As shown in sheet 'Earth
1 Earth cutting cu ft 117960.022 11237.056 129197.078 5.00 56,185.00 645,985.39
excavation'
2 Daily labour for columns Eaichbee Enterprise Hrs 586.000 0.000 586.000 22.50 - 13,185.00

As shown in sheet 'Daily


3 Daily labour for Other Hrs 877.100 0.000 877.100 22.50 - 19,734.75
labour for other work'

4 P.C.C. (M-10) Eaichbee Enterprise cu m 6.000 0.000 6.000 220.00 - 1,320.00


5 R.C.C. (M-30) Eaichbee Enterprise cu m 168.000 0.000 168.000 50.00 - 8,400.00
6 Pile breaking Sanjay Shah R.M. 8.630 0.000 8.630 300.00 - 2,589.00
7 Electric items T.E.P.L. Att. Slip 1.000 0.000 1.000 42.00 - 42.00
8 Others item (Tarpulin) T.E.P.L. Att. Slip 1.000 0.000 1.000 260.00 - 260.00
9 Reinforcement shifting Eaichbee Enterprise MT 70.000 0.000 70.000 70.00 - 4,900.00
10 M.S. Pipe shifting T.E.P.L. MT 6.000 0.000 6.000 70.00 - 420.00
11 Channel shifting T.E.P.L. MT 20.000 0.000 20.000 70.00 - 1,400.00
12 P.C.C. (M-10) T.E.P.L. Cum 10.5 21.000 31.500 250.00 5,250.00 7,875.00
13 Material Shifting T.E.P.L. MT 63.285 0.000 63.285 80.00 - 5,062.80

Total 61,435.00 711,173.94 Rs.

Note : We paid directly to Yusuf for PCC work(19.5Cum from Total work)
Earth Excavation

Strand Road Side

Earth Length (m) Breath Height (m) Volume (cu m) Remarks


marking (m)
A 60.550 8.000 1.250 605.500 A/C of S.B. Enterprise
B 60.550 2.635 1.260 100.516 A/C of S.B. Enterprise
C 60.550 1.200 2.450 178.017 A/C of Sanjay Shah
D 60.550 3.300 2.450 222.318 A/C of Sanjay Shah
Total 1106.351 cu m
39070.800 cu ft

Fairly Place Side

Earth Length (m) Breath Height (m) Volume (cu m) Remarks


marking (m)
A 62.845 8.000 1.250 628.450 A/C of Dutta Enterprise
B 58.345 2.635 1.260 96.856 A/C of Dutta Enterprise
C 58.345 1.200 2.450 171.534 A/C of Sanjay Shah
D 58.345 3.900 2.450 260.545 A/C of Sanjay Shah
Total 1157.385 cu m
40873.054 cu ft

North Side Pile

Earth Length (m) Breath Height (m) Volume (cu m) Remarks


marking (m)
C 58.620 2.500 3.200 468.960 A/C of Sanjay Shah
D 31.120 0.800 2.500 31.120 A/C of Sanjay Shah
Total 437.840 cu m
15462.320 cu ft

Sump pit near Grid-3

Earth Length (m) Breath Height (m) Volume (cu m) Remarks


marking (m)
- 3.000 3.000 1.200 10.800 A/C of Sanjay Shah

X 1.5 times for extra work Total 16.200 cu m


572.103 cu ft

Earth cutting in between Grid 3 - Grid 6 & Grid G - Grid H

Earth Length (m) Breath Height (m) Volume (cu m) Remarks


marking (m)
- 24.300 1.000 0.300 7.290 A/C of Sanjay Shah
Total 7.290 cu m
Daily Labour for Columns casting

Sl Labour Columns status


Date Each hrs. Total hrs
no. (no) Columns no. Lift no.
1 31/3/2010 15 2.3 30 C 43 1
C 42 1
C 29 1
2 5/4/2010 17 2 34 C 44 1
C 28 1
C 14 1
3 8/4/2010 16 2 32 C 45 1
C 27 1
C 26 1
4 9/4/2010 16 2.15 36 C 37 1
C 21 1
C 14 2
5 12/4/2010 16 2.3 40 C 33 1
C 30 1
C 22 1
6 20/4/2010 15 3 45 C 44 2
C 23 1
C 13 1
7 22/4/2010 15 4.3 67.3 C 43 2
C 29 2
C 15 1
8 26/4/2010 14 3 42 C 52 1
C 51 1
C 45 2
9 29/4/2010 13 2.3 32.3 C 59 1
C 51 2
C 42 2
10 6/5/2010 6 4 24 C 22 2
C 21 2
C 12 1
11 8/5/2010 8 2.3 20 C 60 1
C 34 1
C 33 2
12 10/5/2010 15 3.3 52.3 C 53 1
C 27 2
C 20 1
13 19/5/2010 8 2 16 C 34 2
C 30 2
C 12 2
14 20/5/2010 8 3 24 C 23 2
C 19 1
C 13 2
15 23/5/2010 8 2 16 C 36 1
C 15 2
C 11 1
16 25/5/2010 7 3 21 C 28 2
C 20 2
C 11 2
17 29/5/2010 7 2.3 17.3 C 41 1
C 26 2
C 19 2
18 4/6/2010 9 4 36 C 41 2
C 37 2
C 35 1
19 19/6/2010 S.P.L. labour on our A/C C 35 2

Total 586 hrs.


Sl no. Date Volume (Cu m) Remarks
1 0.5 By hand
2 0.5 By hand
3 28.08.2010 4 R.M.C.
4 18.09.2010 2.5 R.M.C.
5 28.09.2010 3 R.M.C.
6 16.11.10 4 R.M.C.
20.11.10 5 R.M.C.
23.11.10 4 R.M.C.
27.11.10 4 R.M.C.
02.12.2010 4 R.M.C.

Total 31.5
Sl no. Date Item Weight (MT) Remarks
1 26.7.10 Cap lock & Bracing 1.240
2 28.7.10 Rod shifting 2.360
3 28.7.10 Cap lock & Bracing 4.950
4 29.7.11 Cap lock & Bracing 5.865
5 31.7.10 Cap lock & Bracing 4.760
6 1.8.10 Cap lock & Bracing 5.190
7 2.8.10 Rod shifting 2.000
8 12.8.10 Rod shifting 5.100
9 21.8.10 Rod shifting 11.290
10 27.8.10 Rod shifting 2.170
11 31.8.10 Cap lock & Bracing 5.350
12 13.9.10 Rod shifting 0.410
13 21.9.10 Rod shifting 7.400
14 26.9.10 Rod shifting 5.200

Total 63.285 MT
Sl Labour Rate Amount
no. Date Description of work (no) Each hrs. Total hrs (Rs.) (Rs.) A/C of Remarks

1 11/4/2010 P.C.C. (M-10) 16 1.00 16.00 22.50 360.00 Eaichbee Enterprise


2 19/4/2010 Compresser 2 7.00 14.00 22.50 315.00 Sanjay Shah

3 27/4/2010 P.C.C. (M-10) 14 3.00 42.00 22.50 945.00 Eaichbee Enterprise

4 3/5/2010 P.C.C. (M-10) 7 15.30 112.30 22.50 2526.75 Eaichbee Enterprise

5 7/5/2010 R.C.C. (M-30) 15 3.00 45.00 22.50 1012.50 Eaichbee Enterprise

6 12/5/2010 Retaining wall (M-30) 14 2.00 28.00 22.50 630.00 S. P. L.

7 16/5/2010 Pedestal (M-40) 8 6.30 52.00 22.50 1170.00 Eaichbee Enterprise

8 16/5/2010 Vibrator repairing 10 2.00 20.00 22.50 450.00 T. E. P. L.

9 17/5/2010 P.C.C. (M-10) 8 3.20 26.20 22.50 589.50 Sarif Enterprise

10 19/5/2010 P.C.C. (M-10) 6 1.30 9.00 22.50 202.50 Eaichbee Enterprise


11 29/5/2010 P.C.C. (M-10) 6 2.00 12.00 22.50 270.00 Eaichbee Enterprise
12 3/7/2010 Vibrator repairing 2 0.35 1.10 22.50 24.75 T. E. P. L.
13 3/7/2010 Pump shifting 2 0.35 1.10 22.50 24.75 Sanjay Shah
14 3/7/2010 Dewatering 4 2.30 10.00 22.50 225.00 Sanjay Shah
15 10/7/2010 Vibrator repairing 1 4.00 4.00 22.50 90.00 T. E. P. L.
16 12/7/2010 Ring shifting 1 2.30 2.30 22.50 51.75 Eaichbee Enterprise
17 14/7/10 Pump shifting 4 1.30 6.00 22.50 135.00 Sanjay Shah
18 14/7/10 Bolder shifting 2 2.00 4.00 22.50 90.00 Sanjay Shah
19 15/7/10 Dewatering 2 3.30 7.00 22.50 157.50 Sanjay Shah
20 15/7/10 Bolder shifting 2 3.30 7.00 22.50 157.50 Sanjay Shah
21 16/7/10 P.C.C. (M-10) 11 6.00 66.00 22.50 1485.00 Eaichbee Enterprise
22 16/7/10 Dewatering 1 8.00 8.00 22.50 180.00 Sanjay Shah
Deduction Sheet

Eaichbee Enterprise

Sl Labour Rate Amount


Date Description of work Each hrs. Total hrs Paid to A/C of Remarks
no. (no) (Rs.) (Rs.)
1 11/4/2010 P.C.C. (M-10) 16 1.00 16.00 22.50 360.00 Maa Laxmi Enterprise
2 27/4/2010 P.C.C. (M-10) 14 3.00 42.00 22.50 945.00 Maa Laxmi Enterprise
3 3/5/2010 P.C.C. (M-10) 7 15.30 112.30 22.5 2526.75 Maa Laxmi Enterprise
4 7/5/2010 R.C.C. (M-30) 15 3.00 45.00 22.5 1012.50 Maa Laxmi Enterprise
5 16/5/2010 Pedestal (M-40) 8 6.30 52.00 22.5 1170.00 Maa Laxmi Enterprise
6 19/5/2010 P.C.C. (M-10) 6 1.30 9.00 22.5 202.50 Maa Laxmi Enterprise
7 29/5/2010 P.C.C. (M-10) 6 2 12 22.5 270 Maa Laxmi Enterprise
8 12/7/2010 Ring shifting 1 2.3 2.3 22.5 51.75 Maa Laxmi Enterprise
9 16/7/10 P.C.C. (M-10) 11 6 66 22.5 1485 Maa Laxmi Enterprise

Total 8023.50 Rs.

Sl Rate Amount
Date Description of work Unit Quantity Paid to A/C of Remarks
no. (Rs.) (Rs.)
1 9/2/2010 P. C. C. (M-10) cu m 6 220.00 1,320.00 Maa Laxmi Enterprise
2 26/2/2010 R. C. C. (M-30) cu m 168 50.00 8,400.00 Maa Laxmi Enterprise

Total 9,720.00 Rs.

Sarif Enterprise

Sl Labour Rate Amount


Date Description of work Each hrs. Total hrs Paid to A/C of Remarks
no. (no) (Rs.) (Rs.)
1 17/5/2010 P.C.C. (M-10) 8 3.2 26.2 22.5 589.5 Maa Laxmi Enterprise

Total 589.50 Rs.

Sanjay Shah

Sl Date Description of work Labour Each hrs. Total hrs Rate Amount Paid to A/C of Remarks
no. (no) (Rs.) (Rs.)
1 19/4/2010 Compresser 2.00 7.00 14.00 22.50 315.00 Maa Laxmi Enterprise
2 3/7/2010 Pump shifting 2.00 0.35 1.10 22.50 24.75
3 3/7/2010 Dewatering 4.00 2.30 10.00 22.50 225.00
4 14/7/10 Pump shifting 4.00 1.30 6.00 22.50 135.00
5 14/7/10 Bolder shifting 2.00 2.00 4.00 22.50 90.00
6 15/7/10 Dewatering 2.00 3.30 7.00 22.50 157.50
7 15/7/10 Bolder shifting 2.00 3.30 7.00 22.50 157.50
8 16/7/10 Dewatering 1.00 8.00 8.00 22.50 180.00

Total 1284.75 Rs.

Sl Rate Amount
Date Description of work Unit Quantity Paid to A/C of Remarks
no. (Rs.) (Rs.)
1 - Pile Breaking R.M. 8.63 300.00 2,589.00 Maa Laxmi Enterprise

Total 2,589.00 Rs.

Sl Length Breath
no. Date Description of work (m) (m) Hight (m) Volume (cu m) Paid to A/C of Remarks
1 - Stand Road Side ( C ) 60.550 1.200 2.450 178.02 Maa Laxmi Enterprise
2 - Stand Road Side ( D ) 60.550 3.300 2.450 222.32 Maa Laxmi Enterprise
3 - Fairly Place Side ( C ) 58.345 1.200 2.450 171.53 Maa Laxmi Enterprise
4 - Fairly Place Side ( D ) 58.345 3.900 2.450 260.55 Maa Laxmi Enterprise
5 - North Side Pile ( C ) 58.620 2.500 3.200 468.96 Maa Laxmi Enterprise
6 - North Side Pile ( D ) 31.120 0.800 2.500 31.12 Maa Laxmi Enterprise
7 - Sump near Grid 3 3.000 3.000 1.200 10.80 Maa Laxmi Enterprise
Earth cutting in between
8 - Grid 3 - Grid 6 & Grid G - 24.300 1.000 0.300 7.29 Maa Laxmi Enterprise
Grid H

Earth cutting at Fairly lane


9 - 0.000 0.000 0.000 0.00 Maa Laxmi Enterprise
side sheet pile & Grid-B

Earth cutting at Fairly lane


10 - 0.000 0.000 0.000 0.00 Maa Laxmi Enterprise
side sheet pile & Grid-A

Earth cutting at Fairly lane


11 - side sheet pile Along Grid- 0.000 0.000 0.000 0.00 Maa Laxmi Enterprise
D
Earth cutting Along Grid-D As per shown in 'Earth excavetion
12 - 5.541 Maa Laxmi Enterprise
& Bet. Grid-A-D sheet'
Earth cutting Bet. Grid-F-
13 - 0.000 0.000 0.000 0.000 Maa Laxmi Enterprise
G & Grid-6-7
Earth cutting Bet. Pour
14 - strip - North side sheet 0.000 0.000 0.000 0.000 Maa Laxmi Enterprise
pile & Grid-5-8
Earth cutting Bet. Grid-A -
15 - 0.000 0.000 0.000 0.000 Maa Laxmi Enterprise
F & Along Grid-8

Earth cutting Bet. Pour


16 - strip-East side sheetpile & Length (m) Breath (m) Height (m) #VALUE! Maa Laxmi Enterprise
Grid-7 - north side sheet
pile
17 - Sump pit near Grid-6 0.000 0.000 0.000 0.000 Maa Laxmi Enterprise

Total #VALUE! Cu m
#VALUE! Cu ft

S. B. Enterprise

Sl Length Breath
no. Date Description of work (m) (m) Hight (m) Volume (cu m) Paid to A/C of Remarks
1 - Stand Road Side ( A ) 60.550 8.000 1.250 605.500 Maa Laxmi Enterprise
2 - Stand Road Side ( B ) 60.550 2.635 1.260 100.516 Maa Laxmi Enterprise

Total 706.016 Cu m

You might also like