Maintenance
Preventative Maintenance
Date:
Serviced by (Print):
Serviced by (Signature):
Task Initials
Fluidics
Task Initials
Verifications
Robot Verification
Run TEST SHAKE.ICL and observe with a tachometer that the performance
is as expected
Incubator Verification
Place Tempa-dots in a strip holder and run the LOAD INCUBATOR TEST.ICL
Wait at least 20 minutes: further tasks can be performed in the meantime
Run the UNLOAD INCUBATOR TEST.ICL Verify the incubator performance
and record the values
Measured
Bay Number
Temp(C)
Forced air chamber
Still air chamber (Bottom)
Still air chamber (Top)
Measured temperatures must be 38.5+1.0°C
Washer Verification
Run the WASH ACCURACY.ICL file and a precision balance to verify the
wash manifold dispense accuracy. Verify wash precision by visually
inspecting fill volume of the strips
Task Initials
Turn off the gating feature by clicking Configuration, G3 Utility Options, and
un-checking the Instrument Gating box.
Run TEST PERI-PUMP.ICL file. Verify that the volume is within the
acceptable range.
Volume (g)
Measured Volume must be between 9.9 to 10.9 g
Turn Instrument Gating Back On.
Run the PROBE ACCURACY.ICL and verify that the volumes dispensed are
within the acceptable range.
Strip Number 1 2 3 4
Weight of Empty Strip
Weight of Strip &
Liquid
Weight of Liquid
Acceptable Range (g) .14-.18 .29-.35 .36-.44 .72-.88
Centrifuge Verification
Camera Verification
Run the CAMERA ALIGN.ICL using two CMT strips (with barcode IDs). Mark
X’s in the bottom of each well in both strips.
Observe that the focus and alignment is acceptable.
Refer to chapter 6 ‘Alignments and Calibrations – section 1.3.4 Camera
Alignment’ of Service Manual to make any necessary adjustments.
Install the top cover. Run the control software and verify that the instrument
runs with the top cover in place
Task Initials
Comments: