 1 Nos x 16.50 Rft x 0.42 Rft = 13.86 Sft
SW40 = 1 × 1 Nos x 25.33 Rft x 0.83 Rft = 21.02 Sft
HW24 = 11 × 1 Nos x 8.00 Rft x 0.83 Rft = 73.04 Sft
W89 = 1 × 1 Nos x 23.83 Rft x 0.83 Rft = 19.78 Sft
W45 = 1 × 1 Nos x 16.50 Rft x 0.83 Rft = 13.70 Sft
W49 = 1 × 1 Nos x 17.17 Rft x 0.83 Rft = 14.25 Sft
W20 = 12 × 1 Nos x 12.33 Rft x 0.83 Rft = 122.81 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 162


= 16080.40 Sft
Deduction W108 = 13 × 1 Nos x 7.33 Rft x 4.50 Rft = 428.81 Sft
W88 = 1 × 1 Nos x 5.67 Rft x 4.50 Rft = 25.52 Sft
W105 = 8 × 1 Nos x 7.08 Rft x 4.50 Rft = 254.88 Sft
W50 = 6 × 1 Nos x 4.17 Rft x 4.50 Rft = 112.59 Sft
W45 = 2 × 1 Nos x 3.75 Rft x 4.50 Rft = 33.75 Sft
SW40 = 1 × 1 Nos x 3.33 Rft x 9.33 Rft = 31.07 Sft
D40 = 9 × 1 Nos x 3.33 Rft x 7.00 Rft = 209.79 Sft
D36 = 2 × 1 Nos x 3.00 Rft x 7.00 Rft = 42.00 Sft
D30 = 10 × 1 Nos x 2.50 Rft x 7.00 Rft = 175.00 Sft
D60 = 2 × 1 Nos x 5.00 Rft x 7.00 Rft = 70.00 Sft
= -1383.40 Sft
Inside Plaster = 14697.00 Sft
= 1365.89 Sqm
For Hostel Bldg
Inside Plaster
Wash = 1 × 2 Nos x 47.83 Rft = 95.66 Rft
= 1 × 2 Nos x 10.92 Rft = 21.84 Rft
Duct = 1 × 1 Nos x 7.50 Rft = 7.50 Rft
Foyer = 2 × 2 Nos x 34.67 Rft = 138.68 Rft
= 1 × 2 Nos x 7.50 Rft = 15.00 Rft
Dining = 1 × 2 Nos x 72.50 Rft = 145.00 Rft
Kitchen = 1 × 2 Nos x 38.00 Rft = 76.00 Rft
Pantry = 1 × 2 Nos x 25.75 Rft = 51.50 Rft
Cook.S.Rm = 1 × 2 Nos x 19.58 Rft = 39.16 Rft
Store = 1 × 2 Nos x 16.83 Rft = 33.66 Rft
= 1 × 2 Nos x 9.75 Rft = 19.50 Rft
Ver = 1 × 1 Nos x 7.83 Rft = 7.83 Rft
= 1 × 2 Nos x 5.58 Rft = 11.16 Rft
Bulk Store = 1 × 2 Nos x 25.67 Rft = 51.34 Rft
Passege = 1 × 2 Nos x 21.42 Rft = 42.84 Rft
Super Room = 1 × 2 Nos x 30.75 Rft = 61.50 Rft
Accounts = 1 × 2 Nos x 24.58 Rft = 49.16 Rft
Admin office = 1 × 2 Nos x 25.00 Rft = 50.00 Rft
Visitor = 1 × 2 Nos x 31.08 Rft = 62.16 Rft
Store Room = 1 × 2 Nos x 38.50 Rft = 77.00 Rft
ST.Keeper = 1 × 2 Nos x 25.00 Rft = 50.00 Rft
Prayer Room = 1 × 2 Nos x 37.83 Rft = 75.66 Rft
Passege = 1 × 2 Nos x 64.33 Rft = 128.66 Rft
= 1 × 2 Nos x 8.17 Rft = 16.34 Rft
Ablusion = 1 × 2 Nos x 17.50 Rft = 35.00 Rft
Entry = 1 × 2 Nos x 9.00 Rft = 18.00 Rft
= 1 × 2 Nos x 22.67 Rft = 45.34 Rft
Back = 1 × 2 Nos x 20.08 Rft = 40.16 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 163


= 1 × 2 Nos x 11.50 Rft = 23.00 Rft
= 1 × 1 Nos x 13.33 Rft = 13.33 Rft
Stair = 1 × 2 Nos x 12.75 Rft = 25.50 Rft
= 1 × 1 Nos x 19.50 Rft = 19.50 Rft
Cup Board = 2 × 19 Nos x 1.67 Rft = 63.46 Rft
= 1,610.44 Rft x 10.08 = 16233.24 Sft
TLT = 2 × 2 Nos x 11.42 Rft x 3.08 Rft = 140.69 Sft
Account,TLT = 1 × 2 Nos x 14.92 Rft x 3.08 Rft = 91.91 Sft
= 2 × 2 Nos x 9.42 Rft x 3.08 Rft = 116.05 Sft
Cobla W50 = 2 × 2 Nos x 17.33 Rft x 0.83 Rft = 57.54 Sft
W80 = 2 × 10 Nos x 22.33 Rft x 0.83 Rft = 370.68 Sft
W48 = 2 × 1 Nos x 17.00 Rft x 0.83 Rft = 28.22 Sft
SW90 = 2 × 1 Nos x 33.67 Rft x 0.42 Rft = 28.28 Sft
W90 = 2 × 1 Nos x 33.67 Rft x 0.83 Rft = 55.89 Sft
W24 = 2 × 1 Nos x 13.00 Rft x 0.83 Rft = 21.58 Sft
HW24 = 2 × 1 Nos x 8.00 Rft x 0.83 Rft = 13.28 Sft
W60 = 9 × 1 Nos x 19.00 Rft x 0.42 Rft = 71.82 Sft
W52 = 2 × 1 Nos x 17.67 Rft x 0.42 Rft = 14.84 Sft
Lobby = 2 × 1 Nos x 27.33 Rft x 0.42 Rft = 22.96 Sft
" = 2 × 1 Nos x 45.50 Rft x 0.42 Rft = 38.22 Sft
Stair = 2 × 1 Nos x 19.00 Rft x 0.83 Rft = 31.54 Sft
Ablusion = 1 × 1 Nos x 21.00 Rft x 0.83 Rft = 17.43 Sft
Store,W40 = 1 × 1 Nos x 15.67 Rft x 0.83 Rft = 13.01 Sft
HW = 1 × 1 Nos x 24.83 Rft x 0.83 Rft = 20.61 Sft
Kitchen = 1 × 1 Nos x 28.83 Rft x 0.83 Rft = 23.93 Sft
" = 1 × 1 Nos x 20.17 Rft x 0.83 Rft = 16.74 Sft
Stair = 2 × 1 Nos x 29.00 Rft x 0.83 Rft = 48.14 Sft
= 17476.59 Sft
Deduction W50 = 4 × 4.17 Rft x 4.50 Rft = 75.06 Sft
W80 = 20 × 6.67 Rft x 4.50 Rft = 600.30 Sft
W48 = 2 × 4.00 Rft x 4.50 Rft = 36.00 Sft
SW90 = 2 × 7.50 Rft x 9.33 Rft = 139.95 Sft
W90 = 2 × 7.50 Rft x 4.50 Rft = 67.50 Sft
W24 = 2 × 2.00 Rft x 4.50 Rft = 18.00 Sft
HW24 = 6 × 2.00 Rft x 2.00 Rft = 24.00 Sft
W60 = 9 × 5.00 Rft x 4.50 Rft = 202.50 Sft
W52 = 2 × 4.33 Rft x 4.50 Rft = 38.97 Sft
Lobby = 2 × 4.33 Rft x 9.50 Rft = 82.27 Sft
" = 2 × 13.25 Rft x 9.50 Rft = 251.75 Sft
Stair = 2 × 5.00 Rft x 4.50 Rft = 45.00 Sft
Ablution = 1 × 6.00 Rft x 4.50 Rft = 27.00 Sft
Store,W40 = 1 × 3.33 Rft x 4.50 Rft = 14.99 Sft
HW = 1 × 10.42 Rft x 2.00 Rft = 20.84 Sft
Kitchen = 1 × 7.00 Rft x 7.00 Rft = 49.00 Sft
" = 1 × 3.08 Rft x 7.00 Rft = 21.56 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 164


Stair,Front = 2 × 7.50 Rft x 7.00 Rft = 105.00 Sft
= -1819.69 Sft
Inside Plaster = 15656.91 Sft
= 1455.10 Sqm
For Principal Qtr
Inside Plaster
M.Bed Room = 1 × 2 Nos x 24.92 Rft = 49.84 Rft
= 1 × 2 Nos x 4.00 Rft = 8.00 Rft
C.Bed = 1 × 2 Nos x 23.17 Rft = 46.34 Rft
= 1 × 2 Nos x 12.25 Rft = 24.50 Rft
Dining = 1 × 2 Nos x 26.17 Rft = 52.34 Rft
F.Space = 1 × 2 Nos x 8.92 Rft = 17.84 Rft
Ver = 1 × 2 Nos x 12.25 Rft = 24.50 Rft
Store = 1 × 2 Nos x 10.33 Rft = 20.66 Rft
Servent = 1 × 2 Nos x 12.75 Rft = 25.50 Rft
Kitchen = 1 × 2 Nos x 16.58 Rft = 33.16 Rft
Ver = 1 × 2 Nos x 9.17 Rft = 18.34 Rft
Wash = 1 × 2 Nos x 4.00 Rft = 8.00 Rft
G.Bed = 1 × 2 Nos x 22.75 Rft = 45.50 Rft
Living = 1 × 2 Nos x 26.33 Rft = 52.66 Rft
Ver = 1 × 2 Nos x 11.33 Rft = 22.66 Rft
Lobby = 1 × 2 Nos x 8.33 Rft = 16.66 Rft
= 1 × 2 Nos x 5.00 Rft = 10.00 Rft
Entry = 1 × 2 Nos x 17.58 Rft = 35.16 Rft
= 1 × 2 Nos x 7.50 Rft = 15.00 Rft
= 526.66 Rft x 9.67 = 5092.80 Sft
C.Bed TLT = 2 × 2 Nos x 13.00 Rft x 3.08 Rft = 160.16 Sft
Account,TLT = 1 × 2 Nos x 13.67 Rft x 3.08 Rft = 84.21 Sft
= 1 × 2 Nos x 7.58 Rft x 3.08 Rft = 46.69 Sft
Cobla W60 = 1 × 9 Nos x 19.00 Rft x 0.83 Rft = 141.93 Sft
W37 = 1 × 1 Nos x 15.17 Rft x 0.83 Rft = 12.59 Sft
HW24 = 1 × 2 Nos x 8.00 Rft x 0.83 Rft = 13.28 Sft
HW18 = 1 × 1 Nos x 7.00 Rft x 0.83 Rft = 5.81 Sft
HW20 = 1 × 1 Nos x 7.33 Rft x 0.83 Rft = 6.08 Sft
HW60 = 1 × 1 Nos x 13.33 Rft x 0.83 Rft = 11.06 Sft
Kitchen = 1 × 1 Nos x 12.33 Rft x 0.42 Rft = 5.18 Sft
Store = 1 × 1 Nos x 12.67 Rft x 0.42 Rft = 5.32 Sft
Living = 1 × 1 Nos x 13.33 Rft x 0.42 Rft = 5.60 Sft
" = 1 × 1 Nos x 18.33 Rft x 0.42 Rft = 7.70 Sft
" = 1 × 1 Nos x 16.33 Rft x 0.42 Rft = 6.86 Sft
Stair = 1 × 1 Nos x 17.00 Rft x 0.42 Rft = 7.14 Sft
= 5612.42 Sft
Deduction W60 = 9 × 5.00 Rft x 4.50 Rft = 202.50 Sft
W37 = 1 × 3.08 Rft x 4.50 Rft = 13.86 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 165


HW24 = 2 × 2.00 Rft x 2.00 Rft = 8.00 Sft
HW20 = 1 × 1.67 Rft x 2.00 Rft = 3.34 Sft
HW18 = 1 × 1.50 Rft x 2.00 Rft = 3.00 Sft
HW60 = 1 × 5.00 Rft x 1.67 Rft = 8.35 Sft
Kitchen = 1 × 1.67 Rft x 4.50 Rft = 7.52 Sft
Store = 1 × 4.67 Rft x 1.67 Rft = 7.80 Sft
Living = 1 × 5.00 Rft x 1.67 Rft = 8.35 Sft
" = 1 × 7.50 Rft x 1.67 Rft = 12.53 Sft
" = 1 × 1.67 Rft x 6.50 Rft = 10.86 Sft
Stair = 1 × 4.00 Rft x 4.50 Rft = 18.00 Sft
= -304.09 Sft
Inside Plaster = 5308.32 Sft
= 493.34 Sqm
= 3314.33 Sqm
@Tk = 180.00 P/sqm Sch = 3967.48 Tk= 596,580.12
ii. First Floor
For Academic Bldg
Inside Plaster
Lobby = 1 × 2 Nos x 54.00 Rft = 108.00 Rft
Demonstration = 1 × 2 Nos x 55.83 Rft = 111.66 Rft
= 1 × 2 Nos x 56.08 Rft = 112.16 Rft
Store = 1 × 2 Nos x 25.83 Rft = 51.66 Rft
Anatomy = 1 × 2 Nos x 46.08 Rft = 92.16 Rft
Museum = 1 × 2 Nos x 55.83 Rft = 111.66 Rft
Stair = 1 × 2 Nos x 17.33 Rft = 34.66 Rft
Corridor = 2 × 1 Nos x 127.83 Rft = 255.66 Rft
Light Control = 2 × 2 Nos x 17.75 Rft = 71.00 Rft
Lect.Hall = 1 × 2 Nos x 47.42 Rft = 94.84 Rft
= 1 × 1 Nos x 50.00 Rft = 50.00 Rft
= 1,093.46 Rft x 10.08 = 11022.08 Sft
C.TLT = 1 × 2 Nos x 25.83 Rft x 6.00 Rft = 309.96 Sft
= 2 × 2 Nos x 8.00 Rft x 3.08 Rft = 98.56 Sft
= 1 × 2 Nos x 19.58 Rft x 6.00 Rft = 234.96 Sft
= 1 × 2 Nos x 19.58 Rft x 3.08 Rft = 120.61 Sft
Stage = 1 × 1 Nos x 39.00 Rft x 11.00 Rft = 429.00 Sft
Cobla W108 = 18 × 1 Nos x 23.67 Rft x 0.83 Rft = 353.63 Sft
W88 = 3 × 1 Nos x 20.33 Rft x 0.83 Rft = 50.62 Sft
W50 = 1 × 1 Nos x 17.33 Rft x 0.83 Rft = 14.38 Sft
W45 = 3 × 1 Nos x 16.50 Rft x 0.83 Rft = 41.09 Sft
SW40 = 1 × 1 Nos x 25.33 Rft x 0.83 Rft = 21.02 Sft
HW24 = 5 × 1 Nos x 8.00 Rft x 0.83 Rft = 33.20 Sft
W105 = 8 × 1 Nos x 23.17 Rft x 0.83 Rft = 153.85 Sft
W20 = 12 × 1 Nos x 12.33 Rft x 0.42 Rft = 62.14 Sft
W50 = 8 × 1 Nos x 17.33 Rft x 0.42 Rft = 58.23 Sft
= 13003.33 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 166


Deduction W108 = 18 × 1 Nos x 7.33 Rft x 4.50 Rft = 593.73 Sft
W88 = 1 × 1 Nos x 5.67 Rft x 4.50 Rft = 25.52 Sft
W105 = 8 × 1 Nos x 7.08 Rft x 4.50 Rft = 254.88 Sft
W50 = 9 × 1 Nos x 4.17 Rft x 4.50 Rft = 168.89 Sft
W45 = 3 × 1 Nos x 3.75 Rft x 4.50 Rft = 50.63 Sft
SW40 = 1 × 1 Nos x 3.33 Rft x 9.33 Rft = 31.07 Sft
D40 = 10 × 1 Nos x 3.33 Rft x 7.00 Rft = 233.10 Sft
D36 = 2 × 1 Nos x 3.00 Rft x 7.00 Rft = 42.00 Sft
D30 = 4 × 1 Nos x 2.50 Rft x 7.00 Rft = 70.00 Sft
= -1469.80 Sft
Inside Plaster = 11533.53 Sft
= 1071.89 Sqm
For Hostel Bldg
Inside Plaster
Bed Room = 2 × 18 Nos x 25.17 Rft = 906.12 Rft
= 2 × 2 Nos x 20.83 Rft = 83.32 Rft
Wash = 2 × 2 Nos x 19.83 Rft = 79.32 Rft
Ver = 2 × 2 Nos x 23.00 Rft = 92.00 Rft
Stair = 2 × 2 Nos x 17.17 Rft = 68.68 Rft
= 2 × 1 Nos x 7.50 Rft = 15.00 Rft
Passege = 2 × 2 Nos x 72.92 Rft = 291.68 Rft
= 2 × 1 Nos x 8.17 Rft = 16.34 Rft
= 2 × 2 Nos x 5.42 Rft = 21.68 Rft
Ver = 2 × 9 Nos x 20.83 Rft = 374.94 Rft
Cup Board = 2 × 18 Nos x 1.67 Rft = 60.12 Rft
Lobby = 2 × 1 Nos x 20.08 Rft = 40.16 Rft
= 2 × 1 Nos x 22.67 Rft = 45.34 Rft
Store = 2 × 1 Nos x 11.25 Rft = 22.50 Rft
= 2 × 3 Nos x 11.25 Rft = 67.50 Rft
Stair = 2 × 1 Nos x 12.75 Rft = 25.50 Rft
= 2 × 1 Nos x 19.50 Rft = 39.00 Rft
= 2,249.20 Rft x 9.08 = 20422.74 Sft
C.TLT = 2 × 2 Nos x 15.83 Rft x 5.00 Rft = 316.60 Sft
= 2 × 1 Nos x 4.00 Rft x 3.08 Rft = 24.64 Sft
= 2 × 4 Nos x 19.58 Rft x 5.00 Rft = 783.20 Sft
Cobla W108 = 18 × 1 Nos x 23.67 Rft x 0.83 Rft = 353.63 Sft
W88 = 3 × 1 Nos x 20.33 Rft x 0.83 Rft = 50.62 Sft
W50 = 1 × 1 Nos x 17.33 Rft x 0.83 Rft = 14.38 Sft
W45 = 3 × 1 Nos x 16.50 Rft x 0.83 Rft = 41.09 Sft
SW40 = 1 × 1 Nos x 25.33 Rft x 0.83 Rft = 21.02 Sft
HW24 = 5 × 1 Nos x 8.00 Rft x 0.83 Rft = 33.20 Sft
W105 = 8 × 1 Nos x 23.17 Rft x 0.83 Rft = 153.85 Sft
W20 = 12 × 1 Nos x 12.33 Rft x 0.42 Rft = 62.14 Sft
W50 = 8 × 1 Nos x 17.33 Rft x 0.42 Rft = 58.23 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 167


= 22335.34 Sft
Deduction W50 = 4 × 4.17 Rft x 4.50 Rft = 75.06 Sft
W36 = 38 × 3.00 Rft x 4.50 Rft = 513.00 Sft
W48 = 20 × 4.00 Rft x 4.50 Rft = 360.00 Sft
W45 = 2 × 3.75 Rft x 4.50 Rft = 33.75 Sft
W59 = 2 × 4.92 Rft x 4.50 Rft = 44.28 Sft
W90 = 2 × 7.50 Rft x 4.50 Rft = 67.50 Sft
HW24 = 8 × 2.00 Rft x 2.00 Rft = 32.00 Sft
Store = 2 × 9.60 Rft x 4.50 Rft = 86.40 Sft
Lobby = 2 × 4.33 Rft x 8.50 Rft = 73.61 Sft
" = 2 × 13.25 Rft x 8.50 Rft = 225.25 Sft
Stair = 2 × 5.00 Rft x 4.50 Rft = 45.00 Sft
Open Space = 2 × 5.00 Rft x 8.50 Rft = 85.00 Sft
" = 2 × 12.00 Rft x 4.50 Rft = 108.00 Sft
SW90 = 2 × 7.50 Rft x 9.17 Rft = 137.55 Sft
= -1886.40 Sft
= 20448.94 Sft
TV Room = 2 × 47.92 Rft x 9.08 Rft = 870.23 Sft
Inside Plaster = 21319.17 Sft
= 1981.34 Sqm
= 3053.22 Sqm
Sch.Qty = 2999.53 Sqm
@Tk = 180.00 P/sqm Sch = 2999.53 Tk= 539,915.40
iii. 2nd Floor
For Academic Bldg
Inside Plaster
General Store = 1 × 2 Nos x 45.83 Rft = 91.66 Rft
Library = 1 × 2 Nos x 66.08 Rft = 132.16 Rft
Store = 1 × 2 Nos x 26.17 Rft = 52.34 Rft
Conferrence = 1 × 2 Nos x 45.83 Rft = 91.66 Rft
Guest Room = 1 × 2 Nos x 46.08 Rft = 92.16 Rft
Dress = 1 × 2 Nos x 17.58 Rft = 35.16 Rft
C.TLT = 1 × 2 Nos x 25.83 Rft = 51.66 Rft
Passege = 2 × 1 Nos x 98.58 Rft = 197.16 Rft
= 2 × 2 Nos x 8.83 Rft = 35.32 Rft
Stair = 1 × 2 Nos x 17.33 Rft = 34.66 Rft
Open Space = 1 × 1 Nos x 18.25 Rft = 18.25 Rft
= 2 × 2 Nos x 27.92 Rft = 111.68 Rft
= 2 × 2 Nos x 20.33 Rft = 81.32 Rft
= 1,025.19 Rft x 10.08 = 10333.92 Sft
Dress = 2 × 2 Nos x 17.58 Rft x 3.08 Rft = 216.59 Sft
C.TLT = 2 × 2 Nos x 8.00 Rft x 3.08 Rft = 98.56 Sft
Open Space = 1 × 1 Nos x 32.75 Rft x 6.83 Rft = 223.68 Sft
= 1 × 1 Nos x 46.92 Rft x 6.83 Rft = 320.46 Sft
= 1 × 1 Nos x 8.17 Rft x 6.83 Rft = 55.80 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 168


= 2 × 1 Nos x 41.92 Rft x 6.83 Rft = 572.63 Sft
= 1 × 1 Nos x 48.00 Rft x 6.83 Rft = 327.84 Sft
= 1 × 1 Nos x 2.08 Rft x 6.83 Rft = 14.21 Sft
Cobla W108 = 14 × 1 Nos x 23.67 Rft x 0.83 Rft = 275.05 Sft
W88 = 1 × 1 Nos x 20.33 Rft x 0.83 Rft = 16.87 Sft
W91 = 1 × 1 Nos x 24.17 Rft x 0.83 Rft = 20.06 Sft
W50 = 1 × 1 Nos x 17.33 Rft x 0.83 Rft = 14.38 Sft
W45 = 1 × 1 Nos x 16.50 Rft x 0.83 Rft = 13.70 Sft
SW40 = 1 × 1 Nos x 25.33 Rft x 0.83 Rft = 21.02 Sft
HW24 = 3 × 1 Nos x 8.00 Rft x 0.83 Rft = 19.92 Sft
W105 = 11 × 1 Nos x 23.17 Rft x 0.42 Rft = 107.05 Sft
W43 = 1 × 1 Nos x 16.17 Rft x 0.42 Rft = 6.79 Sft
W50 = 6 × 1 Nos x 17.33 Rft x 0.42 Rft = 43.67 Sft
= 12702.19 Sft
Deduction W108 = 14 × 1 Nos x 7.33 Rft x 4.50 Rft = 461.79 Sft
W88 = 1 × 1 Nos x 5.67 Rft x 4.50 Rft = 25.52 Sft
W91 = 1 × 1 Nos x 7.58 Rft x 4.50 Rft = 34.11 Sft
W105 = 11 × 1 Nos x 7.08 Rft x 4.50 Rft = 350.46 Sft
W50 = 7 × 1 Nos x 4.17 Rft x 4.50 Rft = 131.36 Sft
W45 = 1 × 1 Nos x 3.75 Rft x 4.50 Rft = 16.88 Sft
SW40 = 1 × 1 Nos x 3.33 Rft x 9.33 Rft = 31.07 Sft
W43 = 1 × 1 Nos x 3.58 Rft x 4.50 Rft = 16.11 Sft
D40 = 7 × 1 Nos x 3.33 Rft x 7.00 Rft = 163.17 Sft
D36 = 1 × 1 Nos x 3.00 Rft x 7.00 Rft = 21.00 Sft
D30 = 3 × 1 Nos x 2.50 Rft x 7.00 Rft = 52.50 Sft
= -1303.95 Sft
Inside Plaster = 11398.24 Sft
= 1059.32 Sqm
For Hostel Bldg
Inside Plaster
Same measurement at 1st.Floor,Qty = 20,448.94 Sft = 1900.46 Sqm
= 2959.78 Sqm
Sch.Qty = 2578.16 Sqm
@Tk = 180.00 P/sqm Sch = 2578.16 Tk= 464,068.80
C. On R.C.C. surface 6mm & above thick in (1:4)
i. Ground Floor
= 19,996.54 Sft = 1858.41 Sqm
For Principal Qtr
Inside Plaster
M.Bed Room = 1 × 12.25 Rft x 12.67 Rft = 155.21 Sft
C.Bed = 1 × 10.50 Rft x 12.67 Rft = 133.04 Sft
Living = 1 × 11.25 Rft x 15.08 Rft = 169.65 Sft
G.Bed = 1 × 11.67 Rft x 11.08 Rft = 129.30 Sft
Dining = 1 × 15.17 Rft x 11.00 Rft = 166.87 Sft
F.Space = 1 × 10.17 Rft x 8.92 Rft = 90.72 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 169


Servent = 1 × 7.08 Rft x 5.67 Rft = 40.14 Sft
Store = 1 × 4.67 Rft x 5.67 Rft = 26.48 Sft
Kitchen = 1 × 8.33 Rft x 8.25 Rft = 68.72 Sft
Lobby = 1 × 8.33 Rft x 5.00 Rft = 41.65 Sft
Stair = 1 × 16.33 Rft x 7.50 Rft = 122.48 Sft
Wash = 1 × 4.25 Rft x 4.00 Rft = 17.00 Sft
C.Bed = 2 × 4.25 Rft x 8.75 Rft = 74.38 Sft
M.Bed Room = 2 × 8.67 Rft x 5.00 Rft = 86.70 Sft
Dining = 2 × 4.58 Rft x 8.42 Rft = 77.13 Sft
Servent = 2 × 3.83 Rft x 3.75 Rft = 28.73 Sft
Kitchen = 2 × 12.42 Rft x 3.75 Rft = 93.15 Sft
= 1,521.33 Sft = 141.39 Sqm
For Hostel Bldg
Bulk Store = 1 × 13.17 Rft x 12.50 Rft = 164.63 Sft
Ver = 1 × 13.17 Rft x 8.25 Rft = 108.65 Sft
Wash = 2 × 6.42 Rft x 7.50 Rft = 96.30 Sft
TLT = 4 × 6.42 Rft x 5.00 Rft = 128.40 Sft
Foyer = 2 × 10.50 Rft x 16.00 Rft = 336.00 Sft
Stair = 2 × 7.50 Rft x 17.17 Rft = 257.55 Sft
Porch = 2 × 9.75 Rft x 6.50 Rft = 126.75 Sft
Super Room = 1 × 18.17 Rft x 12.58 Rft = 228.58 Sft
= 1 × 6.08 Rft x 5.00 Rft = 30.40 Sft
TLT = 2 × 7.42 Rft x 7.50 Rft = 111.30 Sft
Account = 1 × 12.00 Rft x 12.58 Rft = 150.96 Sft
Shelves = 4 × 5.00 Rft x 4.25 Rft = 85.00 Sft
Admin off = 1 × 12.42 Rft x 12.58 Rft = 156.24 Sft
Visitor = 1 × 18.50 Rft x 12.58 Rft = 232.73 Sft
Store = 1 × 25.92 Rft x 12.58 Rft = 326.07 Sft
ST.Keeper = 1 × 12.42 Rft x 12.58 Rft = 156.24 Sft
Prayer = 1 × 25.25 Rft x 12.58 Rft = 317.65 Sft
Ablution = 1 × 12.58 Rft x 5.08 Rft = 63.91 Sft
Passege = 1 × 72.92 Rft x 8.17 Rft = 595.76 Sft
Cup Board = 20 × 5.00 Rft x 3.58 Rft = 358.00 Sft
Wash = 1 × 34.50 Rft x 13.17 Rft = 454.37 Sft
C.TLT = 4 × 13.33 Rft x 4.17 Rft = 222.34 Sft
Dining = 1 × 34.17 Rft x 38.33 Rft = 1,309.74 Sft
Beam = 4 × 38.33 Rft x 1.33 Rft = 203.92 Sft
Kitchen = 1 × 21.42 Rft x 16.58 Rft = 355.14 Sft
Shelves = 1 × 10.00 Rft x 4.33 Rft = 43.30 Sft
Pantry = 1 × 10.00 Rft x 16.58 Rft = 165.80 Sft
= 3 × 9.50 Rft x 4.33 Rft = 123.41 Sft
Store = 1 × 6.42 Rft x 10.42 Rft = 66.90 Sft
= 3 × 10.42 Rft x 4.33 Rft = 135.36 Sft
Cook.S.Room = 1 × 9.17 Rft x 10.42 Rft = 95.55 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 170


Ver = 1 × 7.83 Rft x 5.50 Rft = 43.07 Sft
Passege = 1 × 26.67 Rft x 13.33 Rft = 355.51 Sft
Entry Porch = 1 × 24.17 Rft x 20.00 Rft = 483.40 Sft
= 1 × 24.17 Rft x 9.50 Rft = 229.62 Sft
= 1 × 48.67 Rft x 16.42 Rft = 799.16 Sft
Stair = 1 × 12.75 Rft x 11.67 Rft = 148.79 Sft
= 1 × 11.67 Rft x 5.50 Rft = 64.19 Sft
Coln = 2 × 1.77 Rft x 13.50 Rft = 47.79 Sft
Beam = 2 × 20.00 Rft x 1.25 Rft = 50.00 Sft
= 2 × 22.67 Rft x 1.25 Rft = 56.68 Sft
= 9485.12 Sft = 881.52 Sqm
= 2881.32 Sqm
@Tk = 170.00 P/sqm Sch = 4604.78 Tk= 489,824.25
ii. 1st Floor
= 19,552.35 Sft = 1817.13 Sqm
For Hostel Bldg
Room = 18 × 12.58 Rft x 12.50 Rft = 2,830.50 Sft
= 2 × 8.33 Rft x 12.50 Rft = 208.25 Sft
Wash = 2 × 12.33 Rft x 7.50 Rft = 184.95 Sft
Ver = 4 × 12.67 Rft x 10.33 Rft = 523.52 Sft
Stair = 2 × 7.50 Rft x 17.17 Rft = 257.55 Sft
TLT = 2 × 15.83 Rft x 12.67 Rft = 401.13 Sft
= 4 × 15.83 Rft x 4.17 Rft = 264.04 Sft
Passege = 2 × 72.92 Rft x 8.17 Rft = 1,191.51 Sft
= 2 × 12.00 Rft x 5.42 Rft = 130.08 Sft
Store = 2 × 11.00 Rft x 6.00 Rft = 132.00 Sft
Lobby = 1 × 24.67 Rft x 21.75 Rft = 536.57 Sft
= 2 × 18.25 Rft x 16.25 Rft = 593.13 Sft
Stair = 1 × 10.83 Rft x 17.17 Rft = 185.95 Sft
Beam = 12 × 8.17 Rft x 2.50 Rft = 245.10 Sft
= 6 × 16.25 Rft x 3.00 Rft = 292.50 Sft
= 2 × 12.00 Rft x 2.50 Rft = 60.00 Sft
= 2 × 12.67 Rft x 2.50 Rft = 63.35 Sft
Cup Board = 20 × 5.00 Rft x 3.58 Rft = 358.00 Sft
= 8,458.14 Sft
TV Room = 1 × 20.92 Rft x 27.00 Rft = 564.84 Sft
Beam = 1 × 20.92 Rft x 3.00 Rft = 62.76 Sft
Coln = 2 × 1.77 Rft x 8.50 Rft = 30.09 Sft
= 657.69 Sft
= 9115.83 Sft = 847.20 Sqm
= 2664.33 Sqm
@Tk = 170.00 P/sqm Sch = 4398.05 Tk= 452,935.90
iii. 2nd Floor
For Academic Bldg
General Store = 1 × 29.33 Rft x 16.50 Rft = 483.95 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 171


Library = 1 × 49.58 Rft x 16.50 Rft = 818.07 Sft
Store = 1 × 9.67 Rft x 16.50 Rft = 159.56 Sft
Stair = 1 × 9.00 Rft x 17.00 Rft = 153.00 Sft
Corridor = 1 × 99.58 Rft x 8.42 Rft = 838.46 Sft
Conferrence = 1 × 29.33 Rft x 16.50 Rft = 483.95 Sft
Guest = 1 × 29.58 Rft x 16.50 Rft = 488.07 Sft
Room
Toilet = 2 × 9.58 Rft x 8.00 Rft = 153.28 Sft
Dress = 1 × 9.58 Rft x 8.00 Rft = 76.64 Sft
C.TLT = 1 × 9.33 Rft x 16.50 Rft = 153.95 Sft
= 2 × 4.50 Rft x 3.50 Rft = 31.50 Sft
Coln = 18 × 2.00 Rft x 10.08 Rft = 362.88 Sft
= 11 × 5.33 Rft x 3.00 Rft = 175.89 Sft
= 11 × 1.67 Rft x 1.00 Rft = 18.37 Sft
= 1 × 8.50 Rft x 3.00 Rft = 25.50 Sft
= 1 × 2.58 Rft x 1.67 Rft = 4.31 Sft
= 4427.36 Sft = 411.46 Sqm
For Hostel Bldg
Same measurement at 1st.Floor,Qty = 8,458.14 Sft = 786.07 Sqm
= 1197.54 Sqm
@Tk = 170.00 P/sqm Sch = 3845.34 Tk= 203,581.39
Civil WorkTk= 163,485,772.61
B. External Work
B.1. External Civil Work
B.1.a Site Development
Qty BF from 1st R/A Bill Page No-8 of TMB = 41317.71 Cum
@Tk = 175.00 P/Cum Sch = 51100.00 Tk= 7,230,599.25
Tk= 170,716,371.86
Less Tk. - 14.15% Tk= -24,156,366.62
Total Tk= 146,560,005.24
Deduction upto 6th R/A BillTk= -130,055,605.22
Payable AmountTk= 16,504,400.02

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 172


Name of Work : Construction of Medical Assistant Training School (MATS) at Sadar Upazila in Gazipur
District.
Package No : WP-599/SDP(GOB)-HED.
Name of Contrctor : BBL & Essen Engineering & Co.Ltd.
7th R/A Bill
Part-A (Civil works)
Sl No-1.01 a. Layout and marking for earthwork in Excavation in foundation
= 1,889.81 Sqm
Schedule Qty = 1,745.00 Sqm
@Tk = 15.00 /= P/Sqm Tk= 26,175.00
Sl No-1.02 Earth Work in excavation in Foundation
a). Upto 1.5m depth
= 562.89 cum
@Tk = 175.00 /= P/Cum Sch = 576.80 Tk= 98,505.25
Sl No-1.03 Brick flat Soling
a In Foundation
= 568.36 Sqm
@Tk = 325.00 P/Sqm Sch = 606.16 Tk= 184,716.97
Sl No-1.07 a.Exposed Brick work in foundation & Plinth (1:6)
For Academic Bldg
Front Side = 1 × 117.00 Rft x 2.25 Rft = 263.25 Sft
Rear Side = 1 × 87.83 Rft x 2.25 Rft = 197.62 Sft
= 4 × 39.67 Rft x 2.25 Rft = 357.03 Sft
Side = 1 × 48.50 Rft x 2.25 Rft = 109.13 Sft
Lect.Hall = 2 × 38.83 rft x 3.00 Rft = 232.98 Sft
Back Side = 1 × 46.00 rft x 4.25 Rft = 195.50 Sft
= 1,355.50 Sft x 0.83 = 1125.07 Cft
For Hostel Bldg
Front = 4 × 77.58 Rft x 1.83 Rft = 567.89 Sft
Side = 2 × 30.83 Rft x 1.83 Rft = 112.84 Sft
= 2 × 15.00 Rft x 1.83 Rft = 54.90 Sft
= 2 × 10.58 Rft x 1.83 Rft = 38.72 Sft
= 2 × 27.75 Rft x 1.83 Rft = 101.57 Sft
= 1 × 22.67 Rft x 1.83 Rft = 41.49 Sft
= 917.40 Sft x 0.83 = 761.44 Cft
For Principal Qtr
= 2 × 43.92 Rft x 1.83 Rft = 160.75 Sft
= 2 × 37.42 Rft x 1.83 Rft = 136.96 Sft
= 2 × 1.58 Rft x 1.83 Rft = 5.78 Sft
= 1 × 18.21 Rft x 1.83 Rft = 33.32 Sft
= 336.81 Sft x 0.83 = 279.55 Cft
A = 2,609.71 Sft = 2,166.06 Cft
= 61.34 Cum
@Tk = 6,800.00 P/cum Sch = 82.87
Boring/drilling for cast in situ Pile upto require depth and diameter with mim 6m long temporary steel
Tk= 417,139.92
Sl No-1.09 casting,true to vertical,providing ventonite slurry and maintaining water level in the hole (450mm dia
upto 20mdia
(450mm depth)
upto 20m depth)

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 173


= 492 Nos × 70.00 Rft = 34,440.0 Rft = 10,500.00 Rm
@Tk = 1,250.00 /= P/Rm Sch = 11227.13 Tk= 13,125,000.00
Sl No-1.10 Casting of Cast in Situ bored pile R.C.C work of 1:1.5:3
= 492 × 4 70.00 Rft = 1,726.39 cum
@Tk = 13,000.00 /= P/Cum Sch = 1772.11 Tk= 22,443,058.62

Sl No-1.11 Providing and making point welding


= 492 × 6.00 × 138.00 Point = 407,376.00 Point
@Tk = 0.50 P/point Sch = 371196.00 Tk= 185,598.00
Sl No-1.12 Providing and making joint welding
= 492 × 6.00 × 1.33 = 3,926.16 Rft = 1,197.00 Rm
@Tk = 1.00 P/Rm Sch = 2095.73 Tk= 1,197.00
Sl No-1.13 Labour for breaking of pile head
4 = 73.54 Cum
@Tk = 2,000.00 P/Cum Sch = 73.84 Tk= 147,073.92
Sl No-1.14 a. Conducting static load test for the cast-in-situ pile providing required
= 1 × 3.00 Test = 3.00 Test
@Tk = 80,000.00 P/Test Sch = 3.00 Tk= 240,000.00
b. For Intermediate Loading from 75-125 tonne for each additional tonne
= 3 × 45.00 Ton = 135.00 Test
@Tk = 800.00 P/Ton Sch = 75.00 Tk= 60,000.00
SL No-1.16 Reinforced cement concrete works using steel shutter with mim cement concrete to mix ratio(1:1.5:3)
A. In Foundation (Footing,Raft,Pile cap etc)
i. Concrete
Total Qty = 18,016.49 Cft
= 510.24 cum
@Tk = 11,000.00 P/Cum Sch = 522.01 Tk= 5,612,613.62
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 1,191.55 Sqm
@Tk = 400.00 P/Sqm Sch = 1204.23 Tk= 476,619.42
B. In Foundation Beam/Grade Beam
i. Concrete
= 112.49 cum
@Tk = 17,000.00 P/Cum Sch = 112.78 Tk= 1,912,283.35
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 1075.10 Sqm
@Tk = 700.00 P/Sqm Sch = 1127.75 Tk= 752,567.66
B. In Floor Slab at plinth level
i) Concrete
= 241.22 Cum
@Tk = 18,000.00 P/Cum Sch = 241.73 Tk= 4,341,964.86
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
BF Qty = 2,521.84
@Tk = 800.00 P/Sqm Sch = 2568.19 Sqm Tk= 2,017,468.87
C. Beam at Plinth level
a). Concrete.
i) Gr.Floor/Plinth level

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 174


BF Qty = 111.81
@Tk = 18,000.00 P/Cum Sch = 112.45 Tk= 2,012,514.01
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF Qty = 1292.34 Sqm
Sch.Qty = 1244.48 Sqm
@Tk = 500.00 P/Sqm Sch = 1244.48 Tk= 622,240.00

C. In Pedestal Column,Column,Column capital ,lift wall etc.


a. Concrete
i). Below PL level and in Ground Floor.
BF Qty = 213.95 Cum
Concrete Presigm
Academic Bldg
Ground Floor
D40 = 9 × 8.00 Nos = 72.00 Nos

D36 = 2 × 8.00 Nos = 16.00 Nos

D60 = 2 × 8.00 Nos = 16.00 Nos

D30 = 10 × 8.00 Nos = 80.00 Nos

Cat door = 5 × 4.00 Nos = 20.00 Nos

= 204.00 Nos

Qty = 204.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 14.14 Cft
For Hostel Bldg
Ground Floor
D40 = 11 × 8.00 Nos = 88.00 Nos

D36 = 1 × 8.00 Nos = 8.00 Nos

D60 = 6 × 8.00 Nos = 48.00 Nos

D30 = 12 × 8.00 Nos = 96.00 Nos

Cat door = 5 × 4.00 Nos = 20.00 Nos

= 260.00 Nos

Qty = 260.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 18.02 Cft
Principal Qtr
D40 = 4 × 8.00 Nos = 32.00 Nos

D36 = 1 × 8.00 Nos = 8.00 Nos

D56 = 1 × 8.00 Nos = 8.00 Nos

D30 = 8 × 8.00 Nos = 64.00 Nos

Cat door = 4 × 4.00 Nos = 16.00 Nos

= 128.00 Nos

Qty = 128.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 8.87 Cft
= 41.03 Cft
= 1.16 Cum
= 215.12 Cum
@Tk = 17,000.00 P/Cum Sch = 219.67 cum Tk= 3,656,971.92
ii).1st Floor.
BF Qty = 88.44 Cum
Concrete Presigm
Academic Bldg

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 175


Frist Floor
D40 = 10 × 8.00 Nos = 80.00 Nos

D36 = 2 × 8.00 Nos = 16.00 Nos

D30 = 5 × 8.00 Nos = 40.00 Nos

Cat door = 2 × 4.00 Nos = 8.00 Nos

= 144.00 Nos

Qty = 144.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 9.98 Cft
For Hostel Bldg
Frist Floor
D40 = 22 × 8.00 Nos = 176.00 Nos

D60 = 2 × 8.00 Nos = 16.00 Nos

D30 = 32 × 8.00 Nos = 256.00 Nos

Cat door = 4 × 4.00 Nos = 16.00 Nos

= 464.00 Nos

Qty = 464.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 32.16 Cft
= 42.13 Cft
= 1.19 Cum
= 89.64 Cum
@Tk = 17,000.00 P/Cum Sch = 105.89 cum Tk= 1,523,802.68
iii). 2nd Floor.
BF Qty from 5th R/A Bill = 24.73 Cum
BF Qty from 6th R/A Bill = 41.08 Cum
Academic Bldg
C1 = 5 × 1.00 Rft × 1.67 Rft × 3.00 Rft = 25.05 Cft
C8 = 6 × 2.79 Rft × 1.67 Rft × 3.00 Rft = 83.87 Cft
C9 = 1 × 2.67 Rft × 1.67 Rft × 3.00 Rft = 13.38 Cft
= 122.29 Cft
= 3.46 Cum
BF Qty = 95.27 Cum
Hostel Bldg
C1 = 20 × 1.67 Rft × 1.25 Rft × 3.00 Rft = 125.25 Cft
4 × 1.67 Rft × 1.00 Rft × 10.00 Rft = 66.80 Cft
C2 30 × 1.67 Rft × 1.00 Rft × 3.00 Rft = 150.30 Cft
= 8 × 1.67 Rft × 1.00 Rft × 10.00 Rft = 133.60 Cft
C3 = 6 × 1.67 Rft × 1.00 Rft × 3.00 Rft = 30.06 Cft
C4 10 × 1.33 Rft × 1.00 Rft × 3.00 Rft = 39.90 Cft
C5 = 4 × 1.33 Rft × 1.00 Rft × 3.00 Rft = 15.96 Cft
= 561.87 Cft
= 15.91 Cum
= 111.18 Cum
Concrete Presigm
Academic Bldg
Second Floor
D40 = 8 × 8.00 Nos = 64.00 Nos

D36 = 1 × 8.00 Nos = 8.00 Nos

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 176


D30 = 3 × 8.00 Nos = 24.00 Nos

Cat door = 2 × 4.00 Nos = 8.00 Nos

= 104.00 Nos

Qty = 104.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 7.21 Cft
For Hostel Bldg
Second Floor
D40 = 22 × 8.00 Nos = 176.00 Nos

D30 = 32 × 8.00 Nos = 256.00 Nos

Cat door = 4 × 4.00 Nos = 16.00 Nos

= 448.00 Nos

Qty = 448.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 31.05 Cft
= 38.25 Cft
= 1.08 Cum
= 112.26 Cum
@Tk = 17,000.00 P/Cum Sch = 119.97 cum Tk= 1,908,490.87
iv). 3rd Floor.
BF Qty from 6th R/A Bill = 41.08 Cum
Academic Bldg
C1 = 20 × 1.67 Rft × 1.00 Rft × 3.00 Rft = 100.20 Cft
1 × 1.67 Rft × 1.00 Rft × 11.00 Rft = 18.37 Cft
C2 3 × 1.67 Rft × 1.00 Rft × 3.00 Rft = 15.03 Cft
C3 = 4 × 1.67 Rft × 1.25 Rft × 3.00 Rft = 25.05 Cft
= 2 × 1.67 Rft × 1.25 Rft × 11.00 Rft = 45.93 Cft
C4 18 × 1.33 Rft × 1.33 Rft × 3.00 Rft = 95.52 Cft
1 × 1.33 Rft × 1.33 Rft × 11.00 Rft = 19.46 Cft
C5 = 4 × 1.33 Rft × 1.33 Rft × 3.00 Rft = 21.23 Cft
C6 6 × 1.50 Rft × 1.00 Rft × 3.00 Rft = 27.00 Cft
C7 = 1 × 1.50 Rft × 1.00 Rft × 3.00 Rft = 4.50 Cft
C9 1 × 1.67 Rft × 2.67 Rft × 3.00 Rft = 13.38 Cft
= 385.66 Cft
= 10.92 Cum
BF Qty = 52.00 Cum
@Tk = 17,000.00 P/Cum Sch = 57.50 cum Tk= 883,969.67
v). 4th Floor.
Hostel Bldg
False Column
C1 = 20 × 1.67 Rft × 1.25 Rft × 3.00 Rft = 125.25 Cft
4 × 1.67 Rft × 1.00 Rft × 10.00 Rft = 66.80 Cft
C2 30 × 1.67 Rft × 1.00 Rft × 3.00 Rft = 150.30 Cft
= 8 × 1.67 Rft × 1.00 Rft × 10.00 Rft = 133.60 Cft
C3 = 6 × 1.67 Rft × 1.00 Rft × 3.00 Rft = 30.06 Cft
C4 10 × 1.33 Rft × 1.00 Rft × 3.00 Rft = 39.90 Cft
C5 = 4 × 1.33 Rft × 1.00 Rft × 3.00 Rft = 15.96 Cft
= 561.87 Cft
= 15.91 Cum
Sch.Qty = 1.50 Cum

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 177


@Tk = 17,000.00 P/Cum Sch = 1.50 cum Tk= 25,500.00
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Below PL level and in Ground Floor.
= 1956.82 Sqm
@Tk = 450.00 P/Sqm Sch = 2636.00 cum Tk= 880,568.03
ii). 1st Floor.
BF Qty = 898.52 Sqm
@Tk = 450.00 P/Sqm Sch = 1270.72 sqm Tk= 404,333.36
iii). 2nd Floor.
BF Qty from 5th R/A Bill = 244.54 Sqm
BF Qty from 6th R/A Bill = 417.73 Sqm
Academic Bldg
C1 = 5 × 5.33 Rft × 3.00 Rft = 79.95 Sft
C8 = 6 × 8.92 Rft × 3.00 Rft = 160.56 Sft
C9 = 1 × 8.67 Rft × 3.00 Rft = 26.01 Sft
= 266.52 Sft
= 24.77 Sqm
BF Qty = 987.04 Sqm
@Tk = 450.00 P/Sqm Sch = 1439.68 Tk= 444,166.73
iv). 3rd Floor.
BF Qty from 6th R/A Bill = 417.73 Sqm
Academic Bldg
C1 = 20 × 5.33 Rft × 3.00 Rft = 319.80 Sft
1 × 5.33 Rft × 11.00 Rft = 58.63 Sft
C2 3 × 5.33 Rft × 3.00 Rft = 47.97 Sft
C3 = 4 × 5.83 Rft × 3.00 Rft = 69.96 Sft
= 2 × 5.83 Rft × 11.00 Rft = 128.26 Sft
C4 18 × 5.33 Rft × 3.00 Rft = 287.82 Sft
1 × 5.33 Rft × 11.00 Rft = 58.63 Sft
C5 = 4 × 5.33 Rft × 3.00 Rft = 63.96 Sft
C6 6 × 5.00 Rft × 3.00 Rft = 90.00 Sft
C7 = 1 × 5.00 Rft × 3.00 Rft = 15.00 Sft
C9 1 × 8.67 Rft × 3.00 Rft = 26.01 Sft
= 1166.04 Sft
= 108.37 Sqm
BF Qty = 626.10 Sqm
@Tk = 450.00 P/Sqm Sch = 690.00 Tk= 281,745.17
v). 4th Floor.
Hostel Bldg
False Column
C1 = 20 × 5.83 Rft × 3.00 Rft = 349.80 Sft
P. house 4 × 5.33 Rft × 10.00 Rft = 213.20 Sft
C2 30 × 5.33 Rft × 3.00 Rft = 479.70 Sft
P. house = 8 × 5.33 Rft × 10.00 Rft = 426.40 Sft
C3 = 6 × 5.33 Rft × 3.00 Rft = 95.94 Sft
C4 10 × 4.67 Rft × 3.00 Rft = 140.10 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 178


C5 = 4 × 4.67 Rft × 3.00 Rft = 56.04 Sft
= 1761.18 Sft = 163.68 sqm
Sch.Qty = 18.00 sqm
@Tk = 450.00 P/Sqm Sch = 18.00 Tk= 8,100.00
D. Beam: (Tee-beam, Ell beam, Rib-beam rectangular beam)
a). Concrete.
i) Gr.Floor
= 95.51 Cum
@Tk = 18,000.00 P/Cum Sch = 97.64 Tk= 1,719,263.37
ii) 1st. Floor
BF Qty = 102.39 cum
Sch.Qty = 94.12 cum
@Tk = 18,000.00 P/Cum Sch = 94.12 Tk= 1,694,160.00
iii) 2nd. Floor
BF Qty = 93.50 cum
@Tk = 18,000.00 P/Cum Sch = 94.12 Tk= 1,683,016.23
iv). 3rd Floor
BF Qty = 1.37 cum
Hostel Bldg
Same measurement at 2nd Floor Qty = 54.01 Cum
= 55.38 Cum
Sch.Qty = 43.85 cum
@Tk = 18,000.00 P/Cum Sch = 43.85 cum Tk= 789,300.00
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF. Qty = 1166.09 Sqm
@Tk = 500.00 P/Sqm Sch = 1171.71 Tk= 583,047.28
ii). 1st. Floor
BF Qty = 1117.85 Sqm
@Tk = 500.00 P/Sqm Sch = 1129.42 Tk= 558,926.86
iv). 2nd. Floor
BF Qty = 956.67 Sqm
@Tk = 500.00 P/Sqm Sch = 1129.42 Tk= 478,334.63
iv). 3rd Floor
= 166.27 Sft BF Qty = 15.45 Sqm
Hostel Bldg
Same measurement at 2nd Floor Qty = 545.12 Sqm
= 560.57 Sqm
Sch.Qty = 526.20 Sqm
@Tk = 500.00 P/Sqm Sch = 526.20 Tk= 263,100.00
E. Lintel & Tie Beam
a). Concrete.
i). Gr. Floor
BF Qty = 22.66 Cum
@Tk = 12,000.00 P/Cum Sch = 24.00 Tk= 271,929.35
ii). 1st Floor
BF Qty = 17.87 Cum

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 179


@Tk = 12,000.00 P/Cum Sch = 18.75 Tk= 214,413.71
iii).2nd Floor
Academic Bldg
On 10'' Wall = 1 × 18 Nos × 9.00 Rft = 162.00 Rft

= 1 × 3 Nos × 8.50 Rft = 25.50 Rft

= 1 × 4 Nos × 7.50 Rft = 30.00 Rft

= 1 × 3 Nos × 7.58 Rft = 22.74 Rft

= 1 × 2 Nos × 16.08 Rft = 32.16 Rft

= 1 × 4 Nos × 8.58 Rft = 34.32 Rft

= 306.72 Rft x 0.83 x 0.75


= 190.93 Cft
On 5'' Wall = 1 × 5 Nos × 9.00 Rft = 45.00 Rft

= 1 × 2 Nos × 7.50 Rft = 15.00 Rft

= 1 × 1 Nos × 10.25 Rft = 10.25 Rft

= 1 × 6 Nos × 16.17 Rft = 97.02 Rft

= 167.27 Rft x 0.42 x 0.50


= 35.13 Cft
= 226.06 Cft
Hostel Bldg
Same measurement at 1st. Floor Qty = 343.93 Cft
= 569.99 Cft
= 16.14 Cum
@Tk = 12,000.00 P/Cum Sch = 16.50 Tk= 193,709.40
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF Qty = 377.57 Sqm
Sch.Qty = 288.00 Sqm
@Tk = 400.00 P/Sqm Sch = 288.00 Tk= 115,200.00
ii). 1st Floor
BF Qty = 249.39 Sqm
Sch.Qty = 225.00 Sqm
@Tk = 400.00 P/Sqm Sch = 225.00 Tk= 90,000.00
iii).2nd Floor
Academic Bldg
On 10'' Wall = Rft Qty Same as,Qty = 306.72 Rft x 2.33 = 714.66 Sft
On 5'' Wall = Rft Qty Same as,Qty = 167.27 Rft x 1.42 = 237.52 Sft
= 952.18 Sft
Hostel Bldg
Same measurement at 1st. Floor/6th R/A Bill = 1417.61 Sft
= 2369.79 Sft
BF Qty = 220.24 Sqm
Sch.Qty = 198.00 Sqm
@Tk = 400.00 P/Sqm Sch = 198.00 Tk= 79,200.00
F. Floor & Roof slab
a). Concrete.
i). Gr.Floor
BF Qty = 209.39 Cum
Sch.Qty = 207.91 Cum

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 180


@Tk = 20,000.00 P/Cum Sch = 207.91 Tk= 4,158,200.00
ii). 1st Floor
BF Qty = 213.84 cum
Sch.Qty = 208.87 Cum
@Tk = 20,000.00 P/Cum Sch = 208.87 Tk= 4,177,400.00
iii). 2nd Floor
BF Qty = 165.42 cum
For Hostel Bldg
2nd Floor-Bed Room
Ver, Portion = 18 × 8.08 Rft × 3.58 Rft = 520.68 Sft x 0.38 Rft

= 197.86 Cft
False Slab = 5.60 cum
Academic Bldg
Toilet = 1 × 5.17 Rft × 8.25 Rft = 42.65 Sft
= 2 × 7.42 Rft × 5.50 Rft = 81.62 Sft
= 124.27 Sft x 0.25 = 31.07 Cft
= 0.88 Cum
= 171.90 cum
@Tk = 20,000.00 P/Cum Sch = 178.16 Tk= 3,437,991.43
iv). 3rd Floor
For Academic Bldg
BF Qty/6th R/A Bill = 3.28 Cum
Hostel Bldg
Same measurement at 2nd. Floor/6th R/A Bill Qty = 100.82 Cum
For Hostel Bldg = 104.10 cum
3rd Floor-Bed Room
Ver, Portion = 18 × 8.08 Rft × 3.58 Rft = 520.68 Sft x 0.38 Rft
= 197.86 Cft
= 5.60 cum
= 109.70 Cum
@Tk = 20,000.00 P/Cum Sch = 110.03 Tk= 2,194,080.45
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF Qty = 1846.60 Sqm
@Tk = 600.00 P/Sqm Sch = 2494.92 Tk= 1,107,962.06
ii).1st Floor
BF Qty = 1922.09 Sqm
@Tk = 500.00 P/Sqm Sch = 2506.44 Tk= 961,047.35
iii). 2nd Floor
BF Qty/6th R/A Bill = 1525.18 Sqm
For Hostel Bldg
Ver, Portion = 18 × 8.83 Rft × 4.33 Rft = 688.21 Sft = 63.96 Sqm
False Slab
Academic Bldg
Toilet = 1 × 5.17 Rft × 8.92 Rft = 46.12 Sft
= 1 × 8.08 Rft × 5.50 Rft = 44.44 Sft
= 90.56 Sft = 8.42 Sqm

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 181


= 1597.56 Sqm
@Tk = 500.00 P/Sqm Sch = 2137.96 Tk= 798,779.69
iv). 3rd Floor
Academic Bldg
Pent House = 1 × 23.17 Rft × 14.75 Rft = 341.76 Sft = 31.76 Sqm
Hostel Bldg
Same measurement at 2nd Floor/6th R/A Bill = 10920.14 Sft = 1014.88 Sqm
Ver, Portion = 18 × 8.83 Rft × 4.33 Rft = 688.21 Sft = 63.96 Sqm
= 1110.60 Sqm
@Tk = 500.00 P/sqm Sch = 1320.36 Tk= 555,302.34
G. Sunshade, drop wall, railing shelves, cornice, louver, fins, parapet etc.
a). Concrete.
i). Gr.Floor
BF Qty = 5.12 Cum
Hostel Bldg
Sunshade
W80 = 18 × 6.92 Rft = 124.56 Rft

W50 = 4 × 4.17 Rft = 16.68 Rft

W60 = 2 × 5.00 Rft = 10.00 Rft

W48 = 2 × 4.00 Rft = 8.00 Rft

W90 = 2 × 7.50 Rft = 15.00 Rft

HW24 = 10 × 2.00 Rft = 20.00 Rft

= 2 × 4.33 Rft = 8.66 Rft

= 2 × 13.25 Rft = 26.50 Rft

= 229.40 Rft x 1.67 Sft x 0.25 = 95.77 Cft


Shelves
Accounts = 4 × 5.83 Rft = 23.32 Rft

Kitchen = 1 × 10.83 Rft = 10.83 Rft

Pantry = 3 × 10.50 Rft = 31.50 Rft

= 365.21 Rft x 2.08 Sft x 0.25 = 189.91 Cft


Cup Board
= 18 × 5.17 Rft = 93.06 Rft x 2.08 Sft x 0.25 = 48.39 Cft
= 334.07 Cft
= 9.46 Cum
= 14.58 Cum
Sch.Qty = 9.75 Cum
@Tk = 12,000.00 P/Cum Sch = 9.75 Tk= 117,000.00
ii). 1st.Floor
BF Qty = 5.03 Cum
Hostel Bldg
Sunshade Qty Same as Gr.Floor Qty = 95.77 Cft
Cup Board Qty Same as Gr.Floor Qty = 48.39 Cft
Drop Wall
= 18 × 8.67 Rft = 156.06 Rft x 3.00 Rft x 0.25 = 117.05 Cft
Railing
= 18 × 8.67 Rft = 156.06 Rft x 2.50 Rft x 0.25 = 97.54 Cft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 182


= 358.74 Cft
= 10.16 Cum
= 15.19 Cum
Sch.Qty = 13.60 Cum
@Tk = 12,000.00 P/Cum Sch = 13.60 Tk= 163,200.00
iii). 2nd.Floor
Academic Bldg
Sunshade
L/D = 1 × 19 Nos × 9.00 Rft = 171.00 Rft
S/D = 1 × 1 Nos × 8.83 Rft = 8.83 Rft
= 1 × 1 Nos × 9.33 Rft = 9.33 Rft
= 1 × 1 Nos × 19.00 Rft = 19.00 Rft
= 2 × 4 Nos × 8.58 Rft = 68.64 Rft
= 276.80 Rft x 0.83 x 0.25
= 57.44 Cft
Hostel Bldg
Qty Same as 1st. Floor Qty = 358.74 Cft
= 416.18 Cft
= 11.79 Cum
@Tk = 12,000.00 P/Cum Sch = 12.50 Tk= 141,437.04
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
Academic Bldg
BF Qty/6th = 116.63 Sqm
Hostel Bldg
Sunshade
Qty Same as Gr.Floor Qty = 229.40 Rft x 1.92 = 440.45 Sft
Shelves
Qty Same as Gr.Floor Qty = 65.65 Rft x 2.17 = 142.46 Sft
Cup Board
Qty Same as Gr.Floor Qty = 93.06 Rft x 2.33 = 216.83 Sft
= 799.74 Sft
= 74.33 Sqm
= 190.95 Sqm
Sch.Qty = 117.00 Sqm
@Tk = 400.00 P/Sqm Sch = 117.00 Tk= 46,800.00

ii). 1st.Floor
BF Qty/6th = 116.66 Sqm
Hostel Bldg
Sunshade
Qty Same as Gr.Floor Qty = 229.40 Rft x 1.92 = 440.45 Sft
Drop Wall
Qty Same as Gr.Floor Qty = 156.06 Rft x 6.25 = 975.38 Sft
Railing

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 183


Qty Same as Gr.Floor Qty = 156.06 Rft x 5.00 = 780.30 Sft
Cup Board
Qty Same as Gr.Floor Qty = 93.06 Rft x 2.33 = 216.83 Sft
= 2,412.95 Sft
= 224.25 Sqm
= 340.91 Sqm
Sch.Qty = 163.20 Sqm
@Tk = 400.00 P/Sqm Sch = 163.20 Tk= 65,280.00
iii). 2nd.Floor
Academic Bldg
Rft Qty Same as 2nd.Floor Qty = 276.80 Rft x 1.92 = 531.46 Sft
Hostel Bldg
Qty Same as 1st.Floor Qty = 2,412.95 Sft
= 2,944.41 Sft
= 273.64 Sqm
Sch.Qty = 150.00 Sqm
@Tk = 400.00 P/Sqm Sch = 150.00 Tk= 60,000.00
H. In stair case, slab & steps, ramp etc
a). Concrete.
i). Gr.Floor
BF Qty = 19.48 Cum
Sch Qty = 16.00 Cum
@Tk = 12,000.00 P/Cum Sch = 16.00 Tk= 192,000.00

ii). 1st.Floor
Academic Bldg
BF Qty = 13.20 Cum
Sch Qty = 12.40 Cum
@Tk = 12,000.00 P/Cum Sch = 12.40 Tk= 148,800.00
iii). 2nd.Floor
BF Qty = 13.20 Cum
Sch Qty = 12.15 Cum
@Tk = 12,000.00 P/Cum Sch = 12.15 Tk= 145,800.00
iv). 3rd.Floor
Hostel Bldg
Same Qty at 2nd.Floor Qty = 9.97 Cum
Sch Qty = 9.65 Cum
@Tk = 12,000.00 P/Cum Sch = 12.15 Tk= 115,800.00
b) Formwork/Shuttering
i). Gr.Floor
BF Qty = 156.02 sqm
@Tk = 400.00 P/sqm Sch = 192.00 Tk= 62,408.34
ii). First Floor
BF Qty = 95.74 sqm
@Tk = 400.00 P/sqm Sch = 148.80 Tk= 38,295.07
iii). 2nd Floor

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 184


BF Qty = 95.74 sqm
@Tk = 400.00 P/sqm Sch = 145.80 Tk= 38,295.07
iv). 3rd.Floor
For Hostel Bldg
Same Qty at 2nd.Floor Qty = 71.27 sqm
@Tk = 400.00 P/sqm Sch = 115.80 Tk= 28,507.25
SL No-1.17 Supplying fabrication and fixing to details as per design deform bar
b).60 grade deformed bar
BF Qty = 579,481.97 kg

Hostel Bldg
Slab & Slab Beam Same measurement at 2nd Floor Qty = 24926.42 kg
Hostel Bldg
Column - 4th Floor
20mmØ,C1 = 20 × 8 Nos = 160.00 Nos

C2 = 30 × 8 Nos = 240.00 Nos

C3 = 6 × 8 Nos = 48.00 Nos

C4 = 10 × 6 Nos = 60.00 Nos

C5 = 4 × 4 Nos = 16.00 Nos

= 524.00 Nos x 2.87 Rft = 1503.88 Rft

Lapping = 524.00 Nos x 1 Nos x 2.67 Rft = 1399.08 Rft


= 2902.96 Rft

20mmØ,C1 = 4 × 8 Nos = 32.00 Nos

C2 = 8 × 8 Nos = 64.00 Nos


No
= 96.00 s x 10.00 Rft = 960.00 Rft
No
Lapping = Nos x 1 s x 2.67 Rft = 0.00 Rft
= 960.00 Rft

16 mmØ,C1 = 20 × 6 Nos = 120.00 Nos

C2 = 30 × 4 Nos = 120.00 Nos

C3 = 6 × 4 Nos = 24.00 Nos

C4 = 10 × 6 Nos = 60.00 Nos

C5 = 4 × 8 Nos = 32.00 Nos


No
= 356.00 s x 2.87 Rft = 1021.72 Rft
No
Lapping = 356.00 Nos x 1 s x 2.17 Rft = 772.52 Rft
= 1794.24 Rft

16 mmØ,C1 = 4 × 6 Nos = 24.00 Nos

C2 = 8 × 4 Nos = 32.00 Nos


No
= 56.00 s x 10.00 Rft = 560.00 Rft
No
Lapping = Nos x 1 s x 2.67 Rft = 0.00 Rft
= 560.00 Rft

10mmØ stirup
C1 = 20 × 7 Nos × 5.33 Rft × = 746.20 Rft

= 20 × 7 Nos × 4.17 Rft × = 583.80 Rft

= 20 × 7 Nos × 4.00 Rft × = 560.00 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 185


C1 = 4 × 23 Nos × 5.33 Rft × = 490.36 Rft

= 4 × 23 Nos × 4.17 Rft × = 383.64 Rft

= 4 × 23 Nos × 4.00 Rft × = 368.00 Rft

C2 = 30 × 7 Nos × 4.83 Rft × = 1014.30 Rft

= 30 × 7 Nos × 3.67 Rft × = 770.70 Rft

C2 = 8 × 23 Nos × 4.83 Rft × = 888.72 Rft

= 8 × 23 Nos × 3.67 Rft × = 675.28 Rft

C3,C4,C5 = 20 × 7 Nos × 4.83 Rft × = 676.20 Rft

= 20 × 7 Nos × 3.67 Rft × = 513.80 Rft


= 7671.00 Rft

Column Summary
20mm Ø = 3862.96 Rft = 2909.00 Kg
16mm Ø = 2,354.24 Rft = 1134.05 Kg
10mm Ø = 7,671.00 Rft = 1450.01 Kg
For Column = 5493.06 kg
Academic Bldg
Lintel
2nd. Floor
On 10" Wall with Sunshade
12 mm Ø/ M = 1 × 1 Nos × 6 × 88.25 Rft = 529.50 Rft

" = 1 × 1 Nos × 6 × 1.58 Rft = 9.48 Rft

" = 1 × 1 Nos × 6 × 78.00 Rft = 468.00 Rft

" = 1 × 1 Nos × 6 × 19.50 Rft = 117.00 Rft

" = 1 × 2 Nos × 6 × 18.83 Rft = 225.96 Rft

= 1,349.94 Rft

= 366.29 kg
10mm Ø Strp = 1 × 1 Nos × 222 × 4.50 Rft = 999.00 Rft
" = 1 × 1 Nos × 42 × 4.50 Rft = 189.00 Rft

" = 1 × 1 Nos × 193 × 4.50 Rft = 868.50 Rft

" = 1 × 2 Nos × 46 × 4.50 Rft = 414.00 Rft

" = 1 × 2 Nos × 92 × 4.50 Rft = 828.00 Rft

10mm Ø binder = 1 × 1 Nos × 2 × 88.25 Rft = 176.50 Rft

" = 1 × 2 Nos × 2 × 19.50 Rft = 78.00 Rft

" = 1 × 1 Nos × 2 × 78.00 Rft = 156.00 Rft

" = 1 × 2 Nos × 2 × 18.75 Rft = 75.00 Rft

" = 1 × 2 Nos × 2 × 42.00 Rft = 168.00 Rft

= 3,952.00 Rft

= 747.02 kg
On 10" Wall without Sunshade
12 mm Ø/ M = 1 × 1 Nos × 6 × 20.42 Rft = 122.52 Rft

" = 1 × 2 Nos × 6 × 9.33 Rft = 111.96 Rft

" = 1 × 1 Nos × 6 × 11.08 Rft = 66.48 Rft

= 300.96 Rft
= 81.66 kg
10mm Ø Strp = 1 × 1 Nos × 48 × 3.00 Rft = 144.00 Rft

" = 1 × 2 Nos × 21 × 3.00 Rft = 126.00 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 186


" = 1 × 1 Nos × 25 × 3.00 Rft = 75.00 Rft
= 345.00 Rft
= 65.21 kg

On 5" Wall without Sunshade


12 mm Ø/ M = 1 × 16 Nos × 4 × 9.25 Rft = 592.00 Rft

" = 1 × 6 Nos × 4 × 18.83 Rft = 451.92 Rft

= 1,043.92 Rft

= 283.26 kg
10mm Ø Strp = 1 × 16 Nos × 24 × 1.67 Rft = 641.28 Rft

" = 1 × 6 Nos × 44 × 1.67 Rft = 440.88 Rft

= 1,082.16 Rft

= 204.55 kg
= 1748.01 kg
Hostel Bldg
2nd. Floor
Verandah Slab = Same Measurement at 1st. Floor Qty = 473.45 kg
Railing = Same Measurement at 1st. Floor Qty = 369.37 kg
Sunshade = Same Measurement at 1st. Floor Qty = 485.65 kg
Cup Board = Same Measurement at 1st. Floor Qty = 159.91 kg
Lintel = Same Measurement at 1st. Floor Qty = 1747.66 kg
3rd. Floor
Lintel = Same Measurement at 2nd. Floor Qty = 1747.66 kg
= 4983.70 kg
= 616,633.16 kg

@Tk = 90.00 P/Kg Sch = 616804.75 Tk= 55,496,984.21


SL No-1.18 Casting and Testing work of Concrete cylinder (size 150 x 300 mm)
For Academic Bldg
= 13.00 Nos x 3.00 Set = 39.00 Set
For Hostel Bldg
= 16.00 Nos x 3.00 Set = 48.00 Set
For Principal Qtr
= 7.00 Nos x 3.00 Set = 21.00 Set
= 108.00 Set
Sch.Qty = 72.00 Set
@Tk = 1,000.00 P/Each Sch = 72.00 Tk= 72,000.00
SL No-1.19 Brick work in super structure 250mm thick wall
a. Exposed brick work in superstructure in (1:4) with special quality sorted out 1st class brick

i. Ground Floor
BF Qty = 225.66 Cum
@Tk = 7,200.00 P/cum Sch = 278.00 Tk= 1,624,722.98
ii. 1st Floor
Add, BF Qty = 169.28 Cum
Hostel Side = 2 × 7.92 Rft x 8.00 Rft = 126.72 Sft
= 2 × 4.58 Rft x 8.00 Rft = 73.28 Sft
= 2 × 7.58 Rft x 8.00 Rft = 121.28 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 187


= 321.28 Sft x 0.83 = 266.66 Cft
= 7.55 Cum
= 176.83 Cum
@Tk = 7,200.00 P/cum Sch = 188.00 Tk= 1,273,174.33
iii. 2nd Floor
For Academic Bldg
Out side = 16 × 9.00 Rft x 9.00 Rft = 1,296.00 Sft
Side = 4 × 16.50 Rft x 9.25 Rft = 610.50 Sft
= 2 × 7.58 Rft x 9.25 Rft = 140.23 Sft
Stair = 1 × 8.50 Rft x 9.75 Rft = 82.88 Sft
W88 = 1 × 1.33 Rft x 9.00 Rft = 11.97 Sft
= 2,141.58 Sft x 0.83 = 1,777.51 Cft
Deduction
W/108 = 8 × 7.33 Rft x 4.50 Rft = 263.88 Sft
HW/24 = 2 × 2.00 Rft x 2.00 Rft = 8.00 Sft
W/88 = 1 × 5.50 Rft x 4.50 Rft = 24.75 Sft
W/91 = 1 × 5.75 Rft x 4.50 Rft = 25.88 Sft
W/45 = 1 × 3.75 Rft x 4.50 Rft = 16.88 Sft
W/50 = 1 × 4.17 Rft x 4.50 Rft = 18.77 Sft
= 358.15 Sft x 0.83 = -297.26 Cft
= 1,783.43 Sft = 1,480.25 Cft
For Hostel Bldg
Same measurement at First.Floor,Qty - = 3,984.05 Sft
Same measurement at First.Floor,Qty = 321.28 Sft
= 4,305.33 Sft x 0.83 = 3,573.42 Cft
= 6,088.76 Sft Qty = 5,053.67 Cft
= 143.12 Cum
Sch.Qty = 132.00 Cum
@Tk = 7,200.00 P/cum Sch = 132.00 Tk= 950,400.00
iv. 3rd Floor
For Hostel Bldg
Same measurement at 2nd.Floor,Qty = 4,305.33 Sft x 0.83 = 3,573.42 Cft
= 101.20 Cum
@Tk = 7,200.00 P/cum Sch = 102.00 Tk= 728,650.04
b. In (1:6) proportion for non exposed brick wall.
i. Ground Floor
BF Qty = 118.14 Cum
Sch.Qty = 88.50 Cum
@Tk = 6,800.00 P/cum Sch = 88.50 Tk= 601,800.00
ii. 1st Floor
BF Qty = 51.91 Cum
Sch.Qty = 44.00 Cum
@Tk = 6,800.00 P/cum Sch = 44.00 Tk= 299,200.00
iii. 2nd Floor
For Academic Bldg
= 2 × 16.50 Rft x 9.25 Rft = 305.25 Sft
= 3 × 7.58 Rft x 9.25 Rft = 210.35 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 188


= 2 × 7.50 Rft x 9.25 Rft = 138.75 Sft
= 1 × 6.75 Rft x 11.25 Rft = 75.94 Sft
= 730.28 Sft x 0.83 = 606.13 Cft
For Hostel Bldg
= 2 × 9.50 Rft x 8.50 Rft = 161.50 Sft
= 2 × 17.75 Rft x 8.50 Rft = 301.75 Sft
= 2 × 13.33 Rft x 8.50 Rft = 226.61 Sft
= 4 × 4.33 Rft x 8.50 Rft = 147.22 Sft
= 2 × 11.25 Rft x 8.50 Rft = 191.25 Sft
= 1 × 10.67 Rft x 8.50 Rft = 90.70 Sft
= 4 × 7.50 Rft x 8.50 Rft = 255.00 Sft
= 2 × 18.08 Rft x 8.50 Rft = 307.36 Sft
= 1 × 21.17 Rft x 8.50 Rft = 179.95 Sft
Deduct,Gap = 2 × 13.33 Rft x 4.50 Rft = -119.97 Sft
= 2 × 4.33 Rft x 4.50 Rft = -38.97 Sft
D60 = 2 × 5.00 Rft x 7.00 Rft = -70.00 Sft
= 1,632.39 Sft x 0.83 = 1,354.88 Cft
= 2,362.67 Sft = 1,961.02 Cft
= 55.54 Cum

Sch.Qty = 44.00 Cum

@Tk = 6,800.00 P/cum Sch = 44.00 Tk= 299,200.00


iv. 3rd Floor
For Academic Bldg
Pent house = 2 × 16.50 Rft x 9.50 Rft = 313.50 Sft
= 2 × 8.50 Rft x 9.50 Rft = 161.50 Sft
Deduct,W/40 = 1 × 3.33 Rft x 4.50 Rft = -14.99 Sft
= 460.02 Sft x 0.83 = 381.81 Cft
For Hostel Bldg
Same measurement at First.Floor,Qty = 1,632.39 Sft x 0.83 = 1,354.88 Cft
= 2,092.41 Sft = 1,736.70 Cft
= 49.18 Cum

Sch.Qty = 26.00 Cum

@Tk = 6,800.00 P/cum Sch = 26.00 Tk= 176,800.00


SL No-1.20 125mm thick brick work in (1:4)
b On-Exposed brick work 125mm thick in (1:4)
i. Ground Floor
Total Qty = 10,141.09 Sft = 942.48 Sqm
Sch.Qty= 707.00 Sqm
@Tk = 850.00 P/sqm Sch = 707.00 Tk= 600,950.00
ii. 1st Floor
Total Qty = 9,458.23 Sft = 879.02 Sqm
Sch.Qty = 502.00 Sqm
@Tk = 850.00 P/sqm Sch = 502.00 Tk= 426,700.00
iii. 2nd Floor
For Academic Bldg
General Store = 3 × 9.00 Rft x 8.75 Rft = 236.25 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 189


" = 1 × 16.50 Rft x 9.25 Rft = 152.63 Sft
Library = 5 × 9.00 Rft x 8.75 Rft = 393.75 Sft
Store = 2 × 16.50 Rft x 9.25 Rft = 305.25 Sft
Conference= 3 × 9.00 Rft x 8.75 Rft = 236.25 Sft
Guest = 3 × 9.00 Rft x 8.75 Rft = 236.25 Sft
Partition = 3 × 16.50 Rft x 9.25 Rft = 457.88 Sft
Corridor = 1 × 17.50 Rft x 8.75 Rft = 153.13 Sft
Dress = 1 × 9.58 Rft x 10.33 Rft = 98.96 Sft
Toilet = 2 × 8.42 Rft x 10.33 Rft = 173.96 Sft
Urinal = 2 × 3.50 Rft x 7.00 Rft = 49.00 Sft
Parapet = 1 × 87.83 Rft x 3.00 Rft = 263.49 Sft
Lect.Hall = 1 × 133.00 Rft x 3.00 Rft = 399.00 Sft
= 3,155.78 Sft

Deduction
W/105 = 10 × 7.33 Rft x 4.50 Rft = -329.85 Sft
W/50 = 6 × 4.17 Rft x 4.50 Rft = -112.59 Sft
W/43 = 1 × 3.58 Rft x 4.50 Rft = -16.11 Sft
D/40 = 7 × 3.33 Rft x 7.00 Rft = -163.17 Sft
D/36 = 1 × 3.00 Rft x 7.00 Rft = -21.00 Sft
D/30 = 4 × 2.50 Rft x 7.00 Rft = -70.00 Sft
= -712.72 Sft
Qty = 2,443.06 Sft
For Hostel Bldg
Same measurement at First.Floor,Qty = 7,136.26 Sft
= 9,579.32 Sft = 890.27171 Sqm
Sch.Qty = 469.00 Sqm
@Tk = 850.00 P/sqm Sch = 469.00 Tk= 398,650.00
iv. 3rd Floor
For Academic Bldg
Parapet = 2 × 99.58 Rft x 3.00 Rft = 597.48 Sft
= 2 × 45.67 Rft x 3.00 Rft = 274.02 Sft
= 871.50 Sft
For Hostel Bldg
Same measurement at 2nd.Floor,Qty = 7,136.26 Sft
= 8,007.76 Sft = 744.215613 Sqm
Sch.Qty = 392.00 Sqm
@Tk = 850.00 P/sqm Sch = 392.00 Tk= 333,200.00
SL No-1.25 Wood work in chowkat of door & window with Silkarai wood
For Academic Bldg
D40 = 27 × 17.33 Rft = 467.91 Rft

D36 = 5 × 17.00 Rft = 85.00 Rft

D30 = 18 × 16.50 Rft = 297.00 Rft

D60 = 2 × 19.00 Rft = 38.00 Rft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 190


= 887.91 Rft x 0.50 Rft x 0.21 = 93.23 Cft
Cat door = 9 × 11.67 Rft = 105.03 Rft x 0.33 Rft x 0.21 = 7.28 Cft
= 100.51 Cft
For Hostel Bldg
D40 = 55 × 17.33 Rft = 953.15 Rft

D36 = 1 × 17.00 Rft = 17.00 Rft

D30 = 76 × 16.50 Rft = 1,254.00 Rft

D60 = 8 × 19.00 Rft = 152.00 Rft

= 2,376.15 Rft x 0.50 Rft x 0.21 = 249.50 Cft


Cat door = 13 × 11.25 Rft = 146.25 Rft x 0.33 Rft x 0.21 = 10.14 Cft
= 259.63 Cft
Principal Qtr
D40 = 4 × 17.33 Rft = 69.32 Rft

D36 = 1 × 17.00 Rft = 17.00 Rft

D56 = 1 × 18.67 Rft = 18.67 Rft

D30 = 8 × 16.50 Rft = 132.00 Rft

= 236.99 Rft x 0.50 Rft x 0.21 = 24.88 Cft


Cat door = 4 × 10.25 Rft = 41.00 Rft x 0.33 Rft x 0.21 = 2.84 Cft
= 27.73 Cft
= 387.87 Cft
= 10.98 Cum
@Tk = 195,000.00 P/cum Sch = 13.98 cum Tk= 2,141,991.63
SL No-1.26 Supplying fitting and fixing M.S. flat bar clamp 150 x 38 x 6mm size etc. all complete
and accepted by the Engineer.

For Academic Bldg


Gr. Floor-2nd Floor
Door = 52 × 8.00 Nos = 416.00 Nos

Cat door = 9 × 4.00 Nos = 36.00 Nos

= 452.00 Nos

For Hostel Bldg


Gr. Floor-3rd Floor
Door = 194 × 8.00 Nos = 1,552.00 Nos

Cat door = 17 × 4.00 Nos = 68.00 Nos

= 1,620.00 Nos

Principal Qtr
Door = 14 × 8.00 Nos = 112.00 Nos

Cat door = 4 × 4.00 Nos = 16.00 Nos

= 128.00 Nos

= 2,200.00 Nos

Sch.Qty = 1,213.00 Nos


@Tk = 60.00 P/Each Sch = 1213.00 Tk= 72,780.00
SL No-1.32 a. S.F.F. of M.S. window grill with 20mmx5mm F.I. Bar as per design & drawing.
For Academic Bldg
Ground Floor
W108 = 18 × 9.00 Rft x 4.50 Rft = 729.00 Sft
W88 = 1 × 7.33 Rft x 4.50 Rft = 32.99 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 191


W105 = 8 × 8.75 Rft x 4.50 Rft = 315.00 Sft
W50 = 7 × 4.17 Rft x 4.50 Rft = 131.36 Sft
W45 = 4 × 3.75 Rft x 4.50 Rft = 67.50 Sft
W89 = 1 × 7.42 Rft x 4.50 Rft = 33.39 Sft
W20 = 12 × 1.67 Rft x 4.50 Rft = 90.18 Sft
SW40 = 1 × 3.33 Rft x 9.33 Rft = 31.07 Sft
HW24 = 11 × 2.00 Rft x 2.00 Rft = 44.00 Sft
= 1,474.48 Sft
First Floor
W108 = 18 × 9.00 Rft x 4.50 Rft = 729.00 Sft
W88 = 1 × 7.33 Rft x 4.50 Rft = 32.99 Sft
W105 = 12 × 8.75 Rft x 4.50 Rft = 472.50 Sft
W50 = 9 × 4.17 Rft x 4.50 Rft = 168.89 Sft
W45 = 3 × 3.75 Rft x 4.50 Rft = 50.63 Sft
W89 = 2 × 7.42 Rft x 4.50 Rft = 66.78 Sft
W20 = 12 × 1.67 Rft x 4.50 Rft = 90.18 Sft
SW40 = 1 × 3.33 Rft x 9.33 Rft = 31.07 Sft
HW24 = 5 × 2.00 Rft x 2.00 Rft = 20.00 Sft
= 1,662.02 Sft
Second Floor
W108 = 14 × 9.00 Rft x 4.50 Rft = 567.00 Sft
W88 = 1 × 7.33 Rft x 4.50 Rft = 32.99 Sft
W105 = 14 × 8.75 Rft x 4.50 Rft = 551.25 Sft
W50 = 8 × 4.17 Rft x 4.50 Rft = 150.12 Sft
W45 = 2 × 3.75 Rft x 4.50 Rft = 33.75 Sft
W91 = 2 × 7.58 Rft x 4.50 Rft = 68.22 Sft
SW40 = 1 × 3.33 Rft x 9.33 Rft = 31.07 Sft
HW24 = 5 × 2.00 Rft x 2.00 Rft = 20.00 Sft
= 1,454.39 Sft

S/T = 4,590.90 Sft


For Hostel Bldg
Ground Floor
W50 = 4 × 4.17 Rft x 4.50 Rft = 75.06 Sft
W80 = 20 × 6.67 Rft x 4.50 Rft = 600.30 Sft
W48 = 2 × 4.00 Rft x 4.50 Rft = 36.00 Sft
SW90 = 2 × 7.50 Rft x 9.33 Rft = 139.95 Sft
W90 = 2 × 7.50 Rft x 4.50 Rft = 67.50 Sft
W24 = 2 × 2.00 Rft x 4.50 Rft = 18.00 Sft
HW24 = 6 × 2.00 Rft x 2.00 Rft = 24.00 Sft
W60 = 9 × 5.00 Rft x 4.50 Rft = 202.50 Sft
W52 = 2 × 4.33 Rft x 4.50 Rft = 38.97 Sft
Lobby = 2 × 4.33 Rft x 9.50 Rft = 82.27 Sft
"= 2 × 13.25 Rft x 9.50 Rft = 251.75 Sft
Stair = 2 × 5.00 Rft x 4.50 Rft = 45.00 Sft
Ablution = 2 × 12.00 Rft x 4.50 Rft = 108.00 Sft
Store,W40 = 2 × 3.33 Rft x 4.50 Rft = 29.97 Sft
HW = 2 × 10.42 Rft x 2.00 Rft = 41.68 Sft

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 192


Kitchen = 1 × 7.00 Rft x 7.00 Rft = 49.00 Sft
" = 2 × 3.08 Rft x 7.00 Rft = 43.12 Sft
Stair,Front = 4 × 7.50 Rft x 7.00 Rft = 210.00 Sft
= 2,063.07 Sft
First Floor
W50 = 4 × 4.17 Rft x 4.50 Rft = 75.06 Sft
W36 = 38 × 3.00 Rft x 4.50 Rft = 513.00 Sft
W48 = 20 × 4.00 Rft x 4.50 Rft = 360.00 Sft
W45 = 2 × 3.75 Rft x 4.50 Rft = 33.75 Sft
W59 = 2 × 4.92 Rft x 4.50 Rft = 44.28 Sft
W90 = 2 × 7.50 Rft x 4.50 Rft = 67.50 Sft
HW24 = 8 × 2.00 Rft x 2.00 Rft = 32.00 Sft
Store = 2 × 9.60 Rft x 4.50 Rft = 86.40 Sft
Lobby = 2 × 14.33 Rft x 8.50 Rft = 243.61 Sft
" = 2 × 13.25 Rft x 8.50 Rft = 225.25 Sft
Stair = 2 × 5.00 Rft x 4.50 Rft = 45.00 Sft
Open Space = 6 × 5.00 Rft x 8.50 Rft = 255.00 Sft
" = 2 × 12.00 Rft x 4.50 Rft = 108.00 Sft
SW90 = 2 × 7.50 Rft x 9.17 Rft = 137.55 Sft
= 2,226.40 Sft

TV Room = 2 × 12.50 Rft x 4.50 Rft = 112.50 Sft


= 2 × 4.33 Rft x 4.50 Rft = 38.97 Sft
= 2,377.87 Sft
Second Floor
Same measurement at First.Floor,Qty Rft = 2,226.40 Sft
TV Room = 2 × 10.67 Rft x 4.50 Rft = 96.03 Sft
= 2 × 4.33 Rft x 4.50 Rft = 38.97 Sft
= 2,361.40 Sft

S/T = 6,802.34 Sft


Principal Qtr
W60 = 10 × 5.00 Rft x 4.50 Rft = 225.00 Sft
W37 = 1 × 3.08 Rft x 4.50 Rft = 13.86 Sft
HW24 = 2 × 2.00 Rft x 2.00 Rft = 8.00 Sft
HW20 = 1 × 1.67 Rft x 2.00 Rft = 3.34 Sft
HW18 = 1 × 1.50 Rft x 2.00 Rft = 3.00 Sft
HW60 = 1 × 5.00 Rft x 1.67 Rft = 8.35 Sft
Kitchen = 1 × 1.67 Rft x 4.50 Rft = 7.52 Sft
Store = 1 × 4.67 Rft x 1.67 Rft = 7.80 Sft
Living = 2 × 5.00 Rft x 1.67 Rft = 16.70 Sft
" = 1 × 7.50 Rft x 1.67 Rft = 12.53 Sft
" = 1 × 1.67 Rft x 6.50 Rft = 10.86 Sft
Stair = 1 × 4.00 Rft x 4.50 Rft = 18.00 Sft
S/T = 334.94 Sft
Total Qty = 11,728.18 Sft = 1089.98 Sqm
@Tk = 2,500.00 P/sqm Sch = 1465.25 Tk= 2,724,949.02
SL No-1.35 Plastering work
B. On masonry surface 10mm to 20mm thick in proportion (1:6)
i. Ground Floor

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 193


Ref Item No - 1.19(a)-i. Exposed Brick = 9,599.89 Sft x 1.00 = 9,599.89 Sft
1.19(b)-i. Non Exposed Brick = 2,492.17 Sft x 2.00 = 4,984.34 Sft
1.20(b)-i. Non Exposed Brick = 10,141.09 Sft x 2.00 = 20,282.18 Sft
1.07(a) Non Exposed Brick = 2,609.71 Sft x 2.00 = 5,219.42 Sft
= 40,085.83 Sft
= 3725.45 Sqm
@Tk = 180.00 P/sqm Sch = 3967.48 Tk= 670,580.84
ii. First Floor
Ref Item No - 1.19(a)-ii. Exposed Brick = 7,201.44 Sft x 1.00 = 7,201.44 Sft
= 321.28 Sft x 1.00 = 321.28 Sft
1.19(b)-ii. Non Exposed Brick = 2,208.19 Sft x 2.00 = 4,416.38 Sft
1.20(b)-ii. Non Exposed Brick = 9,458.23 Sft x 2.00 = 18,916.45 Sft
= 30,855.55 Sft
= 2867.62 Sqm
@Tk = 180.00 P/sqm Sch = 2999.53 Tk= 516,170.92
iii. 2nd Floor
Ref Item No - 1.19(a)-iii. Exposed Brick = 6,088.76 Sft x 1.00 = 6,088.76 Sft
1.19(b)-iii. Non Exposed Brick = 2,362.67 Sft x 2.00 = 4,725.35 Sft
1.20(b)-iii. Non Exposed Brick = 9,579.32 Sft x 2.00 = 19,158.65 Sft
= 29,972.75 Sft
= 2785.57 Sqm
Sch.Qty = 2578.16 Sqm
@Tk = 180.00 P/sqm Sch = 2578.16 Tk= 464,068.80
C. On R.C.C. surface 6mm & above thick in (1:4)
i. Ground Floor
Ref Item No - 1.16(C-b)-i. Column-Shutter = = 1,956.82 Sqm
1.16(D-b)-i. Beam-Shutter = = 1,166.09 Sqm
1.16(E-b)-i. Lintel = = 377.57 Sqm
1.16(F-b)-i. Floor Slab = = 1,846.60 Sqm
1.16(G-b)-i. Suhshade = = 190.95 Sqm
1.16(H-b)-i. In Stair,Slab & step = = 156.02 Sqm
= 5694.05 Sqm
Sch.Qty = 4604.78 Sqm
@Tk = 170.00 P/sqm Sch = 4604.78 Tk= 782,812.60
ii. 1st Floor
Ref Item No - 1.16(C-b)-ii. Column-Shutter = = 898.52 Sqm
1.16(D-b)-ii. Beam-Shutter = = 1,117.85 Sqm
1.16(E-b)-ii. Lintel = = 249.39 Sqm
1.16(F-b)-ii. Floor Slab = = 1,922.09 Sqm
1.16(G-b)-ii. Suhshade = = 340.91 Sqm
1.16(H-b)-ii. In Stair,Slab & step = = 95.74 Sqm
= 4624.50 Sqm
Sch.Qty = 4398.05 Sqm
@Tk = 170.00 P/sqm Sch = 4398.05 Tk= 747,668.50
iii. 2nd Floor
Ref Item No - 1.16(C-b)-iii. Column-Shutter = 987.04 Sqm
1.16(D-b)-iii. Beam-Shutter = 956.67 Sqm
1.16(E-b)-iii. Lintel = 220.24 Sqm

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 194


1.16(F-b)-iii. Floor Slab = 1,597.56 Sqm
1.16(G-b)-iii. Suhshade = 273.64 Sqm
1.16(H-b)-iii. In Stair,Slab & step = 95.74 Sqm
= 4130.89 Sqm
Sch.Qty = 3845.34 Sqm
@Tk = 170.00 P/sqm Sch = 3845.34 Tk= 653,707.80
iv. 3rd Floor
Ref Item No - 1.16(C-b)-iv. Column-Shutter = 626.10 Sqm
1.16(D-b)-iv. Beam-Shutter = 560.57 Sqm
1.16(F-b)-iv. Floor Slab = 1,110.60 Sqm
1.16(H-b)-iv. In Stair,Slab & step = 71.27 Sqm
= Sqm
@Tk = 170.00 P/sqm Sch = 2619.00 Tk= -
Civil WorkTk= 164,239,533.48
B. External Work
B.1. External Civil Work
B.1.a Site Development
Qty BF from 1st R/A Bill Page No-8 of TMB = 41317.71 Cum
@Tk = 175.00 P/Cum Sch = 51100.00 Tk= 7,230,599.25
Tk= 171,470,132.73
Less Tk. - 14.15% Tk= -24,263,023.78
Total Tk= 147,207,108.95
Deduction upto 6 R/A Bill Tk= -130,055,605.22
th

Payable AmountTk= 17,151,503.73

file:///conversion/tmp/activity_task_scratch/569816934.xlsx Page 195


Name of Work : Construction of Medical Assistant Training School (MATS) at Sadar Upazila in Gazipur
District.

Package No : WP-599/SDP(GOB)-HED.
Name of Contractor : BBL & Essen Engineering & Co. Ltd (JV),Dhaka-1207.
8th R/A Bill
Part-A (Civil works)
Sl No-1.01 a. Layout and marking for earthwork in Excavation in foundation
= 1,889.81 Sqm
Schedule Qty = 1,745.00 Sqm
@Tk = 15.00 /= P/Sqm Tk= 26,175.00
Sl No-1.02 Earth Work in excavation in Foundation
a). Upto 1.5m depth
= 562.89 cum
@Tk = 175.00 /= P/Cum Tk= 98,505.25
Sl No-1.03 Brick flat Soling
a). In Foundation
= 568.36 Sqm
@Tk = 325.00 P/Sqm Tk= 184,716.97
Sl No-1.07 a.Exposed Brick work in foundation & Plinth (1:6)
= 61.34 Cum
@Tk = 6,800.00 P/cum Tk= 417,139.92
Boring/drilling for cast in situ Pile upto require depth and diameter with mim 6m long temporary steel
Sl No-1.09 casting,true to vertical,providing ventonite slurry and maintaining water level in the hole (450mm dia
upto 20m depth)
= 492 Nos × 70.00 Rft = 34,440.0 Rft = 10,500.00 Rm
@Tk = 1,250.00 /= P/Rm Tk= 13,125,000.00
Sl No-1.10 Casting of Cast in Situ bored pile R.C.C work of 1:1.5:3
π (1.5)2 × = 60,958.80 cft
= 492 × 70.00 Rft
4 = 1,726.39 cum
@Tk = 13,000.00 /= P/Cum Tk= 22,443,058.62

Sl No-1.11 Providing and making point welding


= 492 × 6.00 × 138.00 Point = 407,376.00 Point
Sch Qty = 371,196.00 Point
@Tk = 0.50 P/point Tk= 185,598.00
Sl No-1.12 Providing and making joint welding
= 492 × 6.00 × 1.33 = 3,926.16 Rft = 1,197.00 Rm
@Tk = 1.00 P/Rm Tk= 1,197.00
Sl No-1.13 Labour for breaking of pile head
4 = 73.54 Cum
@Tk = 2,000.00 P/Cum Tk= 147,073.92
Sl No-1.14 a. Conducting static load test for the cast-in-situ pile providing required
= 1 × 3.00 Test = 3.00 Test
@Tk = 80,000.00 P/Test Tk= 240,000.00
b. For Intermediate Loading from 75-125 tonne for each additional tonne
= 3 × 45.00 Ton = 135.00 Test

Page 196
@Tk = 800.00 P/Ton Tk= 108,000.00
Sl No-1.15 Reinforced cement concrete work (1:2:4) of specified compressive strength f'c 19 Mpa at 28
days with bricks chips using steel shutter, best quality 50% course sand of F.M. 2.2 and 50%
local sand of F.M. 1.2 with 20mm down well graded picked jhama brick chips in/c breaking chips
and screening through proper sleves, making, placing in position the centering shuttering by
M.S. sheet steel forms etc. making shuttering water-tight, placing of reinforcement in position,
concrete mixing with mixer machine, compacting by vibrator machine and curing at least for 28
days etc. all complete as per direction of the engineer-in-charge (rate is excluding the cost of
reinforcement and its fabrication, placing and binding).

A. In foundation (Footing, Raft, Pile cap etc.)


i. Concrete
Sub-Station-Footing
CF1 = 1 × 25.83 Rft × 5.50 Rft × 1.00 Rft = 142.07 Cft
CF2 = 1 × 25.83 Rft × 6.00 Rft × 1.00 Rft = 154.98 Cft
CF3 = 1 × 25.83 Rft × 7.00 Rft × 1.08 Rft = 195.27 Cft
= 492.32 Cft
= 13.94 Cum
Schedule Qty = 13.00 Cum
@Tk = 8,000.00 P/ Cum Tk= 104,000.00
ii. Formwork/shuttering, prop and necessary supports including curing etc.
Sub-Station-Footing
CF1 = 2 × 25.83 Rft × 1.00 Rft = 51.66 Sft
= 2 × 5.50 Rft × 1.00 Rft = 11.00 Sft
CF2 = 2 × 25.83 Rft × 1.00 Rft = 51.66 Sft
= 2 × 6.00 Rft × 1.00 Rft = 12.00 Sft
CF3 = 2 × 25.83 Rft × 1.08 Rft = 55.79 Sft
= 2 × 7.00 Rft × 1.08 Rft = 15.12 Sft
= 197.23 Sft
= 18.35 Sqm
@Tk = 400.00 P/ Sqm Tk= 7,338.89
B. Foundation beam / Grade beam/Floor Beam
i. Concrete
Sub-Station-Footing Beam
CF1 = 1 × 25.83 Rft × 1.50 Rft × 1.25 Rft = 48.43 Cft
CF2 = 1 × 25.83 Rft × 1.50 Rft × 1.25 Rft = 48.43 Cft
CF3 = 1 × 25.83 Rft × 1.50 Rft × 1.17 Rft = 45.33 Cft
= 142.19 Cft
Drop Wall = 2 × 10.25 Rft = 20.50 Rft
= 2 × 8.58 Rft = 17.16 Rft
= 2 × 9.83 Rft = 19.66 Rft
= 2 × 13.17 Rft = 26.34 Rft
= 83.66 Rft x 1.50 Rft x 0.50 = 62.75 Cft
Plinth Beam
PFB1 = 2 × 18.83 Rft = 37.66 Rft
PFB2 = 1 × 18.83 Rft = 18.83 Rft
PFB3 = 2 × 23.00 Rft = 46.00 Rft

Page 197
PFB4 = 1 × 23.00 Rft = 23.00 Rft
= 125.49 Rft x 0.83 Rft x 1.08 = 112.49 Cft
= 317.43 Cft
= 8.99 Cum
@Tk = 8,000.00 P/ Cum Tk= 71,918.07
ii. Formwork/shuttering, prop and necessary supports including curing etc.
Sub-Station-Footing Beam
CF1 = 2 × 25.83 Rft × 1.25 Rft = 64.58 Sft
= 2 × 5.50 Rft × 1.25 Rft = 13.75 Sft
CF2 = 2 × 25.83 Rft × 1.25 Rft = 64.58 Sft
= 2 × 6.00 Rft × 1.25 Rft = 15.00 Sft
CF3 = 2 × 25.83 Rft × 1.17 Rft = 60.44 Sft
= 2 × 7.00 Rft × 1.17 Rft = 16.38 Sft
= 234.72 Sft
Drop Wall
Rft Qty Same as = 1 × 83.66 Rft × 3.50 Rft = 292.81 Sft
Plinth Beam
Rft Qty Same as = 125.49 Rft × 3.00 Rft = 376.47 Sft
904.00
= 84.09 Sqm
Sch.Qty = 78.00 Sqm
@Tk = 400.00 P/ Sqm Tk= 31,200.00
C In pedestal column, column, column capital, lift wall etc.
a. Concrete
i. Below PL level and in Ground Floor
Sub-Station
Col upto FGL
C1-C2 = 9 × 7.50 Rft × 1.25 Rft × 1.25 Rft = 105.47 Cft
Col Above FGL
C1-C2 = 9 × 14.46 Rft × 1.00 Rft × 1.00 Rft = 130.14 Cft
= 235.61 Cft
= 6.67 Cum
Schedule Qty = 5.40 Cum
@Tk = 9,000.00 P/ Cum Tk= 48,600.00
b. Formwork/shuttering, prop and necessary supports including curing etc.
i. Ground Floor
Sub-Station
Col upto FGL
C1-C2 = 9 × 7.50 Rft × 5.00 Rft = 337.50 Sft
Col Above FGL
C1-C2 = 9 × 14.46 Rft × 4.00 Rft = 520.56 Sft
= 858.06 Sft
= 79.82 Sqm
Schedule Qty = 61.80 Sqm

Page 198
@Tk = 400.00 P/ Sqm Tk= 24,720.00
D Beam: (Tee-beam, Ell beam, Rib-beam rectangular beam)
a. Concrete
i. Ground Floor
Sub-Station
Roof Beam
FB1 = 2 × 18.83 Rft = 37.66 Rft
FB2 = 1 × 18.83 Rft = 18.83 Rft
= 2 × 23.00 Rft = 46.00 Rft
FB3 = 2 × 23.00 Rft = 46.00 Rft
= 148.49 Rft x 0.83 Rft x 1.25 = 154.06 Cft
= 4.36 cum
@Tk = 9,000.00 P/ Cum Tk= 39,267.22
b. Formwork/shuttering, prop and necessary supports including curing etc.
i. Ground Floor
Sub-Station
Roof Beam
Rft Qty Same as = 148.49 Rft × 2.58 Rft = 383.10 Sft
= 35.60 Sqm
@Tk = 400.00 P/ Sqm Tk= 14,241.79
E Lintel & Tie - beam
a. Concrete
i. Ground Floor
Sub-Station
Window = 4 × 6.00 Rft × 0.42 Rft × 0.75 Rft = 7.56 Cft
On 10'' = 1 × 17.75 Rft × 0.83 Rft × 0.83 Rft = 12.23 Cft
D40 = 2 × 4.00 Rft × 0.42 Rft × 0.50 Rft = 1.68 Cft
D30 = 1 × 3.50 Rft × 0.42 Rft × 0.50 Rft = 0.74 Cft
Generator = 1 × 10.25 Rft × 0.42 Rft × 0.75 Rft = 3.23 Cft
= 25.43 Cft
= 0.72 Cum
@Tk = 9,000.00 P/ Cum Tk= 6,482.17
b. Formwork/shuttering, prop and necessary supports including curing etc.
i. Ground Floor
Sub-Station
Window = 4 × 6.00 Rft × 1.58 Rft = 37.92 Sft
On 10'' = 1 × 17.75 Rft × 2.50 Rft = 44.38 Sft
D40 = 2 × 4.00 Rft × 1.33 Rft = 10.64 Sft
D30 = 1 × 3.50 Rft × 1.33 Rft = 4.66 Sft
Generator = 1 × 10.25 Rft × 1.58 Rft = 16.20 Sft
= 113.79 Sft
= 10.57 Sqm
@Tk = 400.00 P/ Sqm Tk= 4,229.93
F. Roof slab, cantilever slab, drop panel etc.

Page 199
a. Concrete
i. Ground Floor
Sub-Station
Plinth Slab = 1 × 21.83 Rft × 26.00 Rft × 0.42 Rft = 238.38 Cft
Roof Slab = 1 × 25.17 Rft × 29.33 Rft × 0.38 Rft = 280.53 Cft
= 518.91 Cft
= 14.70 Cum
Schedule Qty = 14.50 Cum
@Tk = 9,500.00 P/ Cum Tk= 137,750.00
b. Formwork/shuttering, prop and necessary supports including curing etc.
i. Ground Floor
Sub-Station
Plinth Slab = 1 × 21.83 Rft × 26.00 Rft = 567.58 Sft
= 2 × 47.83 Rft × 0.42 Rft = 40.18 Sft
Roof Slab = 1 × 25.17 Rft × 29.33 Rft = 738.24 Sft
= 2 × 54.50 Rft × 0.38 Rft = 41.42 Sft
= 1,387.41 Sft
= 128.94 Sqm
@Tk = 400.00 P/ Sqm Tk= 51,576.70
G Sunshade, drop wall, railing shelves, cornice, louver, fins, parapet etc.
a. Concrete
i. Ground Floor
Sub-Station
Sunshade = 4 × 6.00 Rft × 1.25 Rft × 0.29 Rft = 8.70 Cft
= 0.25 Cum
@Tk = 9,000.00 P/ Cum Tk= 2,217.50
b. Formwork/shuttering, prop and necessary supports including curing etc.
i. Ground Floor
Sub-Station
Sunshade = 4 × 7.91 Rft × 1.67 Rft = 52.84 Sft
= 4.91 Sqm
@Tk = 400.00 P/ Sqm Tk= 1,964.27
SL No-1.16 Reinforced cement concrete works using steel shutter with mim cement concrete to mix ratio(1:1.5:3)
A. In Foundation (Footing,Raft,Pile cap etc)
i. Concrete
= 510.24 cum
@Tk = 11,000.00 P/Cum Tk= 5,612,613.62
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 1,191.55 Sqm
@Tk = 400.00 P/Sqm Tk= 476,619.42
B. In Foundation Beam/Grade Beam
i. Concrete
= 112.49 cum
@Tk = 17,000.00 P/Cum Tk= 1,912,283.35

Page 200
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
= 1075.10 Sqm
@Tk = 700.00 P/Sqm Tk= 752,567.66
B. In Floor Slab at plinth level
i) Concrete
= 241.22 Cum
@Tk = 18,000.00 P/Cum Tk= 4,341,964.86
ii). Formwork/Shuttering.prop and necessary suports including curing etc.
BF Qty = 2,521.84 Sqm
@Tk = 800.00 P/Sqm Tk= 2,017,468.87
C. Beam at Plinth level
a). Concrete.
i) Gr.Floor/Plinth level
BF Qty = 111.81 Cum
@Tk = 18,000.00 P/Cum Tk= 2,012,514.01
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF Qty = 1292.34 Sqm
Sch.Qty = 1244.48 Sqm
@Tk = 500.00 P/Sqm Tk= 622,240.00

C. In Pedestal Column,Column,Column capital ,lift wall etc.


a. Concrete
i). Below PL level and in Ground Floor.
= 215.12 Cum
Concrete Presigm
Add Academic Bldg
Ground Floor
W = 47 × 8.00 Nos = 376.00 Nos

Hw = 11 × 4.00 Nos = 44.00 Nos

= 420.00 Nos

Qty = 420.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 29.11 Cft
For Hostel Bldg
Ground Floor
= × 8.00 Nos = 0.00 Nos

= × 8.00 Nos = 0.00 Nos

= × 8.00 Nos = 0.00 Nos

= × 8.00 Nos = 0.00 Nos

= × 4.00 Nos = 0.00 Nos

= 0.00 Nos

Qty = - Nos x 0.50 Rft x 0.42 Rft x 0.33 = 0.00 Cft


Principal Qtr
W60 = 10 × 8.00 Nos = 80.00 Nos

Page 201
W= 2 × 8.00 Nos = 16.00 Nos

HW = 4 × 4.00 Nos = 16.00 Nos

VG = 3 × 10.00 Nos = 30.00 Nos

HW = 1 × 4.00 Nos = 4.00 Nos

= 146.00 Nos

Qty = 146.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 10.12 Cft
= 39.22 Cft
= 1.11 Cum
= 216.23 Cum
@Tk = 17,000.00 P/Cum Tk= 3,675,856.22
ii).1st Floor.
= 89.64 Cum
Concrete Presigm
Academic Bldg
Frist Floor
W = 54 × 8.00 Nos = 432.00 Nos

HW = 6 × 4.00 Nos = 24.00 Nos

= 456.00 Nos

Qty = 456.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 31.60 Cft
For Hostel Bldg
Frist Floor
= × 8.00 Nos = 0.00 Nos

= × 8.00 Nos = 0.00 Nos

= × 8.00 Nos = 0.00 Nos

= × 4.00 Nos = 0.00 Nos

= 0.00 Nos

Qty = - Nos x 0.50 Rft x 0.42 Rft x 0.33 = 0.00 Cft


= 31.60 Cft
= 0.89 Cum
= 90.53 Cum
@Tk = 17,000.00 P/Cum Tk= 1,539,016.88
iii). 2nd Floor.
Add, = 112.26 Cum
Academic Bldg
False Col C5 = 6 × 1.33 Rft × 1.33 Rft × 3.00 Rft = 31.84 Cft
C7 = 5 × 1.00 Rft × 1.50 Rft × 3.00 Rft = 22.50 Cft
= 54.34 Cft
= 1.54 Cum
Concrete Presigm for Window
Academic Bldg
Second Floor
W = 37 × 8.00 Nos = 296.00 Nos

Page 202
HW = 3 × 4.00 Nos = 12.00 Nos

= 308.00 Nos

Qty = 308.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 21.34 Cft
For Hostel Bldg
Second Floor
= × 8.00 Nos = 0.00 Nos

= × 8.00 Nos = 0.00 Nos

= × 4.00 Nos = 0.00 Nos

= 0.00 Nos

Qty = - Nos x 0.50 Rft x 0.42 Rft x 0.33 = 0.00 Cft


= 21.34 Cft
= 0.60 Cum
= 114.41 Cum
@Tk = 17,000.00 P/Cum Tk= 1,944,929.22
iv). 3rd Floor.
BF Qty = 52.00 Cum
For Hostel Bldg
Concrete Presigm for Door Chowkat
Third Floor
D40 = 22 × 8.00 Nos = 176.00 Nos

D30 = 32 × 8.00 Nos = 256.00 Nos

Cat door = 4 × 4.00 Nos = 16.00 Nos

= 448.00 Nos

Qty = 448.00 Nos x 0.50 Rft x 0.42 Rft x 0.33 = 31.05 Cft

Concrete Presigm for Window


third Floor
= × 8.00 Nos = 0.00 Nos

= × 8.00 Nos = 0.00 Nos

= × 4.00 Nos = 0.00 Nos

= 0.00 Nos

Qty = - Nos x 0.50 Rft x 0.42 Rft x 0.33 = 0.00 Cft


= 31.05 Cft
= 0.88 Cum
= 52.88 Cum
@Tk = 17,000.00 P/Cum Tk= 898,916.96
v). 4th Floor.
= 15.91 Cum
Sch.Qty = 1.50 Cum
@Tk = 17,000.00 P/Cum Tk= 25,500.00
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Below PL level and in Ground Floor.
= 1956.82 Sqm

Page 203
@Tk = 450.00 P/Sqm Tk= 880,568.03
ii). 1st Floor.
Qty = 898.52 Sqm
@Tk = 450.00 P/Sqm Tk= 404,333.36
iii). 2nd Floor.
= 987.04 Sqm
Add, Academic Bldg
False Col C5 = 6 × 5.33 Rft × 3.00 Rft = 95.94 Sft
C7 = 5 × 5.00 Rft × 3.00 Rft = 75.00 Sft
= 170.94 Sft
= 15.89 Sqm
= 1002.92 Sqm
@Tk = 450.00 P/Sqm Tk= 451,315.71
iv). 3rd Floor.
= 626.10 Sqm
@Tk = 450.00 P/Sqm Tk= 281,745.17
v). 4th Floor.
= 1761.18 Sft = 163.68 sqm
Sch.Qty = 18.00 sqm
@Tk = 450.00 P/Sqm Tk= 8,100.00
D. Beam: (Tee-beam, Ell beam, Rib-beam rectangular beam)
a). Concrete.
i) Gr.Floor
= 95.51 Cum
@Tk = 18,000.00 P/Cum Tk= 1,719,263.37
ii) 1st. Floor
BF Qty = 102.39 cum
Sch.Qty = 94.12 cum
@Tk = 18,000.00 P/Cum Tk= 1,694,160.00
iii) 2nd. Floor
BF Qty = 93.50 cum
@Tk = 18,000.00 P/Cum Tk= 1,683,016.23
iv). 3rd Floor
= 55.38 Cum
Sch.Qty = 43.85 cum
@Tk = 18,000.00 P/Cum Tk= 789,300.00
V). 4th Floor
For Hostel Bldg
Pent House,PB1 = × Rft × Rft x Rft = 0.00 Cft
PB2 = × Rft × Rft x Rft = 0.00 Cft
= 0.00 Cft
= 0.00 cum

Page 204
@Tk = 18,000.00 P/Cum Tk= -
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF. Qty = 1166.09 Sqm
@Tk = 500.00 P/Sqm Tk= 583,047.28
ii). 1st. Floor
BF Qty = 1117.85 Sqm
@Tk = 500.00 P/Sqm Tk= 558,926.86
iv). 2nd. Floor
BF Qty = 956.67 Sqm
@Tk = 500.00 P/Sqm Tk= 478,334.63
iv). 3rd Floor
= 560.57 Sqm
Sch.Qty = 526.20 Sqm
@Tk = 500.00 P/Sqm Tk= 263,100.00
V). 4th Floor
For Hostel Bldg
Pent House,PB1 = × Rft × Rft = 0.00 Sft

PB2 = × Rft × Rft = 0.00 Sft

= 0.00 Sft = 0.00 Sqm


@Tk = 500.00 P/Sqm Tk= -
E. Lintel & Tie Beam
a). Concrete.
i). Gr.Floor
Qty = 22.66 Cum
@Tk = 12,000.00 P/Cum Tk= 271,929.35
ii). 1st Floor
BF Qty = 17.87 Cum
@Tk = 12,000.00 P/Cum Tk= 214,413.71
iii).2nd Floor
= 569.99 Cft
= 16.14 Cum
@Tk = 12,000.00 P/Cum Tk= 193,709.40
iv). 3rd Floor
Hostel Bldg
Same measurement at 2nd. Floor Qty = 343.93 Cft
= 9.74 Cum
Sch.Qty = 9.50 Cum
@Tk = 12,000.00 P/Cum Tk= 114,000.00
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
Qty = 377.57 Sqm

Page 205
Sch.Qty = 288.00 Sqm
@Tk = 400.00 P/Sqm Tk= 115,200.00
ii). 1st Floor
Qty = 249.39 Sqm
Sch.Qty = 225.00 Sqm
@Tk = 400.00 P/Sqm Tk= 90,000.00
iii).2nd Floor
Qty = 220.24 Sqm
Sch.Qty = 198.00 Sqm
@Tk = 400.00 P/Sqm Tk= 79,200.00
iv). 3rd Floor
Hostel Bldg
Same measurement at 2nd Floor = 1417.61 Sft
= 131.75 Sqm
Sch.Qty = 114.00 Sqm
@Tk = 400.00 P/Sqm Tk= 45,600.00
F. Floor & Roof slab
a). Concrete.
i). Gr.Floor
Qty = 209.39 Cum
Sch.Qty = 207.91 Cum
@Tk = 20,000.00 P/Cum Tk= 4,158,200.00
ii). 1st Floor
Qty = 213.84 Cum
Sch.Qty = 208.87 Cum
@Tk = 20,000.00 P/Cum Tk= 4,177,400.00
iii). 2nd Floor
Qty = 171.90 Cum
@Tk = 20,000.00 P/Cum Tk= 3,437,991.43
iv). 3rd Floor
Qty = 109.70 Cum
@Tk = 20,000.00 P/Cum Tk= 2,194,080.45
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
BF Qty = 1846.60 Sqm
@Tk = 600.00 P/Sqm Tk= 1,107,962.06
ii).1st Floor
BF Qty = 1922.09 Sqm
@Tk = 500.00 P/Sqm Tk= 961,047.35
iii). 2nd Floor
= 1597.56 Sqm
@Tk = 500.00 P/Sqm Tk= 798,779.69
iv). 3rd Floor

Page 206
= 1110.60 Sqm
@Tk = 500.00 P/sqm Tk= 555,302.34
G. Sunshade, drop wall, railing shelves, cornice, louver, fins, parapet etc.
a). Concrete.
i). Gr.Floor
= 14.58 Cum
Sch.Qty = 9.75 Cum
@Tk = 12,000.00 P/Cum Tk= 117,000.00
ii). 1st.Floor
= 15.19 Cum
Sch.Qty = 13.60 Cum
@Tk = 12,000.00 P/Cum Tk= 163,200.00
iii). 2nd.Floor
= 416.18 Cft
Qty = 11.79 Cum
@Tk = 12,000.00 P/Cum Tk= 141,437.04
iv). 3rd.Floor
Hostel Bldg
Qty Same as 2nd. Floor Qty = 358.74 Cft
= 10.16 Cum
Sch.Qty = 10.00 Cum
@Tk = 12,000.00 P/Cum Tk= 120,000.00
b). Formwork/Shuttering.prop and necessary suports including curing etc.
i). Gr.Floor
= 192.16 Sqm
Sch.Qty = 117.00 Sqm
@Tk = 400.00 P/Sqm Tk= 46,800.00
ii). 1st.Floor
Qty = 340.91 Sqm
Sch.Qty = 163.20 Sqm
@Tk = 400.00 P/Sqm Tk= 65,280.00
iii). 2nd.Floor
Qty = 273.64 Sqm
Sch.Qty = 150.00 Sqm
@Tk = 400.00 P/Sqm Tk= 60,000.00
iv). 3rd.Floor
Hostel Bldg
Qty Same as 2nd Floor Qty = 2,412.95 Sft
Qty = 224.25 Sqm
Sch.Qty = 120.00 Sqm
@Tk = 400.00 P/Sqm Tk= 48,000.00
H. In stair case, slab & steps, ramp etc
a). Concrete.

Page 207
i). Gr.Floor
BF Qty = 19.48 Cum
Sch Qty = 16.00 Cum
@Tk = 12,000.00 P/Cum Tk= 192,000.00

ii). 1st.Floor
Qty = 13.20 Cum
Sch Qty = 12.40 Cum
@Tk = 12,000.00 P/Cum Tk= 148,800.00
iii). 2nd.Floor
Qty = 13.20 Cum
Sch Qty = 12.15 Cum
@Tk = 12,000.00 P/Cum Tk= 145,800.00
iv). 3rd.Floor
Hostel Bldg
Same Qty at 2nd.Floor Qty = 9.97 Cum
Sch Qty = 9.65 Cum
@Tk = 12,000.00 P/Cum Tk= 115,800.00
b) Formwork/Shuttering
i). Gr.Floor
ST. Qty = 156.02 sqm
Add, Hostel Bldg
Entry Beam
Academic Bldg = 1 × 1 Rft × 20.50 Rft × 3.50 Rft = 71.75 Sft

Hostel Bldg = 1 × 1 Rft × 21.67 Rft × 3.50 Rft = 75.85 Sft

= 147.60 Sft
= 13.72 sqm
Total Qty = 169.74 sqm
@Tk = 400.00 P/sqm Tk= 67,895.14
ii). First Floor
For Academic Bldg
Same Qty at Gr.For Qty = 24.47 Cum
For Hostel Bldg
Same Qty at Gr.For Qty = 71.27 Cum
BF Qty = 95.74 sqm
@Tk = 400.00 P/sqm Tk= 38,295.07
iii). 2nd Floor
BF Qty = 95.74 sqm
@Tk = 400.00 P/sqm Tk= 38,295.07
iv). 3rd.Floor
For Hostel Bldg
Same Qty at 2nd.Floor Qty = 71.27 sqm
@Tk = 400.00 P/sqm Tk= 28,507.25

Page 208
SL No-1.17 Supplying fabrication and fixing to details as per design deform bar

a).40 grade deformed bar


Footing
CF1
12 mm Ø/ M = 1 × 78 Nos × 5.00 Rft = 390.00 Rft

" = 1 × 8 Nos × 25.33 Rft = 202.64 Rft

" = 1 × 8 Nos × 1.58 Rft = 12.64 Rft

= 605.28 Rft = 164.24 kg

Beam
20 mmØ ST = 1 × 12 Nos × 26.33 Rft = 315.96 Rft

" = 1 × 12 Nos × 2.67 Rft = 32.04 Rft

348.00 Rft = 262.06 kg


10 mmØ Strp = 1 × 78 Nos × 7.00 Rft = 546.00 Rft

" = 1 × 78 Nos × 6.33 Rft = 493.74 Rft

= 1,039.74 Rft = 196.54 kg

CF2
12 mm Ø/ M = 1 × 78 Nos × 5.50 Rft = 429.00 Rft

" = 1 × 8 Nos × 25.33 Rft = 202.64 Rft

" = 1 × 8 Nos × 1.58 Rft = 12.64 Rft

= 644.28 Rft = 174.82 kg

Beam
20 mmØ ST = 1 × 12 Nos × 26.33 Rft = 315.96 Rft

" = 1 × 12 Nos × 2.67 Rft = 32.04 Rft

348.00 Rft = 262.06 kg


10 mmØ Strp = 1 × 78 Nos × 7.00 Rft = 546.00 Rft

" = 1 × 78 Nos × 6.33 Rft = 493.74 Rft

= 1,039.74 Rft = 196.54 kg

CF3
16 mm Ø/ M = 2 × 61 Nos × 6.50 Rft = 793.00 Rft = 381.99 kg
12 mm Ø/ M = 2 × 8 Nos × 25.33 Rft = 405.28 Rft

" = 2 × 8 Nos × 1.58 Rft = 25.28 Rft

= 430.56 Rft = 116.83 kg

Beam
20 mmØ ST = 2 × 11 Nos × 26.33 Rft = 579.26 Rft

" = 2 × 11 Nos × 2.67 Rft = 58.74 Rft

= 638.00 Rft = 480.45 kg


16 mm Ø/ M = 1 × 4 Nos × 26.33 Rft = 105.32 Rft

= 1 × 4 Nos × 2.17 Rft = 8.68 Rft

= 114.00 Rft = 54.91 kg

Page 209
10 mmØ Strp = 1 × 78 Nos × 7.00 Rft = 546.00 Rft

" = 1 × 78 Nos × 6.33 Rft = 493.74 Rft

= 1,039.74 Rft = 196.54 kg


= 2486.97 kg
Col Upto FGL
C1
16 mm Ø/ M = 4 × 6 Nos × 13.00 Rft = 312.00 Rft

C2
16 mm Ø/ M = 5 × 8 Nos × 13.00 Rft = 520.00 Rft

= 832.00 Rft = 400.78 kg


10 mmØ Strp = 9 × 28 Nos × 3.50 Rft = 882.00 Rft = 166.72 kg
Above FGL
C1
16 mm Ø/ M = 4 × 6 Nos × 14.92 Rft = 358.08 Rft

= 4 × 6 Nos × 2.17 Rft = 52.08 Rft

C2
16 mm Ø/ M = 5 × 8 Nos × 14.92 Rft = 596.80 Rft

= 5 × 8 Nos × 2.17 Rft = 86.80 Rft

= 1,093.76 Rft = 526.87 kg


10 mmØ Strp = 9 × 36 Nos × 3.50 Rft = 1,134.00 Rft = 214.35 kg
= 1308.73 kg
Plinth Beam
PFB1
16 mmØ ST = 2 × 6 Nos × 22.83 Rft = 273.96 Rft

" = 2 × 6 Nos × 2.17 Rft = 26.04 Rft

= 300.00 Rft = 144.51 kg


10 mmØ Strp = 2 × 45 Nos × 5.67 Rft = 510.30 Rft

= 2 × 2 Nos × 21.83 Rft = 87.32 Rft

" = 2 × 2 Nos × 1.33 Rft = 5.32 Rft

= 602.94 Rft = 113.97 kg


PFB2
20 mmØ ST = 1 × 4 Nos × 22.83 Rft = 91.32 Rft

" = 1 × 4 Nos × 2.67 Rft = 10.68 Rft

= 102.00 Rft = 76.81 kg


16 mmØ ST = 1 × 2 Nos × 22.83 Rft = 45.66 Rft

" = 1 × 2 Nos × 2.17 Rft = 4.34 Rft

= 50.00 Rft = 24.09 kg


10 mmØ Strp = 1 × 45 Nos × 4.25 Rft = 191.25 Rft = 36.15 kg
PFB3
20 mmØ ST = 2 × 4 Nos × 18.67 Rft = 149.36 Rft = 112.48 kg
16 mmØ ST = 2 × 4 Nos × 27.00 Rft = 216.00 Rft

Ext/End = 2 × 1 Nos × 3.67 Rft = 7.34 Rft

" = 2 × 2 Nos × 4.75 Rft = 19.00 Rft

Ext/Bott = 2 × 1 Nos × 8.08 Rft = 16.16 Rft

Page 210
" = 2 × 1 Nos × 10.58 Rft = 21.16 Rft

= 279.66 Rft = 134.71 kg


10 mmØ Strp = 2 × 53 Nos × 4.25 Rft = 450.50 Rft = 85.16 kg
PFB4
20 mmØ ST = 1 × 4 Nos × 18.67 Rft = 74.68 Rft = 56.24 kg
16 mmØ ST = 1 × 4 Nos × 27.00 Rft = 108.00 Rft

Ext/End = 1 × 1 Nos × 3.67 Rft = 3.67 Rft

" = 1 × 1 Nos × 4.75 Rft = 4.75 Rft

Ext/Bott = 1 × 1 Nos × 8.08 Rft = 8.08 Rft

" = 1 × 2 Nos × 10.58 Rft = 21.16 Rft

= 145.66 Rft = 70.17 kg


10 mmØ Strp = 1 × 53 Nos × 4.25 Rft = 225.25 Rft = 42.58 kg
= 896.86 kg
Plinth Slab
E/W
10mmØ ST = 1 × 41 Nos × 25.83 Rft = 1,059.03 Rft

Cut = 1 × 40 Nos × 10.67 Rft = 426.80 Rft

= 1 × 20 Nos × 8.08 Rft = 161.60 Rft

Ext/end = 1 × 41 Nos × 3.83 Rft = 157.03 Rft

= 1 × 41 Nos × 5.25 Rft = 215.25 Rft

Ext/Mid = 1 × 61 Nos × 8.83 Rft = 538.63 Rft

Binder = 1 × 26 Nos × 25.83 Rft = 671.58 Rft

= 3,229.92 Rft = 610.53 kg


N/S
10mmØ ST = 1 × 49 Nos × 21.67 Rft = 1,061.83 Rft

10mmØ ST = 1 × 48 Nos × 8.42 Rft = 404.16 Rft

Cut = 1 × 48 Nos × 7.17 Rft = 344.16 Rft

= 1 × 49 Nos × 4.00 Rft = 196.00 Rft

Ext/end = 2 × 49 Nos × 6.50 Rft = 637.00 Rft

= 2 × 73 Nos × 7.25 Rft = 1,058.50 Rft

Ext/Mid = 1 × 22 Nos × 21.67 Rft = 476.74 Rft

Binder = 4,178.39 Rft = 789.82 kg


= 1400.35 kg
Roof Beam
FB1
16 mmØ ST = 2 × 4 Nos × 22.83 Rft = 182.64 Rft = 87.98 kg
10 mmØ Strp = 2 × 45 Nos × 3.67 Rft = 330.30 Rft = 62.43 kg
FB2
16 mmØ ST = 1 × 6 Nos × 22.83 Rft = 136.98 Rft = 65.98 kg
10 mmØ Strp = 1 × 45 Nos × 3.67 Rft = 165.15 Rft = 31.22 kg
FB2
16 mmØ ST = 2 × 6 Nos × 27.00 Rft = 324.00 Rft = 156.07 kg
10 mmØ Strp = 2 × 52 Nos × 3.67 Rft = 381.68 Rft = 72.15 kg
FB3

Page 211
16 mmØ ST = 1 × 4 Nos × 27.00 Rft = 108.00 Rft

Ext/End = 1 × 1 Nos × 4.75 Rft = 4.75 Rft

Ext/Mid = 1 × 2 Nos × 8.67 Rft = 17.34 Rft

Ext/Bott = 1 × 1 Nos × 10.58 Rft = 10.58 Rft

= 140.67 Rft = 67.76 kg


10 mmØ Strp = 1 × 52 Nos × 3.67 Rft = 190.84 Rft = 36.07 kg
= 579.67 kg
Roof Slab
Same measurement at Plinth Slab,Qty = 1400.35 kg
Cornice
10 mmØ ST = 2 × 60 Nos × 1.50 Rft = 180.00 Rft

Ext/End = 2 × 51 Nos × 1.50 Rft = 153.00 Rft

Binder = 2 × 4 Nos × 29.17 Rft = 233.36 Rft

Binder = 2 × 4 Nos × 25.00 Rft = 200.00 Rft

= 766.36 Rft = 144.86 kg


= 1545.21 kg
Lintel
12 mmØ ST,Wind = 1 × 4 Nos × 5.83 Rft = 23.32 Rft = 6.33 kg
10 mmØ ST,D40 = 2 × 4 Nos × 3.67 Rft = 29.36 Rft

10 mmØ ST,D30 = 2 × 4 Nos × 2.83 Rft = 22.64 Rft

10 mmØ ST,Gap = 1 × 4 Nos × 10.08 Rft = 40.32 Rft

= 92.32 Rft = 17.45 kg


16 mmØ,Generat = 1 × 4 Nos × 17.58 Rft = 70.32 Rft = 33.87 kg

10 mmØ Strp = 4 × 23 Nos × 2.17 Rft = 199.64 Rft

= 2 × 18 Nos × 1.67 Rft = 60.12 Rft

= 1 × 6 Nos × 1.67 Rft = 10.02 Rft

= 1 × 21 Nos × 1.67 Rft = 35.07 Rft

= 1 × 36 Nos × 2.83 Rft = 101.88 Rft

= 406.73 Rft = 76.88 kg


= 134.53 kg
Sunshade = 4 × 13 Nos × 1.67 Rft = 86.84 Rft

= 4 × 3 Nos × 5.83 Rft = 69.96 Rft

= 156.80 Rft = 29.64 kg


= 8381.96 kg
@Tk = 80.00 P/Kg Tk= 670,556.73
b).60 grade deformed bar
= 616,633.16 kg
@Tk = 90.00 P/Kg Tk= 55,496,984.21
SL No-1.18 Casting and Testing work of Concrete cylinder (size 150 x 300 mm)
Sch.Qty = 72.00 Set
@Tk = 1,000.00 P/Each Tk= 72,000.00
SL No-1.19 Brick work in super structure 250mm thick wall
a. Exposed brick work in superstructure in (1:4) with special quality sorted out 1st class brick

Page 212
i. Ground Floor
= 225.66 Cum
@Tk = 7,200.00 P/cum Tk= 1,624,722.98
ii. 1st Floor
For Academic Bldg
= 176.83 Cum
@Tk = 7,200.00 P/cum Tk= 1,273,174.33
iii. 2nd Floor
= 143.12 Cum
Sch.Qty = 132.00 Cum
@Tk = 7,200.00 P/cum Tk= 950,400.00
iv. 3rd Floor
For Hostel Bldg
Same measurement at 2nd.Floor,Qty = 4,305.33 Sft x 0.83 = 3,573.42 Cft
= 101.20 Cum
@Tk = 7,200.00 P/cum Tk= 728,650.04
b. In (1:6) proportion for non exposed brick wall.
i. Ground Floor
= 118.14 Cum
Sch.Qty = 88.50 Cum
@Tk = 6,800.00 P/cum Tk= 601,800.00
ii. 1st Floor
= 51.91 Cum
Sch.Qty = 44.00 Cum
@Tk = 6,800.00 P/cum Tk= 299,200.00
iii. 2nd Floor
= 55.54 Cum
Sch.Qty = 44.00 Cum
@Tk = 6,800.00 P/cum Tk= 299,200.00
iv. 3rd Floor
= 49.18 Cum
Sch.Qty = 26.00 Cum

@Tk = 6,800.00 P/cum Tk= 176,800.00


v. 4th Floor
Hostel Bldg
Roof Expansion = 4 × 17.08 Rft x 1.00 Rft x 0.83 Rft = 56.71 Cft
= 1.61 Cum
@Tk = 6,800.00 P/cum Tk= 10,920.36
SL No-1.20 125mm thick brick work in (1:4)
a Exposed brick work 125mm thick in (1:4)
i. Ground Floor
For Hostel Bldg
Duct = 2 × 12.17 Rft x 10.58 Rft = 257.52 Sft
= 2 × 8.50 Rft x 10.58 Rft = 179.86 Sft
= 2 × 7.67 Rft x 10.58 Rft = 162.30 Sft

Page 213
= 599.67 Sft = 55.73 Sqm
@Tk = 900.00 P/sqm Tk= 50,158.64
ii. 1st Floor
For Hostel Bldg
Qty Same as Gr.Floor,Qty = 599.67 Sft = 55.73 Sqm
@Tk = 900.00 P/sqm Tk= 50,158.64
iii. 2nd Floor
For Hostel Bldg
Qty Same as 1st.Floor,Qty = 599.67 Sft = 55.73 Sqm
@Tk = 900.00 P/sqm Tk= 50,158.64
iv. 3rd Floor
For Hostel Bldg
Qty Same as 2nd.Floor,Qty = 599.67 Sft = 55.73 Sqm
Sch.Qty = 45.00 Sqm
@Tk = 900.00 P/sqm Tk= 40,500.00
b On-Exposed brick work 125mm thick in (1:4)
i. Ground Floor
Total Qty = 10,141.09 Sft = 942.48 Sqm
Sch.Qty = 707.00 Sqm
@Tk = 850.00 P/sqm Tk= 600,950.00
ii. 1st Floor
Total Qty = 9,458.23 Sft = 879.02 Sqm
Sch.Qty = 502.00 Sqm
@Tk = 850.00 P/sqm Tk= 426,700.00
iii. 2nd Floor
= 9,579.32 Sft = 890.27 Sqm
Sch.Qty = 469.00 Sqm
@Tk = 850.00 P/sqm Tk= 398,650.00
iv. 3rd Floor
= 8,007.76 Sft = 744.22 Sqm
Sch.Qty = 392.00 Sqm
@Tk = 850.00 P/sqm Tk= 333,200.00
SL No-1.21 Raised/Tack pointing work to brick wall with cement sand mortar (1:2) with fresh cement minimum
12x20mm in size in/c. raking out the joints etc. all complete.
i. Ground Floor
Principal Qtr Ref Item No - 1.19 a = 1,157.71 Sft
Academic Bldg Ref Item No - 1.19 a = 3,340.29 Sft
Hostel Bldg Ref Item No - 1.19 a = 5,101.89 Sft
Ref Item No - 1.20 a = 599.67 Sft
= 10,199.57 Sft = 947.92 Sqm
@Tk = 250.00 P/sqm Tk= 236,978.83
ii. 1st. Floor
Academic Bldg Ref Item No - 1.19 a = 3,217.40 Sft
Hostel Bldg Ref Item No - 1.19 a = 4,305.33 Sft

Page 214
Ref Item No - 1.20 a = 599.67 Sft
= 8,122.40 Sft = 754.87 Sqm
@Tk = 250.00 P/sqm Tk= 188,717.38
iii. 2nd. Floor
Academic Bldg Ref Item No - 1.19 a = 1,783.43 Sft
Hostel Bldg Ref Item No - 1.19 a = 4,305.33 Sft
Ref Item No - 1.20 a = 599.67 Sft
= 6,688.43 Sft = 621.60 Sqm
Sch.Qty = 606.89 Sqm
@Tk = 250.00 P/sqm Tk= 151,722.50
iv. 3rd. Floor
Hostel Bldg Ref Item No - 1.19 a = 4,305.33 Sft
Ref Item No - 1.20 a = 599.67 Sft
= 4,905.00 Sft = 455.86 Sqm
Sch.Qty = 448.28 Sqm
@Tk = 250.00 P/sqm Tk= 112,070.00
SL No-1.23 38 mm thick artificial patent stone (1:2:4) flooring with (50% coarse sand F.M. 2.2 and 50% local sand
F.M. 1.2) brick chips etc. all complete.

i. Gr.Floor
Academic Bldg
Lecture Hall = 12 × 44.00 Rft x 3.25 Rft = 1,716.00 Sft
= 1 × 49.00 Rft x 3.67 Rft = 179.83 Sft
= 1,895.83 Sft = 176.19 Sqm
Sub-Station
Operator Room = 1 × 9.58 Rft x 9.00 Rft = 86.22 Sft
Generator = 1 × 9.58 Rft x 10.83 Rft = 103.75 Sft
X-former = 1 × 14.17 Rft x 20.00 Rft = 283.40 Sft
Ramp = 1 × 18.58 Rft x 5.00 Rft = 92.90 Sft
= 566.27 Sft = 52.63 Sqm
= 228.82 Sqm
Sch.Qty = 57.00 Sqm
@Tk = 350.00 P/sqm Tk= 19,950.00
SL No-1.24 Tiles Works
a. Supplying, fitting and fixing unglazed homogeneous floor tiles (size 400 mm x 400 mm local
made)

Academic Bldg
Gr.Floor
Prof. Room = 1 × 20.33 Rft x 17.50 Rft = 355.78 Sft
Demonst = 1 × 20.58 Rft x 17.50 Rft = 360.15 Sft
Admin = 1 × 20.58 Rft x 17.50 Rft = 360.15 Sft
= 1 × 20.67 Rft x 17.50 Rft = 361.73 Sft
Suptd = 2 × 15.58 Rft x 17.50 Rft = 545.30 Sft
Deduct,TLT = 4 × 4.58 Rft x 6.00 Rft = -109.92 Sft
Accounts = 2 × 10.58 Rft x 17.50 Rft = 370.30 Sft
Office = 1 × 20.33 Rft x 17.50 Rft = 355.78 Sft

Page 215
Passege = 1 × 10.58 Rft x 11.08 Rft = 117.23 Sft
Entrance Hall = 1 × 29.92 Rft x 25.67 Rft = 768.05 Sft
Stair Bott = 1 × 10.00 Rft x 17.75 Rft = 177.50 Sft
Corridoor = 1 × 100.50 Rft x 9.42 Rft = 946.71 Sft
Stage = 1 × 21.00 Rft x 8.83 Rft = 185.43 Sft
= 2 × 9.75 Rft x 9.58 Rft = 186.81 Sft
= 1 × 40.00 Rft x 9.75 Rft = 390.00 Sft
= 1 × 42.50 Rft x 39.92 Rft = 1,696.60 Sft
Cobla,D40 = 9 × 3.33 Rft x 0.50 Rft = 14.99 Sft
D36 = 1 × 3.00 Rft x 0.50 Rft = 1.50 Sft
Col = 44 × 0.50 Rft x 0.50 Rft = 11.00 Sft
= 2 × 5.33 Rft x 0.50 Rft = 5.33 Sft
Landing = 3 × 9.50 Rft x 4.50 Rft = 128.25 Sft
= 1 × 9.50 Rft x 2.33 Rft = 22.14 Sft
Deduct,D40 = 9 × 3.33 Rft x 0.50 Rft = -14.99 Sft
D36 = 1 × 3.00 Rft x 0.50 Rft = -1.50 Sft
D30 = 7 × 2.50 Rft x 0.50 Rft = -8.75 Sft
Col = 2 × 1.33 Rft x 1.33 Rft = -3.54 Sft
= 7,222.01 Sft
First Floor
Museum = 1 × 40.33 Rft x 17.50 Rft = 705.78 Sft
Anatomy = 1 × 30.58 Rft x 17.50 Rft = 535.15 Sft
Store = 1 × 10.33 Rft x 17.50 Rft = 180.78 Sft
Demonst = 1 × 40.58 Rft x 17.50 Rft = 710.15 Sft
= 1 × 40.33 Rft x 17.50 Rft = 705.78 Sft
Stair lobby = 1 × 10.00 Rft x 4.25 Rft = 42.50 Sft
Lobby = 2 × 29.83 Rft x 26.17 Rft = 1,561.30 Sft
Store & Light Rm = 2 × 9.58 Rft x 10.17 Rft = 194.86 Sft
Corridoor = 2 × 100.50 Rft x 9.42 Rft = 1,893.42 Sft
Cobla,D40 = 10 × 3.33 Rft x 0.50 Rft = 16.65 Sft
D36 = 2 × 3.00 Rft x 0.50 Rft = 3.00 Sft
Col = 44 × 0.50 Rft x 0.50 Rft = 11.00 Sft
= 2 × 5.33 Rft x 0.50 Rft = 5.33 Sft
Store = 2 × 4.08 Rft x 8.17 Rft = 66.67 Sft
Deduct,D40 = 10 × 3.33 Rft x 0.50 Rft = -16.65 Sft
D36 = 2 × 3.00 Rft x 0.50 Rft = -3.00 Sft
Col = 2 × 1.33 Rft x 1.33 Rft = -3.54 Sft
= 6,609.16 Sft
2nd Floor
Conference = 1 × 30.33 Rft x 17.50 Rft = 530.78 Sft
Guest = 1 × 30.58 Rft x 17.50 Rft = 535.15 Sft
Dress = 1 × 9.58 Rft x 8.00 Rft = 76.64 Sft
G.Store = 1 × 30.33 Rft x 17.50 Rft = 530.78 Sft
Library = 1 × 50.58 Rft x 17.50 Rft = 885.15 Sft

Page 216
Store = 1 × 10.67 Rft x 17.50 Rft = 186.73 Sft
Stair Lobby = 1 × 10.00 Rft x 4.25 Rft = 42.50 Sft
Corridoor = 2 × 100.50 Rft x 9.42 Rft = 1,893.42 Sft
Cobla,D40 = 8 × 3.33 Rft x 0.50 Rft = 13.32 Sft
D36 = 1 × 3.00 Rft x 0.50 Rft = 1.50 Sft
Col = 44 × 0.50 Rft x 0.50 Rft = 11.00 Sft
Deduct,D40 = 8 × 3.33 Rft x 0.50 Rft = -13.32 Sft
D36 = 1 × 3.00 Rft x 0.50 Rft = -1.50 Sft
= 4,692.14 Sft
Qty = 18,523.30 Sft = 1721.50 Sqm
Hostel Bldg
Gr.Floor
Visitor Wait = 1 × 19.50 Rft x 13.58 Rft = 264.81 Sft
Admin Office = 1 × 13.42 Rft x 13.58 Rft = 182.24 Sft
Accounts = 1 × 13.00 Rft x 13.58 Rft = 176.54 Sft
= 4 × 5.67 Rft x 2.42 Rft = 54.89 Sft
Super Rm = 1 × 19.17 Rft x 13.58 Rft = 260.33 Sft
= 1 × 15.67 Rft x 5.83 Rft = 91.36 Sft
Store Room = 1 × 26.92 Rft x 13.58 Rft = 365.57 Sft
ST.Keeper = 1 × 13.42 Rft x 13.58 Rft = 182.24 Sft
Prayer = 1 × 26.25 Rft x 13.58 Rft = 356.48 Sft
Bulk Store = 1 × 14.17 Rft x 13.50 Rft = 191.30 Sft
Ver = 2 × 14.17 Rft x 9.25 Rft = 262.15 Sft
Foyer = 2 × 8.50 Rft x 17.50 Rft = 297.50 Sft
Stair Lobby = 2 × 8.50 Rft x 17.67 Rft = 300.39 Sft
Passage = 1 × 171.17 Rft x 9.17 Rft = 1,569.63 Sft
Ablution = 1 × 13.33 Rft x 6.00 Rft = 79.98 Sft
= 1 × 17.00 Rft x 3.50 Rft = 59.50 Sft
Corridoor = 1 × 127.17 Rft x 12.67 Rft = 1,611.24 Sft
Cup Board = 19 × 6.96 Rft x 2.17 Rft = 286.96 Sft
Dining = 1 × 35.17 Rft x 39.33 Rft = 1,383.24 Sft
Kitchen = 1 × 22.42 Rft x 17.58 Rft = 394.14 Sft
Cook's Room = 1 × 10.17 Rft x 11.42 Rft = 116.14 Sft
Pantry = 1 × 10.33 Rft x 17.58 Rft = 181.60 Sft
Shelf = 3 × 9.50 Rft x 2.33 Rft = 66.41 Sft
= 2 × 10.00 Rft x 2.33 Rft = 46.60 Sft
Store = 1 × 17.42 Rft x 11.42 Rft = 198.94 Sft
Passage = 1 × 18.50 Rft x 5.25 Rft = 97.13 Sft
Lobby = 1 × 26.67 Rft x 12.67 Rft = 337.91 Sft
Wash = 2 × 24.92 Rft x 14.17 Rft = 706.23 Sft
= 2 × 12.00 Rft x 5.00 Rft = 120.00 Sft
Lobby = 1 × 24.67 Rft x 22.75 Rft = 561.24 Sft
Entry = 1 × 25.67 Rft x 9.75 Rft = 250.28 Sft
Landing = 2 × 8.50 Rft x 4.50 Rft = 76.50 Sft

Page 217
= 1 × 18.08 Rft x 11.83 Rft = 213.89 Sft
Platform Stair = 2 × 11.83 Rft x 17.67 Rft = 418.07 Sft
= 2 × 26.50 Rft x 11.00 Rft = 583.00 Sft
= 2 × 17.42 Rft x 9.75 Rft = 339.69 Sft
Col = 18 × 2.50 Rft x 0.50 Rft = 22.50 Sft
Cobla,D40 = 4 × 5.33 Rft x 0.50 Rft = 10.66 Sft
= 12,717.26 Sft
First Floor
Std. Room = 18 × 13.62 Rft x 13.67 Rft = 3,351.34 Sft
= 2 × 9.33 Rft x 13.67 Rft = 255.08 Sft
Wash = 2 × 12.33 Rft x 8.50 Rft = 209.61 Sft
Ver = 2 × 13.67 Rft x 11.33 Rft = 309.76 Sft
Stair = 2 × 8.00 Rft x 10.17 Rft = 162.72 Sft
Corridoor = 2 × 65.17 Rft x 9.17 Rft = 1,195.22 Sft
= 2 × 43.00 Rft x 15.92 Rft = 1,369.12 Sft
Cup Board = 18 × 5.42 Rft x 2.08 Rft = 202.92 Sft
Ver = 18 × 7.96 Rft x 4.50 Rft = 644.76 Sft
Store = 2 × 14.33 Rft x 8.75 Rft = 250.78 Sft
Lobby = 2 × 24.67 Rft x 22.75 Rft = 1,122.49 Sft
= 2 × 18.67 Rft x 17.25 Rft = 644.12 Sft
Landing = 2 × 8.50 Rft x 4.50 Rft = 76.50 Sft
= 1 × 8.08 Rft x 11.83 Rft = 95.59 Sft
Stair = 2 × 11.83 Rft x 2.67 Rft = 63.17 Sft
= 44 × 2.50 Rft x 0.50 Rft = 55.00 Sft
= 10,008.17 Sft
TV Room = 1 × 21.92 Rft x 28.00 Rft = 613.76 Sft
= 10,621.93 Sft
2nd Floor
Sft Qty Same as 1st Floor Qty = 10,008.17 Sft
3rd Floor
Sft Qty Same as 2nd Floor Qty = 10,008.17 Sft
P.house = 2 × 8.50 Rft x 4.33 Rft = 73.61 Sft
= 1 × 11.83 Rft x 4.33 Rft = 51.22 Sft
= 10,133.00 Sft
Qty = 43,480.36 Sft = 4040.93 Sqm
Principal Qtr
M.Bed Room = 1 × 13.25 Rft x 13.67 Rft = 181.13 Sft
C.Bed Room = 1 × 11.50 Rft x 13.67 Rft = 157.21 Sft
G.Bed = 1 × 12.67 Rft x 12.08 Rft = 153.05 Sft
Living = 1 × 12.25 Rft x 16.17 Rft = 198.08 Sft
Ver = 3 × 10.75 Rft x 5.58 Rft = 179.96 Sft
Family Space = 1 × 14.17 Rft x 9.42 Rft = 133.48 Sft
Dining = 1 × 15.67 Rft x 11.50 Rft = 180.21 Sft
= 1 × 14.33 Rft x 4.92 Rft = 70.50 Sft

Page 218
Wash = 1 × 3.92 Rft x 4.33 Rft = 16.97 Sft
Kitchen = 1 × 9.33 Rft x 9.25 Rft = 86.30 Sft
= 1 × 12.33 Rft x 2.33 Rft = 28.73 Sft
Servent = 1 × 8.08 Rft x 6.67 Rft = 53.89 Sft
Store = 1 × 5.67 Rft x 6.67 Rft = 37.82 Sft
Ver = 2 × 6.17 Rft x 5.00 Rft = 61.70 Sft
Landing = 2 × 5.50 Rft x 8.42 Rft = 92.62 Sft
Lobby = 1 × 18.83 Rft x 6.00 Rft = 112.98 Sft
= 1 × 8.42 Rft x 19.33 Rft = 162.76 Sft
Qty = 1,907.39 Sft = 177.27 Sqm
Total Qty = 5939.69 Sqm
@Tk = 2,050.00 P/Sqm Tk= 12,176,362.65
b. Supplying, fitting and fixing unglazed homogeneous floor tiles (size 300 mm x 300 mm local
made)

Academic Bldg
Gr.Floor
Prof.TLT = 2 × 4.58 Rft x 7.00 Rft = 64.12 Sft
Admin TLT = 2 × 4.58 Rft x 6.00 Rft = 54.96 Sft
Suptd,TLT = 2 × 4.58 Rft x 6.00 Rft = 54.96 Sft
CTLT-1 = 2 × 4.50 Rft x 3.50 Rft = 31.50 Sft
Urinal = 2 × 3.50 Rft x 1.83 Rft = 12.81 Sft
Passage = 1 × 4.42 Rft x 7.83 Rft = 34.61 Sft
= 1 × 6.50 Rft x 6.33 Rft = 41.15 Sft
= 1 × 9.33 Rft x 4.00 Rft = 37.32 Sft
CTLT-2 = 2 × 2.83 Rft x 4.00 Rft = 22.64 Sft
Urinal = 1 × 2.50 Rft x 4.42 Rft = 11.05 Sft
Passage = 1 × 9.58 Rft x 4.75 Rft = 45.51 Sft
= 410.62 Sft
1st. Floor
C.TLT-1 = 2 × 4.50 Rft x 3.50 Rft = 31.50 Sft
Urinal = 2 × 3.50 Rft x 1.83 Rft = 12.81 Sft
Passage = 1 × 4.42 Rft x 7.83 Rft = 34.61 Sft
= 1 × 6.50 Rft x 6.33 Rft = 41.15 Sft
= 1 × 9.33 Rft x 4.00 Rft = 37.32 Sft
C.TLT-2 = 2 × 3.08 Rft x 4.00 Rft = 24.64 Sft
Passage = 1 × 8.58 Rft x 4.75 Rft = 40.76 Sft
Urinal = 2 × 2.00 Rft x 1.83 Rft = 7.32 Sft
= 230.10 Sft
2nd. Floor
TLT = 1 × 9.58 Rft x 8.00 Rft = 76.64 Sft
C.TLT-1 = 2 × 4.50 Rft x 3.50 Rft = 31.50 Sft
Passage = 1 × 4.42 Rft x 7.83 Rft = 34.61 Sft
= 1 × 6.50 Rft x 6.33 Rft = 41.15 Sft
= 1 × 9.33 Rft x 4.00 Rft = 37.32 Sft
= 221.21 Sft

Page 219
Stair
Trade & Riser = 66 × 4.42 Rft x 1.50 Rft = 437.58 Sft
Skirting = 6 × 9.17 Rft x 1.00 Rft = 55.02 Sft
Entry = 5 × 18.50 Rft x 1.50 Rft = 138.75 Sft
= 2 × 4.00 Rft x 1.00 Rft = 8.00 Sft
= 5 × 7.58 Rft x 1.50 Rft = 56.85 Sft
Lecture Hall = 6 × 9.00 Rft x 1.50 Rft = 81.00 Sft
= 2 × 2.50 Rft x 1.00 Rft = 5.00 Sft
= 6 × 2.50 Rft x 1.50 Rft = 22.50 Sft
= 2 × 2.00 Rft x 1.00 Rft = 4.00 Sft
= 808.70 Sft
Qty = 1,670.63 Sft = 155.26 Sqm
Hostel Bldg
Gr.Floor
Supper TLT = 1 × 7.42 Rft x 7.50 Rft = 55.65 Sft
C.TLT = 2 × 6.42 Rft x 5.00 Rft = 64.20 Sft
Wash = 2 × 6.42 Rft x 7.50 Rft = 96.30 Sft
= 2 × 7.50 Rft x 7.92 Rft = 118.80 Sft
Cook.TLT = 1 × 4.75 Rft x 5.00 Rft = 23.75 Sft
WC = 4 × 5.25 Rft x 4.17 Rft = 87.57 Sft
= 1 × 11.33 Rft x 4.00 Rft = 45.32 Sft
= 491.59 Sft
1st. Floor-3rd Floor
C.TLT 3x 12 × 4.17 Rft x 5.00 Rft = 750.60 Sft
3x 2 × 16.25 Rft x 4.00 Rft = 390.00 Sft
Wash 3x 4 × 7.50 Rft x 1.92 Rft = 172.80 Sft
3x 2 × 12.33 Rft x 7.50 Rft = 554.85 Sft
= 1,868.25 Sft
Stair-Step,Riser
Stair-1,2 16 x 11 × 3.33 Rft x 1.50 Rft = 879.12 Sft
2x 8 × 9.17 Rft x 1.00 Rft = 146.72 Sft
Stair-3 8x 12 × 5.00 Rft x 1.50 Rft = 720.00 Sft
8x 1 × 10.08 Rft x 1.00 Rft = 80.64 Sft
Entry 1x 5 × 21.67 Rft x 1.50 Rft = 162.53 Sft
2x 5 × 7.50 Rft x 1.50 Rft = 112.50 Sft
6x 1 × 2.50 Rft x 1.00 Rft = 15.00 Sft
= 2,116.51 Sft
= 4,476.35 Sft = 416.02 Sqm
Principal Qtr
M.Bed TLT = 1 × 8.67 Rft x 5.00 Rft = 43.35 Sft
F.Space TLT = 1 × 4.58 Rft x 8.42 Rft = 38.56 Sft
C.Bed TLT = 1 × 4.25 Rft x 8.75 Rft = 37.19 Sft
Servent TLT = 1 × 3.83 Rft x 3.75 Rft = 14.36 Sft
= 133.46 Sft

Page 220
Stair
Trade & Riser = 22 × 3.50 Rft x 1.50 Rft = 115.50 Sft
Skirting = 2 × 9.17 Rft x 1.00 Rft = 18.34 Sft
Entry = 5 × 3.50 Rft x 1.50 Rft = 26.25 Sft
= 2 × 4.17 Rft x 1.00 Rft = 8.34 Sft
= 168.43 Sft
Qty = 301.89 Sft = 28.06 Sqm
= 599.34 Sqm
Sch.Qty = 480.00 Sqm
@Tk = 1,400.00 P/Sqm Tk= 672,000.00
c. Supplying, fitting and fixing white glazed wall tiles (size 250 mm x 3330 mm local made)

Academic Bldg
Gr.Floor
Prof.TLT = 4 × 11.58 Rft x 7.00 Rft = 324.24 Sft
Admin TLT = 4 × 10.58 Rft x 7.00 Rft = 296.24 Sft
Suptd,TLT = 4 × 10.58 Rft x 7.00 Rft = 296.24 Sft
CTLT-1 = 4 × 8.00 Rft x 7.00 Rft = 224.00 Sft
Urinal = 2 × 8.83 Rft x 7.42 Rft = 131.04 Sft
Passage = 1 × 16.50 Rft x 7.00 Rft = 115.50 Sft
= 2 × 12.00 Rft x 7.00 Rft = 168.00 Sft
= 2 × 19.33 Rft x 7.00 Rft = 270.62 Sft
CTLT-2 = 4 × 17.08 Rft x 7.00 Rft = 478.24 Sft
= 4 × 14.33 Rft x 7.00 Rft = 401.24 Sft
Cobla,HW/24 = 11 × 8.00 Rft x 0.33 Rft = 29.04 Sft
W/50 = 1 × 17.33 Rft x 0.33 Rft = 5.72 Sft
W/45 = 2 × 16.50 Rft x 0.33 Rft = 10.89 Sft
Deduct,D30 = 10 × 2.50 Rft x 7.00 Rft = -175.00 Sft
D36 = 2 × 3.00 Rft x 7.00 Rft = -42.00 Sft
D22 = 2 × 1.83 Rft x 7.00 Rft = -25.62 Sft
HW/24 = 11 × 2.00 Rft x 2.00 Rft = -44.00 Sft
W50 = 1 × 4.17 Rft x 4.50 Rft = -18.77 Sft
W45 = 2 × 3.75 Rft x 4.50 Rft = -33.75 Sft
= 2,411.87 Sft
1 . Floor
st

CTLT-1 = 4 × 8.00 Rft x 7.00 Rft = 224.00 Sft


Urinal = 2 × 8.83 Rft x 7.42 Rft = 131.04 Sft
Passage = 2 × 16.50 Rft x 7.00 Rft = 231.00 Sft
= 2 × 12.00 Rft x 7.00 Rft = 168.00 Sft
= 2 × 9.33 Rft x 7.00 Rft = 130.62 Sft
CTLT-2 = 4 × 17.08 Rft x 7.00 Rft = 478.24 Sft
Urinal = 2 × 9.00 Rft x 7.42 Rft = 133.56 Sft
Passage = 2 × 19.58 Rft x 7.00 Rft = 274.12 Sft
= 2 × 14.75 Rft x 7.00 Rft = 206.50 Sft
Cobla,HW/24 = 1 × 17.33 Rft x 0.33 Rft = 5.72 Sft

Page 221
W/50 = 2 × 16.50 Rft x 0.33 Rft = 10.89 Sft
W/45 = 5 × 8.00 Rft x 0.33 Rft = 13.20 Sft
Deduct,D30 = 4 × 2.50 Rft x 7.00 Rft = -70.00 Sft
W50 = 1 × 4.17 Rft x 4.50 Rft = -18.77 Sft
W45 = 2 × 3.75 Rft x 4.50 Rft = -33.75 Sft
HW/24 = 5 × 2.00 Rft x 2.00 Rft = -20.00 Sft
= 1,864.37 Sft
2nd. Floor
Guest,TLT = 4 × 17.58 Rft x 7.00 Rft = 492.24 Sft
CTL-1 = 4 × 8.00 Rft x 7.00 Rft = 224.00 Sft
Urinal = 2 × 8.83 Rft x 7.42 Rft = 131.04 Sft
Passage = 2 × 16.50 Rft x 7.00 Rft = 231.00 Sft
= 2 × 12.00 Rft x 7.00 Rft = 168.00 Sft
= 4 × 19.33 Rft x 7.00 Rft = 541.24 Sft
Cobla,W50 = 1 × 17.33 Rft x 0.33 Rft = 5.72 Sft
W45 = 2 × 16.50 Rft x 0.33 Rft = 10.89 Sft
HW/24 = 2 × 8.00 Rft x 0.33 Rft = 5.28 Sft
Deduct,W50 = 1 × 4.17 Rft x 4.50 Rft = -18.77 Sft
W45 = 2 × 3.75 Rft x 4.50 Rft = -33.75 Sft
HW/24 = 2 × 2.00 Rft x 2.00 Rft = -8.00 Sft
D30 = 3 × 2.50 Rft x 7.00 Rft = -52.50 Sft
= 1,696.39 Sft
= 5,972.63 Sft = 555.08 Sqm
Hostel Bldg
Gr.Floor
Supper TLT = 2 × 14.92 Rft x 7.00 Rft = 208.88 Sft
Cook.TLT = 2 × 9.75 Rft x 7.00 Rft = 136.50 Sft
CTLT = 4 × 11.42 Rft x 7.00 Rft = 319.76 Sft
Wash = 4 × 13.92 Rft x 7.00 Rft = 389.76 Sft
Ver = 2 × 21.42 Rft x 5.00 Rft = 214.20 Sft
CTLT = 8 × 19.42 Rft x 7.00 Rft = 1,087.52 Sft
Wash = 2 × 34.50 Rft x 5.00 Rft = 345.00 Sft
= 4 × 13.17 Rft x 5.00 Rft = 263.40 Sft
Duct = 4 × 10.00 Rft x 5.00 Rft = 200.00 Sft
Sink = 8 × 16.17 Rft x 3.42 Rft = 442.41 Sft
Cobla,W48 = 12 × 17.00 Rft x 0.33 Rft = 67.32 Sft
W50 = 4 × 17.33 Rft x 0.33 Rft = 22.88 Sft
W60 = 6 × 19.00 Rft x 0.33 Rft = 37.62 Sft
W90 = 4 × 24.00 Rft x 0.33 Rft = 31.68 Sft
HW/24 = 8 × 8.00 Rft x 0.33 Rft = 21.12 Sft
W80 = 4 × 22.33 Rft x 0.33 Rft = 29.48 Sft
Deduct,D30 = 9 × 2.50 Rft x 7.00 Rft = -157.50 Sft
HW/24 = 8 × 2.00 Rft x 2.00 Rft = -32.00 Sft
W48 = 1 × 4.00 Rft x 2.50 Rft = -10.00 Sft

Page 222
W50 = 2 × 4.17 Rft x 2.50 Rft = -20.85 Sft
W90 = 1 × 7.50 Rft x 2.50 Rft = -18.75 Sft
W80 = 1 × 6.67 Rft x 2.00 Rft = -13.34 Sft
= 3,565.08 Sft
1st Floor to 2nd Floor
WC & SH = 36 × 18.33 Rft x 7.00 Rft = 4,619.16 Sft
Wash = 24 × 39.67 Rft x 7.00 Rft = 6,664.56 Sft
Ver = 18 × 46.00 Rft x 5.00 Rft = 4,140.00 Sft
Passage = 12 × 16.25 Rft x 5.00 Rft = 975.00 Sft
Cobla,HW/24 = 24 × 8.00 Rft x 0.33 Rft = 63.36 Sft
W48 = 6 × 17.00 Rft x 0.33 Rft = 33.66 Sft
W50 = 12 × 17.33 Rft x 0.33 Rft = 68.63 Sft
W45 = 6 × 16.50 Rft x 0.33 Rft = 32.67 Sft
W60 = 6 × 19.00 Rft x 0.33 Rft = 37.62 Sft
Deduct,D30 = 36 × 2.50 Rft x 7.00 Rft = -630.00 Sft
HW/24 = 24 × 2.00 Rft x 2.00 Rft = -96.00 Sft
W48 = 6 × 4.00 Rft x 2.50 Rft = -60.00 Sft
W50 = 12 × 4.17 Rft x 2.50 Rft = -125.10 Sft
W45 = 6 × 3.75 Rft x 2.50 Rft = -56.25 Sft
W60 = 6 × 4.92 Rft x 2.50 Rft = -73.80 Sft
= 15,593.51 Sft
= 19,158.59 Sft = 1780.54 Sqm
Principal Qtr
M.Bed TLT = 2 × 13.67 Rft x 7.00 Rft = 191.38 Sft
C.Bed TLT = 2 × 13.00 Rft x 7.00 Rft = 182.00 Sft
F.Space TLT = 4 × 18.00 Rft x 7.00 Rft = 504.00 Sft
Servent TLT = 2 × 7.58 Rft x 7.00 Rft = 106.12 Sft
Kitchen = 2 × 16.58 Rft x 7.00 Rft = 232.12 Sft
Wash = 2 × 12.08 Rft x 7.00 Rft = 169.12 Sft
Cobla,HW/20 = 4 × 7.33 Rft x 0.33 Rft = 9.68 Sft
W60 = 8 × 19.50 Rft x 0.33 Rft = 51.48 Sft
Deduct,D30 = 4 × 2.50 Rft x 7.00 Rft = -70.00 Sft
HW/20 = 4 × 1.67 Rft x 2.00 Rft = -13.36 Sft
= 1,362.54 Sft = 126.63 Sqm
Sub-Station
TLT = 2 × 12.00 Rft x 7.00 Rft = 168.00 Sft
Deduct,D30 = 1 × 2.50 Rft x 7.00 Rft = -17.50 Sft
HW = 1 × 1.67 Rft x 1.67 Rft = -2.79 Sft
= 147.71 Sft = 13.73 Sqm
= 2475.97 Sqm
@Tk = 1,600.00 P/Sqm Tk= 3,961,556.76
SL No-1.25 Wood work in chowkat of door & window with Silkarai wood
For Academic Bldg
BF Qty = 100.51 Cft

Page 223
For Hostel Bldg
D40 = 77 × 17.33 Rft = 1,334.41 Rft

D36 = 1 × 17.00 Rft = 17.00 Rft

D30 = 108 × 16.50 Rft = 1,782.00 Rft

D60 = 6 × 19.00 Rft = 114.00 Rft

= 3,247.41 Rft x 0.50 Rft x 0.21 = 340.98 Cft


D60 = 6 × 7.00 Rft = 42.00 Rft

= 2 × 10.83 Rft = 21.66 Rft

= 63.66 Rft x 0.92 Rft x 0.25 = 14.64 Cft


Cat door = 18 × 11.25 Rft = 202.50 Rft x 0.33 Rft x 0.21 = 14.03 Cft
= 369.65 Cft
Principal Qtr
BF Qty = 27.73 Cft
Sub-Station
D40 = 2 × 17.33 Rft = 34.66 Rft

D30 = 2 × 16.50 Rft = 33.00 Rft

= 67.66 Rft x 0.50 Rft x 0.21 = 7.10 Cft


Total Qty = 504.99 Cft
= 14.30 Cum
Sch.Qty = 13.98 Cum
@Tk = 195,000.00 P/cum Tk= 2,726,100.00
SL No-1.26 Supplying fitting and fixing M.S. flat bar clamp 150 x 38 x 6mm size etc. all complete
and accepted by the Engineer.

Sch.Qty = 1,213.00 Nos


@Tk = 60.00 P/Each Tk= 72,780.00
SL No-1.27 Wooden single leaf door shutter work with 38mm thick in solid wood door with Gamari wood

Academic Bldg
D40 = 27 × 3.00 Rft x 6.83 Rft = 553.23 Sft
D36 = 5 × 2.67 Rft x 6.83 Rft = 91.18 Sft
D30 = 18 × 2.17 Rft x 6.83 Rft = 266.78 Sft
Cat door = 9 × 2.17 Rft x 3.00 Rft = 58.59 Sft
= 969.78 Sft = 90.13 Sqm
Principal Qtr
D40 = 4 × 3.00 Rft x 6.83 Rft = 81.96 Sft
D36 = 1 × 2.67 Rft x 6.83 Rft = 18.24 Sft
D30 = 8 × 2.17 Rft x 6.83 Rft = 118.57 Sft
Cat door = 4 × 2.17 Rft x 2.33 Rft = 20.22 Sft
= 238.99 Sft = 22.21 Sqm
Hostel Bldg
D40 = 17 × 3.00 Rft x 6.83 Rft = 348.33 Sft
D36 = 1 × 2.67 Rft x 6.83 Rft = 18.24 Sft
D30 = 108 × 2.17 Rft x 6.83 Rft = 1,600.68 Sft
Cat door = 6 × 3.00 Rft x 2.17 Rft = 39.06 Sft

Page 224
= 12 × 2.33 Rft x 2.17 Rft = 60.67 Sft
= 2,066.98 Sft = 192.10 Sqm
Sub-Station
D40 = 2 × 3.00 Rft x 6.83 Rft = 40.98 Sft
D30 = 2 × 2.17 Rft x 6.83 Rft = 29.64 Sft
= 70.62 Sft = 6.56 Sqm
= 311.00 Sqm
@Tk = 5,000.00 P/Sqm Tk= 1,555,004.60
SL No-1.28 Wooden double leaf panel door shutter work with 38mm thick Gamari wood

Academic Bldg
D60 = 2 × 4.67 Rft x 6.83 Rft = 63.79 Sft = 5.93 Sqm

Principal Qtr
D56 = 1 × 4.33 Rft x 6.83 Rft = 29.57 Sft = 2.75 Sqm
Hostel Bldg
D60 = 6 × 4.67 Rft x 6.83 Rft = 191.38 Sft
= 4 × 5.08 Rft x 6.83 Rft = 138.79 Sft
D40 = 60 × 3.00 Rft x 6.83 Rft = 1,229.40 Sft
= 1,559.56 Sft = 144.94 Sqm
= 153.62 Sqm
@Tk = 5,200.00 P/Sqm Tk= 798,812.93
SL No-1.29 S.F.F of M.S Door shutter made with 38mm x 38 mm x 6mm angle outer frame ,inner member 25 mmx
6mm F.I bar ,clading with 16 BWG M.S sheet ,hinged with 50 mmx 50 mmx6mm M.S angle Chowkat
etc. all complete and accepted by the Engineer.

Principal Qtr = 1 × 3.33 Rft x 7.00 Rft = 23.31 Sft


Academic Bldg = 2 × 3.33 Rft x 7.00 Rft = 46.62 Sft
Hostel Bldg = 3 × 3.33 Rft x 7.00 Rft = 69.93 Sft
= 139.86 Sft
Duct door/Inspt. = 24 × 1.00 Rft x 0.67 Rft = 16.08 Sft
= 155.94 Sft = 14.49 Sqm
Sch.Qty = 12.35 Sqm
@Tk = 5,000.00 P/Sqm Tk= 61,750.00
SL No-1.30 S.F.F. of M.S. glazed window frame and shutter with 19mm x 19mm x 19mm 3mm thick Z section Tee
and 19mm x 3mm F.I. bar etc. all complete.

For Hostel Bldg


Ground Floor
W50 = 4 × 4.17 Rft x 4.50 Rft = 75.06 Sft
W80 = 20 × 6.67 Rft x 4.50 Rft = 600.30 Sft
W48 = 2 × 4.00 Rft x 4.50 Rft = 36.00 Sft
SW90 = 2 × 7.50 Rft x 9.33 Rft = 139.95 Sft
W90 = 2 × 7.50 Rft x 4.50 Rft = 67.50 Sft
W24 = 2 × 2.00 Rft x 4.50 Rft = 18.00 Sft
HW24 = 6 × 2.00 Rft x 2.00 Rft = 24.00 Sft
W60 = 9 × 5.00 Rft x 4.50 Rft = 202.50 Sft

Page 225
W52 = 2 × 4.33 Rft x 4.50 Rft = 38.97 Sft
Stair = 2 × 5.00 Rft x 4.50 Rft = 45.00 Sft
Ablution = 2 × 12.00 Rft x 4.50 Rft = 108.00 Sft
Store,W40 = 2 × 3.33 Rft x 4.50 Rft = 29.97 Sft
Kitchen = 1 × 7.00 Rft x 7.00 Rft = 49.00 Sft
" = 2 × 3.08 Rft x 7.00 Rft = 43.12 Sft
Stair,Front = 4 × 7.50 Rft x 7.00 Rft = 210.00 Sft
= 1,687.37 Sft
First Floor
W50 = 4 × 4.17 Rft x 4.50 Rft = 75.06 Sft
W36 = 38 × 3.00 Rft x 4.50 Rft = 513.00 Sft
W48 = 20 × 4.00 Rft x 4.50 Rft = 360.00 Sft
W45 = 2 × 3.75 Rft x 4.50 Rft = 33.75 Sft
W59 = 2 × 4.92 Rft x 4.50 Rft = 44.28 Sft
W90 = 4 × 7.50 Rft x 4.50 Rft = 135.00 Sft
HW24 = 8 × 2.00 Rft x 2.00 Rft = 32.00 Sft
Store = 2 × 9.60 Rft x 4.50 Rft = 86.40 Sft
Lobby = 2 × 14.33 Rft x 8.50 Rft = 243.61 Sft
" = 2 × 13.25 Rft x 8.50 Rft = 225.25 Sft
Round Stair = 2 × 5.00 Rft x 4.50 Rft = 45.00 Sft
Open Space = 6 × 5.00 Rft x 8.50 Rft = 255.00 Sft
" = 2 × 12.00 Rft x 4.50 Rft = 108.00 Sft
SW90 = 2 × 7.50 Rft x 9.17 Rft = 137.55 Sft
= 2,293.90 Sft
TV Room = 2 × 12.50 Rft x 4.50 Rft = 112.50 Sft
= 2 × 4.33 Rft x 4.50 Rft = 38.97 Sft
= 2,445.37 Sft
Second Floor
Same measurement at First.Floor,Qty Rft = 2,293.90 Sft
Passege = 2 × 10.67 Rft x 4.50 Rft = 96.03 Sft
= 2 × 4.33 Rft x 4.50 Rft = 38.97 Sft
= 2,428.90 Sft
S/T = 6,561.64 Sft = 609.82 Sqm
Sub-Station
W1 = 1 × 5.00 Rft x 4.50 Rft = 22.50 Sft
L2 = 9 × 5.00 Rft x 1.75 Rft = 78.75 Sft
HW20 = 1 × 1.67 Rft x 2.00 Rft = 3.34 Sft
S/T = 104.59 Sft = 9.72 Sqm
= 619.54 Sqm
@Tk = 2,200.00 P/sqm Tk= 1,362,983.83
SL No-1.31 S.F.F. of M.S. fixed glazed frame and shutter with 19mm x 19mm angle & 19mmx3mm Tee section &
F.I. Bar as per drawing.

For Hostel Bldg


Ground Floor

Page 226
Lobby = 2 × 4.33 Rft x 9.50 Rft = 82.27 Sft
"= 3 × 13.25 Rft x 9.50 Rft = 377.63 Sft
HW = 2 × 10.42 Rft x 2.00 Rft = 41.68 Sft
Kitchen = 3 × 7.00 Rft x 7.00 Rft = 147.00 Sft
" = 2 × 3.08 Rft x 7.00 Rft = 43.12 Sft
Stair,Front = 4 × 7.50 Rft x 7.00 Rft = 210.00 Sft
= 901.70 Sft
First Floor
Store = 2 × 9.60 Rft x 4.50 Rft = 86.40 Sft
Lobby = 2 × 14.33 Rft x 8.50 Rft = 243.61 Sft
" = 3 × 13.25 Rft x 8.50 Rft = 337.88 Sft
SW90 = 2 × 7.50 Rft x 9.17 Rft = 137.55 Sft
= 805.44 Sft
Second Floor
Same measurement at First.Floor,Qty Rft = 805.44 Sft
S/T = 2,512.57 Sft = 233.51 Sqm
@Tk = 1,500.00 P/sqm Tk= 350,264.64
SL No-1.32 a. S.F.F. of M.S. window grill with 20mmx5mm F.I. Bar as per design & drawing.
Qty = 11,728.18 Sft
Third Floor
Same measurement at 2nd.Floor,Qty Rft = 2,361.40 Sft
" = 2 × 13.25 Rft x 8.50 Rft = 225.25 Sft
Stair = 2 × 5.00 Rft x 4.50 Rft = 45.00 Sft
S/T Qty = 2,631.65 Sft
Sub-Station
W2 = 1 × 5.00 Rft x 4.50 Rft = 22.50 Sft
L2 = 9 × 5.00 Rft x 1.75 Rft = 78.75 Sft
HW20 = 1 × 1.67 Rft x 2.00 Rft = 3.34 Sft
X-former = 1 × 22.00 Rft x 5.00 Rft = 110.00 Sft
S/T = 214.59 Sft
Total Qty = 14,574.42 Sft = 1354.50 Sqm
@Tk = 2,500.00 P/sqm Tk= 3,386,250.14
SL No-1.33 a. S.F.F. of M.S.varandha grill made of 3/8" dia M.S. rod placed @ 3" c/c both ways as per drawing.

Hostel Bldg
Front Ver = 6 × 12.00 Rft x 4.50 Rft = 324.00 Sft = 30.11 Sqm
Principal Qtr
Front Ver = 2 × 15.67 Rft x 4.50 Rft = 141.03 Sft
F.Space = 2 × 16.00 Rft x 4.50 Rft = 144.00 Sft
Kitchen = 1 × 6.33 Rft x 4.50 Rft = 28.49 Sft
Living = 1 × 11.33 Rft x 4.50 Rft = 50.99 Sft
S/T = 364.50 Sft = 33.88 Sqm
= 63.99 Sqm
@Tk = 1,600.00 P/sqm Tk= 102,379.18
SL No-1.35 Plastering work

Page 227
a. 12mm to 20mm thick cement sand plaster in skirting & dado with NCF (1:4) all floor

Academic Bldg
Front Side = 1 × 110.50 Rft = 110.50 Rft

Side = 2 × 45.67 Rft = 91.34 Rft

Rear side = 1 × 91.00 Rft = 91.00 Rft


= 2 × 41.50 Rft = 83.00 Rft

Lecture Hall = 1 × 51.00 Rft = 51.00 Rft

Col = 37 × 0.83 Rft = 30.71 Rft


= 15 × 1.83 Rft = 27.45 Rft
= 485.00 Rft x 2.50 Rft = 1212.50 Sft
Lecture Hall
Skirting = 2 × 41.50 Rft = 83.00 Rft
= 1 × 50.00 Rft = 50.00 Rft
= 133.00 Rft x 0.50 Rft = 66.50 Sft
= 1279.00 Sft
Hostel Bldg
Long Side = 4 × 90.08 Rft = 360.32 Rft

Short side = 2 × 39.17 Rft = 78.34 Rft

Rear side = 2 × 37.50 Rft = 75.00 Rft

Round Stair = 1 × 48.83 Rft = 48.83 Rft

Col side = 33 × 1.67 Rft = 55.11 Rft


= 617.60 Rft x 2.50 Rft = 1544.00 Sft
Principal Qtr
= 2 × 48.92 Rft = 97.84 Rft
= 2 × 38.58 Rft = 77.16 Rft
= 14 × 0.67 Rft = 9.38 Rft
= 184.38 Rft x 2.50 Rft = 460.95 Sft
Sub-Station
Skirting = 1 × 26.00 Rft = 26.00 Rft
= 1 × 9.08 Rft = 9.08 Rft
= 2 × 21.83 Rft = 43.66 Rft
= 78.74 Rft x 2.50 Rft = 196.85 Sft
Operator Room = 2 × 18.58 Rft = 37.16 Rft

Generator Room = 2 × 20.83 Rft = 41.66 Rft

X-former Room = 2 × 35.00 Rft = 70.00 Rft

HTM = 2 × 13.58 Rft = 27.16 Rft


= 175.98 Rft x 0.50 Rft = 87.99 Sft
Stair = 1 × 5.33 Rft x 3.50 Rft = 18.66 Sft
= 2 × 5.83 Rft x 0.50 Rft = 5.83 Sft
= 309.33 Sft
= 3593.28 Sft

Page 228
= 333.95 Sqm
@Tk = 200.00 P/sqm Tk= 66,789.50
b. On masonry surface 10mm to 20mm thick in proportion (1:6)
i. Ground Floor
BF Qty = 3725.45 Sqm

@Tk = 180.00 P/sqm Tk= 670,580.84


ii. First Floor
BF Qty = 2867.62 Sqm

@Tk = 180.00 P/sqm Tk= 516,170.92


iii. 2nd Floor
Sch.Qty = 2578.16 Sqm
@Tk = 180.00 P/sqm Tk= 464,068.80
iv. 3rd Floor
For Academic Bldg
Inside Plaster
Pent house = 2 × 1 Nos x 26.25 Rft x 10.58 Rft = 555.45 Sft
Deduct,D = 1 × 1 Nos x 3.00 Rft x 7.00 Rft = -21.00 Sft
Inside Plaster = 534.45 Sft
= 49.67 Sqm
Outside Plaster
Pent house = 2 × 1 Nos x 28.58 Rft x 10.58 Rft = 604.75 Sft
= 2 × 1 Nos x 32.00 Rft x 3.00 Rft = 192.00 Sft
Parrapet = 1 × 1 Nos x 267.58 Rft x 6.42 Rft = 1717.86 Sft
Outside Plaster = 2514.62 Sft
= 233.70 Sqm
Total Qty = 283.37 Sqm
For Hostel Bldg
Inside Plaster

Same measurement at 2nd.Floor,Qty = 20,448.94 Sft = 1900.46 Sqm


Outside Plaster

Same measurement at 2nd.Floor,Qty = 3,415.57 Sft = 317.43 Sqm


Total Qty = 2217.89 Sqm
G.Total Qty = 2501.26 Sqm
Sch.Qty = 2056.00 Sqm

@Tk = 180.00 P/sqm Tk= 370,080.00


v. 4th Floor
For Hostel Bldg
Inside Plaster

Pent house = 4 × 22.50 Rft x 8.75 Rft = 787.50 Sft


= 2 × 14.42 Rft x 8.75 Rft = 252.35 Sft
= 1 × 21.67 Rft x 8.75 Rft = 189.61 Sft
= 1 × 11.67 Rft x 8.75 Rft = 102.11 Sft

Page 229
Inside Plaster = 1331.58 Sft
= 123.75 Sqm
Outside Plaster

Pent house = 4 × 25.75 Rft x 8.75 Rft = 901.25 Sft


= 2 × 15.50 Rft x 8.75 Rft = 271.25 Sft
= 1 × 22.50 Rft x 8.75 Rft = 196.88 Sft
= 1 × 12.67 Rft x 8.75 Rft = 110.86 Sft
Deduct,D = 3 × 3.00 Rft x 7.00 Rft = -63.00 Sft
Parapet = 4 × 87.25 Rft x 6.42 Rft = 2,240.58 Sft
= 4 × 36.67 Rft x 6.42 Rft = 941.69 Sft
= 2 × 20.33 Rft x 6.42 Rft = 261.04 Sft
= 1 × 24.67 Rft x 6.42 Rft = 158.38 Sft
= 4 × 31.17 Rft x 3.00 Rft = 374.04 Sft
= 1 × 74.50 Rft x 3.00 Rft = 223.50 Sft
= 36 × 1.67 Rft x 6.42 Rft = 385.97 Sft
= 20 × 2.50 Rft x 6.42 Rft = 321.00 Sft
Outside Plaster = 6323.43 Sft
= 587.68 Sqm
Total Qty = 711.43 Sqm
Sch.Qty = 653.00 Sqm

@Tk = 180.00 P/sqm Tk= 117,540.00


C. On R.C.C. surface 6mm & above thick in (1:4)
i. Ground Floor
Sch.Qty = 4604.78 Sqm
@Tk = 170.00 P/sqm Tk= 782,812.60
ii. 1st Floor
Sch.Qty = 4398.05 Sqm
@Tk = 170.00 P/sqm Tk= 747,668.50
iii. 2nd Floor
G.Total Qty = 4130.89 Sqm
Sch.Qty = 3845.34 Sqm
@Tk = 170.00 P/sqm Tk= 653,707.80
iv. 3rd Floor
G.Total Qty = 4130.89 Sqm
Sch.Qty = 2619.00 Sqm
@Tk = 170.00 P/sqm Tk= 445,230.00
SL No-1.46 S/F/F of M.S. collapsible gate with 1"x1"x1/8" M.S. angle as vertical member and 1"x1/8" F.I. Bar as
scissors.

Principal Qtr
= 1 × 7.42 Rft x 7.00 Rft = 51.94 Sft
Academic Bldg
Entrance = 1 × 9.00 Rft x 9.50 Rft = 85.50 Sft
= 1 × 8.50 Rft x 9.50 Rft = 80.75 Sft
= 1 × 7.58 Rft x 9.50 Rft = 72.01 Sft

Page 230
= 238.26 Sft
Hostel Bldg
= 2 × 7.50 Rft x 9.50 Rft = 142.50 Sft
= 1 × 10.67 Rft x 9.50 Rft = 101.37 Sft
= 243.87 Sft
= 534.07 Sft = 49.63 Sqm
@Tk = 4,500.00 P/sqm Tk= 223,354.32
SL No-1.51 Lime terracing with 20 mm down graded first class brick chips (Khoa), surki from 1st class bricks and
lime (stone lime brought at site, not being powdered in open air and to be slaked in presence of
engineer-in-charge and to be measured in volume three da

Academic Bldg

Terrace = 1 × 30.75 Rft x 31.25 Rft = 960.94 Sft


= 1 × 50.00 Rft x 18.25 Rft = 912.50 Sft
Deduct = 1 × 8.17 Rft x 7.17 Rft = -58.58 Sft
Lecture Hall = 1 × 45.50 Rft x 41.50 Rft = 1,888.25 Sft
Porch = 1 × 15.58 Rft x 19.50 Rft = 303.81 Sft
= 1 × 7.00 Rft x 9.67 Rft = 67.69 Sft
Roor Top = 1 × 80.00 Rft x 44.00 Rft = 3,520.00 Sft
= 1 × 21.08 Rft x 27.08 Rft = 570.85 Sft
Deduct,Col = 29 × 1.00 Rft x 1.67 Rft = -48.43 Sft
Pent house = 1 × 20.08 Rft x 13.00 Rft = 261.04 Sft
= 8,378.07 Sft x 0.33 = 2764.76 Cft
Ghundi

Terrace = 1 × 152.08 Rft x 0.50 Rft = 76.04 Sft


= 11 × 9.33 Rft x 0.50 Rft = 51.32 Sft
= 4 × 1.00 Rft x 0.50 Rft = 2.00 Sft
Lecture Hall = 1 × 138.00 Rft x 0.50 Rft = 69.00 Sft
Porch = 1 × 70.17 Rft x 0.50 Rft = 35.09 Sft
= 2 × 99.58 Rft x 0.50 Rft = 99.58 Sft
Roor Top = 2 × 43.17 Rft x 0.50 Rft = 43.17 Sft
= 16 × 5.33 Rft x 0.50 Rft = 42.64 Sft
= 18 × 9.33 Rft x 0.50 Rft = 83.97 Sft
= 18 × 1.33 Rft x 0.50 Rft = 11.97 Sft
Pent house = 1 × 66.17 Rft x 0.50 Rft = 33.09 Sft
= 547.86 Sft x 0.25 = 136.96 Cft
= 2901.73 Cft
For Hostel Bldg

Open terrace = 2 × 13.33 Rft x 6.00 Rft = 159.96 Sft


Gap = 2 × 10.00 Rft x 12.00 Rft = 240.00 Sft
TV Room = 2 × 5.00 Rft x 1.67 Rft = 16.70 Sft
Porch = 1 × 24.17 Rft x 28.17 Rft = 680.87 Sft
= 2 × 9.50 Rft x 8.17 Rft = 155.23 Sft

Page 231
Roof = 2 × 36.00 Rft x 86.92 Rft = 6,258.24 Sft
= 2 × 25.67 Rft x 20.00 Rft = 1,026.80 Sft

Ver = 20 × 8.25 Rft x 3.50 Rft = 577.50 Sft


= 20 × 5.00 Rft x 1.67 Rft = 167.00 Sft
= 6 × 3.58 Rft x 1.67 Rft = 35.87 Sft
Gap = 2 × 7.50 Rft x 13.33 Rft = 199.95 Sft
Deduct,Gap = 2 × 12.00 Rft x 8.33 Rft = -199.92 Sft
Mid Portion = 1 × 24.17 Rft x 46.75 Rft = 1,129.95 Sft
Pent house = 2 × 16.67 Rft x 12.08 Rft = 402.75 Sft
= 1 × 21.75 Rft x 15.00 Rft = 326.25 Sft
Deduction,Col = 46 × 1.00 Rft x 1.67 Rft = -76.82 Sft
= 11,100.33 Sft x 0.33 = 3663.11 Cft
Ghundi

Open terrace = 2 × 38.67 Rft x 0.50 Rft = 38.67 Sft


Porch = 2 × 9.50 Rft x 0.50 Rft = 9.50 Sft
Gap = 2 × 44.00 Rft x 0.50 Rft = 44.00 Sft

TV Room = 1 × 104.67 Rft x 0.50 Rft = 52.34 Sft


Roof = 2 × 245.83 Rft x 0.50 Rft = 245.83 Sft
= 2 × 51.33 Rft x 0.50 Rft = 51.33 Sft
Ver = 20 × 7.00 Rft x 0.50 Rft = 70.00 Sft
= 20 × 3.33 Rft x 0.50 Rft = 33.30 Sft
Gap = 2 × 20.83 Rft x 0.50 Rft = 20.83 Sft
Mid Portion = 2 × 46.75 Rft x 0.50 Rft = 46.75 Sft
Pent house = 2 × 57.50 Rft x 0.50 Rft = 57.50 Sft
= 1 × 73.50 Rft x 0.50 Rft = 36.75 Sft
Col = 46 × 9.33 Rft x 0.50 Rft = 214.59 Sft
= 21 × 1.00 Rft x 0.50 Rft = 10.50 Sft
= 931.89 Sft x 0.25 = 232.97 Cft
= 3896.08 Cft
For Principal Qtr

Roof = 1 × 51.42 Rft x 37.00 Rft = 1,902.54 Sft


Ver = 1 × 8.17 Rft x 2.00 Rft = 16.34 Sft
= 1 × 7.75 Rft x 2.33 Rft = 18.06 Sft
Deduct = 1 × 7.50 Rft x 8.75 Rft = -65.63 Sft
= 1 × 10.50 Rft x 6.25 Rft = -65.63 Sft
Pent house = 1 × 14.00 Rft x 10.75 Rft = 150.50 Sft
= 1,956.19 Sft x 0.33 = 645.54 Cft
Ghundi
Roof = 1 × 176.83 Rft x 0.50 Rft = 88.42 Sft
Pent house = 1 × 49.50 Rft x 0.50 Rft = 24.75 Sft
= 113.17 Sft x 0.25 = 28.29 Cft
= 673.83 Cft

Page 232
Sub-Station

Roof = 1 × 29.33 Rft x 25.17 Rft = 738.24 Sft x 0.33 = 243.62 Cft
= 7715.25 Cft
= 218.50 Cum
Sch Qty = 205.00 Cum
@Tk = 7,000.00 P/Cum Tk= 1,435,000.00
Civil Work Tk 191,785,169.57

A.II SANITARY AND PLUMBING WORK


SL No-2.01 Supply installation work of sanitary equipment including cutting hole/grove in floor or wall, mending
good the damages using cement concrete (`1:2:4) & cement sand mortar (1:4) as & where necessary,
supply of all auxiliary materials, scaffolding, cleaning

c. Bangladesh pattern, 570 mmx 445 mmx290 mm white long pan with foot-rest of
approved best quality
Qty = 53 x 1.00 No = 53.00 Nos
s
@Tk = 2,000.00 P/ Each Tk= 106,000.00
g. 100 mm dia uPVC "P" or "S" trap cleanout
Qty = 174 x 1.00 No = 174.00 Nos
s
@Tk = 500.00 P/ Each Tk= 87,000.00
2.05 Supply & fitting pipe line work with 100mm dia uPVC soil, waste and ventilation pipe etc.
Academic Bldg

= 10 Nos x 40.00 Rft = 400.00 Rft

= 10 Nos x 7.00 Rft = 70.00 Rft

= 8 Nos x 3.50 Rft = 28.00 Rft

= 2 Nos x 29.00 Rft = 58.00 Rft

= 4 Nos x 4.00 Rft = 16.00 Rft

= 572.00 Rft = 174.39 Rm


Hostel Bldg

= 12 Nos x 47.00 Rft = 564.00 Rft

= 12 Nos x 9.00 Rft = 108.00 Rft

= 12 Nos x 4.00 Rft = 48.00 Rft

= 720.00 Rft = 219.51 Rm


Principa Qtr

= 5 Nos x 16.00 Rft = 80.00 Rft

= 5 Nos x 9.00 Rft = 45.00 Rft

= 4 Nos x 4.00 Rft = 16.00 Rft

= 1 Nos x 15.00 Rft = 15.00 Rft

= 156.00 Rft = 47.56 Rm


Sub-Station = 1 Nos x 16.00 Rft = 16.00 Rft = 4.88 Rm
= 441.46 Rm
@Tk = 300.00 P/ Rm Tk= 132,439.02
2.06 Supply 150 mm dia uPVC pipe for under ground laying including fitting ,fixing etc.

@Tk = P/ Tk= -

Page 233
2.07 Supplying, fitting and fixing of 100mm dia uPVC rain water down pipe
Academic Bldg

= 8 Nos x 37.00 Rft = 296.00 Rft

Lect.Hall = 8 Nos x 26.00 Rft = 208.00 Rft

Pent house = 1 Nos x 10.00 Rft = 10.00 Rft

= 514.00 Rft = 156.71 Rm


Hostel Bldg

= 10 Nos x 44.00 Rft = 440.00 Rft

Pent house = 3 Nos x 10.00 Rft = 30.00 Rft

= 470.00 Rft = 143.29 Rm


Principa Qtr

= 2 Nos x 13.50 Rft = 27.00 Rft

Pent house = 1 Nos x 10.00 Rft = 10.00 Rft

= 37.00 Rft = 11.28 Rm


= 311.28 Rm
@Tk = 300.00 P/ Rm Tk= 93,384.15
2.08 Pipe line work with G.I. pipe
a. 50mm dia with wall thickness 4.50mm
@Tk = P/ Tk= -
b. 40mm dia with wall thickness 4.05mm
@Tk = P/ Tk= -
c. 25mm dia with wall thickness 4.05mm
@Tk = P/ Tk= -
2.09 Pipe line work with u-PVC pressure pipe for water supply having specific gravity 1.35-1.45
a. 19mm dia with wall thickness 2.9mm-3.4mm
@Tk = P/ Tk= -
b. 12mm dia with wall thickness 2.8mm-3.3mm
@Tk = P/ Tk= -
2.10 Concealing works of G.I./PVC Pipe
@Tk = P/ Tk= -
2.14 Construction of septic tank of different sizes with walls of brick work in cement morter (1:6) etc.
all complete as per drawing, design and direction of the Engineer-in-Charge (Rate is including
cost of reinforcement and its fabrication, binding and placing.

a. For 200 user


Academic Bldg = 2 No x 1.00 Nos= 2.00 Nos
s
Hostel Bldg = 2 No x 1.00 Nos= 2.00 Nos
s
= 4.00 No
s
@Tk = 100,000.00 P/ Each Tk= 400,000.00
b. For 50 user
Principal Qtr = 1 No x 1.00 Nos= 1.00 Nos
s
= 1.00 No
s
@Tk = 75,000.00 P/ Each Tk= 75,000.00

Page 234
2.15 Construction of soak well of different sizes with walls of brick work in cement morter (1:6) etc. all
complete as per drawing, design and direction of the Engineer-in-Charge (Rate is including cost
of reinforcement and its fabrication, binding and placing

a. For 200 user


Academic Bldg = 2 No x 1.00 Nos= 2.00 Nos
s
Hostel Bldg = 2 No x 1.00 Nos= 2.00 Nos
s
= 4.00 No
s
@Tk = 75,000.00 P/ Each Tk= 300,000.00
b For 50 user
Principal Qtr = 1 No x 1.00 Nos= 1.00 Nos
s
= 1.00 No
s
@Tk = 50,000.00 P/ Each Tk= 50,000.00
2.16 S/F/F of food grade plastic overhead water reservoir (Gazi/Padma/Boss water tank) including all
necessary fittings
a. 1000 liter capacity
Principal Qtr = 1 No x 1.00 Nos= 1.00 Nos
s
Hostel Bldg = 1 No x 3.00 Nos= 3.00 Nos
s
= 4.00 No
s
@Tk = 12,000.00 P/ Tk= 48,000.00
b 2000 liter capacity
Academic Bldg = 1 No x 4.00 Nos= 4.00 Nos
s
Hostel Bldg = 1 No x 6.00 Nos= 6.00 Nos
s
= 10.00 No
s
@Tk = 24,000.00 P/ Tk= 240,000.00
2.17 Rain water spout with 38mm dia and 600mm long PVC Pipe
Qty = 51 x 1.00 No = 51.00 Nos
s
@Tk = 100.00 P/ Each Tk= 5,100.00
Total of A-II (Sanitary & Plumbing Works): Tk. 1,536,923.17
A-III INTERNAL ELECTRICAL WORKS
3.01 PVC CONCEALED CONDUIT WIRING :
(i) Point wiring
a. Light Point/Exhaust Fan Point
Qty = 952 x 1.00 No = 952.00 Nos
s
@Tk = 800.00 P/ Each Tk= 761,600.00
b. Fan Point
Qty = 214 x 1.00 No = 214.00 Nos
s
@Tk = 800.00 P/ Tk= 171,200.00
c. 2-pin 5amp socket point (outlet) with control switch on switch board.
Qty = 232 x 1.00 No = 232.00 Nos
s
@Tk = 100.00 P/ Each Tk= 23,200.00
d. Call bell point with bell push
Qty = 5 x 1.00 No = 5.00 Nos
s
@Tk = 800.00 P/ Each Tk= 4,000.00
3.03 Distribution Board/Sub-distribution Board/Meter/Machine Box

Page 235
a. S.F.F. of 16 SWG Metal Board of depth 228mm duly painted with gray hammer paint on
out side and enamel paint inside surfaces having built in push type locking arrangement
including metal bridges of suitable size for fixing of all electrical control device

Academic Bldg
MDB = 1 x 4.00 Rft x 2.50 Rft = 10.00 Sft
SDB = 9 x 2.00 Rft x 1.50 Rft = 27.00 Sft
DB = 3 x 2.50 Rft x 2.00 Rft = 15.00 Sft
= 52.00 Sft = 4.83 Sqm
Hostel Bldg
MDB = 1 x 4.00 Rft x 2.50 Rft = 10.00 Sft
SDB = 16 x 2.00 Rft x 1.50 Rft = 48.00 Sft
DB = 4 x 2.50 Rft x 2.00 Rft = 20.00 Sft
= 78.00 Sft = 7.25 Sqm
Principa Qtr
MDB = 1 x 2.00 Rft x 1.50 Rft = 3.00 Sft = 0.28 Sqm
= 12.36 Sqm

Sch.Qty = 11.65 Sqm


@Tk = 12,000.00 P/ Sqm Tk= 139,800.00
3.04 MCB/MCCB
(i) MCB (SP) : Brand and Country of origin of DOORMAN SMITH (UK/GERMANY, MEM
(UK), SIEMENS (USA/GERMANY) or equivalent approved one
a. 6 Amp. SP MCB to 30 Amp SP MCB
Qty = x 1.00 No = 0.00 Nos
s
@Tk = P/ Tk= -
b. 63 Amp. SP MCB
Qty = x 1.00 No = 0.00 Nos
s
@Tk = P/ Tk= -
(ii) MCCB (TP) : Brand and country of origin of ABB (Italy), AEG (Germany), DOORMAN
SMITH (England), LEGRAND (France/Italy), MEM (UK), MERLIN GERIN (France) or
equivalent approved one.

a. 30 Amp TP MCCB to 100 TP MCCB


Qty = x 1.00 No = 0.00 Nos
s
@Tk = P/ Tk= -
3.14 Bus Bar
a) 100A Rating 4 nos of Bar
Qty = x 1.00 No = 0.00 Nos
s
@Tk = P/ Tk= -
b) 400A Rating 4 nos of Bar
Qty = x 1.00 No = 0.00 Nos
s
@Tk = P/ Tk= -
Total of A-III (Internal Electrical Works): Tk. 1,099,800.00
TOTAL FOR BUILDING WORKS. A : (A.I+A.II+A.III) TK. 194,421,892.74
B. EXTERNAL WORKS:

Page 236
B1. EXTERNAL CIVIL WORKS:
B.1a Site Development
1.0 Site Development with Imported Earth:

Qty BF from 1st R/A Bill Page No-8 of MB-797 = 41317.71 Cum
@Tk = 175.00 P/Cum Tk= 7,230,599.25
Total for Site Developmentl (B.1a) Tk. 7,230,599.25

Total for External Civil work : B.I (B.1a+B.1b+B.1c+B.1d) Tk. 7,230,599.25


B.II External Electrical Works
1 Conduit (Concealed)
(i) Concealed G.I. Pipe Work
a) 40mm Nominal inside dia
Qty = 20 x 1.00 No = 20.00 Rm
s
@Tk = 600.00 P/ Rm Tk= 12,000.00
2 Distribution system ( M.S. Pole )
a. L.T. Pole : 30' ft long having 6" dia 20' ft at the bottom and 4" dia 10' ft at the top with 2'-
0" x 2'-0" x 0'-0.25" size steel base plate (including erection)
Qty = 12 x 1.00 No = 12.00 Nos
s
@Tk = 12,000.00 P/ Tk= 144,000.00
8 Wire Rack/Cross Arm (For L.T. Pole):
a) 1524mm long 5 spool vertical wire rack fabricated with 38.1mm x 76.2mm x 38.1mm x
6.35mm M.S. channel complete with 5 Nos. of `U' clamp & 2 Nos. `D' clamp.

Qty = 10 x 1.00 No = 10.00 No


s
@Tk = 2,000.00 P/ Tk= 20,000.00
11 Guy Assembly :
a. 10.67m long for L.T. pole (8 SWG 7 strand)
Qty = 15 x 1.00 No = 15.00 Nos
s
@Tk = 1,500.00 P/ Each Tk= 22,500.00
b. 13.71m long for H.T. pole (8 SWG 7 strand)
Qty = 8 x 1.00 No = 8.00 Nos
s
@Tk = 1,800.00 P/ Each Tk= 14,400.00
12 H.T. Pole( G I: 40'-0"):
Qty = 1 x 1.00 No = 1.00 Nos
s
@Tk = 15,000.00 P/ Each Tk= 15,000.00
14 H.T. Insulators:
i. Disc Type:
Qty = 6 x 1.00 No = 6.00 Nos
s
@Tk = 1,500.00 P/ Tk= 9,000.00
ii. Pin Type:
Qty = 6 x 1.00 No = 6.00 Nos
s
@Tk = 1,000.00 P/ Tk= 6,000.00
15 Supply of Distribution Transformer, Oil-immersed natural air cooled type, 3-phase, 50-Hz,
complete with two windings of high conductivity copper, transformer tank, off load type 5
position standard tap changer, buchholz relay, temp. sensor, radiator and conservator with
necessary painting, oil level indicator, valves for filter connection and oil inlet & outlet valves, oil
sampling valve and dehydrating breather, lugs for lifting and towing complete unit, earthing
terminals, thermometer pocket with thermometer, primary and secondary marking name plate
0 Page 237
Capacity 200 KVA (No load loss : 500 watts, maximum. Full load loss 2800 watts, Maximum)
Assembled by the valid ISO-9001 certified company having test certificate according to relevant
IEC standards from BUET/CUET/ DUET/KUET/RUET.
Qty = 1 x 1.00 No = 1.00 Nos
s
@Tk = 600,000.00 P/ Tk= 600,000.00
16 L.T. Cable
Providing and laying of the following single core (1C) PVC insulated and PVC sheathed NYY
cable of Eastern Cable Ltd. in underground trench.
a. 1C-4x120mm² NYFGbY Cable with 120mm² (BYA) ECC through PVC pipe of min. inner dia
125mm having wall thickness of 3mm.
@Tk = P/ Tk= -
b. 1C-3 x 95mm² NYY Cable
@Tk = P/ Tk= -
17 L.T Switch Gear, (For 200 KVA Transformer) : (MCCB'S in L.T. Panel must comply
NEMA/VDE/IEC/JIS/BSS standard) INCOMING: 1 Set-415V, 400 amps. TP&NE hard drawn
electrolytic copper busbar. 1 No.-415V, 300/320 Amps (25KA), adjustable type TPMCCB for
OUTGOING: 1 Nos.-415V, 200 (25KA) TPMCCB with thermal over load & instantaneous
main control with thermal overload & instantaneous electro-magnetic short circuit release. 3
electromagnetic short circuit release. 1 No.-415V,150/160A (25KA), TPMCCB wwith thermal
Nos.-415V, 300/5 ratio current transformer with suitable accuracy & burden.
over load & instantaneous electromagnetic short circuit release (for PFI control).2 No.-
Assembled by the valid ISO-9001 certified company having test certificate according to relevant
415V,100A (16KA), TPMCCB with thermal over load & instantaneous electromagnetic short
IEC standards from BUET/CUET/ DUET/KUET/RUET.
circuit release . 1 No.-415V, 60/63A (16KA) TPMCCB with thermal over load & instantaneous
Qty = 1 short
electromagneic x 1.00 No =1 1.00
circuit release No.-415V,Nos
30/32A (16KA) TPMCCB with thermal over load
& instantaneous electromagneic s short circuit release(AEG/ENERGYPAC/GEC/SBEL OR
Equivalent).@Tk = 260,000.00 P/ Each Tk= 260,000.00
18 P FI:Supply of sheet steel clad (16 SWG), dust and vermin proof, free-standing, floor mounting
type 415V,
P.F.I - 12050KVAR
Hz, 187.5 KVAR power
: 3 Nos.-415V, factor
250A improvement
hard plant complete
drawn electrolytic with painting
copper busbar, and
1 No.-415V, 5
KVAR, 50 Hz
Assembled TPvalid
by the powerISOcapacitor bank company
9001 certified with builthaving
in/separate discharge
test certificate coil required
for the for connection
or
higherQty
capacity
= 1 of x transformer
1.00 according
No = 1.00to relevent
Nos IEC standards from
s
@Tk = 250,000.00 P/ Each Tk= 250,000.00
Total for External Electrical works (B.II) Tk. 1,352,900.00
TOTAL FOR EXTERNAL WORKS. B : (B.I+B.II) 8,583,499.25
C. 100mm Deep Set Tube well with G.I./uPVC Pipe
1 Mobilization for test boring or observation well : Transportation of materials, equipments, tools &
plants and Cleaning the site after completion of the work.
Qty = 1.00 Test
@Tk = 20,000.00 P/ Test Tk= 20,000.00
2 Test boring by 100mm dia cutter and 38mm dia G.I. Pipe upto 400m depth with strainer
a. From 0.0m to 50m = 50 m
Qty = 1 x 50.00 Rm = 50.00 Rm
@Tk = 100.00 P/ Rm Tk= 5,000.00
b. From 50m to 100m = 50m
Qty = 1 x 50.00 Rm = 50.00 Rm
@Tk = 100.00 P/ Rm Tk= 5,000.00
c. From 100 to 152 m = 52m
Qty = 1 x 52.00 Rm = 52.00 Rm
@Tk = 100.00 P/ Rm Tk= 5,200.00
d. From 152 to 200 m = 48m
Qty = 1 x 48.00 Rm = 48.00 Rm
@Tk = 100.00 P/ Rm Tk= 4,800.00

Page 238
There are about 55 (fifty-five) tests for potable water Quality Standard according to Bangladesh
Environment Conservation Rules-12 (Schedule-3), 1997, under ECA 1998 of Ministry of
Environment and Forest. Therefore, additional test/ tests on water or sieve analysis of soil if
required, other than the above specified 12 (twelve) tests, may be carried out for public interest
as (a) Furnishing
per direction design
of the considering
design engineer1 on
No.actual
Test Bore
payment including profit, VAT and all other
charges.
Disinfection of the well by using min. 3 kg of bleaching powder of 33% strength or any other
disinfectant as per standard specification and accepted by the Engineer-in-Charge.

Qty = 1.00 Test


@Tk = 25,000.00 P/ Tk= 25,000.00
Total for 100 mm Deep Set Tube well (C): Tk. 65,000.00
TOTAL FOR (A+B+C) Tk 203,070,391.99
Less Tk. - 14.15% Tk= -28,734,460.47
GRAND TOTAL FOR (A+B+C) Tk 174,335,931.52
Deduction upto 7th R/A BillTk= -147,207,108.95
Payable AmountTk= 27,128,822.57

Page 239
PWD Rate - 2018
Estimate For …………………………………………………... District.

Package no: WP-……….../SDP-4(GOB)-HED


A: BUILDING WORKS
A-1: CIVIL WORKS
A-1.1 Foundation upto Plinth level
Rate in Taka
Sl. No. Description of Item Unit Quantity Amount in Taka
1 Earth work in excavation in all kinds of soil for foundation Sqm 15.00 0.00
trenches including layout,providing center lines, local
bench-mark pillars, levelling, ramming and preparing the
base,fixing bamboo spikes and marking layout with chalk
powder, providing necessary tools andplants, protecting
and maintaining the trench dry etc., stacking, cleaning the
2 a) Earthwork in excavation in foundation trenches up to Cum 189.00 0.00
excavatedearth at a safe distance out of the area enclosed
1.5 m depth and maximum 10 m lead: in very stiff (hard)
by the layout etc. all complete andaccepted by the
clayey soil/ rubbish etc
Engineer-in-charge, subject to submit method statement
(b)carrying
2 of From 1.5outexcavation
m to 2.00m =0.5m work todepth the Engineer-in-charge Cum 209.00 0.00
for approval. However, engineer‟s approvalshall not
2 (relieve
c) From the2.00 m to 2.50m
contractor of his=0.5m depth and obligations
responsibilities Cum 229.00 -
under the contract.
(d) From
2 02.1.1 2.50 m
Layout andtomarking
3.00m =0.5m depth in excavation in
for earthwork Cum 249.00 -
foundation accepted by the (a) Layout and marking for
(e) From 3.00
2 earthwork m to 3.50min =0.5m
in excavation foundation depthaccepted by the Cum 269.00 -
Engineer. [Plinth area of the structure shall be considered
3 (a) One layer brick flat soling in foundation with first
for measurement]. Sqm 420.00 0.00
class/picked jhama bricks including preparation of bed and
3 (b) One
filling thelayer brick flat
interstices with soling
localinsand, floor leveling
with firstetc. class/picked
complete Sqm 420.00 0.00
jhama bricks including
and accepted by the Engineer-in-charge) preparation of bed and filling the
4 (a) Mass concrete
interstices with local (1:3:6)
sand,inlevelingfoundation etc. with
complete cement, andsand Cum 6647.00 0.00
(F.M.
accepted 1.2)by andthepicked jhama brick chips including breaking
Engineer-in-charge).
4 (b) Mass screening,
of chips, concrete (1:3:6) mixing, in laying,
floor with cement, sand
compacting (F.M.
to required Cum 6579.00 0.00
1.2)
levelandandpicked
curing jhama
for at least brick7chips daysincluding
includingbreakingthe supply of of
5 (a)
chips,
water,Sand filling in costs
screening,
electricity, foundation
mixing, of laying,
tools trenches
&compacting
plants and and plinth with
to required
other sand
charges Cum 635.00 0.00
having
level
etc. allandF.M.
complete 0.5 to
curing for
and 0.8 in 150mm
ataccepted
least 7 days bylayers
including
the including
the supply
Engineer-incharge. leveling,of
5 (b)
water,Sand
watering
(Cement: filling
and
electricity, in costs
foundation
compaction
CEM-II/A-M) of to
tools trenches
achieve
& plants and
minimumand plinth
otherdrywith sand
density
charges Cum 2631.00 0.00
having
of
etc.90% minimum
with optimum
all complete F.M.accepted
and 2.2 in 150content
moisture bymm thelayers
(Modifiedincluding
Engineer-incharge. proctor
6 Earth
leveling,
test)
(Cement: filling
by in foundation
watering
ramming
CEM-II/A-M) and compaction
each trenches
layer and plinth
to achieve
up to finished levelinminimum
150
as per mmdry Cum 149.00 0.00
layer
designwith
density of earth
95% with
supplied available
by the optimum within
design 90 monly
moisture
office ofcontent
the
etc.building
all(Modified site to
complete
7 Brick
achive
proctor works
test) with
minimum
and accepted first
dry classeach
the density
bybyramming Engineer bricks
of layer
95%withup cement
with tooptimum
finishedsandmoisture
(F.M.as
level Cum 6040.00 0.00
1.2)
contentmortar
per design (1:6) inproctor
(Modified
supplied foundation
by thetest) designand plinth,carrying,
including
office fillingallthe
only, watering,
complete
8 Damp
leveling, proof
joints/interstices
and accepted course
dressing by fully
and
the (DPC)
with (1:1.5:3)racking
mortar,
compacting
Engineer-in-charge. toofacement out the
specified concrete
joints, Sqm 1095.00 0.00
with cement,
cleaning
percentage andeachsand
soaking andthe
layer picked
up bricks jhama
to finishedat east brick chips
for etc.
level allorcomplete
24 hours stone
before
9 Supplying
chips
use
and and andby
including
curing
accepted layingleastoffor
breaking
at single
of7chips,
Engineer-in-charge. dayslayer polythene
screening,
etc. all complete sheet
centering, Sqm 42.00 0.00
weighing
including one
shuttering, kilogram
casting,
cost of water, curing per 6.5 finishing
and
electricity square meter
and other aincoat
with charges floorofor any
and
10 Reinforced
where
bitumen
accepted below bycement
cement
including
the concrete
the supply works
concrete
Engineer-in-charge. ofcomplete
water,with minimum
in all respect
electricity,
(Cement: cement
costs
CEM-II/A- and
of Cum 7517.00 0.00
content
accepted
tools
M) & plants relates to mix
by Engineer-in-charge
and other ratio 1:2:4 having
charges etc. all minimum
complete f'cr and= 24
B) Foundation
10 MPa,
accepted satisfying beam / Gradecompressive
a specified
by Engineer-in-charge. beam/Tie
(Cement: Beam:
strength
CEM-II/A-M) f'c= 19 Cum 7517.00 0.00
MPa
(a) 75atmm 28 thick
days dampon standard proof coursecylinders as perwith
(1:1.5:3) standard cement,
10 C) In Sylhet
practice
50% pedestal
of Code
sandcolumn,
(F.M. column,
ACI/BNBC/ASTM,2.2) & 50% column cement
local capital,
sand lift wall
conforming
(F.M. 1.2)and
to Cum 7730.00 0.00
RCC
BDS wall etc.
EN-197-1-CEM-I,
and picked jhama brick 52.5N chips. (52.5 MPa) / ASTM-C 150
Type – I, best quality sand [50% quantity of best local
sand (F.M. 1.2) and 50% quantity of Sylhet sand or coarse
sand of equivalent F.M. 2.2] and 20 mm down well graded
picked jhama brick chips conforming to ASTM C-33
11 FORM WORK (Steel): Centering and shuttering, including Sqm 438.00 0.00
shuttering, propping etc. ( The formwork must be rigid
B) Foundation
11 enough both inbeamand out / Grade
of planebeam/Tie
to makeBeam: the concrete Sqm 380.00 0.00
surface true to the designed shape and size using
11 C) In pedestal
necessary MS column,
sheets ofcolumn, minimum column
16 BWG, capital, lift wall
angles of and Sqm 408.00 0.00
RCC wall etc.
minimum size 40mmx40mmx5mm, flat bars etc. and
12 Grade
removal300 (RB 300
of form after/RB 300W: complying
hardening of the concrete BDS for.
ISO(A)6935- Kg 79.00 0.00
2:2006)
Individualribbed or deformed
& combined footing, barpile
produced and marked
cap, raft/mat, floor slab
12 Grade
according 400to( RB
and foundation 400 / upto
Bangladesh
beam 400sandard,
W : complying
piling BDS ISOyield
with minimum
level 6935- Kg 82.00 0.00
2:2006)
strength,ribbed or deformed
fy (ReH)= 300 MPabar butproduced and marked
fy not exceeding 330
A.1.1 For
MPa foundation
accoriding
and whateverup to plinth
to bangladesh standard
is the yield , withwithin
strength mimimum
allowableyield Tk. 0.00
strength
limit as per ,Fy(ReH)
BNBC/ =ACI 400318,MPAthebutratio fy not exceeding
of ultimate 450
tensile
A.1.2 Above
MP„and
strengthplinth
whatlevel
fu to ever is
yield the yield
strength fy,strength
shall be within
at leastallowable
1.25 and
limit
minimumas perelongation
BNBC secafter 8.3.3.5/
fractureACIand318-11 sec 21.1.5.2,
minimum total
1 Reinforced
the cement
ratoi ultimate
elongation at concrete
tensile
maximum forceworks
strength Fuwith
is 16% toandminimum
yield
8%strength cement
fy, Cum 7730.00 0.00
content
shat be relates
respectively : upto
at least tomix
1.25 ratiominimum
and
ground 1:2:4
floor having minimum
elongation afterf'cr = 24
1 MPa,
ii. 1stsatisfying
fracture and minimum
Floor a specified total compressive
elongation at strength
maximumf'c= 19 is
force Cum 7838.00 0.00
MPa
16% and at 288% days on standard
respectively : (i)cylinders
Ground floor as per standard
1 practice of Code ACI/BNBC/ASTM, cement conforming to
iii. 2nd Floor Cum 7946.00 0.00
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150
1 Type
iv. 3rd– Floor
I, best quality sand [50% quantity of best local Cum 8054.00 0.00
sand (F.M. 1.2) and 50% quantity of Sylhet sand or coarse
1 sand
v. 4thofFloor
equivalent F.M. 2.2] and 20 mm down well graded Cum 8162.00 0.00
picked jhama brick chips conforming to ASTM C-33
1 including
B) Beam: breaking
(Tee-beam, chips and screening,
L-beam and rectangulamakingbeam and , lintel Cum 7602.00 0.00
placing shutter
beam (i) Ground floor in position maintaining true to plumb,
1 making shutter water-tight properly, placing reinforcement
ii. 1st Floor Cum 7710.00 0.00
in position; mixing in standard mixer machine with hopper
1 fed by standard
iii. 2nd Floor measuring boxes or mixing in batching Cum 7818.00 0.00
plant, casting in forms, compacting by vibrator machine
1 and
iv. 3rdcuring
Floorat least for 28 days, removing centering- Cum 7926.00 0.00
shuttering after specified time approved; including cost of
1 water, electricity, testing charges of material sand
v. 4th Floor Cum 8034.00 0.00
cylinders as required, other charges etc. all complete,
1 approved
C) Lintel (i)and accepted
Ground floorby the Engineer-in-charge. (Rate Cum 7602.00 0.00
is excluding the cost of reinforcement and its fabrication,
1 placing, binding etc. and the cost of shuttering & centering)
ii. 1st Floor Cum 7710.00 0.00
(A) Pedestal, column, column capital, lift wall and wall (i)
1 Ground floor
iii. 2nd Floor Cum 7818.00 0.00

1 iv. 3rd Floor Cum 7926.00 0.00

1 v. 4th Floor Cum 8034.00 0.00

1 D) Roof slab (i) Ground floor Cum 7602.00 0.00

1 ii. 1st Floor Cum 7710.00 0.00

1 iii. 2nd Floor Cum 7818.00 0.00

1 iv. 3rd Floor Cum 7926.00 0.00

1 v. 4th Floor Cum 8034.00 0.00


1 E) Cornice, railing, drop wall, lover, fins etc (i) Ground floor Cum 7944.00 0.00

1 ii. 1st Floor Cum 8052.00 0.00

1 iii. 2nd Floor Cum 8160.00 0.00

1 iv. 3rd Floor Cum 8268.00 0.00

1 v. 4th Floor Cum 8376.00 0.00

1 F) Sunshade, false ceiling etc. (i) Ground floor Cum 7944.00 0.00

1 ii. 1st Floor Cum 8052.00 0.00

1 iii. 2nd Floor Cum 8160.00 0.00

1 iv. 3rd Floor Cum 8268.00 0.00

1 v. 4th Floor Cum 8376.00 0.00

1 G) In Stair case, slab & steps, ramp (i) Ground floor Cum 7602.00 0.00

1 ii. 1st Floor Cum 7710.00 0.00

1 iii. 2nd Floor Cum 7818.00 0.00

1 iv. 3rd Floor Cum 7926.00 0.00

1 v. 4th Floor Cum 8034.00 0.00

2 FORM WORK (Steel): In Column: Centering and Sqm 408.00 0.00


shuttering, including shuttering, propping etc. ( The
2 ii. 1st Floor
formwork must be rigid enough both in and out of plane to Sqm 449.00 0.00
make the concrete surface true to the designed shape and
2 iii. 2nd
size Floor
using necessary MS sheets of minimum 16 BWG, Sqm 490.00 0.00
angles of minimum size 40mmx40mmx5mm, flat bars etc.
2 iv. 3rd
and Floor of form after hardening of the concrete for. A)
removal Sqm 531.00 0.00
In pedestal column, column, column capital, lift wall etc. (i)
2 v. 4th Floor
Ground floor Sqm 572.00 0.00

2 vi. 5th Floor Sqm 613.00 0.00

2 B) Beam: (Tee-beam, L-beam and rectangula beam , lintel Sqm 419.00 0.00
beam (i) Ground floor
2 ii. 1st Floor Sqm 460.00 0.00

2 iii. 2nd Floor Sqm 501.00 0.00

2 iv. 3rd Floor Sqm 542.00 0.00

2 v. 4th Floor Sqm 583.00 0.00

2 vi. 5th Floor Sqm 624.00 0.00


2 C) Lintel (i) Ground floor Sqm 419.00 0.00

2 ii. 1st Floor Sqm 460.00 0.00

2 iii. 2nd Floor Sqm 501.00 0.00

2 iv. 3rd Floor Sqm 542.00 0.00

2 v. 4th Floor Sqm 583.00 0.00

2 vi. 5th Floor Sqm 624.00 0.00

2 D) Roof slab (i) Ground floor Sqm 532.00 0.00

2 ii. 1st Floor Sqm 573.00 0.00

2 iii. 2nd Floor Sqm 614.00 0.00

2 iv. 3rd Floor Sqm 655.00 0.00

2 v. 4th Floor Sqm 696.00 0.00

2 vi. 5th Floor Sqm 737.00 0.00

2 E) Cornice, railing, drop wall, lover, fins etc. (i) Ground Sqm 387.00 0.00
floor
2 ii. 1st Floor Sqm 428.00 0.00

2 iii. 2nd Floor Sqm 469.00 0.00

2 iv. 3rd Floor Sqm 510.00 0.00

2 v. 4th Floor Sqm 551.00 0.00

2 vi. 5th Floor Sqm 592.00 0.00

2 F) Sunshade, false ceiling etc. (i) Ground floor Sqm 438.00 0.00

2 ii. 1st Floor Sqm 479.00 0.00

2 iii. 2nd Floor Sqm 520.00 0.00

2 iv. 3rd Floor Sqm 561.00 0.00

2 v. 4th Floor Sqm 602.00 0.00

2 vi. 5th Floor Sqm 643.00 0.00

2 G In Stair case, slab & steps, ramp (i) Ground floor Sqm 437.00 0.00

2 ii. 1st Floor Sqm 478.00 0.00

2 iii. 2nd Floor Sqm 519.00 0.00


2 iv. 3rd Floor Sqm 560.00 0.00

2 v. 4th Floor Sqm 601.00 0.00

3 Grade 300 (RB 300 /RB 300W: complying BDS ISO 6935- Kg 79.00 0.00
2:2006) ribbed or deformed bar produced and marked
3 ii. 1st Floorto Bangladesh sandard, with minimum yield
according Kg 79.48 0.00
strength, fy (ReH)= 300 MPa but fy not exceeding 330
3 iii. 2nd
MPa andFloor
whatever is the yield strength within allowable Kg 79.96 0.00
limit as per BNBC/ ACI 318, the ratio of ultimate tensile
3 iv. 3rd Floor
strength fu to yield strength fy, shall be at least 1.25 and Kg 80.44 0.00
minimum elongation after fracture and minimum total
3 v. 4th Floorat maximum force is 16% and 8%
elongation Kg 80.92 0.00
respectively : up to ground floor
3 vi. 5th Floor Kg 81.40 0.00

3 Grade 400 ( RB 400 / 400 W : complying BDS ISO 6935- Kg 82.00 0.00
2:2006) ribbed or deformed bar produced and marked
3 ii. 1st Floorto bangladesh standard , with mimimum yield
accoriding Kg 82.48 0.00
strength ,Fy(ReH) = 400 MPA but fy not exceeding
3 iii. 2nd Floor
418MPA and what ever is the yield strength within Kg 82.96 0.00
allowable limit as per BNBC sec 8.3.3.5/ ACI 318-11 sec
3 iv. 3rd Floor
21.1.5.2, the ratoi ultimate tensile strength Fu to yield Kg 83.44 0.00
strength fy, shat be at least 1.25 and minimum elongation
3 v. 4thfracture
after Floor and minimum total elongation at maximum Kg 83.92 0.00
force is 16% and 8% respectively : (i) Ground floor
3 vi. 5th Floor Kg 84.40 0.00

4 Brick works of width one brick or one and a half brick Cum 6443.00 0.00
length with first class bricks in cement sand (F.M. 1.2)
4 ii. 1st Floor
mortar (1:6) in superstructure including raking out joints, Cum 6614.00 0.00
filling the interstices with mortar, cleaning and soaking the
4 iii. 2ndatFloor
bricks least for 24 hours before use and washing of Cum 6785.00 0.00
sand, necessary scaffolding, curing at least for 7 days etc.
4 iv. complete
all 3rd Floor (measurement to given as 250 mm width for Cum 6956.00 0.00
one brick length and 375 mm for one brick and a half brick
4 v. 4th Floor
length) and accepted by the Engineer.(Cement: CEM-II/A- Cum 7127.00 0.00
M) i. In ground floor
4 vi. 5th Floor Cum 7298.00 0.00

5 125 mm brick works with first class bricks in cement sand Sqm 948.00 0.00
(F.M. 1.2) mortar (1:4) and making bond with connected
5 ii. 1stincluding
walls Floor necessary scaffolding, raking out joints, Sqm 979.00 0.00
cleaning and soaking the bricks for at least 24 hours
5 iii. 2nduse
before Floor
and washing of sand curing at least for 7 days Sqm 1010.00 0.00
in all floors including cost of water, electricity and other
5 iv. 3rd Floor
charges etc. all complete and accepted by the Engineer. Sqm 1041.00 0.00
(Cement: CEM-II/A-M) i. In ground floor
5 v. 4th Floor Sqm 1072.00 0.00

5 vi. 5th Floor Sqm 1103.00 0.00

6 Exposed brick works (for exterior wall without outside Cum 7894.00 0.00
plaster) with special quality sorted out first class bricks,
very carefully laid in cement sand (F.M. 1.2) mortar (1:4) in
superstructure with uniform width and depth of joints, true
to vertical and horizontal lines including raking out joints,
scaffolding, soaking the bricks at least for 24 hours before
use, washing and screening of sand, curing at least for 7
6 ii. 1st Floor Cum 8065.00 0.00

6 iii. 2nd Floor Cum 8236.00 0.00

6 iv. 3rd Floor Cum 8407.00 0.00

6 v. 4th Floor Cum 8578.00 0.00

6 vi. 5th Floor Cum 8749.00 0.00

7 Exposed 125 mm thick pointing ornamental brick work with Sqm 1155.00 0.00
sorted out first class bricks with cement sand (F.M. 1.2)
7 ii. 1st Floor
mortar (1:4) and making bond with connected walls Sqm 1186.00 0.00
including necessary scaffolding, raking out joints, cleaning
7 iii. 2nd
and Floorthe bricks for at least 24 hours before use and
soaking Sqm 1217.00 0.00
washing of sand, curing at least for 7 days in all floors
7 iv. 3rd Floor
including cost of water, electricity and other charges etc. Sqm 1248.00 0.00
all complete and accepted by the Engineer-in-charge.
7 v. 4th Floor
(Cement: CEM-II/A-M) (i) In ground floor Sqm 1279.00 0.00

7 vi. 5th Floor Sqm 1310.00 0.00

8 Brick works with 10 holes machine made bricks of Cum 11862.00 0.00
approved size (241 mm x 114 mm x 70 mm) having
8 ii. 1st Floor
uniform colour carefully laid in cement sand (F.M. 1.2) Cum 12033.00 0.00
mortar (1:4) in superstructure with uniform width and depth
8 iii. joints,
of 2nd Floor
true to vertical and horizontal lines including Cum 12204.00 0.00
raking out joints, filling the interstices with mortar, cleaning
8 iv. 3rd
and Floor bricks at least for 24 hours before use and
soaking Cum 12375.00 0.00
washing and screening of sand, necessary scaffolding,
8 v.
curing4th Floor
at least for 7 days and pointing with cement sand Cum 12546.00 0.00
(F.M. 1.2) mortar (1:2) including cost of water, electricity
8 vi. 5th
and Floor
other charges etc. complete and accepted by the Cum 12717.00 0.00
Engineer-incharge. (Cement: CEM-II/A-M) In ground floor
9 25 mm thick artificial patent stone (1:2:4) flooring with Sqm 372.00 0.00
cement, best quality coarse sand (50% quantity of Sylhet
9 ii. 1storFloor
sand coarse sand of equivalent F.M. 2.2 and 50% best Sqm 403.00
quality local sand of FM 1.2) and 12 mm down well graded
9 iii.
brick 2nd Floor
chips including breaking chips, screening, laying the Sqm 434.00
concrete in alternate panels, compacting and finishing the
9 iv. 3rd
top withFloor
neat cement and curing at least for 7 days in all Sqm 465.00
floors including cost of water, electricity and other charges
9 v. 4th
etc. all Floor
complete and accepted by the Engineer-in-charge. Sqm 496.00
(Cement: CEM-II/A-M) In ground floor
10 38 mm thick artificial patent stone (1:2:4) flooring with Sqm 468.00 0.00
cement, best quality coarse sand (50% quantity of Sylhet
10 ii. 1storFloor
sand coarse sand of equivalent F.M. 2.2 and 50% best Sqm 499.00
quality local sand of FM 1.2) and 12 mm down well graded
10 iii. 2nd
brick Floor
chips including breaking chips, screening, laying the Sqm 530.00
concrete in alternate panels, compacting and finishing the
10 iv. 3rd
top withFloor
neat cement and curing at least for 7 days in all Sqm 561.00
floors including cost of water, electricity and other charges
10 v. 4th
etc. all Floor
complete and accepted by the Engineer-in-charge. Sqm 592.00
(Cement: CEM-II/A-M) In ground floor
11 (a) GP (homogeneous) 300 mm x 300 mm floor Sqm 1526.00 0.00
tiles:Suppling ,fitting and fixing country made GP ( Gress
11 ii. 1st Floor - glazed of unglazed homogeneous floor tiles
Porcellanto) Sqm 1536.00 0.00
complying BDS ISO 13006 :2015, water absorbtion
11 iii. 2nd Floor
<_0.5% modulus of rupture (MOR) _>27 N/mm2 , Sqm 1546.00 0.00
Irrespective of color &/ or design , with cement sab (F.M.
11 iv. 3rd
1.2) Floor(1:4) base and ranking out the joints with
mortar Sqm 1556.00 0.00
white cement including cutting and laying the tiles in
11 v. 4th Floor
proper way and finishing with care etc. all complete and Sqm 1566.00 0.00
accepted by the Engineering -in-charge . ( Cement : CEM-
11 (b) GP ( (i)
II/A-M). homogeneous ) 400 mm x 400 mm floor tiles (i)
In Ground floor Sqm 1663.00 0.00
Ground floor
11 ii. 1st Floor Sqm 1673.00 0.00

11 iii. 2nd Floor Sqm 1683.00 0.00

11 iv. 3rd Floor Sqm 1693.00 0.00

11 v. 4th Floor Sqm 1703.00 0.00

12 Supplying, fitting and fixing country made mirror polished Sqm 2072.00 0.00
homogeneous floor tiles complying BDS ISO 13006:2015,
12 ii.
water1st absorbtion
Floor <_ 0.5% , modulus of rupture (MOR) >_ Sqm 2082.00 0.00
27 N/mm2, irrespective of color &/or design, with cement
12 iii. 2nd
sand Floor
(F.M. 1.2) mortar (1:4) base and raking out the joints Sqm 2092.00 0.00
with white cement including cutting and laying the tiles in
12 iv. 3rd way
proper Floorand finishing with care etc. all complete and Sqm 2102.00 0.00
accepted by the Engineer. (Cement: CEM-II/A-M) a. GP
12 v. 4th Floor
(morror polished) 600 mm x600 mm floor tiles i. In ground Sqm 2112.00 0.00
floor
13 Wall tiles more than 250 mm x 330 mm and less than or Sqm 1571.00 0.00
equal to 250 mm x 400 mm in sizes. Supplying, fitting and
13 ii. 1stcountry
fixing Floor made glazed wall tiles complying BDS ISO Sqm 1581.00 0.00
13006:2015 ,irrespective of color &/or design, with on 20
13 iii. 2nd
mm thickFloor
cement sand (F.M. 1.2) mortar (1:3) base and Sqm 1591.00 0.00
raking out the joints with repective joint filler & binder
13 iv. 3rd Floor
including cutting, laying and hire charge of machine and Sqm 1601.00 0.00
finishing with care etc. including water, electricity and other
13 v. 4th Floor
charges complete all respect accepted by the Engineer. Sqm 1611.00 0.00
(Cement: CEM-II/A-M). i. In ground floor
14 Glazed stair tiles having size of wide 250 mm to 300 mm Sqm 1553.00 0.00
and length 300 mm. Supplying, fitting and fixing country
14 ii. 1st GP
made Floorhomogeneous stair tiles having non skidding Sqm 1563.00 0.00
offset , complying BDS ISO 13006: 2015, water absorbtion
14 iii. 2nd Floor
<_0.50% , modulus of rupture (MOR) >_27N/mm2 Sqm 1573.00 0.00
irrespective of color &/or design, with cement sand (F.M.
14 iv.
1.2)3rd Floor(1:4) base and raking out the joints with white
mortar Sqm 1583.00 0.00
cement including cutting and laying the tiles in proper way
14 v. 4th
and Floor with care etc. all complete and accepted by
finishing Sqm 1593.00 0.00
the Engineer. (Cement: CEM-II/A-M) i. In ground floor
15 Supplying and making door and window frames (Chowkat) Cum 249308.00 -
for all floors with matured natural seasoned wood of
15 b) Silkaraisize including painting two coats of coal tar to the
required Cum 154787.00 0.00
surface in contact with wall, fitting and fixing in position
etc. complete and accepted by the Engineer. (All sizes of
wood are finished). (a) Chittagong Teak
16 c) Mehgoni Cum 120461.00 0.00

16 d) Garjan/Jam/Local sal Cum 130410.00 0.00

17 Supplying, fitting and fixing double leaf door frame for all Rm 611.00 0.00
floors made with 38mm x 38 mm x 6 mm M.S. angle fitted
17 Supplying,
with 150 mm fitting
longand fixing
6 nos. ironsingle
clamps leafofdoor
same frame
sizefor all
M.S. Rm 597.00 0.00
floors
angle made
(with one withend 38 mm x 38 mm
bifurcated) withx 6themmvertical
M.S. angle,
members
18 Supplying
fixing
of the 125
frame, matured
mm seasoned
long the
fixing 6 nos.
frame ironinwood
wall and
clamps ofmaking
with same size
cement roof truss
(with
concrete Cum 111101.00 0.00
of
oneany
end
(1:2:4), size with wall
bifurcated)
mending goodplates
withthethe asvertical
per design
damages, fixingincluding
members of the
6 Nos. of 100
18 a) Mehgoni
supplying,
frame,
mm long fixingfabricating
iron the frame
hinges and
with hoisting,
in wall
the scaffolding,
with cement
vertical members fitting
concrete
of the and Cum 102147.00 0.00
fixing
frame inallmending
(1:2:4), position
complete with
good bolts, nuts,
the damages,
including making painting
fixingtwo
holes coats100
4 nos.
in walls, of coal
mm
cutting,
18 c)
tarSilkarai/Chickrashi
sizeetc.
iron all complete
hinges with and
the accepted
vertical by
members the
sizing, welding, fabricating, carrying from work-shop to site Engineer-in–
of the frame, all Cum 133040.00 0.00
charge.
and local(All
complete sizes ofcuring
including
carriage, wood etc.
making are finished).
holes
all in walls,a)cutting,
complete as per plansizing,
and
19 Supplying
Garjan/Jam/Local
welding,
drawing and and making
fabricating,
accepted hand
salcarriage
by therail
from forworkshop
stair casetowith
Engineer-in-charge. sitematured Cum 123458.00 0.00
seasoned
including local woodcarriage,
includingcuring necessary
etc. asmoulding
per plan with
and proper
19 b) Localfinishing
corner,
drawing Sal all complete
etc. as per design, fitting and
and accepted byfixing in position
the Engineer- Cum 132413.00 0.00
in all floors etc. all complete and accepted by the
in–charge.
19 c) Chittagong Teak Wood
Engineer-in-charge. a) Mehgoni Cum 239420.00 0.00

20 Supplying fitting and fixing M.S. flat bar clamp 150 x 38 x Each 97.00 0.00
6mm size etc. all complete and accepted by the Engineer.
21 Supplying, fitting and fixing 38 mm thick well matured Sqm 11779.00 -
seasoned (minimum 250 mm wide plank) solid wood
21 (a) Gamari
single leaf door Wood shutter having top rail style of sections 100 Sqm 6390.00 0.00
mm x 38 mm, lock rail 125 mm x 38 mm and bottom rail
21 Supplying,
225 mm x 38 fitting
mm.and Closedfixingjoints
38 mm withthick
25 mm well xmatured
12 mm size Sqm 10180.00 -
seasoned
wooden peg (minimum
and provided 250 mm withwide
bestplank)
qualitysolid 4 nos wood100 mm
21 (a) Gamari
single
iron leaf flush
hinges, Wood
2 (two) doornos shutter
best having
quality 12 a frame
mm dia of top,
250 lock
mm Sqm 5386.00 0.00
and bottom rail of sections 100 mm
200 mm long iron tower and socket bolts, 2 (two) nos x 12 mm styles 100
21 Supplying,
mm
heavy x 38type mm fitting
covered
nickel and
plated fixing
with 38 mm
100
handle,1 mm(one)thick
x 12no well
mmbest matured
plank,quality Sqm 14285.00 -
seasoned
screwed
hasp bolt,tohinged (minimum
each face cleats,250 mm
andbuffer wide
providedblocks plank)
withand wooden
best qualitydouble
finished by4 nos
21 (a) Gamari
leaf
100
sand panel
mm iron
papering Wood
door shutters.
hinges,
etc. Topnos
all2complete
(two) rail in
and
bestall styles
floors of
quality 12sections
and mm dia
accepted Sqm 7553.00 0.00
100
250
by the mm xand38 200
mm,mm
Engineer-in-charge. locklong rail iron
125 mm xofand
tower
(All sizes 38woodmmsocketand bottom1
are bolts,
finished
21 Supplying,
rail
(one) 225 nomm
(a) Chittagong bestfitting
x quality
38Teakand
mm,hasp fixing
paneling 38 mm
bolt, thicknos
238(two)
mm finished
thick bothwell
heavy sides
type Sqm 13731.00 -
matured
raised,
nickel plated seasoned
provided with
handles, (minimum
best
hinged 2508mm
quality
cleats, nos wide plank)
100blocks
buffer mm longwooden
and iron
21 (a)
grooved
hinges,Gamari 2 Wood
single
(two) panel
nos bestflush door
quality
finished by sand papering etc. all complete in all floors shutters
12 mm diawith250 top mm and and Sqm 7373.00 0.00
middle
200
and mm rail
accepted long100iron
bymm x Engineer-in-charge.
tower
the 38 andmm,socket
bottombolts, rail 225 mm
2 (two)
(All x of
sizesnos 38 mm
21 Supplying,
and
woodstyle
heavy type100
are fitting and
mm plated
nickel
finished) fixing
x 38 mm, 36 mm
having
handle, 1 nothick
verticaland
hasp-bolt, having
panels 100
hinged Sqm 4989.00 -
density
mm
cleats, 400
(a)xChittagong
38 mmkg/cum
buffer including
blocksTeak solid
andkeepingparticle6 board
finished mmsand
by x single mmleaf
12papering, even flush
21 (a) Garjan
door
groove
necessaryforall Wood for
allaround
floors
screws and
etc.internal
minimum use12
all complete made mm ofgrooved
in all well matured
floors lap to
and Sqm 3885.00 0.00
mechanical
each
accepted panel. byseasoned
Providing 4Rubber
nos best
the Engineer-in-charge. (Malaysian
quality
(All 100 timber)
sizes mm or other
long
of wood iron
are
21 Supplying,
approved
finished)12wooden
hinges, fitting
mm
(a) diaand
Chittagongframe
best fixing 25 mm
having
quality
Teak thick
finished
200 mm and well
size250 matured
35 mm xlong 50 Sqm 5897.00 0.00
seasoned
mm socket(minimum
iron around upontower
and which 250 1.2
bolts, mmmm2 wide thick
(two) plank)
nos veneer Kathal
heavy (total
typewood
two
bestnos
21 S.F.F
door
of ofnickel
and
veneers
quality M.S
window
one Door shutter
of shutters
plated 0.7 made
for1all
mm horizontally
handle, withno
floors
(one) 38mm
best xquality
having
made of38
75 mm
garjon haspxand25 Sqm 5870.00 0.00
6mm
mm
another „Zangle
bolt, hinged‟ of 0.5 outer
battens, frame
provided
mm vertically
cleats, ,inner
wooden buffer with member
best
made blocks 25
quality
of Burma mmx
6 nos 6mm
100
Teak orsupply
including F.I
mm
22 (a)
bar
long
ChampaS.F.F.
,clading
iron or
of necessary ofChapalish
hinges,M.S.
with
nails162 window
BWG
nos
and grill sheet
M.S
62Garjan
or mm
screws, made
dia iron
wood)
finished ofring
12mmx12mm
,hinged
are
by sand withpapering
fitted
pested 50onmmx
with M.S
nuts,
each Sqm 2473.00 0.00
solid
50
2side
etc. bar
mmx6mm
nos bybest
complete with outer
M.S
quality
mechanized in all12 frame
anglemmChowkat
process
floors 38mmx6mm
dia,
as per250
and etc.
mmall
provided
drawing F.I.
andand Bar
complete
200
with as
mmper
best
accepted and
longby
22 (a)
the Supplying,
design
accepted
iron
qualitytower4approved
by
and
nos the
Engineer-in-charge. fitting
100 mmand
and
Engineer.
socket bolts,
long fixing
accepted
(All window
hinged
iron
sizes byofthe
hinges, grills
Engineer.
cleats,
wood 2 nos ofbest
buffer
are any design
blocks,
quality
finished). Sqm 1596.00 0.00
made
screws
12
(a) mm with
and20
dia
Chittagong 250 mm mmx and
finished
Teak 5with
mm F.I.mm
sand
200 bar as inner
papering
long in all
iron members
tower floorsandetc.butall
22 (c)
no Supplying,
outer
complete
socket frame;
bolts, fitting,
including
and2accepted
(two) fixing
nos by window typegrills
fabricating,
heavy of plated
welding,
the Engineer-in-charge.
nickel anycost designof
(All
handles, Sqm 2334.00 0.00
made
hingedofwith
electricity
sizes wood 25 mm
and
cleats, tools
are
buffer x and
6blocks,
mm
finished). F.I.necessary
plants bar
etc.as both
complete outer
screws and
foretc. allinner
all floors
section;
accepted including
by the fabrication,
Engineer-incharge.
complete and accepted by the Engineer-in-charge (a) welding, cost
(Total of
weight electricity
per sqm
workshop
should be
Burma Teak veneeredcharges,
approx 10carriage,
kg. and cutting
add or grooves,
deduct. @ mending
Tk. 160.00
good
for each thekg/sqm
damages, excesstoolsorand lessplants etc. complete for all
respectively
floors accepted by the Engineer-in-charge. (Total weight
per sqm should be approx 21 kg. and add or deduct @ Tk.
111.00 for each kg/sqm excess or less respectively)
(d) Supplying, fitting and fixing window grills made of 16
mm dia M.S. rod @ 100 mm c/c fitted with 3 (three) nos.
horizontal M.S. flat bar (38 mm x 6 mm) including
fabrication, welding, riveting, cost of electricity, workshop
22 charges, carriage, fixing with pre-placed clamps in Sqm 2206.00 0.00
wall/RCC member for all floors etc. complete and
accepted by the Engineer-incharge. (Total weight per sqm
should be approx. 22.8 kg and add or deduct @ Tk. 97.00
for each kg/sqm excess or less respectively)
23 (a) S.F.F. of M.S. verandah grill made of 12mmx12mm Sqm 2473.00 0.00
M.S solid bar with outer frame 38mmx6mm F.I. Bar as per
23 (b) Supplying,
design approved fitting
andand fixing verandah
accepted grill made of 10
by the Engineer. Sqm 2357.00 0.00
mm dia M.S. rod provided @ 75
24 (a)
mm12mm to 20mm
c/c in any thick
position cement
both wayssand plaster
as per design in with
skirting & Sqm 280.00 0.00
dado
outsidewith NCFof(1:4)
frame 25 mmall floor
x 25 mm x 6mm M.S. angle
24 (b) On masonry
including surface
fabricating, 10mmintoeach
welding 20mm thick
point in proportion
, painting 2 Sqm 228.00 0.00
(1:6)
coats(i)ofGround
synthetic floor
enamel paint over a coat of anti-
24 ii. 1st Floor
corrosive priming including cost of electricity, tools and Sqm 242.00 0.00
plants, workshop charges, carriage of the same including
24 iii. 2nd groves
cutting Floor in the R.C.C. or brick work, mending good Sqm 256.00 0.00
the damages with C.C. (1:2:4) etc, all complete for all
24 iv. 3rdaccepted
floors Floor by the Engineer-in-charge. [Rate is Sqm 270.00 0.00
excluding the cost of painting] (Total weight per sqm
24 v. 4th Floor
should be min 21.00 kg. and add or deduct @ Tk. 112.00 Sqm 284.00 0.00
for each kg/sqm excess or less respectively)
24 vi. 5th Floor Sqm 298.00 0.00

24 (c) On R.C.C. surface 6mm & above thick in (1:4) (i) Sqm 225.00 0.00
Ground floor
24 ii. 1st Floor Sqm 239.00 0.00

24 iii. 2nd Floor Sqm 253.00 0.00

24 iv. 3rd Floor Sqm 267.00 0.00

24 v. 4th Floor Sqm 281.00 0.00

24 vi. 5th Floor Sqm 295.00 0.00

25 Making groove in plaster on outside wall upto 38mm X Rm 35.00 0.00


6mm size including scaffolding, curing etc. complete as
26 Providing
per drawing dripand course
accepted or Nosingby theatEngineer..
the edge of sunshade Rm 116.00 0.00
or cornice with cement sand (F.M. 1.2) mortar (1:2) with
27 Exterior
fresh cement standard includingacrylicscaffolding,
emulsion paint curing of atapprove
least forbest 7 Sqm 238.00 0.00
quality
days, cost andofcolor water, having water and
electricity resistinng properties
other charges etc.against
all
26 Standard
fumgi,
complete synthetic
fadinf
in all& flaking
respect enameldelivered
as per paint of approved
from
drawing authorized
and accepted best quality
local by Sqm 189.00 0.00
and
agent colour
of thedelivered
the Engineer. manufacturer from (authorized
Berger weather local agent of the /
coat smooth
27 French
manufacturer
Elite smoot polishing to door
(Berger
exterior and
jhilik
/ Asian window
synthetic
apex weather frames coatand
enamel/Elite or shutters
quick Sqm 372.00 0.00
three
equivalentcoatsbrand)
drying/Asian over
decora aincoat of priming
asynthetic
seal enamel
container including putty,
or equivalent
applying cleaning
brand)
to exterior
28 Interior
finishing
in a sealed
surface stander
andcontainer,
with surface acrylic
polishing withemulsion
having
preperation sand paintetc.
paper
highincluding
water ( cleaning
Plastic
all complete
resistance, or
,high matt
drying in Sqm 234.00 0.00
finish)
all floorsof
bondibility,
making free approved
accepted
flexibility
from dirt best
byproperty;
,the quality
Engineer.
grease using
, waxand,removing
colour delivered
specified brand
all chalked from
29 Approved
authorized
thinner
and scaled best
applying localtoquality
materials agent
metallic
,fungus,and thecolour
ofor wooden
mending synthetic
manufacturer(
surface
good the polyvinyl
Berrger
bysurface Sqm 196.00 0.00
distemper
defects useing sand paper and necessary scaffoldingof: the
rbbialac
brass/roller/spray delivered
plastic emulsion
in 2 from
coats authorized
/Asian
over apcolite
single local
coat agent
plastic emulsion
anti-corrosive
30 White
of washing
manufacturer
equinalent
coating
applying 1 coatin
including by
brand)
of three
acleaning,
sealed
exterior in coats,
container,
asealer
sealed
drying, lime mixture
applying
container,
ofmaking
specific free
brandprepared
to
from wall
ondirt,and
applying at
to Sqm 22.00 0.00
least
ceiling
wall
grease,
prepared 12
andwithhours
wax, surface
ceiling
surface before
with
removing : then use,
preparation
surface
all slacking
applyingpreperation
chalked 1 and stone
including lime,
cleaning
ofincluding
coatscaled supplying
drying,
cleaning
materials,
specific putty of
31 Colour
of
making
,all gums,
drying wash
complete
specific freeblue,
making
brand with
infrom
forfree yellow
allstirring
dirt,from
floors
leveling orchard/any
thoroughly,
grease,
and dirt , filling
grease
accepted
spot other
wax, removing
removingthecolour
by, wax
,crack the pigment
alland
,removing floating
chalked
Engineer-in-
filling all Sqm 25.00 0.00
by two
materials
and
chalked
charge.
cutting coats
scaled
byandfrom overthe
materials,
sand scaled
paper amixer,
prime coat
surface
fungus,
materials
/zero water of white
paper;wash,
cleaning
mending
,fungus, good
mending
finnaly lime
to free
the mixture
from
surface
good
applying all
the
prepared
foreign
defects
surface at least
2 coat ofmaterials
using
defects
exterior sand12useing
before hours
emulsion paper before
andbyuse,
application
sand
paint of slacking
necessary
paper eachand
spreading coat, stone
scaffolding;
with necessary
brush lime,
applying
supplying
one
/rollarvertical
applying
scaffolding
/spary1of:coat
gums,
and
applying
machine ofone blue,
interior stirring
&horizontal
1 nessary
coat sealer thoroughly,
wash for
of specified
of scafolding
interior sealer removing
each
etc. ofcoat
brand
up specific
to the
and
on
floating
successive
prepared materials
coat is from
to be the mixer,
applied
desired finishing . elapsing specified time for drying or of
brand on surface;
prepared then
surface applying
: then 1 surface
aftercoat
applyingdrying
of cleaning
1 up
interior
coat ofof to
previous
putty free
interior
from
coat
putty all
recoating foreign
including
specified brand
of specific materials
hair forbrass,
brand
; all complete levelling,
for before spotapplication
providing
leveling
in all floors necessary
filling,
spot
and crack
filling
accepted of,crack
each
scaffolding
filling
by the coat,
and
filling
applying
and
cuttingcleaningone
by sand
cutting
Engineer-in- vertical
byplinth,
charge. sandfloors,
paper/zero and one
doors,
paperwater horizontal
/zeropaper;windows,
water wash
finally for
portions
paper; applying each
and2
finnaly
32 Manufacturing, supplying, fitting and fixing collapsible gate Sqm 17525.00 0.00
of any design and shape made of 25 mm x 25 mm x 3 mm
33 Manufacturing,
S.S. angle placed supplying,
@ 112 mm fitting c/cand fixing collapsible
vertically and connecting gate Sqm 5299.00 0.00
of
theany same design with and eachshape othermade by 25 of mm 25xmm 3 mm x 25 S.Smm flatx bar
3 mm
34 Supplying
M.S.
scissors angle 525 F/F
placed
mm/ of 20mm @ 112
600 mm diamm foreign
long c/c made in
vertically
provided aluminium
3 rows pipe
and Rm 655.00 0.00
curtain
connecting rail
including cutting for door
the same and window
with each
the different S.S. including
other membersby 25 mmcutting xand
to required3 mm fitting
35 Supplying,
etc.
M.S
sizes, all barfitting
complete.
flatfabricating, scissors and fixing
525
welding, mm/ best
riveting600 quality
mm
with longheavy
required type
providedsize19inmm 3 Each 525.00 0.00
dia
rows and
rivets, 300 mmcutting
including
providing long brass
required thesize different wheels, M.S.pulling members handles to on
36 Supplying,
hasp
required
both sides,boltsizes, fitting
including
suitable and fixinggrooves
cutting
locking mortice
arrangement, door
in door lock of approved
shutter
electrodes, and Each 1023.00 0.00
quality
grease including
frames,
fabricating, screws
and welding,
finally allplacing
etc. all complete
riveting thewith same required
in position size rivets,
in between
37 Average
necessary
approved
providing
2 (two) nos. 100 tools
and
required
50 mm and thick
accepted
mm size 50finished
xaccessories
by limeetc.terracing
mmthex 6Engineer-in-charge.
wheels, mm tee with
all complete
S.S. rail made20 mm by Cum 13165.00 0.00
down
approved
pulling graded
handlesand first class
accepted
on both brick
welding 2 nos. 50 mm x 6 mm S.S. flat bar fitted and fixed by
sides, the chips
suitable (khoa), locking surki from 1st
38 Extra
class rate
at top bricks and for
Engineer-in-charge
arrangement, and
bottom lime terracing
minimum
electrodes,
with R.C.C. work
lime
grease in
content
and
lintel/roof additional
500 floor:
slab,kgfloors
finally per 2.83 (a)
and2nd Cum 13267.00 0.00
floor
cubic
placing
side wallthemeter with (stone
same required lime
in position brought
nos. 150 at
in between site,
mm to 225 not being
2 (two)
mm Nos. long 38 50
39 Reinforced
powdered
mm x 50 6 mm mm inConcrete
open
x 6 flat
S.S. mm airbar Pad
andclamps
M.S. on
totee Roof
be slaked
rail one (1:2:4)
end excluding
in presence
welded withofMS the Cum 7602.00 0.00
Rod
engineer-in-charge
made
gate member by welding and2the andother
nos. to
50be mm
end measured
xbifurcated
6 mm M.S. in volume
and three
flatembedded
bar fitted
40 days
and
in C.C.
Supplying, after
fixed at at slaking
the top
fitting and
respectiveforbottom
and using
fixing point in
plainthe mix) incutting
including
particle the proportion
board holes
ceilingand Sqm. 2913.00 0.00
7:2:2
with
mending (brick
R.C.C. good chips
lintel/roof
the : surki
damages
(complying unit wt 499 to 550 kg/m3, bending strengthslab, : lime)
floors
by including
and
pouring side preparation
wall
concrete with (1:2:4)of the
41 mix
required
into theon
Supplying,
0.35 N/mm2,the nos.
holes ground
fitting150
andand
max by
mm
swellingmaking
finishing, to 225
fixing plain
8%, a
mm
both suitable
longcarriage,
end
particle
moisture platform
board
content under
including
asnot in item
more Sqm. 3147.00 0.00
proper
38 mm
greasing,
18.1.1.
than 10%), polythene
x 6electrodes,
for mm
of 12M.S.
ceiling cover.
of 12
mm flat
curing
thickmmCutting
barwith clamps the
etc.auditorium
for mix
one
complete
best quality twice
endasand
and daily
welded
per
other with
drawing
well with
type
42 limewater
the
andtall
of gate
seasoneddesign
Supplying, structures(1:10)
member and accepted
fitting
Garjan atand
and
beyond
woodleast the
fixing 4for
frameother
bymof 7the
days
up 12 mm 8until
oftoEngineer-in-charge
section m,thick the mixdoattain
75melamine
which mm xnot
38 cover
mm Sqm. 1765.00 0.00
desirable
end600
board
the
at above mmconsistency.
bifurcated
ceiling item
x 600 and
laminated
[Item
mm inLaying
embedded
No. by
grid the
in C.C.
mechanical
18.1.1]. suspended mix in athot
Description proper
thepress
from of slope,
respective
milkor
item
ceiling iswhite
the
43 beating
point
Supplying,
PVC
same the
including
membrane,
as in same
fitting
item cuttingwith
and
framing
No. standard
holes
fixing
18.1.1
roof or beam by 12 SWG double ply G.I. wire fixed to the by and
gypsum „koppa
aluminium
above. board ‟ for
T-bar minimum
ceiling
of of
natural9 7
mm Sqm. 2130.00 0.00
days
mending
thick
anodized toby
ceilingboard gain
good maximum
laminated
finish
rowel the damages
suspended
plug, byconsolidation,
screws, inby600
mechanical pouring
hooks, mmnails making
x concrete
hot press
600 etc,mmghoondy
with (1:2:4)
grid milk
maintaining and
from
44 neat
into
Supplying,
white
ceiling
straight finishing
the PVC byholes
lines12 fittingwith
and
and and
membrane,
SWG lime
finishing,
double
desired Surki
fixing
framing ply
finishedmortar
etc
stainless by level
wire, (1:2)
steel
aluminium
fixed and
(SS) curing
stair
theT-bar
attobottom ceiling
face for by21
ofrailing Sqm. 5361.00 0.00
days
complete,
of
natural
rowel
including providing
standard painting
anodized
plug, screws,
vertical polythene
heightstrut 2with
finish (two)
hooks,as 2mm cover
suspendedcoats
nails
required, thick after
with
etc., each
in approved
62 mmmm
600 day
dia SS
maintaining
cutting holes work
xbest
600 pipe and
quality
mm
instraight
slabs foror
45 cleaning
synthetic
Supplying,
hand
grid
lines
beams fromrailbyetc.
and enamel
as
ceiling
desired
electriccomplete
fitting
per bypaint
and
drawing 12fixing
finished
drill inand
over
SWG
machine all
levelarespect
verandah
accepted
double at
andbottom accepted
plyrailing
by
mending thewith
wire,
face by 2the
Engineer.
fixed mm
to
including
good thethe Sqm. 10268.00 0.00
Engineer-in-charge.
coat of
thick
ceiling
vertical
damages, 50by anticorrosive
mm
woodenrowel
if anydia plug,SS
strut
during hand1stexecution
painting,
screws,
as Floor
required, 2both
rail, hooks, mm end
making
of thick carriage,
nails
the 20 mm
etc.,
holes
work, inincluding
also dia
slabs5 nos or
46 greasing,
Supplying,
SS horizontal
maintaining
beams
including bycostelectrodes,
fitting andand
pipes,
straight
electric drill 2curing
fixing
lines
carriage mmand
machine of desired
thick rolling
50
alland mm shutter
mending
materials, of anySSthe
x 25accessories,
finished mm level
good design
atbox Sqm. 5461.00 0.00
etc.
and
vertical
bottom
damages,
labour complete
shape post
face
for ifmade@as450
including
any
installation, per
of 24
during mmdrawing
SWGc/c. Among
vertical
execution
electricity G.P.
and
wooden design
sheet
of
charge, thestrut unit
and asminimum
vertical
work, accepted
box post
required,
also
scaffolding, 69by5
47 S/F/F
the
mm
nos
making
screws, holes
including of Aluminium
Engineer-in-charge.
width
box having
posts
cost in
nails, will 10
of slabs be swing
mmfitted
all materials,
painting or and
beams
2 coats door
with 12 with
mm
floor spandrel
dia
bed
by electric
electricity,
over circular
by 65 as
ofdrill
a coataccessories, mm per
folding
machine
priming x the
withat
55 Sqm. 6612.00 0.00
U.S.
ends,
mm
and Architectural
(Ratexmending
scaffoldings,
best 6is
rolled
quality excluding
mm in
SS
and machine,
good
labour Aluminium
plate,the
the
approved cost locked
forremaining
damages,
installation,
colourManufacturer’s
of painting)
together
no SS box
if screws,
any
synthetic properly
during Association
post
nails,
enamel to
will
execution
etc. form
beall of
paint
48 S.F.F.
(AAMA)
rolling
fitted
the
completealland
etc. work, of aluminium
standard
shutter,
fixed
also
as
complete, per top
with
includingof50
drawing,
as sliding
specification
themm
per shutter
cost door
x of
design
drawing 25havinghaving
allto
mm 21.5mm
1.8
bexaccepted
fitted
materials,
and
design mm
andmm with
SS thick
thick
by outer
wall
circular
horizontal
electricity,
accepted the by Sqm 2841.00 0.00
bottom
frame
spring
box at size
accessories, (size101.60
box
bottom
Engineer-in-charge.
the Engineer-incharge. made 75.50mm,
(50ofmm
scaffoldings,mm. 22 above 17.79mm,
44.45
BWG
(All labour mm.of
sheet,
from
sizes 0.528
for 83.21
containing
floor kg/m),
mm).
bottom)
installation,
wood 1.5mm
2.33
best
screws,
are finished) mm
quality
including
49 S.F.F.
thick
spring
all outer
fittings,
nails, of
shutter
made
etc. aluminium
top in(size
size
fixtures,
all (54
China,
complete sliding
75.5mm,
mm, nutted
polishing,
as per 46 window
26.80mm,
mm),
with
carrying
drawing, 38 having
0.99mm
etc. 0.58
mm
design 1.5mm
G.I.
all kg/m),
thick
anddoor
pipe
complete thick
at one as Sqm 3563.00 0.00
outer
1.5mm
glass
end
per and bottom
bitthick
approved
accepted (size
the
by other (size
shutter
the 16.54
design 75.50mm,
end top
mm.
and (size
nutted
Engineer-in-charge. 14.49
drawing 32mm),
33mm,
to mm shutter
and 1.5mm
26.80mm,
0.115
accepted thick
kg/m),
including 0.536
by outer
2.5 themm
fitting the
49 b) Anodized
top
kg/m),
thick
G.I. (size 1.5mm
clousure
pipe
Engineer-in-charge. 75.5mm,
again tothickSilver
with16.80mm),
section 375 colour
shutter(sizemmbottom x 1.5mm
101.60 300 (size mm,
mm thick 6 shutter
x60mm,
42.93mmmm 24mm,
pankhatop
1.2 at Sqm 3485.00 0.00
(size
ends 33mm,
0.736
mm), kg/m)
106.60
with side 26.80mm,
etc.
mm allclousure
guide complete22mm),
channel cover (side 1.5mm
(Bronge(0.45
channel thickconsist
colour),
kg/m), shutter
4Size:
mmofthick 50
50 S.F.F.
bottom
2100mmx2100mm,
floor
mm xbottom of
100 mm aluminium
(size 60mm,
(size x 6101.60 fixed
24.40mm)
(Total
mm M.S. composite
wt.
mm. min.
plate etc.
12.70 window
all complete
14.789kg).
withmm 2 mm having
1 kg/m), (Bronge
Complete
x 19 mm 1.8 mm x 3in Sqm 3409.00 0.00
1.5mm
colour),
all
mmrespect
thick shutter
F.I. thick
Size:
bar,asmiddleouter
bottom bottom
1500mmx1400mm,
per drawing (size 82.6
channel (size
and 75.50mm,
(Total
accepted
mm,
consist of 2 wt.
43.99 by
mm 32mm,
mm,min.
the 0.695
9.081kg).
Engineer.
0.60
x 150 mmkg/m), x6
50 b) Anodized
kg/m),
Complete
a)
1.8
mm mm
M.S. 1.5mm
thickin to
plate all Silver
thick
respect
Bronze
shutter
with outer
2topcolour
mm colourtop
as(size per(size
x19 drawing
51
mm mm,75.5mm,
x 6 43.99andfixed
mm 26.80mm,
accepted
mm,to1.88 wallbyor Sqm 3355.00
0.78
the
kg/m)
column kg/m),
Engineer.
and with2.3 1.5mma)mm
clamps tothick
Anodized 4.01shutter
embedded to Bronze
mm intopR.C.C.
thick (size
colour
handle 33mm,
part(sizeby 101.60
cement
51 S.F.F.
26.80mm,
mm,
concrete 38.10in aluminium
0.536
mm, 25.40
(1:2:4) kg/mmm),
including door mmframes 1.5mm1.35
short,
cutting Partitions/windows
thick
holes kg/m)shutter
(minimum bottom
section 3 mm of allx Sqm 1352.00 0.00
distortion
(size
aluminum
25 mm 60mm, x 6freemembers
mm) glass
24.40mm,mending of
willapproved
kg/m)
betheanodizedetc.quality
damages, all to and
complete shade
aluminium
finishing, (Bronge
curing,
51 (b) 5mmend
including
colour),
bronze/silver
bottom thick
cost
Size: ambushed/frostedglass
of fitting,
1500mmx2100mm,
ofcolour
shutter with fixing
fitted a coat toall necessary
not
folded (Total
less accessories
wt.sheet
G.P.than min.
15 (min12.297kg)
micrones 125 Sqm 1120.00 0.00
etc.
Complete
in
mm complete
thickness
width and in allin all
respect respect
density of
two layers), as which as
per per
4 mgisperdrawing drawing
again and
square and direction
accepted
fittedcm to 25etc.mmbyxof
52 Renewing,
the
25 mm Engineer-in-Charge
Engineer.
including x 3allmm supplying
a)angle,
accessoriesAnodized and (a) fitting-fixing
like
providing to5mm Bronze
swing thick
handle of
colour
door 300
tinted
with mmbar
glass
clousure,
F.I. long 25F.I.
swing Each 96.00
Clamp
door
mm xlock, in
6 mm CC
swing (1:2:4)
and lockingdoor mohiar, arrangement labour charge, in both fabrication,
sides,
53 Renewing,
fitting
painting fixingtwosupplying
incoats
position, withand fitting-fixing
carriage
approved andcolour of and150 brand
electricity mm long
charge of F.I. Each 63.00
Clamp
keeping
synthetic inprovision
CC (1:2:4)
enamel for fitting
paint over5amm coatthick glass including
of priming etc.
54 Supply
completeofin
neoprene essential
sealant
all respect etc.hard complete
accepted waresinbyand allthe consumables
respect as per for
Engineer-in- Each 3260.00
repairing
drawing
charge. [Rate aluminium
and accepted is excluding door-widow
by the theEngineer. frame
cost of painting and shutter,
a) Anodized to
54 (b) Swing
partition
Bronze etc.
colourdoor (a)lock Swing door clouser Each 755.00
54 (c) Sliding door /window key lock Each 241.00

54 ( d) Sliding door /window wheel Each 85.00

55 Stripping of unserviceable plaster including racking out Sqm 25.00 0.00


joints, cleaning etc.
56 Picking-up of unserviceable patent stone from floor and Sqm 39.00 0.00
dado etc. and removal of debris to a safe distance.
57 Dismantling of plain concrete made of lime or cement and Cum 1325.00 0.00
removal of debris to a safe distance.
58 Dismantling of unserviceable/damaged brick works Cum 434.00 0.00
(with cement or lime mortar) of thickness 250 mm in
59 Dismantling
foundation and of unserviceable/damaged
superstructure and removalbrick ofworks
debris Sqm 53.00 0.00
(with cement
to a safe or lime mortar) of thickness 75/125 mm in
distance.
60 Dismantling
foundation andof R.C.C. beam, lintel,
superstructure and column,
removaldrop wall, to
of debris sun
a Cum 3347.00 0.00
shade from any
safe distance. height and removal of debris to a safe
61 Dismantling of R.C.C. Railing of any kind, jally brickwork,
distance. Cum 183.00 0.00
and hollow block wall from any height and removal of
62 Dismantling of R.C.C.
debris to a safe in roof slab and removal of debris to
distance. Cum 2790.00 0.00
a safe distance.
63 Taking out of old & unserviceable wooden chowkat /door Each 274.00 0.00
or window frame
64 Taking out of old wooden chowkat/door or window frame Each 857.00 0.00
and refitting and refixing after minor repair (excluding the
65 Renewing
cost of woodof fly
andproof
M.S.wire netting (with old and new
clamp) Sqm 630.00
materials) the excluding cost of wood
66 Renewing of 12 x 12 mm mesh wire netting the excluding Sqm 540.00
cost of wood
67 Taking out of hard board ceiling, walling Sqm 18.00

68 Renewing of hard board ceiling or walling excluding cost of Sqm 576.00


wood
69 Thorough repairs to wooden door and window Pannel Sqm 669.00 0.00
shutter excluding the cost of wood
70 Thorough repairs to wooden door and window Glazed Sqm 535.00 0.00
shutter excluding the cost of glass & wood
71 Repairing of steel grill/window frame and shutter/stair Sqm 739.00 0.00
railing, veranda grill, rolling shutter excluding the cost of
steel materials.
72 Renewing of 3 mm glass panes in wooden frame including Sqm 869.00 0.00
supply of glass
73 Renewing of 3 mm glass panes in steel frame including Sqm 989.00 0.00
supply of glass
74 Renewing of 5 mm glass panes including supply of glass Sqm 1101.00 0.00

75 Taking out of hard board ceiling, walling Sqm 18.00 0.00

76 Renewing of hard board ceiling or walling excluding cost of Sqm 576.00 0.00
wood
77 Replacing of wooden cleat, making, finishing and fixing Each 75.00 0.00
with chowkat by means of 40 mm hinge
78 Replacing of cleat with brass hinge Each 79.00 0.00
79 Replacing of wooden buffer block Each 55.00 0.00

80 Replacig of wooden catcher block Each 81.00 0.00

81 Replacing of 75 mm long galvanized iron catch hook Each 14.00 0.00

82 Replacing of 100 mm long galvanized iron catch hook Each 16.00

83 Replacing of 150 mm long galvanized iron catch hook Each 19.00

84 Replacing of 200 mm long galvanized iron catch hook Each 21.00

85 Replacing of 225 mm long galvanized iron catch hook Each 27.00

86 Replacing of 75 mm long iron hinge Each 46.00

87 Replacing of 100 mm long iron hinge Each 78.00

88 Replacing of 75 mm long brass hinge Each 153.00

89 Replacing of 100 mm long brass hinge Each 204.00

90 Replacing of 50 mm dia iron ring Each 29.00

91 Replacing of 75 mm dia brass ring Each 60.00

92 Supplying, fitting and fixing of 25 x 25 mm expanded mesh Sqm 917.00


metal net of wooden or steel frame (excluding the cost of
wood or steel sections and painting)
93 Supplying, fitting and fixing of 25 x 25 mm expanded mesh Sqm 1687.00
metal net in F.I. Bar frame ( including the cost of F.I. Bar)

94 Labour for taking out C.I. sheet roofing Sqm 32.00

95 Labour for taking out and refitting of old G.I. Ridge/valley meter 128.00

96 Labour for C.I. Sheet roofing including supply of limpet, Sqm 103.00
washer, screws, putty etc.
97 Labour for C.I. Sheet walling including supply of limpet, Sqm 77.00
washer, screws, putty etc.
98 Renewing of Exterior standard acrylic emulsion paint of Sqm 146.00 0.00
approved brand and quality: 2 coats
99 Renewing of standard synthetic enamel paint to door- Sqm 148.00 0.00
windows frame and shutter: 2 coat
100 Renewing of synthetic polyvinyl distemper : 2 coat Sqm 115.00 0.00

101 Renewing of Interior standard acrylic emulsion paint Sqm 130.00 0.00
(Plastic) to walls and ceiling: 2 coat
102 Renewing of white washing: 2 coats Sqm 18.00 0.00

103 Renewing of colour washing with yellow ochre: 2 coats Sqm 21.00 0.00
104 Site cleaning work LS 5000.00 0.00

Total above plinth level Tk. 0.00

A-II Sanitary and Plumbing Works.

1 Supplying, fitting and fixing of European type glazed Each 11966.00 0.00
porcelain combi closet, including plastic seat cover, cistern
2 Supplying,
system, preparing fitting and thefixing
base of withEuropean
cement type concrete glazed and with Each 3158.00 0.00
porcelain
wire meshcommode "S" type 465in all floors including
or rods if necessary,
3 Supplying,
mm
making x 340 holes fitting
mm and mm
x 415
wherever fixing in plastic
required size, and low-down
mendingincluding
approximately 14 kgtheby
good all Each 1920.00 0.00
fittings
weight,
damages and
plastic
and accessories
seat cover
fitting, each
fixing, and preparing
finishing etc. the base with
complete with all
4 Supplying,
cement
necessary fitting and
concrete
fittings andfixing
with of Bangladesh
wire
connections mesh or rods,
approved pattern, long
if necessary,
and accepted Each 2272.00 0.00
pan
in
byall with
thefloors foot-rest,
Engineer-including made of
making (a)
in- charge. vitreous
holes China
670wherever clay
mm x 365required and
mm x 755 and
5 Supplying
preparing
mending
mm, 31.0good of white
the
kg: base glazed
of pan
the damages,
Special vitreous
coloured withfitting,
cement
(Deep W/H wash
mortar
fixing,
Blue/ basin
(1:4)Rain
finishing
Ruby/ and
etc. Each 9757.00 0.00
including
with
complete
Forest/ pedastal
wireGreen)
mesh
with allornecessaryand fitting,fixing
rods, fittings the
if necessary in same
and in position
allconnections
floors including
6 Supplying,
with
making heavy
approved holes fitting
andtype andbrackets,
C.I.
wherever
accepted fixing
required
by the of white
32 mmglazed
and
Engineer- dia PVC
mending in-vitreous
wasteW/H
good
charge. water
the
a) Each 3050.00 0.00
wash
pipe
Whitewith
damages basin brass
and excluding,pedestal,
coupling
fitting, fixing,(notfinishing fitting,
exceeding etc.fixing
750 the
mmsame
complete inwithinall
7 Supplying,
position
length),
necessary with
32 fitting
mm heavy
fittings and
dia andtype
C.P.fixing
C.I.basin
basin
connections Brackets.
waste pedestal,
with30 chain
approved mm with
anddiarowel
plug,
acceptedplug Each 1846.00 0.00
and
bracket
by the screws
PVC,waste including
Engineer- etc. allin-
water complete
pipe
making withholes
charge approved
brass walls and
in coupling and(not accepted
floors andby
exceeding
8 Supplying,
the
530Engineer-
750
fittingmm
mm fitting
withinx wooden in-mm
length),
430 and
charge.x fixing
basin 670
210waste
blocks, mm of mm
screwssingle xand
with,chain
size bowl
&186 mm
mending
12.5 stainless
plug
kg xof170 good steel
mm
including
weight the Each 4144.00 0.00
sink
size.
making with
Light
Special holes
damages sink tray
Colored
withincement
coloured (size
walls and 450
(Ivory/
mortar mm
Alpine
floors x 1050
White/
andetc.
(1:4), mm)
fitting Grey/ with Pink/
with wall,
all complete heavy Blue/
9 Supplying,
type
Aqua
screws
approvedCIVerde)
steel fitting
and,mending
and and good
brackets,
accepted fixing
12bymm of double
the dia C.P.bowl
damages,
Engineer- in-stainless
bib-cock,
finishing
charge 40etc.steel
mm all Each 7390.00 0.00
sink
dia with
665C.P.
completemmchainsink 490tray
xapproved mmwith
plug, heavy
x40840
and mmaccepted
mm diatype
inC.P. byCIwaste,
size, or29.5
steel 40brackets,
the,Engineer-in-
kg ofmm dia 12
weight .
10 Supplying,
mm
PVC
charge.
Specialdia
wasteC.P.
. 600 fitting
coloured chain
pipe
mmwithandxplug,
(Deep 465fixing
brassmm
Blue/ of
40 coupling
mm porcelain
xRuby/
225diamm C.P.
(750
Rain insink,
waste,
mm
size 635
Forest/ mm
40Green)
length)
,14kg mm ofx dia Each 3299.00 0.00
480
PVC mm
waste
including
weight x195
making
.Special pipemm with
holesize,
coloured in19.5
brass walls
each kgand floors
coupling (750and mmmending
length)
11 Supplying,
of weight
including
good fitting
fitted
making
the damages, andand
hole fixing
fixed with
in walls
finishing ofwith
450
heavy
and1:4 xfloors
600
type
cement mm
C.I. size
and brackets,
mending
mortar andetc. 512 Each 886.00 0.00
mm
good thick
dia
theC.P.
all complete unframed
damages,bib cock,
approved super40
andmm
finishing qualityetc. all
accepted mirror by with
complete hard boards
approved
the Engineer-in-
12 Supplying,
at
dia
and the
C.P.
charge. backchain
accepted fitting
(Malaysiawith alland
plug.
by the 40fixing
mm super
/ necessary dia.fitting
Engineer-in-charge.
Singapore C.P.quality
/ Thailand including
waste, 600 40xmaking
(Malaysia
made 125
or mm
mm dia
/ Each 1412.00 0.00
coloured
holes
PVC in glass
walls
waste/ pipe
Singapore
equivalent). and(plate)
Thailand mending
with brass shelf having
good
made or equivalent). the 5 mm
damages thickness with with
13 Supplying,
fancy
cement
coupling C.P.
mortar
(750 fitting
brackets,
mm and
(1:4) fixing
screws
etc.
length) ofandsuper
allincluding
complete frames quality C.P.
including
approved
making holes towel
and making
in wallsrail Each 711.00 0.00
of
and600
holes
accepted inmm
floors walls
by long
and and
the and 20 mm
mending
Engineer.
mending good in diathe
good
(Made with
in C.P.orholder
damages
Japan with
equivalent)
14 Supplying,
including
cement
the damages mortar fitting
making and
drills
(1:4)
with fixing
etc.
cement in all
wallsof special
and(1:4)
complete
mortar toilet
mending
approved
etc. all paper
good and holder
completethe Each 444.00 0.00
with
damagescoverby
accepted
approved of the
with
and size
cement (150 mortar
Engineer.
accepted mmby the x 150(1:4)mm etc.x all126 mm) including
complete
15 Supplying,
making
approved
Engineer- drills fitting
and
in- in and and
walls
accepted
charge. fixing of standard
bymending
Colored the Engineer-goodsize in- soap
the damages
charge tray with Each 363.00 0.00
including
cement mortar making holes
(1:4) etc.inallwalls and mending
complete approved good andthe
16 Supplying,
damages
accepted by fitting
with the and fixing
cement
Engineer- mortar of (1:4)
in- Liquid
charge. etc.soap dispenser
all complete
Colored (porceline) Each 1060.00 0.00
(push-up
approved type) to dispense
and accepted by the 16 oz (.47 liters)
Engineer- in- of
chargesoap,
17 Supplying,
detergent
Porcelain soap orfitting
lotion. and
tray Unitfixing
(white) shallofbe Stainless
fabricated steel of floor
tamper grating Each 257.00 0.00
of following
resistant, type 26.28.1
chrome Supplying,
plated plastic, fitting andwhite
a translucent fixing of 125
18 12
mm mmdia special
polyethylene stainless soapquality
steel CP
floorbibgrating
container, cocka:in
and Supplying, infitting
traps or resistant
corrosion drainsand Each 1104.00 0.00
fixing
includingof best
dispensing making quality
valve holes
which faucets
in
can etc. complete
walls/floors
provide noand more approved
mending
than 5 good and
lbs
19 12
the
(22.2mm
accepted
damagesCPbyspecial
Newtons) the
with heavy and
Engineer-
cement
pressure duty pillar
in- unitcan
mortar charge(1:4) cockbeetc. : Supplying,
all complete
reloaded by Each 1280.00 0.00
fitting
approved
unscrewingand and fixing
base offrom
accepted bestbracket
quality
by the collar,CP
Engineer-pillar cock
inverting etc.
unit,complete
in- charge. and
20 12 mm CPandaccepted
approved
unscrewing Stop
soap cock container concealed(heavy)
by the Engineer-
in which soapin- : will
Supplying,
continuefitting
charge to Each 1245.00 0.00
and fixing of stop cock with all
feed properly until empty with a continuously visible soap necessary hardware and
21 12 mm
consumables
level etc.CPallsurfaceapproved
complete mounted angle
and accepted
approved andstop bycock
accepted (Heavy
the Engineer-
by the in- Each 853.00 0.00
Type):
charge
Engineer- Supplying,
in- charge. fitting and fixing of angle stop cock etc.
22 Moving
each type
complete 100 mmand
approved CPaccepted
shower rose: by theSupplyingEngineer-and in- Each 1396.00 0.00
fitting-fixing
charge cleansing shower for ablution including holder
23 Supplying
etc. all complete and fitting-fixing
approved hand / push shower
and accepted by thefor ablution
Engineer- Each 967.00 0.00
including
in- chargeholder . etc. all complete approved and accepted
24 100
by the mm dia uPVCin-„Pcharge
Engineer- ‟ or „S‟Moving trap :Supplying
type pushdifferent shower Each 611.00 0.00
inside dia best quality uPVC clean out / trap having
specific gravity 1.35 -1.45 and other physical, chemical,
themal, fire resistivity properties etc. as per BSTI approved
manufacturer standards or ASTM, BS/ISO/IS standards,
fitting and fixing in position etc. complete approved and
accepted by the Engineer- in- charge.
25 Rain water pipe: Supplying, fitting and fixing of 100 mm Rm 701.00 0.00
inside diameter & wall thickness 2.7 mm - 3.4 mm best
26 Supplying
quality uPVC 100rain
mmwaterinsidedown
dia best
pipequality
fitting, uPVC
fixed insoil, waste
position Rm 617.00 0.00
and
with ventilation
head and shoes, pipe having
bends,specific gravitymm
minimum20 1.35-1.45,
width F.I.wall
27 Supplying
thickness
Bar clamp3.4- 150
and4.0mm inside
mm,
nails, andand diaother
bestphysical,
including quality uPVC soil,
chemical,
all accessories suchwaste
as Rm 1075.00 0.00
and ventilation
themal, pipe having
fire resistivity roof
round grating/domed specific
properties
grating,etc. gravity 1.35
as persockets
bands, - 1.45,
BSTI approvedwall
28 25 mm dia4.5
thickness
manufacturer
approved G.I.mm
and pipe
standards
acceptedwithmm,
- 5.2 wall
or
by thickness
and
ASTM,
the other
Engineer- 3.35
in- mm,
physical,
BS/ISO/IS outside
chemical,
standards
charge. Rm 424.00 0.00
diameter
thermal, min
fitting andfire 31.7
in mm,
resistivity
fixing weight
with2.59
properties
position etc.kg/m,
sockets,as percan
bends, withstand
BSTI with all
29 32
min mm diamanufacturer
50 kg/cm2
approved
accessories G.I.
suchpipe
aswith
hydraulic
roundwall thickness
pressure
standards 3.25
or ASTM,
grating/domed mm, outside
BS/ISO/IS
roof grating Rm 529.00 0.00
diameter
standards min
bands, sockets 38.5
fitting and
etc. mm, weight
fixing 3.33 kg/m,
in position with can withstand
sockets, bends,
30 40
min
with mm
50 dia
all kg/cm2
approved G.I.accepted
accessories
and pipe such
withby
hydraulic wall thickness
pressure.
astheRound 3.25
in- mm,
grating/domed
Engineer- outside
charge roof Rm 669.00 0.00
diameter min 46.5
grating bands, mm, etc.
sockets weight 3.83 kg/m,
approved can withstand
and accepted by the
31 50
min mm
50 dia
kg/cm2G.I.
Engineer- in- charge. pipe with
hydraulic wall thickness
pressure 3.65 mm, outside Rm 860.00 0.00
diameter min 57.3 mm, weight 5.38 kg/m, can withstand
32 75
min-8050 mm
kg/cm2 dia G.I. pipe with
hydraulic wall thickness 3.25 mm,
pressure Rm 1526.00 0.00
outside diameter min 86.5 mm, weight 7.22 kg/m, can
33 100 mm dia
withstand min G.I.
50pipe
kg/cm2withhydraulic
wall thickness 3.65 mm, outside
pressure Rm 2262.00 0.00
diameter min 107.3 mm, weight 10.42 kg/m, can withstand
34 12
minmm dia wall thickness
50 kg/cm2 hydraulic 1.7 mm - 2.8 mm uPVC Pipe:
pressure. Rm 102.00 0.00
Supplying different inside dia best quality uPVC pressure
35 pipe
19 mm fordia
waterwallsupply
thicknesshaving1.9specific
mm - 2.9 mm uPVC
gravity 1.35 -pipe
1.45, Rm 140.00 0.00
and other physical, chemical, themal, fire resistivity
36 25 mm dia etc.
properties wallasthickness
per BSTI2.2 mm - 3.4manufacturer
approved mm uPVC pipe Rm 164.00 0.00
standards or ASTM, BS/ISO/IS standards fitted and fixed
37 in
37position
mm dia withwall sockets,
thicknessbends,2.5 mm - 3.1
with all mm uPVC pipe
accessories such Rm 157.00 0.00
as Round grating/domed roof grating, bends, sockets etc.
38 approved
60 mm diaand wallaccepted
thicknessby3.0 themm - 3.9 mm uPVC pipe
Engineerin-charge. Rm 360.00 0.00

39 Providing 37 mm dia and 600 mm long PVC spout Each 228.00 228.00

40 Groove cutting in brick work and R.C.C work, including Rm 65.00 0.00
cost for concealing of G.I. pipe / upvc pipe work (12 mm
41 (a)
and20 20mmmmbrass
dia) ingate
brickvalve
wallSupplying: fitting and
by cutting groove fixing of
in wall, Each 484.00 0.00
best
lintel,quality
beam G.I.
etc. gate
by any valve withcarefully
means sealant etc. complete
without damaging
41 approved
(b) 25
the mmand
structurebrass gate
fillingvalv:
accepted
and by grooves
the the Engineer- in- charge
with C.C (4:2:1) after Each 650.00 0.00
laying of pipe including cost of scaffolding, finishing, curing
41 etc.
(c ) 40 mm brassapproved
all complete gate valve: and accepted by the Engineer- Each 1072.00 0.00
in- charge. Groove size 40 mm x 40 mm (For laying 12
41 (d)
mm50 mmmm
to 20 brass
dia gate
pipes) valve Each 1714.00 0.00

42 a) 50 mm dia G.I. Union. Supplying, fitting and fixing of Each 416.00 0.00
G.I. Union with sealant etc. complete in all respects
42 approved
b) 40 mm and
dia G.I. Union by the Engineer- in- charge.
accepted Each 356.00 0.00

42 c) 25 mm dia G.I. Union Each 195.00 0.00

43 (a) 1000 liter capacity : Supplying, fitting and fixing of food Each 10912.00 0.00
graded plastic overhead water reservoir tankincluding all
43 necessary
(b) 1500 liter capacity:
fittings, hardware and consumables etc. all Each 15295.00 0.00
complete approved and accepted by the Engineer- in-
43 charge.
( c) 2000 liter capacity: Each 20064.00 0.00

44 Supplying, fitting and fixing of best quality G.I. float valve, Each 568.00 0.00
threaded joint Pit valve etc. complete approved and
accepted by the Engineer- in- charge. (a) 25 mm brass
float valve
45 Inspection pit: Construction of masonry inspection pits up Each 5810.00 0.00
to a depth of 700 mm with 250 mm thick brick work in
46 Construction
cement mortarand (1:4)placing
including of R.C.C 100 mm inspection
thick R.C.C.pit cover top Each 2280.00 0.00
(slab) with supplying
slab (1:2:4) and provisionsman-hole
with 1% reinforcement, for placing, fitting,
cover with
47 (a)
fixing100450
locking users
mmSeptic
arrangement dia C.I.tank.Construction
man-hole
ncluding cover with
necessary of earth
septicwork,side
tank with Each 183728.00 0.00
walls
filling of brick
onework
locking/unlocking
and brick inflat
cement
soling.mortar
arrangement mm(1:6)
including
75 having
(1:3:6)a(1:2:4)
concrete
thick lining of
base
47 minimum
(b) 50approx.
with
concrete users
for Septic
125making
1% tank.
mmre-enforcement,
R.C.C cast against
nvertchannel and the
necessary12 mm walls
earth as cutting,
thick per(1:2) Each 121120.00 0.00
approved
or cleaning,
cement type
plaster side plan over
filling,
with afinishing
neatcuring bricketc. flatetc.
soling
with and 150
minimum
all 12mm mm
47 thick
(c) 10reinforced
cement users
plaster
completeapproved Septiccement
(1:4) tank.
and concrete
andaccepted
neat cement flooring
by the (1:2:4)onwith
finishing
Engineer- in-125
edges Each 46023.00 0.00
mm
and
charge thickallwalls
top Clear completein partition
450 mm andx 450 andmm
accepted 12 andmm thickEngineer-
by depth
the cement
450 mmplaster in-
to
48 (a)
600100
(1:4)
charge. with
mm, users
950N.C.F.
average mmSoak tox525wellmm
insides
950 :Construction
mm ofx walls
for 75 mm
single of
on150 soak
floor
R.C.C.
mm and well
pit
dia allR.C.C.
cover around
with Each 76264.00 0.00
(medium
outside
450 mm and
walls
dia large
by
C.I. 450 sizes)
manhole mm with
height
cover.
pipes and 400 mm PVC pipe with pit cover and 450 mm 250at mm
top thick
including solid brick
supplying,
48 work
(b)
dia 50
fitting users
and
and
C.I. 250 Soak
fixing
man-hole mm of well
two :R.C.C.
honey combTees brickand workproviding
with cement 450 mm Each 64420.00 0.00
mortar
dia
cover. (1:6) as per design
water sealed heavy type C.I. manhole cover over R.C.C. (1:2:4) well
with curb
48 with
(c) 101% users Soak arrangement
reinforcement
locking/unlocking well: up to theand depth 100asmm perthick
drawingR.C.C with Each 37667.00 0.00
450
(1:2:4)mmtop diaslab,water sealed centering,
including heavy type.shuttering, C.I. manhole cover
fabricating,
49 Supplying
with
casting andand
locking sinking
arrangement,
curing etc.ofcomplete
40filling
mm the dia water
up well
to upgrade
requiredto the uPVC
required
depth Rm 182.00
tube
depth well
including withpipegraded
necessary having khoa wall
earth and thickness
worksand 2.5 mmsupplying
including
in excavation toand
3.0shoring,
mmand
50 Supplying
including
bailing outtrial
fabricating and
M.S.
water sinking
boring
andand
rod, of 40
casting,
side with mm dia
allincluding
curing
filling waterthe
necessary
including grade
fittings uPVC
ofasall
necessary
cost Rm 329.00
tube
required
earth well
work
materials, pipe
etc.in all having
complete
excavation,
operations wallside
and thickness
and accepted
filling and
incidental 2.5 bymm the
bailing
charges. toetc.
3.0
outallmm
Engineer-water
51 Supplying
including
in-charge.
complete cost and
trial
a.
as per 40 sinking
boring
mm
of type andof
dia
all materials 3
with
pipe m
plan approved long
all
up to uPVC
necessary
60
etc. all and m strainer
depth
complete fittings
accepted with
as per by all
as the Each 500.00
necessary
required
rawing, etc.fittings
all
design approved
Engineer-in-charge as
complete required
(Rateand and etc.
acceptedcomplete
acceptedcost
is including by
by the and
the accepted
Engineer-
of (Rate is
52 Supplying,
by
including
reinforcement a.fitting
the Engineer-in-charge.
in-charge. cost 40of
and and
mm fixing
itsdia
reinforcement pipeofbeyond
fabrication, No.
and 6 its
pump
binding60 m fordepth.
fabrication,
and 40 mm
placing dia
binding Each 3252.00
tube well withEngineer-
and placing) all necessary in- chargefittings including 0.61 m long
53 Construction
40 mm dia G.I. of Pipe
platform etc. of allsize 1.4 m as
complete x 1.0
permaccepted
and outlet by Each 4946.00
drain up to1 meter long, as per drawing with 75 mm thick
the Engineer-in-charge.
54 250
cement mmconcrete
and above thick
of f'c minbrick 17 MPa workwith (1:6)brick
in chips and Cum 6743.00
old/unserviceable
cement content relates septictotank 1:2:4, over a brick flat soling and
55 125 mm thick
providing 125 mm brickx work75mm(1:6) brickin band
old/unserviceable
in 1:6 all around, septic Sqm 1069.00
tank
including finished with 12 mm thick cement plaster in 1:4
56 Clearing
followd bysiltneat fromcement
soak well up to all
finishing 1.4complete
m dia and Each 2009.00 0.00
accepted by the Engineer-in-charge
57 Clearing sludges & night soil from septic tank removing to Each 16808.00 0.00
a safe place/distance without affecting environment. (a)
200 user septic tank
57 (b) 100 user septic tank Each 9563.00 0.00

57 (c) 50 user septic tank Each 5458.00 0.00

58 Clearing silt from soak well up to 1.4 m dia Each 2009.00 0.00

59 Clearing sludges & night soil from Inspection pit Each 502.00 0.00

60 Cleaning and mending good the damages surrounding the Each 146.00 0.00
mouth of spout/rain water down pipe
61 Clearing sludges & night soil from RCC soil pipe & sewer Rm 103.00 0.00
line
62 Cleaning rain water down pipe Rm 5.00

63 Taking out broken European type Commode Each 176.00

64 Taking out broken Long Pan Each 196.00 0.00


65 Taking out broken European type Commode Each 176.00 0.00

Total for Sanitary and Plumbing Works. Tk. 0.00

A-III INTERNAL ELECTRICAL WORKS

1 Concealed conduit point wiring (BYM) (without switch): Point 885.00 0.00
Concealed conduit wiring for following point looping at the
1 b.Fan Point
switch board with earth terminal with 1C-2x1.5 sqmm PVC Point 885.00 0.00
insulated and sheathed stranded cable (BYM) & same size
1 c.Callinsulated
PVC bell pointECC with gang (BYA)bell (Greenpush / White color) including Point 928.00 0.00
circuit wiring with IC-2x2.5 sqmm PVC insulated and
1 Concealed
sheathed stranded wiring (BYM) cable: Concealed
(BYM) & conduit same wiring size PVC with Rm. 190.00 0.00
following PVC insulated
insulated ECC (BYA) Green / White color through PVC and sheathed stranded cable
1 b.IC-2x4sq.mm
(BYM)
conduit& (one PVCconduit BYM cable
insulated from Greenwith
switch /4sqWhite mmcoloured
board BYA ECC
to common ECCpoint wire Rm. 259.00 0.00
through
(BYA)
on ceiling PVC
through pipePVC
is considered of minimum to drawinner
conduit 3ofpair diaof20mm
reputed having
cablemanufacturer
) of reputed
1 c.IC-2x6sq.mm
minimum
complete
manufacturer wall BYM
with thickness
18
of SWG
minimumcable GPwith
1.5mm. sheet
25 6mm sqand mmdiapullBYA
& box ECC
1.5 with
mm 3mm wall Rm. 335.00 0.00
through
thick
thickness PVC
ebonite completepipe
sheetofcover, minimum
with 18fixingSWGinner diasheet
materials
GP 20mm etc./ having
as required
PVC switch
1 f.IC-2x10sq.mm
minimum
board & wall
including pullmending boxBYM
thickness with cable
the 1.5mm.
3mm withthick
damages 10sqebonitemm BYA
good. All ECC
sheet electrical
cover, Rm. 478.00 0.00
through
contacts PVC
shall pipe be ofof minimum
brass
without switch, fixing materials etc.(without switch) as / inner
copper dia 20mm
connected having through
1 j.IC-4x4
required sq.mm
minimum
connector wall
or soldering
including NYY/2XY/XLPE
thickness (1.5mm.
mending no twisting cable
the shallwithbe4 sqmm
damages allowed)
good. and All Rm. 381.00 0.00
(BYA)
cables ECC
electricalshall through
contacts PVC
be manufactured pipe
shall be of brass of minimum
and /tested copper inner dia 30 to
according
connected
1 g.IC-4x6
mm
relevant
through having sq.mmNYY/XLPE
IEC minimum
connector / BDS or wall
/ BS /cable
VDEwith
thickness
soldering 1.56sqmm
(no mm.
standards twistingandBYA ECCper
as
shall be Rm. 538.00 0.00
through
allowed)PVC
detailed andpipe
specificationcables of minimum
mentioned
shall beinner india 40mm having
Annexure-1
manufactured andof tested
PWD
1 h.IC-4x10
minimum
Rate
according Schedule sq.mmNYY/
wall thickness
to relevant2018..IEC 2XY/XLPE
The 1.9mm.
/ work
BDS shall / BS cable/beVDE with
carried 10sqmm
standardsout as and per Rm. 693.00 0.00
BYA
direction
as per ECC through
detailed PVC pipe ofofmentioned
& specification
approval minimum the inner dia 40mm
Engineer.Cable
in Annexure-1.
1 i.IC-4x16
having
manufacturer(s)
The work sq.mm
shall beNYY/2XY/XLPE
minimum wall
must thickness
carried have out as cable
1.9mm.
valid pertest with16 sqmm
certificate
direction & approval from Rm. 987.00 0.00
BYA ECC
internationally
of the Engineer.Cablethrough pipe
accrediated of minimum inner
laboratory (like
manufacturer(s) dia
must 40mm
CPRI, haveKEMA valid
1 j.IC-2x1.5sq.mm
having
etc) minimumfrom
accepted
test certificate BYM
wall cable with1.9mm.
thickness
/ approved
internationally by1.5sq themmEngineer.(a):1C-
accrediated BYA laboratory
ECC Rm. 155.00 0.00
through
2x2.5sqmm
(like CPRI, PVC(BYM) pipe
KEMA ofcable
minimum
etc) with inner
accepted 2.5sqmm dia/ 16mm (BYA)having
approved ECC by wirethe
2 SOCKET
minimum
through
Engineer. PVC OUTLETS
wall
(a) pipe thickness
Light/ :
ofexhaust Providing
minimum1.5mm. or inner & fixing
dia 16 mm
wall bracket 250 volt single
having
fan point wall Each 887.00 0.00
phase
thickness3-pin of 1.5combinedmm. switch socket outlet (surface /
2 (ii)
Concealed Providing type)&manufactured
fixing 250 volt, single inphase,
and tested accordance 3-pin, Each 1008.00 0.00
13/15/16/20
with relevantamps. IEC /CombinedVDE / NEMA switch/socket BS / JIS outletstandards
(surface
3 BOARD:
type)
mountedmanufacturedSupplying
on requiredand sizeand fixing
18 tested
SWG of almirah typeplain
in accordance
galvanized 18 sheet
SWG
with Sqm. 16904.00 0.00
metal
board board
relevant IEC/of VDE/NEMA/BS/JIS
/ Plastic depth
Board228mm (6”) duly
(Self-extinguishing painted 650with
standards.mounted o
C) powder
of 76.2 on
4 CIRCUIT
coating
mm. (3")with
required BREAKER
size
depth. epoxy (SPMCB):
polyester
18 (Manufacturer
SWG galvanizedresin Providing
shallonplainall
have & certificate
surfaces
sheet fixing on ofa
of board
board Each 640.00 0.00
prepared
(gray
76.2
standard mm. board
/ off-white)
(3") depth.
which 250 follow).(i)
having
they volt
built grade
Made in push 5 tofollowing
ENGLAND type
10 /Amps. single
suitable
/ GERMANY pole
locking
Made in/
4 (b)
miniature60/63
arrangement
JAPAN
ENGLAND Amp
/ USA circuit SP
including
/ GERMANY MCB(minimum
or EUbreaker metal
countries
/ JAPAN (SPMCBS)
bridges 6 KA)
/ USAoforhaving suitable
EU countries minimum
size for . Each 821.00 0.00
breaking
fixing of allcapacity electrical6-KA controlwith devicesthermal complete over-current
with suitable and
5 TPMCCB
anchoring : arrangement
instantaneous Providing & fixing
electromagnetic in wall on a /prepared
short
columncircuit board
and 500 release
keeping volt Each 6122.00 0.00
grade
provision.
provision following
for SPMCBS
cable triple-pole
of and
inlets molded
DORMAN exits ascase SMITH
required circuit breaker
/(only
MEM /
front
5 (ii) 120 -of200
(TPMCCB)
SIEMENS
surface /the Amps.
with
VIRTZRO
board (minimum
thermal /HAGER
will 16-KA)
beover-current
/ FEDERAL
considered and /instantaneous
KAWAMURA
for measurement). Each 7329.00 0.00
electromagnetic
/(Manufactured
ABB / HAVELLS by RECOshort
/ LEGRAND / circuit
NASCO //release MERLIN
C&S provision,
GERIN /
or equivalent
6 Providing
product of& any
manufactured
SCHNEIDER fixing
and the
orothertested fancy
equivalent in bracket
accordance light with
brand accepted
manufacturer)The fitting ofside
front/relevantthe ofIEC
approved by/
the Each 1050.00 0.00
following
VDE
the
boards / NEMA manufacturer's
engineer.(a)
should be / BS / JIS
: 5 -covered model &
standards.TPMCCB
40 Ampswith catalogue
(minimumrequired 6 KA)number
of ABB
size tempered /with
AEG
6 (ii)
/thick ENERGY+
carrier,
DORMANfiberbrassglassSMITHcat.
holder, no.
with EPWB
earth
/ LEGRAND
rubber 3004
terminal,
gaskets / necessary
2toWobservewiring
/ SCHNEIDER /the
EATON with /
inside Each 1654.00 0.00
or xeqivalent
2HAGER 0.4 sq.mm
arrangement. / MEM product
stranded
/ MERLIN of GLORIA,
PVC GERIN CRESCENT,
insulated/ VITZRO flexible FR cable
/ KAWAMURA
6 BATHROOM
SHWASH
etc. Suitable
/ FEDERAL etc.forLIGHT
or use CFL FITTING
equivalent & LED : Providing
brand lamp (except
accepted & fixing
/ lamp) the bath-
approved by Each 930.00 0.00
room
complete lightsample
the engineer. fitting
(i)15of the following
accepted
- 100 Amps. / approved manufacturer's
(minimum by the 10-KA)Engineer.model(i)&
6 (ii) Providing
catalogue
Fixtures :'1.number & fixing
Fency 1 x Wall
consisting
Single 2'-0"Bracket
xof20oxidized
wattLight fluorescent
or goldentube
CRESCENT or Each 1050.00 0.00
light fitting
chromium
cat. No. of following
plated
CB-790-906 brass manufacturers
base withproduct
or equivalent model
carrier, ofbrass& catalogue
any holder ,
reputed
6 (iii).Supply
number
earth
brand such &
as fixing
consisting
terminal, of LED
necessary 22 SwG
ENERGY+/GLORIA/SHWASH/ASHA. bath-room
wiring with light
sheet x fitting
2steel 0.4 ofproof
rustsq.mm the Each 2801.00 0.00
following
powder
strandedcoated features
PVC and model
base
insulated &flexible
designedwithFRallcable necessary
perspex etc. sheet elements
Suitable cover
for
such
each
use CFL as driver,
of minimumor LEDlengthchips etc.
lamp 640 complete.
(exceptmm (breadth Model
lamp) asof per & sample
fittingcomplete
70mm),shall
be
sampleapproved
superior quality
accepted byelectronic
the Engineer
/ approved ballastby.(i)the GLORIA
with one year
Engineer. cat(i) No.GLML.
guarantee,
GLORIA
2106
holder, earth terminal, necessary wiring with 2 x 0.4
cat. no. GBB-959-2105-FR
sq.mm or stranded
or equiivalent eqivalentproduct product
PVC ofof ENERGY
insulated flexible+ FR
SHWASH, , CRESCENT,
cable etc.
SHWASH
ANYASHA,, (except
complete. ENERGY+, lamp) ASHA. of following model & as per
6 Supply & fixing of LED spot light fitting of the following Each 1050.00 0.00
features and model with all necessary elements such as
6 (i) Round
driver, chips panel etc. (surface
complete.type Model) ENERGY+
& samplecat. shallno.be- Each 1232.00 0.00
EPPLLED
approved by 2006 the Engineer .(i) Square panel (surface type)
6 WT
ENERGY+LightorFittingsequivalent
cat. no.-: (ii)EPPLLED
ENERGY
product2005 + ofModel : EPSL 23001
GLORIA, SUNKO, Each 1292.00 0.00
(15 - 23
ENERGYPAC W)or equivalent
or equivalent etc. product of SHWASH,
product of GLORIA, SUNKO,
6 SupplyRated& life
ANYASHA,GLORIA
(ii)
ENERGYPAC fixing etc.of LED
: 30,000 etc. tube / panel light fitting of the
hr (minimum) Each 1352.00 0.00
following
(iii) Luminux
(ii) Rated features,
life flux : 100size
: 30,000 + 1m/w
hr and model with all necessary
(minimum)
6 (b) 4'
elements
(iv)
(iii) 36 Watt.
LED
Luminux such flux as
chips : 100:driver,
EDISON
+ 1m/w chips/ etc.EPISTORcomplete. / OSRAMModel &/ Each 1654.00 0.00
sample
(iv) LEDshall
PHILIPS / CREE be approved
chips / : EDISON by the/ Engineer
EPISTOR.(i)/GLORIA OSRAMcat/
6 (c)
No- (i)
PHILIPS GTFRectangular
/ (LED).
BRIDGELUX. CREE 774 / panel (should be placed on surface/ Each 3043.00 0.00
False
(v) or ceiling
Driver : )
BRIDGELUX. product of
equivalent MEANWELL ENERGY+,
/ OSRAM ENERGYPAC,
/ PHILIPS / IEC
6 Supply
SUNKOENERGY
standard.12 &etc.
(v) Driver : Wattfixing
+ of
model the no following
- EPPLLED
MEANWELL / OSRAM / PHILIPS / IEC LED - bulbs
2001 / &
2002tube / lamps
2003 Each 398.00 0.00
manufacturers
(ii) RatedorlifeWatt
standard.12 by ENERGY+
equivalent
: 30,000 product/ MEP
hr(minimum) of GLORIA/ HARMONICS ,SUNKO,/
6 (b)601
ELECTRO
ENERGYPAC
(iii) mm / 2'-
Luminux 9: /100
SUNTEC
flux etc. 10 watt-T8 GE /AC
+ /1m/w LED tube Lamp
TRANSTEC or equivalent Each 543.00 0.00
brand
(ii)
(iv)Rated
LEDaccepted
lifechips
: 30,000/ approved
hr (minimum)
: EDISON by /theEPISTOR
Engineer / .(a) 12 watt/
OSRAM
6 (c ) Luminux
LED
(iii) 1200
PHILIPS bulb/mm CREE / 4'-:/ 100
flux 18 / +201m/wwatt-T8 AC LED tube Lamp Each 785.00 0.00
(iv) BRIDGELUX.
LED chips : EDISON / EPISTOR / OSRAM /
7 CEILLING
PHILIPS
(v) Driver/ CREE FAN
: MEANWELL / 1400 mm./ (56") OSRAM Sweep : Supplying
/ PHILIPS / IEC & Each 3502.00 0.00
fixing AC
BRIDGELUX.
standard. capacitor type ceiling fan (without regulator) of
7 (b)
(vi) 48".
following
(v) Driver
Size Input power
: specifications
2 :ft and
MEANWELL4 ft Maximum
(a)and /sizes 75complete
OSRAM
4'x18Watt. watt./ PHILIPSwith minimum/ IEC Each 3260.00 0.00
305 mm (1 ft) long and
standard.Size : 300 mm x 1200 mm ; 40 W. 0.75 -1.0" dia, 2.3 mm thickness
8 EXHAUST
MS pipe down FANrod, : Providing
tempered cast and aluminum
fixing of following
blades, 2.5 axial
µf Each 1739.00 0.00
flow
400V A.C capacitor canopy,
AC capacitor, type wall double mounted exhaust best
Z ball bearing, fan
8 (b):12" silicon
complete
quality sizewith (Foreign blade,made,
sheet steel
core, plastic
best frame body):
quality standard
copper made wall louver
super Each 2101.00 0.00
shutter,
enamel wire, PVC aluminum insulated alloyed connecting casting wirebody etc having
complete as
safety
9 (a)
required
pin withProviding
including
powder & coated
fixing
cuttingbox type
heatwall / docufan paint
and clamp asmade
mending good
required of 25.4
the
etc. Each 133.00 0.00
mm.
damages x 6.35asPVC
connecting mm.per wire(1"x ¼")
direction MS
complete flatasbar
of the with 15.87
Engineer.
required.Rated (a) 8" mm. (5/8"):
Exhaust
voltage
9 (b)
220 volts.Rated frequency : 50 Hz.Rated speed : 300 mm.
dia
fan Providing
MS
plastic hook
body & fixing
including
(foreign U type fan
necessary
made clamp
accepted made
bolts,
/ of
nuts
approved 15.87
etc.
by as
the
rpm Each 157.00 0.00
(5/8")
required
Engineer). diaas MS
per rod
sample as per
approved
± 5 %.Service value : Minimum 3.5 m3 / min / sample
by the approved
Engineer. by the
10 Call Bell : Providing
Engineer.
watt.Temperatur rise :&Maximum
fixing 250v, 50 Hz grade
55ºC.Class remote:
of insulation Each 767.00 0.00
control call bell complete
Class-E.Noise level : 60(foreign db at amade). distance 1 meter.Input
11 Supply,
power :(a) Installation,
MaximumTesting 75 watt.& commissioning of split Each 98407.00 0.00
type Air-cooler comprising condensing and evaporating
11 ii.Capacity:24000
units having following BTU/HR (wall mounted)
cooling capacity based on Each 116519.00 0.00
indoor temperature 27º-30ºC DB / 19.5º-22ºC WB and
12 (a).
outdoorFire Extinguisher(
temperature Carbon-Di-Oxide35º-40ºC DB at high Type):5 fanKg speed Set 4256.00 0.00
Capacity.
condition suitable for installation & operation in
13 Providing
tropicalisedand countryfixinglike 500Bangladesh
V 3-phase& as bus-bar system
per detailed Set 942.00 0.00
assembled
specifications in prelaid
& standard board with porcelain
as mentioned belowinsulators.
:(a).
13 (b)
There
OUTDOOR60 will
- 100 beUNIT Amps.Copper
equal /size holesflat
CONDENSING bar UNIT
on every (5bar nos) :INDOOR
at 0.5"
(b). 4 interval
nos 9" Set 1884.00 0.00
x1"x3mm
and
UNITbar/ to FAN and
barCOIL 1 noshall
gap 4"x1"x4mm
UNIT beAny2" -brandfor earthing
3".(a): 60-100 Amps
manufactured mounted on
Single
or
13 (c) 200-3 atNos
insulator
Phase
assembled 300both
in Amps.
of ends Copperflat
individually.
BarCopper
USA/EUcountries flatbar bar(5 (5nos)
/Japan/Taiwan/Korea nos): 2: nos4 nos9" Set 5144.00 0.00
15"x1"x8mm
x1"x3mm andand
/Thailand/Malaysia 1 no 1 approved/accepted
no4"x1"x4mm
4"x1"x8mmfor forearthing
earthing mountedinon
mounted
by the Engineer
13 (d) 400-500
insulator
accordance at both Amps.
with ends Copper
individually.
fulfillment of theflatabove
bar (5 nos) : 4 nos
specifications and Set 6593.00 0.00
18"x1.5"x10mm and
having relevent certificates as mentioned.:1 no 4"x1.5"x10mm for earthing
14 Providing
mounted on&insulator
(i.):Capacity:18000 fixing BTU/HR 250
at bothvolts.
ends5mounted)
(wall / 6 amps (minimum)
individually. Each 465.00 0.00
concealed type following switch / switch socket
14 ii.Two gang switch
manufactured and tested in accordance with relevant IEC / Each 586.00 0.00
VDE / NEMA / BS / JIS standards mounted on required
14 iii. Three
size 18 SWG Gang galvanized
switch plain sheet / PVC board (Self- Each 706.00 0.00
extinguishing 650oC) of 76.2 mm (3") depth. All electrical
14 iv. Four Gang
contacts shall switchbe of brass / copper. Made in ENGLAND / Each 827.00 0.00
GERMANY / JAPAN / USA or EU countries.(i) One Gang
Switch
14 v. One gang switch and one 5Amp. 2-Pin Socket on switch Each 646.00 0.00
board or beside to the switch board
14 vi. Concealed (Gang type) 250V, 50 Hz Electronic fan Each 1491.00 0.00
regulator
14 vii.Concealed (Gang type) 250V, 50 Hz Electronic Calling Each 525.00 0.00
Bell Push
15 (a) CCTV : Supply and fixing of 4 / 8 / 16 Channel Digital Each 74681.00 0.00
Video Recorder of following technical specification or
15 (b) IP BASED
equivalent :H-264 INDOOR CAMERAvideo
& dual-stream . Supply and fixing of 2
compression.Key Each 30623.00 0.00
MP NETWORK
features : IR MINI PTZ DOME CAMERA (INDOOR)
15 (c )Supplying
(including
Support lens,ofbracket,
HD-TVL Joyestic controller
/ analoghousing)
/ IP camera ofasfollowing
per
triplefollowing
technical
hybrid.Support Each 60372.00 0.00
specification
both HD-TVI :or andequivalent
analog cameras :Key Features :* 1/3"
with adaptive
15 (d)Supply
Power
progressive
access.Full and
supply :fixing
scan
channel9 V-12
CMOS*of V2.0
@ 1080 MEGAPIXEL
DCPower
1920pixel 20X/ real-time
consumption
x 1080 2X
resolution NETWORK
3X :5
zoom * Each 80772.00 0.00
IR
DWDR *PTZ
WTemperatureDOME CAMERA
: 0℃ ~ (OUTDOOR)
+50℃.Humidity
recording.Support wifi  3D intelligent positioning function (including
: 0 ~ 95% lens,
(non-
15 (e) Supply
bracket, and
af) fixing
housing)
condensation).Communication
POE
HDMI (802.3
and VGA ofat49"CCTV
of following
Support hik
output up to MONITOR
technical
:1920
cloud P2P*
x 1080 of 20
specification
Uppixel
to following
morIR Each 79560.00 0.00
technical
equivalent
Infrared
distance
resolution.Longspecification
:* 1/2.8"
emission,
Support Type
plug or
transmission equivalent
progressive
&ofplay.
interfacescan::Device
CMOS : :LED.LED
RS-485.Baud
Specifications
distance over coaxial as rate TV :
16 Supply
:*2400
1920
described of
Yes.Screen
cable.Support
/ 4800 CAT
x 1080.*
in /PWD 6 signal
size
up
9600 (cm)
20X
to :cable
49synchronous
optical
Schedule
/ 16-ch
19200 : of
123
zoom cm.Resolution
.* DWDR
Rates
bps.Transmitting2018 for
playback :3D
full1080
.* ELECTRO-
at
distance: HD Rm 75.00 0.00
1920 xm(0.5
MECHANICAL
pixel 1080.IPS
intelligent positioning panel
WORKS.
1200 resolution.Specifications
mm twisted : Yes.Back
functionpair .*
SUB- HEAD
:calbe)light- 15.
asSupport module
described hik in
cloud: LED.PMI
PWD P2P.*
17 OPTICAL
(Picture
Up to 150
Schedule FIBER
Mastering
m IR
of Rates CABLE
Index)
distance.*
2018 for : Hi-POE
300.Analog / 24VTV
ELECTRO-MECHANICAL ACreception
power : Rm 145.00 0.00
Yes.Specifications
supply.*
WORKS. Support
SUB- HEAD : as-output
BNC described 24inChannel.
PWD Schedule
15. ForSpecifications of
: as described
18 VIDEO
Rates CABLE
2018 for ELECTRO-MECHANICAL
in PWD Schedule of Rates 2018 for ELECTRO- WORKS. SUB- Rm 193.00 0.00
HEAD - 15
MECHANICAL WORKS. SUB- HEAD - 15.
19 Resting & commissioning of entire CCTV system Rm 9976.00 0.00

20 TELECOMMUNICATION CABLE: Supplying and drawing Rm 19.00 0.00


of following sizes PVC insulated & sheathed twisted pair
20 (ii) 2 pair (1C-4x0.282
telecommunication sq mm).
cables having dia of each core is 0.6 Rm 29.00 0.00
mm through prelaid pipes. Cable manufacturer(s) must
20 (iii) 3 pair
have valid(1C-6x0.282 sq mm).
test certificate from internationally accrediated Rm 40.00 0.00
laboratory (like CPRI, KEMA etc) approved / accepted by
20 (iii)
the 4Engineer.(i)
pair (1C-8x0.282 sq mm).
1C-2x0.282 sq mm (1 pair) Rm 55.00 0.00

20 (iii) 5 pair (1C-10x0.282 sq mm). Rm 66.00 0.00

20 (iii) 6 pair (1C-12x0.282 sq mm). Rm 79.00 0.00

20 (iii) 8 pair (1C-16x0.282 sq mm). Rm 101.00 0.00

20 (iii) 10 pair (1C-20x0.282 sq mm). Rm 126.00 0.00

20 (iii) 20pair (1C-40x0.282 sq mm). Rm 235.00 0.00

20 (iii) 30 pair (1C-60x0.282 sq mm). Rm 343.00 0.00

20 (iii) 40 pair (1C-80x0.282 sq mm). Rm 449.00 0.00

21 CO-AXIAL CABLE: Supplying & drawing of following sizes Rm 38.00 0.00


PVC insulated & sheathed 75 ohm impedance co-axial
21 (ii) 4/C through prelaid pipes. Cable manufacturer(s) must
cables Rm 43.00 0.00
have valid test certificate from internationally accrediated
21 (ii) 6/C
laboratory (like CPRI, KEMA etc) ) approved/accepted by Rm 66.00 0.00
the Engineer.
22 16+120 LINE : Supply installation testing & commissioning Each 413188.00 0.00
of 16+120 line (extension capacity 240 line) digital PABX
system.Basic unit : 16 + 120 line PABX system.
Hardware : CPU card, TNT card, power supply unit &
casing.
Software : System operating software & billing
software.Features : Direct inward station access including
23 Supply & Installation of Cat-6 signal Cable. Rm 85.00 0.00

24 16+24 button DSS control. Supplying & installation of Each 11555.00 0.00
standard master telephone set including display, date,
25 Telephone
time & 16+24 Setbutton: Supply installation testing
DSS control.Suitable for use in & Each 1654.00 0.00
commissioning of single line telephone
tropical country like Bangladesh complete with required set for executive
26 EXTENSION
use LINEinvolume
with provision
accessories and CARD:
conformitySupply to installation
up+ down, testing
redial, flash
specified codesetc. & Each 30790.00 0.00
commissioning
including of of
display
specification extension
with CID system
international (24 line)complete.Suitable
standards card
& CEcompatible
/ UL / CSA to
for
27 the Providing
use existing& one.Suitable
laying
in tropical
certified.Model of following
& country
sample forbeuse
like
to PVCinpipe
Bangladesh
approved (Lira
tropical
by brand
thecountry
complete orwith
like
competent Each 121.00 0.00
equivalent
Bangladesh
required product
use inof16+120
complete
accessories
authority.For other
withinreputed
and required manufacturer)
conformity
line system. accessories
to specifiedand codes in
A-III INTERNAL
embedded
conformity ELECTRICAL
& specification of specifiedWORKS
intowall/column/ceiling/floor
international codes
standards&etc.&specification
with
CE /allUL / CSA of Tk. 0.00
accessories,
international
certified.Model18&SWG
standards
sample G.P
&toCEsheet ULpull
be/ approvedbox by
/ CSA withthe3 Engineer.
mm thick &
certified.Model
B. EXTERNAL
sample WORKS:
ebonite sheet
to cover, fixing
be approved materials
by the etc. as required
Engineer.
including mending the damages good.a. Minimum inner
B1. EXTERNAL
dia 40 mmCIVIL WORKS:
& minimum wall thickness 1.9 mm.

B.1a Site Development Works

1 B.1a Site Development Works: Site development/ Cum. 302.00 0.00


Improvement by carted earth or dredged sand, sandy silt
B.1a Site Development
(free from any rganic, Worksforeign, environmental hazardous Tk. 0.00
substances) carried by head or by truck or by any other
B.1b Surface
means Drainincluding and cost Appron of cutting or by dredging of sand,
sandy silt, all; including local carrying, placing the
1 B.1b Surface
earth/sand, sandyDrain: siltEarthwork in excavation
in the designated in foundation
area,maintaining Cum. 189.00 0.00
trenches up to 1.5lumps,
slopes, breaking m depth and maximum
levelling and dressing 10 minlead: layers in up
2 One
very layer(hard)
stiff
to finished brick flat
etc.soling
level clayey allsoil/ inrubbish
completefoundation
asetc.per or in floor and
direction with first Sqm. 420.00 0.00
class/picked
accepted by the jhama bricks in
engineer including
charge.preparation
For other than of bed
Dhaka,and
3 Minimum
Mass
filling the 12
concrete mm
interstices thick
(1:3:6) cement
in
with foundation
local sand
sand,
Chittagong, Sylhet, Rajshahi, Barisal, Khulna metropolitan (F.M.
with
leveling 1.2)
cement, etc.plaster
sand
complete with Cum. 6647.00 0.00
neat
(F.M.
and cement
areaaccepted
and andfinishing
1.2)Narayanganj picked
by todistrict.
plinthbrick
jhama
the Engineer-in-chargewall with cement
chips
By other including(1:4)
method/means up to
breaking
4 150
Brick
of
than mm
chips, below
works with ground
first level
class including
bricks with
screening, mixing, laying, compacting to required
dredgeing. washing
cement of
sand sand,
(F.M. Cum. 6040.00 0.00
finishing
1.2) andthe
levelmortar edges
(1:6)
curing and corners
in foundation
for at least andplinth,
and
7 days curingfilling
including attheleast
the for 7of
supply
days,
5 125 mmcost of
joints/interstices
water, electricity,water,
brick works fullyelectricity,
costswith
withof first
mortar,
tools scaffolding
class bricksand
racking
& plants and
with
out other
cement
the
other joints,
charges Sqm 948.00 0.00
charges
sand
etc. all(F.M.
cleaning etc.
and
complete all
1.2) complete
mortar
soaking in
(1:4)
the
and accepted all
andrespect
bricks atmaking
by least
the asforper
bond 24drawing
hours and
with
Engineer-incharge.
6 accepted
connected
before
(Cement: useby andthecuring
walls
CEM-II/A-M) Engineer-in-charge.
includingatMass necessary
least for 7 days
concrete (Cement:
etc. allCEM-II/A-
scaffolding,
in foundation raking
complete
(1:3:6) Sqm 280.00 0.00
M)
withground
out joints,
including
cement, floor
cleaning
cost of water,
brick and electricity
chips soaking
and sand the
andofbricks
other1.2
F.M. forcharges
at leastand 24
7 Surface
hours
accepted drain
before
by the of 300
use andmm clear width
washing
Engineer-in-charge. of sand, and depthatCEM-II/A-
curing
(Cement: upleast
to 300for 7 Rm 2760.00 0.00
mm:
days
M) Constructing
in all floors RCC
including (fc'=22MPa,
cost of water,minimum electricityfcr=27MPa
and
8 Providing
in
othernominal apron
charges mix1:2:4
etc.with 50
allwith mm
stone
complete thick
andcement
chips) surface
accepted concreteby the(1:2:4)
drain of 300 Sqm 917.00 0.00
with
mm cement,
clear width
Engineer-in-charge. coarse sand and
and depth
(Cement: picked
up toCEM-II/A-M)
300 mm jhamawith Inchips
125
groundmmfloor
9 Cleaning,
including
thick check renewing
breaking
walls and of125
chips drain
andmm and
one apron
layer
thick base with
brick
overcement
flatone
soling
layeratof Rm 193.00
concrete
bottom
brick flatwithor cement
soling.first The
classmortar etc
or picked
surface asjhama
having perminimum
direction of mm thick
bricks including
12
10 Engineer-in-charge.
Clearing
cutting
cementearth chocked
sand for
(F.M. up1.2)
masonry
preparation plasterof surface
bed
(1:3)and anddrain
filling
neatthe cement Rm 28.00
interstices
finishing with withcement
local sandcuring (F.M. 0.8) for
at least including
7 daysfinishing,
including
B.1b Surface
dressing,
excavationDrain inand
curing all at Appron
leastoffor
kinds soil,7 days
back etc.fillingallwith
complete,
fine sand Tk. 0.00
including
(F.M. 0.8),cost of water, electricity,
consolidating and dressing, othercost chargesof water,accepted
B.1c Boundary
by
electricity, wall
the Engineerotherandcharges
inGate
charge.etc. (Cement:
complete CEM-II/A-M)
and accepted by
the Engineer in charge. (Cement: CEM-II/A-M)
1 Earth work in excavation in all kind of soil in foundation. Cum 189.000 0.00
2 Earth re-filling in foundation trenches Cum 149.000 0.00

3 Single brick flat soling Sqm. 420.000 0.00


4 Reinforced cement concrete works with minimum cement Cum 7517.000 0.00
content relates to mix ratio 1:2:4 having minimum f'cr = 24
4 MPa,
b) In grade beam.
satisfying i. concrete.
a specified compressive strength f'c= 19 Cum 7517.000 0.00
MPa at 28 days on standard cylinders as per standard
4 c) In pedestal
practice of Code column, column, column
ACI/BNBC/ASTM, capital,
cement lift wall, i.to
conforming Cum 7730.000 0.00
concrete
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150
4 Type
d) In coping:
– I, besti.Concrete
quality sand [50% quantity of best local Cum 7944.000 0.00
sand (F.M. 1.2) and 50% quantity of Sylhet sand or coarse
5 FORMWORK
sand of equivalent (Wooden)
F.M. 2.2] for boundary
and 20 mm wall,
down gate,
well centry
graded Sqm 399.000 0.00
post
picked etc.Centering
jhama brick and chipsshuttering,
conforming including
to ASTM strutting,
C-33
5 propping
(b) For garde
including etc.
breakingbeamremoval
and / foundation
chips and formBeam
of screening,for (a)making
Individual andand Sqm 381.000 0.00
combined footings
placing shutter in position maintaining true to plumb,
5 (c ) Padestals,
making shutter column,
water-tight wallproperly, placing reinforcement Sqm 429.000 0.00
in position; mixing in standard mixer machine with hopper
5 fed
(d) Coaping,
by standard Cornice,
measuring railing, drop or
boxes wall, louver,
mixing fins
in batching Sqm 370.000 0.00
plant, casting in forms, compacting by vibrator machine
6 Grade 300 at
and curing (RB 300for
least /RB 28300W: complyingcentering-
days, removing BDS ISO 6935- Kg 79.000 0.00
2:2006)
shuttering ribbed
after or deformed
specified time barapproved;
producedincludingand marked cost of
6 Grade
water, electricity, testing charges of materials and 6935-
according400 to ( RB 400
Bangladesh / 400 W :
sandard, complyingwith BDS
minimum ISO yield Kg 82.000 0.00
2:2006)
cylindersribbed
strength,
Minimum fy
12(ReH)=
as or thick
deformed
required,
mm 300 other
cement bar
MPacharges but produced
sandfy not alland
etc.exceeding
(F.M. marked
complete,
1.2) plaster330with
7 accoriding
250mm
MPa
neat and
approved thick
cement to
whateverBrick
andfinishing work
bangladesh
is
accepted the in
to by foundation
standard
yield
plinth strength
the wall , with(1:6)
mimimum
within
Engineer-in-charge. allowable
with cement (1:4)(Rate yield
up to Cum. 6040.000 0.00
strength
limit as per
is excluding
150 mm ,Fy(ReH)
belowBNBC/
theground=
costACI400 MPA
318,
of level but fy not
the ratio ofwashing
reinforcement
including and exceeding
ultimate 450
oftensile
its fabrication,
sand,
8 125mm
placing, thick
MP„and
strength
finishing what
fu non
ever
thetoedges
binding yield exposed
is
strength
etc. and
and thebrick
thecorners
yield fy,
cost work
strength
shall
and be inwithin
at(1:4)
of shuttering
curing at allowable
least &1.25
least and
centering)
for 7 Sqm. 948.000 0.00
limit as
minimum per
Individual &BNBC
elongation sec
combined 8.3.3.5/
after fracture
footing, ACI
pile
days, cost of water, electricity, scaffolding and other 318-11
andcap, minimumsec
raft/mat, 21.1.5.2,
total
floor slab
9 the
and ratoi
elongation ultimate
foundation
charges etc.atall tensile
maximum
beam
complete up strength
force Fu
allisrespect
toin plinth 16%
level toand
yield
as 8%strength
per drawingfy,and Sqm. 280.000 0.00
shat
accepted by the Engineer-in-charge. (Cement:after
be at
respectively least
: up 1.25
to and
ground minimum
floor. elongation CEM-II/A-
fracture
M) ground andfloorminimum total elongation at maximum force is
10 16%
Averageand 12mm
8% respectively
thick cement : (i)sand
Ground floor(1:6)
plaster Sqm. 228.000 0.00

11 Minimum 6mm thick cement sand plaster (1:4) Sqm. 225.000 0.00

12 Colour washing 3 coats Sqm. 25.000 0.00

13 Manufacturing, supplying, fitting and fixing M.S. grill Sqm. 2431.000 0.00
fencing as per design with outer frames having 38 mm x
38 mm x 6 mm M.S. angle and inner members having 6
mm dia M.S. rod placed @ 110 mm c/c diagonally on both
14 direction, welding
Manufacturing, each cris-cross
supplying, fitting and endfixing
of rodM.S. withbox
corners
tube Sqm. 934.000 0.00
of outer frame including cutting rods
(made with 2 nos angle) post (bottom end bifurcated) and size angles to
required shapes and size and setting
made by thorough welding of two Nos. 38 x 38 x 6 mm the entire fence with
the
M.S.previously
angle andinstalled
vertically boxplacing
tube (box the tube
post made
into C.C. with or2
nos. angle)
R.C.C. post including
foundation including thorough
cuttingand angle full welding
to required the
15 Providing
frame barbed
with the wire
angle fencing
box with
posts, R.C.C
painting
shape and size including covering the top of the post with (1:2:4)2 pillars
coats @
of Sqm. 155.000 0.00
2.43 m
synthetic c/c. and
enamel of section
paint 100
over mm
a x
coat100
6 mm thick M.S. plate etc. all complete as per drawing and of mm at top
anti-corrosiveand
150 mmetc.
priming
accepted xby
150 themm
all at bottom
complete of 2.13
as per
Engineer-in-charge.(Rate m total
drawing andisheight (1.37the
accepted
excluding m
by
above
the G.L. and 0.76
Engineer-in-charge.(Rate m below
cost of C.C./R.C.C. foundation and paint) is G.L.)
excluding including
the cost 150
of mm
angle
thick,
box tube450post
mmand square spread footings
its installation (pillars the
and excluding reinforced
cost of
with
paint)4 Nos. 10 mm dia main rod and 6 mm dia stirrups @
150 mm c/c, footing reinforced with 5 Nos. 10 mm dia rod
16 both ways)fitting
Supplying, supplying,
and fixingfitting12and BWG fixing 8 lines
barbed wireof(2barbed
ply, 4 Sqm. 831.000 0.00
wire horizontally (fixed with the post through 6 mm dia
points) in fencing work @ 150 mm c/c in both horizontally
rods embeddedsupported
in to the post)
by 38and mm2xlines
diagonally
and vertically, 38 mm x 6 mm from M.S.
post
L-shape angle post (300 mm embedded in with
to post with 12 BWG 2 ply barbed wire, 4 points
R.C.C. or in
barbs @ atwith
brick work leasta 112
cement mm concrete
c/c including base6ofmm 75 thick
mm (1:4)
x 75
cement
mm x 300 mm) 600 mm vertical and 450 mm inclined oretc.
plaster up to 1500 mm length of the pillars as
complete and accepted by the Engineerin-charge.
per requirement @ 2.4 m c/c including straightening, (Rate is
excluding the cost of concrete and reinforcement
binding the joints with 18 BWG wire, making holes in the which is
to be paid
etc.asincluding
per corresponding
supplyingitems
in the schedule)
angle all necessary materials
17 Supplying, fitting, fixing and installation of ordinary type Sqm. 7843.000 0.00
M.S. gate (double leaf) of any design and shape with 38
mm x 38 mm x 6 mm M.S. angle box (made by welding 2
nos. 38 mm x 38 mm x 6 mm angle) outer frame having 25
mm x 50 mm x 25 mm x 5 mm M.S. channel (made by
welding 2 nos. of channel) placed part diagonally after
cutting and shaping as per requirement, part horizontally
@ 75 mm c/c, the two part of each leaf being separated by
a vertical member of 38 mm x 38 mm x 6 mm M.S. box
18 Manufacturing,
and welded thesupplying, each ends fittingofand fixing G.I.
diagonal andpipe gate of
horizontal Sqm. 9011.000 0.00
any
members designproperlyand shape with having
the box38 framemm as diaper G.I.architectural
pipe outer
frame
drawing and 19 mm dia.
providing G.I. pipearrangement
full locking vertical member on 3 placed
mm thick @
75 mm c/c by welding at top
M.S. plates providing 38 mm x 38 mm x 6 mm M.S. angle and bottom of G.I. pipe frame,
cutting
clamps, the fittingpipesfixinginwith proper
the outer shapeframe and ofsize including
the gate, the
making semicircular band at
clamp being embedded in R.C.C. pillars with cement the corners of the outer frame
without
concretedamaging the pipe,cutting
(1:2:4) including. covering holes 50% andofmending
the gate good area
with 18 BWG finishing,
the damages, M.S. sheet, curing providing
and where also two necessary extra
horizontal
painting 38 mm
two coats diawith G.I. pipesapproved welded with vertical
quality of post,
synthetic
19 Manufacturing, supplying, fitting, fixing of ordinary type Sqm. 5116.000 0.00
providing
enamel 6 nos.
paintgate huskle
overwith a coat domney with R.C.C. or
of xpriming of anticorrosive paint R.C.C core
M.S. folding 12mm
pillar
etc. with
all MS cement
complete concrete (1:2:4) in masonry including
12mm squareincluding
solid bar making and 25 mm and xproviding
25mm x 50 6 mm mm x
cutting
6MS mm M.S.holes,rail mending
and 38 mm good
wheel thesmooth
for damages, movement making of
angle box frame and two nos
provision
the gate for
etc. minimum
all complete 0.61 masx per 1.4 m pocket gate
drawing, design having
and
outer side fixed box post made with 40 mm x 40 mm x 6
its outer frame
accepted and inner vertical members [Rate ismade with the 19
mm angleby at the
bothEngineer-in-charge.
ends attached excluding
mm
cost of dia
painting] G.I. pipe including necessary locking
to column/wall side including locking arrangement
arrangements. Painting the gate with 2 (two) coats of
providing 38 mm x 38 mm x 6 mm M.S.
20 synthetic
Labour for enamel taking outpaint barbed over wireafencingcoat of anti-corrosive Rm 7.000
angle clamps fitted and fixed with the outer frame of the
priming, welding as and where necessary including
main gate, the clamp being
21 Labour
necessary charge lockingfor refitting
arrangement of barbed andwire fencing2 Nos. 16
providing Rm 16.000
embedded in R.C.C. or R.C.C. core pillar with cement
mm M.S. socket bolts etc. all complete as per design and
concrete (1:2:4) in masonry
22 Labour
drawingcharge and acceptedfor tightening by theof Engineer-incharge.
old loose barbed wire [Rate is Rm 2.000
including cutting holes and mending good the damages,
fencing
excluding the cost of painting]
finishing, curing etc. including
B.1c Boundary wall and Gate Tk. 0.00
riveting, welding as and where necessary, painting two
coats with approved quality of
B.1d Road and Pavement
synthetic enamel paint over a coat of priming of anti-
corrosive paint etc. all complete as
1 B.1d Road and Pavement: Earthwork in box cutting in all Sqm 50.00 0.00
per drawing, design and accepted by the Engineer-in-
types of soil. Removing soil to a safe distance, maintaining
2 charge.
Sand
properfilling
(Rate is excludingtrenches
in foundation
alignment, camber and grade
the costand plinth with sand
including leveling, Cum 635.00 0.00
of paint)
having F.M.
dressing and0.5 to 0.8 in 150
compacting the mm sub layers
grade as including
per drawing leveling,
3 Single
watering layer
and accepted andbrick flat Engineer-in-charge
compaction
by the soling to in road work
achieve minimum with first
.Depth dryupclass
density
to 300 or Sqm. 438.00 0.00
picked
mm95% jhama
of with optimumbricks asmoisture per alignment, content camber(Modified and grade
proctor
4 Brick
including
test) by works withjoints
filling
ramming first
eachclass
with
layer bricks
sand towith
up (F.M. cement
0.80)
finished etc.sand
level complete
as per (F.M. Cum. 6040.00 0.00
1.2)
design mortar
including cost
supplied(1:6) in foundation
of by
all materials
the designand andaccepted
office plinth,
only, filling
allby the and
the
complete
5 Reinforced
accepted bycement
joints/interstices
Engineer-in-charge. fullyconcrete
with mortar,
the Engineer-in-charge. worksrackingwith minimum
out the joints,cement Cum. 7517.00 0.00
content
cleaningrelatesand soaking to mix the ratiobricks
1:2:4athavingleast minimum
for 24 hours f'cr = 24
6 Grade
MPa, 300
satisfying(RB 300
a /RB
specified 300W: complying
compressive
before use and curing at least for 7 days etc. all complete BDS
strength ISOf'c= 6935-
19 Kg 79.00 0.00
2:2006)
MPa at 28
including ribbed
daysoforon
cost deformed
water,standard bar
electricity produced
cylinders
and otheras per and marked
standard
charges and
6 Grade
according
practice
accepted 400ofby (RB
toCode
the 400
Bangladesh /RB 400W:
ACI/BNBC/ASTM, sandard,
Engineer-in-charge. complying
with
cement BDS
minimum
(Cement: ISOyield
conforming
CEM-II/A- 6935- to Kg 82.00 0.00
2:2006)
strength,
BDS ribbed
fy (ReH)=
M) EN-197-1-CEM-I, or deformed MPabar
30052.5N but produced
(52.5fy not
MPa) /and
exceeding
ASTM-Cmarked 330 150
7 One
Typelayer
according
MPa and Herringbone
to Bangladesh
whatever
– I, best quality is sand
thebondyield
[50%(HBB)
standard, strengthbrickwithin
with
quantity soling
minimum
of best inlocal
yield
allowable Sqm. 662.00 0.00
foundation
strength,
limit
sandas per
(F.M. fyor in and
(ReH)=
BNBC/
1.2) floorACI with
400
50% MPa
318,firstthe
quantity class/picked
but fyofnot
ratio Sylhet jhama
of exceeding
ultimate orbricks
sandtensile 450coarse
8 Brick
including
MPa
sand and
strength onequivalent
of end toedging
fupreparation
whateveryield F.M. isincluding
of bed
the2.2]
strength yieldfy,
andpreparation
filling
strength
shall
20 bethe
mm of
within
at least
down bed
interstices and
allowable
1.25
well filling
with
and
graded Rm 104.00 0.00
the
local
limit interstices
minimum sand,
as
picked jhamaper BNBC/
elongationwith
leveling local
ACI
brick chips sand,
including
318, the
afterconforming leveling,
supply
ratio of
fracture andtominimumof maintaining
water,
ultimate
ASTM C-33 other
tensile
total
alignment
charges,
strength
includingfu
elongation and
costs grid
of tools
to maximum
at
breakingyield etc. and
strength
chips allforce
and complete
plants etc.
fy,screening,
isshall
16% and
be all accepted
complete
atmaking
and least
8% 1.25 and by
and the
and
Engineer-in-charge
accepted
minimum
respectively
placing shutter by :the
upinEngineer-in-charge
longation after fracture
toposition
ground floor and minimum
maintaining true to plumb, total
elongation
making shutter at maximum
water-tight force is 16% placing
properly, and 8%reinforcement
respectively :
up to groundmixing
in position; floor. in standard mixer machine with hopper
fed by standard measuring boxes or mixing in batching
plant, casting in forms, compacting by vibrator machine
9 Dismantling of brick flat soling and removal of debris to a Sqm. 15.00 0.00
safe distance and removal of debris to a safe distance.
10 Dismantling of H.B.B. Brick soling and removal of debris to Sqm. 21.00 0.00
a safe distance and removal of debris to a safe distance
11 Taking out and relaying of old brick soling including Sqm. 106.00 0.00
replacement of 10% brick
12 Taking out and relaying of brick soling after redressing the Sqm. 68.00 0.00
surfaces
13 Taking out of old brick on edge pavement and resetting Sqm. 170.00 0.00
(Herring bone bond) including replacement of 10% brick
14 Taking out of old brick on edge pavement and restting Sqm. 96.00 0.00
Herring bone bond and redressing the surface
B.1d Road and Pavement Tk. 0.00

Total for External Civil work : B.I (B.1a+B.1b+B.1c+B.1d) Tk. Tk. 0.00

B.II External Electrical work

1 MS POLE (including erection ): Providing following tubular Each 21492.00 0.00


pole fabricated with 4.76 mm (3/16") thick M.S sheet
1 (b)Totaldifferent
having 7620 mmsections (25'-0") long with( including
152.40 mm erection)
longhaving
M.S. Each 14127.00 0.00
101.60
reducingmm (4")joint
collar dia complete
6096 mm with (20')M.Sat the base bottom,
plate, andtop
1 (c
76.20)Spun
cover, mm P.C POLE
(3") diawelding
necessary (including
1524 mm erection
(5') at
& duly ) : Total
the topwith
painted 12000
withtwo457 mm
mmofx
coats Each 26564.00 0.00
(39.37')
457 mmlong
superior x6.35pole
quality mm having
aluminum(1'-6" Topxsilverdiapaint
1'-6" x 230mmover(9"),
0'-0.25") Bottom
sizeprime
two steel coatsdia
base
2 ofH-Pole:
390 redmm
plate. 40'-0"
oxide etc.long.
(15") ,aswall Combination - (a) of
thickness
required: two no's
55mm
:Total 9144 Mmm
(2.16"),S Poleweight
(30'-0") Each 53128.00 0.00
including
1250kg,
long having erection
breaking
152.40 asstrength
per
mmREB/PDB standerd
(6")512kg/sqmm,
dia 6096 mm . (20') bottom
without at the
3 WIRE
plate
bottom, andRACK/
carrying
and CROSS
101.60 mmARM
charge. : (a)3048
(4") dia : Providing
mm (10') and at thefixing
top Each 1087.00 0.00
1524
with 609 mmmm (5'-0")
x 609longmm 5 spool
x6.35vertical wire rack
mm (2'-0"x 2'-0"xfabricated
0’-0.25”)
3 (b)
sizeProviding
with 38.1 mm
steel basexand 76.2fixing
plate. mm 1524x 38.1mm mm (5'-0")
x 6.35 long
mm (1.5"crossx arm3" x Each 1449.00 0.00
fabricated
1.5" x 0.25") withMS.76Channel mm x complete76 mmxwith 6.355 nos mm ofthick ‘U’
4 OVERHEAD
(3"x3"x1/4"thick)
clamp and 2 nos ofMS ASC / ACSR channel
‘D’ clamp CONDUCTOR:
made with necessary
of 25.4 Providing
mm x 6.35 clamp and
mm Rm. 41.00 0.00
drawing
brackets,
(1" x ¼") flat following
nutMS. bolts PVC
baretc. insulated
complete
for fixing (foraluminum
insulators HT andline) stranded
including
clamping the
4 ii) 1C-50
conductor
hot-deep
rack sqmm (ANT)
in overhead
galvanizing
respectively ofline
including atcomplete
proper sag
thenecessary crosscomplete
welding, with
armGI.asnuts,
per Rm. 72.00 0.00
necessary
direction
bolts, washer GIetc.binding
of engineer. with twowire coats as required. painting
of aluminum Cable
4 iii) 1C-100
prime sqmm
manufacturer(s)
over coat of(WASP)
must
red oxide havepainting
valid test certificate from Rm. 142.00 0.00
internationally accredited laboratory (like CPRI, KEMA
5 SHACKLE/PIN/DISC
etc.) accepted / approved TYPEbyINSULATOR
the engineer.(i) : (i) 1C-Providing
25 sq Each 121.00 0.00
and fixing
mm (GNAT) 500 volt grade porcelain shackle type insulator
5 (ii) Providing
of size 89 mmand x 76fixing
mm (3.5"x 500 volt3”) grade porcelain shackle Each 97.00 0.00
type insulator of size 63 mm x 50.8 mm (2.5"x 2”)
6 (a) Provding and fixing of 11 KV Porcelain Disc insulator Each 1932.00 0.00
in/c. Conductor clamps ball eye box, Ball eye hook and
6 (b)
poleProvding
atachment and fixing of 11 KV steel
/ Supporting Porcelain workpinand insulator
their Each 785.00 0.00
and pins in/c.
installation at bolts
the pole etc.topto existing pole top as
as per direction of Eper/C.(2
direction
no.s.
7 Providing
of Engineer
in set). and drawing followingAluminium conductor steel
in Charge. Rm. 169.00 0.00
reinforced (ACSR) Bare conductor in. Overhead line at
8 STAY
proper : sag Providing
complet andwith fixing followingG.I
necessary pole stay made
binding wire as of Each 1630.00 0.00
stranded
required. G.I. Cableswiresmanufactured
complete with by anchor
Govt. ofplate of size
Bangladesh
8 ii). (10 mm
304.8
owned/ SWG x 7304.8
shared strand)
Company mm x Ltd 6.35(Eastern
mm (1' Cables).
x 1'x1/4"), 16 mm IC- Each 1207.00 0.00
(5/8")
100 Sq.mm dia stay (DOG)rod of necessary length and frame bolts,
9 LIGHT FITTING
guy insulator, : (a)with
nuts, Street Light :Supply
necessary adjusting & fixing of LED
arrangement Each 6,098.00
0.00
street
complete lightasfitting of thetofollowing
required be placed features
within and30°-model45° anglewith
9 (b)
withGATE
all necessary
pole. (i)LIGHT :Providing
elements
8 SWG 7 strand & fixingasthedriver,
such garden chips / gate light
etc. Each 2077.00
0.00
fitting
complete. of following
Model & manufacturer's
sample shall be model
approved& catalogue
by the
number
Engineerwith .(i) frosted
ENERGY fancy glass cover,
+ model no- EPSTLbrass -holder,
18003/earth1x
terminal,
E40 / 400 necessary
W / 250 W wiring / with 2 x 0.4 sq.mm stranded
PVC MHLinsulated flexibleproduct
or equivalent FR cable & polished
of SUNKO, GLORIA brass etc.base
suitable
(ii) Ratedforlifefitting with 38.1
: 100,000 mm. dia G.I pipe post, suitable
hr (minimum)
for
(iv) CFL
LED & chips LED lamp : EDISON (except/ lamp) EPISTOR complete/ OSRAM sample/
9 (c )Garden Light : SHWASH cat. no. SCBL-2(ALU) or Each 4649.00
0.00
equivalent product of CRESCENT, GLORIA,
9 FLOOD LIGHT FITTINGS (LED NARROW BEAM)
ANYASHA,ENERGY+. Each 18414.00
0.00
(FOR OUTER ILLUMINATION): (i) ENERGY + model no -
9 (f)GLORIA
EPFDL - 17011 cat No./ 200 GRL-303
W (2) . or equivlent product of Each 10022.00 0.00
CRESCENT,
or equivalent product of, ANYASHA , ENERGY+
SHWASH
10 CIRCUIT
SUNKO, BREAKER GLORIA etc.(SPMCB): Providing & fixing on a Each 640.00 0.00
prepared
(ii) Rated life board: 50,000250hrvolt grade following single pole
(minimum)
11 Underground
miniature
(iii) Luminuxcircuit wiring
flux (NYY)
breaker
: 100 + 1m/w (through
(SPMCBS) PVChaving
pipe): Providing
minimum Rm. 305.00 0.00
&
(iv)laying
breaking LEDofcapacity
the
chips following
:6-KA PVC
EDISON withinsulated
/thermal
EPISTOR&over-current
sheathed
/ OSRAM cable
and/
11 (b) In pucca
(NYY)
instantaneous
PHILIPS / (XLPE)
/ CREE floorelectromagnetic
/insulated & PVCshort sheathed cablerelease
circuit (2XY) Rm. 366.00 0.00
with
provision.PVC insulated
BRIDGELUX. SPMCBSGreen / White colour
of DORMAN SMITHECC wire / MEM (BYA)
/
11 ii)a.
SIEMENS 1C-2
connecting X/ 2.5
at mm
both
VIRTZRO 2
NYY/XLPE
ends, through
/HAGER
(v) Driver : MEANWELL / OSRAM / PHILIPS / IEC / with
PVC2.5
FEDERAL sq
pipe mm
/& (BYA)
accessories
KAWAMURA Rm. 342.00 0.00
ECC
in thewire
/standard.
ABB through
following
/ HAVELLS the /PVC
manner. Allpipe of minimum
electrical
LEGRAND / contacts
MERLIN inner diabe of/
shall
GERIN
11 (b) body:
20mm
brass In /pucca
SCHNEIDER
(vi) &copper
wall floor
thickness
orconnected
Aluminium 1.5 through
equivalent
body. mm connector/ approved
brand accepted or soldering
by Rm. 403.00 0.00
(no twisting shallAmps
the engineer.5-40 be (minimum
allowed) 6and KA) cables shall be
11 iii)a. 1C-2 X 4mm
manufactured NYY/XLPEwith
and2tested according4tosqrelevant
mm (BYA) IECECC
/ BDS / Rm. 405.00 0.00
wire
BS through
/ VDE the PVC pipeand
standards of minimum inner dia
as per detailed 25 mm &
specification
11 (b) Inthickness
wall
mentioned puccain floor 1.5 mm of PWD SCHEDULE OF RATES
Annexure-1 Rm. 466.00 0.00
2018. The work shall be carried out as per direction &
11 iv)a.
approval 1C-2ofXthe 6 mm 2
NYY/XLPE
Engineer.In withground
kutcha 6 sq mm by(BYA)
cuttingECC
45.70 Rm. 480.00 0.00
wire through the PVC pipe of
cm width x 91.40 cm depth trench with necessaryminimum inner dia 25brick
mm & or
11 (b) protection
wall
tile Inthickness
pucca floor 1.5 mm
and mending the damages good by refilling Rm. 541.00 0.00
trench with proper compaction;In pucca floor through PVC
11 v)a.
pipe 1C-2x10
by cuttingmm² trenchNYY/XLPE cable size
of necessary with and
10 sqmm
mendingBYAthe RM 631.00 0.00
ECC
damages through good pipe byofbrick
minimum inner
soling, 75 dia
mm30(1:2:4)
mm havingCC work
11 (b) Inneat
minimum
with pucca wall floor
thickness
cement 1.5 mm.
finishing etc. Cable manufacturer(s) RM 692.00 0.00
must have valid test certificate from internationally
11 v) a. 1C-2x16
accrediated mm² NYY/XLPE
laboratory (like CPRI, cable with 16
KEMA etc)sqmm BYA /
accepted RM 882.00 0.00
ECC through pipe of minimum inner
approved by the Engineer.IC-2x1.5 sqmm (NYY / 2XY) dia 40mm having
11 (b) In1.5
minimum
with pucca wallfloor
sqmm thickness
(BYA) ECC 1.9mm.wire through the PVC pipe of RM 943.00 0.00
minimum inner dia 20 mm & wall thickness 1.5 mm.(a) In
11 (i):a.
kutcha 1C-4X10sq
ground. mm NYY/XLPE With 10sq mm BYA ECC Rm. 787.00 0.00
wire through pipe of minimum inner dia 40mm having
11 (b) In pucca
minimum wallfloor
thickness 1.9mm. Rm. 849.00 0.00

11 ii)a. 1C-4X16 sq mm NYY/XLPE With 16sq mm BYA ECC Rm. 1031.00 0.00
through pipe of minimum inner dia 40mm having minimum
11 wall
(b) Inthickness
pucca floor
1.9mm. Rm. 1093.00 0.00

11 iii) 1C-4X25 sq mm NYY /XLPEWith 16sq mm BYA ECC Rm. 1790.00 0.00
through pipe of minimum inner dia 50 mm having minimum
11 wall
(b) Inthickness
pucca floor
2.5 mm. Rm. 1851.00 0.00

11 iv) 1C-4X35 sq mm NYY /XLPEWith 16sq mm BYA ECC Rm. 2211.00 0.00
through pipe of minimum inner dia 50 mm having minimum
11 wall
(b) Inthickness
pucca floor
2.5 mm. Rm. 2272.00 0.00

11 v) 1C-4X50 sq mm NYY/XLPE With 25 sq mm BYA ECC Rm. 3013.00 0.00


through pipe of minimum inner dia65 mm having minimum
11 wall
(b) Inthickness
pucca floor
2.5 mm. Rm. 3075.00 0.00

11 vi.a. 1C-4X70 sq mm NYY/XLPE With 35 sq mm BYA Rm. 3889.00 0.00


ECC through pipe of minimum inner dia 65 mm having
minimum wall thickness 2.5 mm.
11 (b) In pucca floor Rm. 3951.00 0.00

11 vii. 1C-4X95 sq mm NYY/XLPE With 50sq mm BYA ECC Rm. 5387.00 0.00
through pipe of minimum inner dia 75 mm having minimum
11 wall
(b) Inthickness
pucca floor
3 mm. Rm. 5449.00 0.00

11 viii. 1C-4X120 sq mm NYY /XLPEWith 70sq mm BYA ECC Rm. 6677.00 0.00
through pipe of minimum inner dia 75 mm having minimum
11 wall
(b) Inthickness
pucca floor
3 mm. Rm. 6738.00 0.00

11 x. 1C4X4 sq mm NYY/XLPE With 4 sq mm BYA ECC Rm. 484.00 0.00


through pipe of minimum inner dia 30 mm having minimum
11 wall
(b) Inthickness
pucca floor
1.5 mm. Rm. 545.00 0.00

11 x. 1C4X6 sq mm NYY/XLPE With 6 sq mm BYA ECC Rm. 634.00 0.00


through pipe of minimum inner dia 40mm having minimum
11 wall
(b) Inthickness
pucca floor
1.9mm. Rm. 695.00 0.00

12 Providing & laying of following sizes LT PVC insulated Rm. 4533.00 0.00
sheathed & armoured cable (NYSEYFGbY)/ HT (11KV)
12 PVC
(B) Ininsulated,
pucca floorsheathed, through 100 mm PVC&pipe
screened armouredhaving wall cable Rm. 5042.00 0.00
thickness
(NYSEYFGbY)/HT of 3 mm. (11KV) armoured XLPE Cable: All
12 (C ) In pucca
electrical contacts ground/pucca
shall be ofroad through 100 connected
brass/copper mm PVC Rm. 5043.00 0.00
pipe
through having connectorwall thickness or soldering of 3 mm.( no twisting shall be
13 HT Switchgear
allowed) and cables : Supply shall of 11 beKV, 3-phase, 50 and
manufactured Hz, indoor
tested Each 348499.00 0.00
type,
according high totension relavent switchgear
IEC/BDS/complete BS/ VDEwith Load Break
standards and
14 THREE
Switch
as per (LBS), PHASE800
detailed OIL ATYPE
specificationhard-drawn TRANSFORMER(150
mentioned electrolytic copper bus-
in Annexure-1 of Each 544196.00 0.00
KVA):Supply
bars,
PWD 1SCHEDULE No. 0-15 of following
KVOFrange oil-immersed,
RATES voltmeter 2018. &natural The1 no. work air
ammeter cooled,
shall be of
15 L.T Switch
3-phase,
adequate
carried out Gear:
50-Hz,
ranges as per Supply
11KV/0.415 of 415 KVV,& 3-phase,
bothdirection/approval/acceptance
with selector 0.24switch, 50
KV outdoor1 no. Hz,ofindoortype
ofpanel
the Each 194,399.00 0.00
type
heater
Engineer.low
distribution tension
with(a): transformer
auto switch-gear
thermostat
In kutcha of DYN11
ground of following
control vector specification
group
switch,45.70
by cutting manual complete
cm ON width &
16 Power
complete
with
OFF
x 91.40 two factor
push with
windings
cm button improvement
voltmeter
depth of high
switch trench (0and - panel.:Supply
500V)
conductivity
indicators
with & ammeter
copper
necessary of following
including of adequate
having
brick or 415
following tile Each 173,027.00 0.00
volt,
rating
percentage
components
protection3bothphase, with
impedance
and 50 Hz 4power
selector
(components
mending switch,
- such
6.5%,
the damagesfactor
asbasicLBS,improvement
indicating impulse
HRC lamps
good for CT,
insulation
fuse,by panel
ON -
PT
refilling
17 Instalation,
complete
OFF
trenchand
level
shall 75
bewithKV Testing
with
following
,proper
manufactured Dielectric & busbars
TPcomponentsCommissioning
&strength
compaction.(b) tested as andper
(components
28 KV of
earth
In pucca(for
NEMA 11/.415 block,
1 min),such
/ VDE
floor KV as/ micro
HT & /
IEC
through Job 4588.00 0.00
Transformer
processor
TPMCCBs
LV
JIS porcelain
/ BS size
required Standards (150
controlled
shall beKVA)
bushings,
of PVC auto
manufactured
) pipe manual
assembled power
cutting 5 positionfactorin
according
locally
trench correction
ofstandard
14 toSWG
necessary relevant relay
tapsheet
size
18 (a).Instalation,
with
changer,
steel digital
NEMA/VDE/IEC/JIS/BS
and mending clad, PF
conservator,
dust Testing
reading
good &display,
Commissioning
Standards
thermometer,
&thevermin damages capacitor
proof, and
with oilfree
inlet
one ofbank,
shall L.T
&haveoutlet
standing,
layer swich
contactor,
typeclass
1st floor Job 3549.00 0.00
gear
fuse,
test
mounting, &ON
brick PFI
flat certificate
valves, plant
indicators
oil soling,75
level
epoxy according
indicator,
resin mm forpowder every
todehydrating
relevant
thick coatstage
(1:2:4) IEC of
breather,
painted cc capacitor
Standard) cabinet
work lifting bank
withaslugs, per
neat
19 (a).Instalation,
(except
assembled
earthing
relevant directly
cement finishing locally
terminals,
IEC standards Testing
connected
in 14
wheel,
etc. & SWG
(c)and Commissioning
one)
data
In as sheet etc.
plate
pucca shall
steel
per etc. accepted of
be
metal HT
in/c painting,
ground/road swich
manufactured
clad,
/ approved dust
through Job 6701.00 0.00
gear.
&
by vermin
suitable
the
required Load
tested for
Engineer.
size break
proof,as offree
operation switch.
per
CT
PVC NEMA/VDE/IEC/JIS/BSS
standing,
at pipe
Ratio 40°C (toby floor
ambient
be cutting mounting,
chosen temperature
as per
45.70cm epoxy standards
resin x:
with
capacity)
width
20 Electric
assembled
powder
maximum
-For
91.40100-150 cmlicencing
coat locally
painted
temperature
depth KVABoard
trench in charge
16mending
cabinet
rise
transformer SWGasfor
60°C, per 150
sheet KVA
relevant
locally
10/5.For
good theSub-Station.
steel IEC
manufactured clad dust
200-250
damages KVA by& L.S 26555.40 0.00
Maximum
vermin
standards
and
earthtested
transformer proof,
refillingLoad
and
in5/5 as120
free per
Bangladesh
with KW.
standing,
approval
proper floor
ascompaction
per mounting,
& NEMA/VDE/IEC/BS
acceptance providing epoxy
of the 50resin mm
21 powder
REB/PDB
Engineer.FOR
standards:Capacity
For
thick 300-315
compacted Service
coat painted
300KVA Charge
/315
: 150
premix KVA for TRANSFORMER:Supply
cabinet.
KVA
transformer Three
bituminous (No load Phase
as20/5.ForlossConection.
per
carpeting :relevant
350 400 watts,
over IEC
of
KVA
one L.S. 18649.13 0.00
standards
415 V,
maximum.
transformer 3-phase, and
Full load
25/5.For as
50 per
Hz,
loss500
layer of 1st class flat brick soling and 75 mm thick indoorapproval
2400KVA type
watts, &
low
transformer acceptance
tension
Maximum):(a). switch-
30/5.With of the
LBS
22 LIGHTING
Engineer:FOR
gear of
Manufactured
(load following
break ARRESTER
by 150
switch).1 Govt. KVA
specification
compacted water bound macadam of khoa of brick. Set of & DROPOUT
TRANSFORMER:P.F.I
Bangladesh
of 11 complete
KV, 630 FUSE:
with
owned A (a)
voltmeter
/
(25KA), sharedSupply
capacity-
50 (0Hz,of
- Each 15817.00 0.00
outdoor
90
500V) KVAR
company
triple pole, type11
& ammeter:(i).
ormanually 3
the valid KV,
Nos.-415V, 50
of(d)adequate
ISO-9001
operated Hz,
With (11KV) 100A,
200Arating hard
certified
off load (10
both
XLPE KA),
drawn
with
company
isolator 75
selector
insulated, KV
electrolytic
having
interlocked PVCBIL
22 (b)
copper
switch,
type
with Supply
lightning
sheathed test
earth arrester
busbar,
indicating of outdoor
certificate
switch.1
armoured complete
(ii).1
lamps
forSet the
cables type
No.-415V,
for with
ON
ofrequired
1111KV, 5mounting
-KV,OFF
manufacturedKVAR,50higher
or630A andHz, 50 5KA
accessories
following
capacity
(25KA),
by TP(20
HzParadise 50 ofKA)
poweretc.
Hz,/ Each 31514.00 0.00
dropout
Made
capacitor
components
transformer
spring in
BRB orcharged, fuse
Bangladesh
anybank complete
with
(components
according
other stored (Energy
built
company(s) to
energywith
such
relevant mounting
Pac
in/separate
asIEC ) /
TPMCCBs
mechanism
having accessories
Pakistan
discharge
standards
valid triple
testshall / Brazil
from
polecoil
be anyetc.
load
certificate or
for
22 Supply
Made
EU
connection
manufacturedin
fromcountries.of
internationally
break switch HT
Bangladesh metering
(3
directly
Internationally Nos.
accredited
(LBS) with
according unit
(Energy
in line
complete for
aindependent 11kv
Pac
set).including
to through
with 3fuse.
relevant
accredited )sub-station
/ Pakistan
installation
(iii).
laboratory.
no's of 11
Laboratory with
/
2 No.-415V, TP
Brazil
KV HRC or Set 312125.00 0.00
hard
EU
fuse drawn
countries.
5NEMA/VDE/IEC/JIS/BS
KVAR,
of suitable
accepted/approved 50electrolytic
(3Hz Nos.
Amps. byinthe
TP copper
Standards
(25KA) Engineer.busbar
a set).including
power capacitor
with and earth
spring
3C shall
x 70 link
installation
bank have
operated
sq.mm bars
with
type built
striker
XLPE
23 Providing
manufacture
in/seperate
test
pin
cable certificate
plunger & forfixing
16 SWG
discharge
according
automatic 230 power V,
resistor.
to 50
coat
relevant
tripping
( A ) In kutcha ground Hz,
painted
(iv) IEC single
6
activated louver phase
Nos.-415V,
Standard) by sheet
any 10-40
of 12.5
the Set 2258.00 0.00
Ampere
steel
KVAR,
assembledmetal electronics
50 enclosed
Hz
locally TPin 14 digital
freepower
SWG
three fuses blow-up.2 Nos. of 11 KV, double pole, cast standingenergy
capacitor
sheet floor meter
steel mounting
bank
metal (KWH dust
with
clad, meter)
and
built
dust
23 Providing
steel
vermin body
in/seperate
& vermin
resin proof &with
proof,
insulated, fixing
glass
completely
discharge
free 415V
cover
drystanding,typefactory
resistor. +Potential
on 10%,
prepared
assembled
(v).
floor 50Hz
2 Nos.-415V,
mounting, board. three
& suitable
transformer epoxy BEMCO phase
10A, for50/
resin
(P.T.) Set 12521.00 0.00
electronics
CITIZEN
indoor
Hz use
TP ratio
powder
having /
magnetic digital
in/cELECTRO
coat11/0.11, all
painted energy
standard
contactor /
50VA, with
cabinet meter
HAY
IP54as per
class /(KWH HOSAF/
accessories
AC3 meter)
duty.6
0.5relevant
for metering. steel
JAMUNA
Nos 415V
IEC body
3 Nos. 20/
24 EARTHING
with
MEGHNA glass
manufactured
Amp
of 11,50Hz,
standards KV,and / cover:
PADMA
castEarthing
&
TP on
type
as magnetic
per prepared
/ PRIME
tested
resinapproval the electrical
in / board.
SOLAR
accordance
contactor
insulated, & acceptance
dry installation
BEMCO
meter
withtype, with
AC3 or / with
CITIZEN
equivalent
duty.9
ofsingle
the core 40
Nos/ Set 42261.00 0.00
mm
ELECTRO
foreign(1.5")made
NEMA/IEC/JIS/BDS
415V
Current10transformer
Engineer.INCOMING: dia/ G.I.
HAVELS
as
Amp ,HRC (C.T.) perpipe (earth
(INDIA)
approved
standereds
Fuse
(i). 1 Set with electrode)
/
having HAY
by PDB
(Country
- base.18
415V, / HOSAF/
adequate /
300 having
ofDPDC
Nos origin:
amp. 6.35
JAMUNA
or
415TP&NE
current mm.
,25/
similar
voltratio
dia
MEGHNAhole
USA/Japan/EU
Amps.HRC
hard
(compatible across
drawn /electrolytic
organization. PADMA
Fuse
with the
countries
with pipe
the /copper PRIME at
or relevant
base.(a).
transformer 305
busbar.(ii). mm.
/Assembled
SOLAR
supply
capacity) interval
1 No. orby
Electriciy
burden securely
-equivalent
the valid
415V, 10-
bonded
foreign
Authority
ISO
250 9001
Amps by
made ) and soldering
certified
(35KA), asas per
per
companywith
approved 2
approved/accepted
adjustable
15VA of class 0.5 M5 for metering. 1 No of 415V, 6A ( 10 nos.
having
type by of
PDB test
TPMCCB No-2 / DPDC
by SWG
certificatethe
for or
main ( HDBC
similar
within
earth
at
KA),least
control leads
organization.
Engineer.1 with
50 5 Hz. (at
no.
years
thermal the
10-100
3-phase
)for
TPMCB top the
overloadof4 wire
Amps the &electrode)
(Double
required
for single/double
instantaneous
PT Tariff
or
secondary with
higher itselectro-
) tarrif protection
solid of
capacity
protection.
by
state 20
transformer
magnetic
Assembled mm.
programable
short (3/4")
according
bycircuit dia
KWH G.I. meter pipe
validto ISO-9001
the release. relevent up-to
with LCD
(iii). 3 Nos. plinth
IEC display, level
- standards
415V, company
certified MDIrunon
500/5 at a
from
depth of 609.6period
kw integretion mm (2 30ft.) minutes,below 3G.L nos.up-to castmain resin board to
25 b) Depth of bottom of main electrode at 25146 mm. (82.5 Set 33809.00 0.00
ft.) from GL & length of electrode 24384mm (80 ft.)
25 c) Depth of bottom of main electrode at 12953 mm. (42.50 Set 24149.00 0.00
ft.) from GL & length of electrode 12191mm (40 ft.)
25 d) Construction of Earthing Inspection Pit inside Set 6037.00 0.00
measurement 600 mm. X 600 mm. X 600 mm. With 250
28 Supply
mm. Thick of 400 brick& in230 cement V, 3-phase,morter 4-wire,(1:4) with 50100 Hz. mm.air / water
Thick Each 1733141.00 0.00
cooled,
RCC topfloor mounted, indoor type following continuous
slab (1:2:4).
29 Installation,
capacity (prime testing power) & commissioning
electric generating of following
set suitable electric
for Each 28013.00 0.00
generator
tropicalizedoncountry prepared CC padwith
complete with fourthe help of necessary
stroke,1500 rpm,
32 OFF-
Tdiesel GRID
& P,engine skilledSOLARwithlabour, PANEL
all standard technician, SYSTEM Engineer
accessories :viz.including
Supplying,
12/24 volt2 /KWp 187280.00 0.00
installation,
hrs. / 5 day&testing
DC battery trial
auto run & commissioning
battery operation
chargerbywith of ammeter,
following
skilled operator capacity
with
radiator
33 solar
REB Security
supply
assembly,system
of necessary Deposit
oil(off & grid)
fuelfuelfor pump,&6-8 hours
lubricant
auto as backup
speed with required
per manufacturers
governor, air / Kw 4224.72 0.00
quantities
instruction
cleaner, fuelmanual of mono
& oil tank, /
and level poly
in accordancecrystalline
& oil pressure silicon
with gauge, solar
relevantRPM PV
IEC&/
36 LIGHTNING
modules,
NEMA
hour meter,/ VDE ARRESTER
maintenance stopfree
/ JIS&standards
start : Providing
switch, sosealed
that
exhaust&solar
fixing
vibration
silencer25.4
suited
transfermm (1")
battery,
(to rate
keep Set 5,796.00 0.00
dia
with
to 457 mm
required
foundation
standard (1.5
emission sizeft)maximum
shall be long almost
level), solid copper
power
zero.
mounting 40 rod
KVAwith
point
spring tracking6.6 mm
Generator.
and thick
(MPPT),
vibration
37 Providing
150 mm (to x &150
charge-controller
isolator drawing
keep mm&very no-2
copper
inverterminimumHDBC
madeas per wire
base through
with
relevant
vibration sharp 12.7
end
ininternational
the mm.
top,
room), Rm 857.00 0.00
(½")
fixed dia
standards
mounting on the G.I. top
&steel pipe ofbaseincluding
2.0"(
certification 2.5 such
frame - fitting,
3 mmas fixing
thick
etc.IEC / )CEthe /10'
dia
including G.I.
UL pipe
long GIin
as per
safety &
38 Supply
wall
pole or
following
protection and
bycolumn
necessary drawing
complete
specification
device viz. of
accessories ascopper
toauto required.
produce
shut. The made
AC-
off pole down
shall
220V,
with conductor
fixed pure
50Hz
indicators on
for RM 1,923.00
0.00
having
parapet
sine wave dia for 12.7
wall mm
suitable with or
use copper
necessary
of
overload, over & under voltage, high temperature, low oil standard strip
CC (30mmx2mm)
AC work
appliances and with
other
such
39 Supply
fixing
as energy
pressure, andover
holder
accessories installation
on arresting
for
saving lamps,of
vertical
speed, and
low insulated
horizontal
lightning
tube fuel asAirper
lights,
level Terminal
surface.
LEDs,
etc. plan The mast
fixing
(enclosed)
ceiling
coupled fans,of each
with 14,852.00
0.00
the
shall
and have
brushasless,
computers, 40mm
per direction
self to
etc ofasthe
TV excited 50mm length
a engineer.
primary
alternator or
source
having height and
of power
control will
panel with be
40 Providing
following
placed
necessary
auto voltage &nos laying
3 specification
wirings,per ofmeter
regulator, following
- voltmeter
battery as racksPVC& pipe
per (bestwith
direction
/ cabinet,
ammeter quality
and solar PVC
samplePV
selector Rm 121.00 0.00
pipe
Made
approved
mounting
switch, ofofreputed
stainless
by themanufacturer)
structure,
frequency steel
engineer (Type
combiner . embedded
meter.WITH : box,
316) ATS fuse inbox, wallmeter
AND / column
SOUND etc./
B.II External
ceiling
Length
system Electrical
ATTENUATED /:includes
floor
2300 etc. mmwork with ACOUSTICALLY
compatible all accessories,
solar cables, 18conduit
SWGTREATED GP sheet
including Tk. 0.00
pull
Dia
surge : box
30mm with 3 protection
& lightning
CANOPY(maximum mmsound thicklevel ebonite
control sheetatfire
: 75system,
dBA cover, fixing
7mprotection
distance
C. 100mmx200mm
materials
The
and
in the mast
alarm etc.
shalldia as Deep
be required
fixed
system room).The
generator Set on Tube
including
the
and all accessories well
top ofwith
mending
the uPVC
GI the
tower
generatingas setrequired Pipe
damages
shall SS
with to
be
good.
nuts
complete Minimum
assembledthebolts, inner
clamps
installation
& tested diaas
in USA 40 permm
with/ JAPAN &
sampleminimum
one year approved
/ EU free wall thickness
operation
countries. by Thethe&
1 Mobilization
1.9
major mm.
engineer.
maintenance
components forof test
the like boring
system. engine or observation
shall be of well: Perkins / Deutz / Per set 7,913.00
Transportation
Solar
Cummins system/ Mitsubishiofshall
materials, haveequipments,
/ Volvo the following
/ Kohler tools and
/ Yanmar plants
features:as
brand and
2 Boring
and
described
alternator by
boringshallusing
rigPWD
in 100
tobe work mm dia cutter
site. Construction
ofSCHEDULE
Stamford and
OF RATES
/ Meccalte 40 mm
of derrick dia
2018.
/ Leroy heavy
and SUB-/ Rm.
Somer 191.00
type
HEAD-12
Kohler G.Ibrand.
dismantling pipethe (wallsame.
The thicknessCleaning
engine, 2.9 themm,site
alternator, outside diameter
after completion
ATS, canopy shall minof
2 47.8(b)
the Above
mm,
work 50m
weight
accepted to 100m
3.517
by the =
kg/m,
also be manufactured and tested as per relevant Rm. 50m capable
Engineer. to withstand 50 219.00
kg/cm2
standards pressure)
in USAand / JAPAN other equipments
/ EU countries capable of drilling/
& accepted
2 up (c) Above
to a depth 100 to
of 152
500
approved by the Engineer. (i) 40 KVA m
meter = 52m
by water jet system through all Rm. 252.00
sorts of soil strata providing protection of caving by
2 supplying
(d) Above152 necessaryto 200 m = 48m
casing pipe. Collection of soil Rm. 290.00
samples at every 3 meter interval and at every change of
2 (e) soilAbove
strata and 200 preserving
to 250 m = them 50m in a controlled environment Rm. 334.00
for analysis and laboratory test. Finally, withdrawal of
2 boring
(f) Beyondand 250 casing m pipes etc. complete and accepted by Rm. 384.00
the Engineer-in-charge. (a) From 0.0m to 50m = 50 m
3 Installation of tube-well fixture for observation well: Per set 2,968.00
Supplying and lowering of 40/38 mm inside dia best quality
3 (a) uPVC Supplying
pressureand tubefitting
well38/40 mm dia heavy
pipe (specific gravitytype 1.35G.I pipe
- 1.45, Rm 770.00
conforming
wall thickness to standard
2.5 mm - BS-1387 3.0 mm capable & BDS-1031, to withstandhavinga
3 (b) 38/40mm
chemical
minimum dia waterpressure
composition
hydrostatic gradecarbon
(in%) uPVC
of 170 pipe
psi having
0.17-0.25,for 1 hr). wall
manganese
Fitting Rm 162.00
thickness
and fixing 2.5-3.00
0.95-1.20, insulphur
position mm
0.060 withmax, phosphorous
all accessories, uPVC 0.060 sandmax, trap
3 (c) 38/40mm
tensile
of length properties:
3.00m diawith water
miminum
uPVC grandee yielduPVC
strainer strength strainer
of desired 188slot having
MPa, Rm 204.00
thickness
minimum
installing in 2.5-3.00
tensile
or at mid mm
strength depth313 of theMPamost and suitable
markingwater for a)
3 manufacturer
(d) 38/40mm
bearing strata,dia PVC
mm socket
b)38material dia,c)best adaptor
wall thickness
quality G.I.d)pipe nominal
of length Each 100.00
outside
1.52 m with dia e) M.S.intended
weldeduse flatetc.baron the body
welded on each of theside pipeto
3 having
(e) Bestwall
prevent quality
from 38mmup
thickness
rotation diatomm,
2.9 uPVC
desired capdepth,
weight 3.517 kg/mfixing
fitting, capable the Each 79.00
to
bestwithstand
quality no. 50 kg/cm2
6 C.I. head hydraulic
hand-pump pressure etc including the
cost of solvent cement, socket adapter, filling medium
sand up to 18.00 m above strainer and the remaining
portion with available soil from boring etc. complete as per
standard specification and accepted by the Engineer-in-
charge. (a) Fitting & fixing of no. 6 Hand-pump set
3 (f) SFF of tube well log describing technical information of Each 4,105.00
the tube well as per instruction and accepted by the
3 (g) Filling the top 0.6 meter of the bore hole around the top Each
Engineer-in-Charge. 51.00
pipe with sanitary seal of concrete of proportion 1:2:4 as
4 Complete
per designdevelopmentaccepted by of thethe tube well to obtain sand and
Engineer-in-Charge. L.S 7,024.00
turbidity free water at a satisfactory yield confirmed by
5 Furnishing
tests as perdesign specificationof a production
and accepted well by bytesting of water
the Engineer- L.S 43,227.00
and soil samples
incharge. Water sample from a test mustbores be taken up tofrom 3503mseparate depth
6 Disinfection
collecting
aquifers from ofthree
samples the well of by using
water
tube-wells. min.
fromWellsthe best 3beyoud
kg suitable
of bleaching
200 aquifer,
meter Each 433.00
powder
depth in of
filling 33% strength
sterilized air-tightorglass any otherbottlesdisinfectant
having no as air per
space
7 PRODUCTION
standard specification
inside; collecting WELL: Mobilization:
and
soil (sand, accepted
solids etc) Preparation
byatthe 3m for and Per set
Engineer-in-
interval 44,836.00
installation
Charge.
at each change of tube-well and transportation
of soil strata from the bores, of arranging
complete
7 Preparation
boring
them inequipments,
the cell andofmaking a labour
box in gravel
and pack around
materials
an orderly manner.to the thecarrying
tubesite
work well
out Cum 8,293.00
fixtures
and removewith supply
the of
materials designedafter graded
completion
test of water for (1) pH, (2) CO2 (3) Chloride, (4) Fluoride, pea of gravels
the works.free
8 Making
from anya(6)
Installation
(5) Iron, sanitary
substance
of drilling
Manganese, sealrigup
harmfuland
(7) to Nitrate-Nitrogen,
a minimum
to pipe and health
accessories, depth
making of 6 meter
confirmed
(H)Total Cum 433.00
from
by G.L.
test
arrangements
alkalinity, or as
(Passing
(9) specified
for
Total through
electricity,
hardness, including
10 mesh
water, the
and
labour
(10) Arsenic, supply
retained (11)ofon
shed, approved
site40office
Turbidity,
8 Installation
quality
mesh)
and
followed ofby
including
stores, of
cement, 100
digging
test mm
sand
sieving,
reportsmud xalong
200
and
washing
pit etc, mm
khoa Dia
(12
etc.
leveling,
with Shrounded:
mm downStandards
complete
Bangladesh dressing as Boring:
graded)
per in
and Rm 1,031.00
Execution
ratio
standard
clearing (1:1:5:3)
of potable ofthe400as
ofspecification
water site mm
per
and dia
andof
asstandard
per
(12) boring
accepted
original
Sieve through
specification
by the
condition
analysis onall and sorts
soils accepted
Engineer. of (The
a testing
8 (b) the
strata
by
rate
for From
is by
discharge
throughout 50m
reverse
Engineer.
inclusive toof100m
using
a bore, = 50m
circulation
the cost
minimum
leading ofor1000
to any other
extra
ascertain amount
liter approved
water
the required
best tubsuitable
etc.method
forall Rm 1,186.00
(Method
caving
complete andother
as extra
per than reverse
depth below
specifications circulation
the
sustained aquifers, depths and slot sizes of strainer, typesand tube is
well
accepted to be applied
fixtures,
by the only
8 (c)
andFrom
for wells
shrouding 100
dia ofdeeper
Engineer-in-charge. should
tube to well
152
than mFor
notforbe=specific
152 52mmeter)
more
Tube-well thanBoring
yield, mfor
15thickness
beyond above400
200 of mm
the dia
meter Rm 1,364.00
vertical
strainer
depth
shrouding hole
andaround up to strainer,
measurement designedshould depth be
fineness and collection
allowed
modulus offrom of bottom
soil
shrouding
8 (d)
samples
of From
the
materials, 152
at
tube-well to fixture
every
mechanical 200 munits
3 meter = 48m
to interval
top of theorgravel
(pumps, as required
pack) and
compressor) for at Rm 1,569.00
every
testingchangeand operation in soil stratumof the tube including sinking and test
well, maintaining
8 (e) Above
withdrawing
bore functional200 totill250
necessary tubemwell = 50m
casing pipe and testing
installation, all necessary etc. is Rm. 1,804.00
arrangements
finished, finallycomplete filling andassealing per specification
the left overand testaccepted
bore
8 (f)
by Beyond
permanently, 250including
the Engineer-in-charge. m carrying (Measurement
water and will soil be allowed
samples Rm. 2,074.00
from E.G.L. to bottom of the blind
under direct responsibility of Engineer-in-charge to BRTC, pipe and the rate is
9 Supplying
inclusive
BUET or other ofthe thefollowing
cost of extra
reputed tube depth
laboratory, well fixtures
or of further
approved andbyhaving boring
the Each 226.00
density
required
authority,due 1350 kg/m3,
to caving
submitting opacity
theand report 0.2%
siltation) of visible
and; design details light asallper
9 b)
ISOa)1007686,
(complete
From mmand diaaccepted
minimum
0.0m water
to 50m grade
required
=by50the (Class
mstrength D) uPVC25 MPa
Engineer-in-Charge blind pipe/
conforming
and Rm 649.00
sand
to trap having
BDS-1:2013,
maintaining wall thickness
4.4.1,
the mobilized 4.4.2tools 6.0 plant
at working
and mmsite toatas
6.9site mm
pertill
standard
9 c) 100 mm
practice
satisfactory anddia strainer
accepted
test resultsby of
areany
the slot (if
asnot,
Engineer.
found pera)nextdesign
Best test made
bore with
quality 100 Rm 695.00
water
mm diagrade(Class
uPVC cap D) uPVC pipe
may be executed with the approval of concern S.E Design having wall thickness 6.0
9 d)
mm Best
Office) *quality
to 6.9 TotalmmNo. 100ofmm testx on 200water:mm dia 11 uPVC
types of reducer
test x 1 test Each 980.00
bore x one set sample (3 specimen) = 11 Nos. test (each
10 200 mm dia
specimen 1.5waterliter of grade
water) (Class* SieveD) uPVC analysis: housingmin 9pipe Nos. Rm 1,540.00
having wall thickness 10.3 mm
Sample x one test x One bore = 9 Nos. test (Samples are to 11.9 mm
11 Supplying
of 1 kg drycentralizer
wt. each)There madeare withabout
12 mm 55 dia M.S. rod
(fifty-five) tests of for Each 379.00
approved
potable water design Quality Standard according to Bangladesh
12 Complete
Environment installation
Conservation of 75 Rules-12
mm dia uPVC tube-well 1997,
(Schedule-3), fixtures Rm 103.00
such as expanded top pipes,
under ECA 1998 of Ministry of Environment and Forest. reducer, tube-well pipes,
13 Complete
strainer,
Therefore, development
blind pipe, pipe
additional ofcap
test/ theetc
tests well by
fitting
on water suitable
and orfixing
sieve air with
analysisbest Each 46,272.00
compressor
quality uPVC and pump
solution, of
iron suitable
screws
of soil if required, other than the above specified 12 capacity
and uPVC by alternate
tape and
14 Pumping
surging
placing
(twelve)in andtest
position
tests, ofmay
pumping thewithwell
be bysatisfactory
untill
proper
carried designed
sizefor
out M.S. turbine/submersible
yield,
public sand free
centralizer
interest @
as 3per Hour 984.00
pump
water
meter with
and
c/c supply
the
.in strainer of
turbidity testing
condition
portion
direction of the design engineer on actual payment equipments
is
including reached for
blind pressure/
using
pipe etc.
15 Disinfections
velocity/
includingdischarge
necessary
complete of VAT
asquantity
profit,per the well
etc.
of
standard including
and
calgon
and alland
practice
all other supply
materials
conducting
and accepted
charges.a) of sufficient
for 72Furnishing
stephours
bydraw the Each 1,777.00
quantity
including
down testof bleaching
yield
before
Engineer-in-charge. drawnand
design considering 1 No. Test Bore powder
and
after the (33%
recovery strength)
test
development etc. chlorinated
complete
as per as
16 Filling
water
per of the bore-hole
having
specification
specification 150and
and accepted around
ppmaccepted
available by thethe
byfreetube
the well from
chlorine
Engineer.
Engineer-in-charge. top of as
complete the Rm 42.00
shrouding
per standard
(Development up specification
toshould
the bottom of sanitary
and
be started within seal
accepted 24byhoursby
thewithdrawn
Engineer.
of
17 Protective
selected
completion soiltop cover:
oforshrouding)
local clay Supplying
free
a) andbeyound
from
Wells fitting
any fixing
substances200 bestm depth Each 9,356.00
quality
harmful200 to pipesmm dia and4 health
mm thick as perM.S.standard
pipe 1.0specification
m (3'-4") long
18 Supply
one
and end and
blocked
accepted installation
by the 250ofmm
withEngineer. metal
dia 4clad mm thick surface M.S.mounting
plate Set 20,000.00
type 3- phase
and other end minimum400 volt 300 ±5%mmvolt (1'-0)50 embedded
Hz. automatic in star-
delta
sanitary motorseal forcontrol protection panel of uPVC for the housing following pipe as capacity
per
submersible
standard specification pump motor andset. This device
accepted by thewill get sense to
Engineer.
start pump when water in the overhead tank get down to a
certain level and will stop when the water in the tank reach
to a certain level. Main component manufactured in
18 Providing of following capacity multistage Bore-well sub- Set 245,474.00
mersible water Pump Motor set manufactured according to
18 Providing
EN ISO 9906 and fixing
Gradeof3B following
/ DIN / dia NEMA 3.78/ meter
IEC / (10'-0")
BS / VDE / Each 8,326.00
long
JIS &column
ISO 9001 pipestandard
to be connected
comprising withofsubmersible
2900 RPM, water single/
18 Providing
pump motor
three phase & fixing
set made marine
sub-mersible cable
of steel
rewind forable
column submersible
pipe (oil / pump
type (API-5L, water grade-
cold Rm 1,200.00
motor
B) set manufactured
with allhaving
) motor standard according
accessories
insulation : class to
including DIN / NEMA /
special flange
F & protection IEC
: IP68/at
19 Installation,
BS
both / VDE
(minimum), testing
ends /including
JIS & ISO
suitable and commissioning
for9001
anticorrosivestandard
operation at 400 of/230±
(foreign
painting the following
etc.made)
as5% & as50
pervolt, Job 14489.00
capacity
per
sample
Hz AC sample deep
approved
supply, well
accepted bysubmersible
the
non-return valve,pump-motor
/ approved by
40the
Engineer-in-Charge.80 (set
engineer.
meter bya. (3")
mm
131'-0'') 3C-
long
20 Supplying,
lowering
10
dia sq.mmdown
required fitting
marine and and
cable fixing
in aofsingle
connecting G.I.
pump pipe withetc.
bowl
length all special
assembly
complete and in Rm. 1,526.00
fittings,
column
aIl respect such as
withbends,
pipesmanufactured marine elbows,
cableby sockets,
with
CE the reducing
help
certified sockets,
of/ chain
UL listed
20 (b)
Tee,
pulley62-65
countries aftermm
unions, dia
perG.I.sample
asjam-nuts
checking pipe with
etc.testing
and including wall
acceptedthe thickness
cutting
Pump 3.25set
trenches
Motor
/ approved mm,
by the Rm. 1,340.00
outside
where
including
engineer. diameter
necessary
filling
Motor min
and
distilled 71.5
fitting
Capacitywatermm, the weight
sameHP; with
supplying
7.5 6.15
andearthkg/m, can
fixingduly
Discharge: a 40-200
long
20 (withstand
c)
rammed
bend, 50 mm
6.35and dia
min
mm G.I.
50
fixing
thick
litre/min, Head:71-200meter. pipe
kg/cm2
in walls
M.S with with
sheet wall
hydraulic thickness
holderpressure.
tube-well bats 3.65
and
cover mm,
making
required Rm. 860.00
outside
hole
heavyinduty diameter
floors, walls
holding min and57.3
clamp mm,nuts,
consequent
with weight 5.38and
mending
bolts, kg/m,
good can
makingthe all
20 (d) 40 mmand
withstand
damages
electrical diapipe
min
etc. G.I.complete
50
all pipe
kg/cm2 with
connection inwall
hydraulic thickness
allcompletepressure.
respects 3.25
asapproved
requiredmm,and
as per Rm. 669.00
outside
directiondiameter
accepted ofbythe min 46.5 mm,
theengineers.
Engineer- in- toweight
Upcharge 7.5 HP 3.83
(a) 75 kg/m,
motor -80 mm candia
21 Supplying,
withstand
G.I. pipe with fitting
min 50 and
wall kg/cm2 fixing
thickness of3.25
bestmm,
hydraulic quality
pressure. G.I. gate
outside valve
diameter Each 4519.00
with
min 86.5sealant
mm,etc. complete
weight approved
7.22 kg/m, can and accepted
withstand min by
50the
21 (b) 62 mm
Engineer-
kg/cm2 brass
in-
hydraulic gate
charge. valve
(a)
pressure. 75 .mm Supplying,
brass gate fitting and. fixing of
valve Each 3387.00
best qualityfitting
Supplying, gate valve
and fixingwith of sealant
best qualityetc. complete
gate valve with
21 (c ) 50 mm
approved
sealant and
etc. brass gateapproved
accepted
complete valve
by the . Supplying,
Engineer-
and accepted fitting and
in- charge.
by thefixing Each 1714.00
of best quality
Engineer- in- charge. gate valve with sealant etc. complete
C. 100mmx200mm
approved and diaaccepted
Deep SetbyTube well with uPVC
the Engineer- Pipe
in- charge. Tk. 0.00
Estimate For …………………………………………………... District.

Package no: WP-……….../SDP-4(GOB)-HED

ABSTRACT OF COST

A. BUILDING WORKS

A.I CIVIL WORKS


A.1 Foundation up to P.L Tk. -
A.2 Above P.L Tk. -
Sub -total A-.I ( A.1+A.2) Tk. -
A.II SANITARY AND PLUMBING WORKS Tk. -
A-III INTERNAL ELECTRICAL WORKS Tk. -
A. Building work 's: (A.I+A.II+A.III) TK. -
B. EXTERNAL WORKS
B-I EXTERNAL CIVIL WORKS Tk. -
B-II EXTERNAL ELECTRICAL WORKS Tk. -
B. External Work's: (B.I+B.II) TK. -
C.DEEP TUBE-WELL WORKS. TK. -
GRAND TOTAL (A+B+C) TK. -