You are on page 1of 1

MICROPILES - STEEL PIPES(273mm O.D.

)WITH 4 STRAIGHT AXIS OF DAM


CURVED AXIS OF DAM

BARS OF 25mmØ CONSOLIDATION GROUTING


N 56322.6707
E 49242.2812

No of Micro No of cable anchor No of holes Total drill Cement Qty.


+ELEVATION LOCATION/ Elevation N = 56331.8233 N = 56314.6442

Sl.No. - Depth range (m) E = 49244.6863


provided (100 T) provided Sl.No. grouted depth (bags)
E = 49253.1489
N = 56315.7695
E = 49248.1706
N = 56331.8233

1. EL.1335 58 11 1. Cable Car bench (EL.1260) 331 5778.50m 157178 42-103M


E = 49253.1489
P1 CP1

P2
2. EL:1301 58 10 2.EL-1240 bench 40 3358.50 65504 50-110M P9
BL
P10
OCK
P3
P4
LEGEND:
P1 NO
P12 . 13
P5 N = 56296.3935

3. EL:1260(CABLE CAR) 199 101 3. National highway (EL.1220) 175 13717.50 190525 60-110M N = 56335.4903
E = 49265.0991
P17
P18
P19
1

P13
P14
P6
P7
P8
E = 49263.8203
Completed RCC Piles.
P25 P20 P15

4. EL:1216 (NH) 4.

13
191 95 EL-1211 bench 19 1340.00 3484 60-75M U/S P36
P26
P27
P21
P22 P16 D/S
P28 P23
P29

5. EL:1205 178 93 5. EL-1205 bench 89 5565.00 43922 72-115M


N = 56343.8814
E = 49275.8510
P49
CP17
CP18
P37
P38
P39
P40
P30
P31
P32
C.J P24

P41 P33
P34

6. EL:1193 34 35 6. EL-1194 bench 6 264.00 3301 10-50M P64


CP20
P50
P51
P52
P53
P42
P43
P44
P35
N = 56300.0624
E = 49275.7699

12
P65 P54 P45
P46
EL:1179 BL OC
7. 34 38 7. Grouting Gallery (EL.1165) 60 3120.00 29294 51-63M N = 56347.2996
P79 CP22
CP24 P80
P66

P81
P67
P68
P69
P55

P70
P56 K NO
P57
P58
. 12
P59
P47
P48

8. EL:1165 47 36 8. Approach road to Grouting Gallery 46 3313.50 37336 50-95M


E = 49287.8748

HEEL OF DAM
P94 CP26
P82
P83
P84
P85
P71
P72
P73
P74
P60
P61
P62
P63
N = 56284.1545
E = 49292.4982

P111 CP28 P95 P9 P86 P75


6

9. EL:1140 40 0 Total 566 36457.00 530544 P131


P112
CP30
P113P114
P97
P98
P99
P100
P87
P88
P89
P90
P76
P77
P78

P115 P101 P91


P132 CP32 P116 P102 C.J P92
P103 P93
GRAVITY GROUTING N = 56360.3422
CP34P133
P134 BLOC
P117
P118 P104
P105
N = 56287.5761
E = 49304.5210

11
P119
E = 49305.4691 P135 K NO P120 P106
CP36 P136. 11 P121 P107

2M DIA. RCC PILES AT RIGHT BANK 1. EL-1165m Bench 27 1890 1861 70m CP37
P137
P138
P139
P140
P122
P123
P124
P125
P108
P109
P110
N P141 P1
P142 26 P1

Sl.No. Location Completed Elevation TAM GROUTING P143


P144
P145
27 P1
28
P129
TOE OF DAM
P146 P130

1. EL-1165m Bench 26 1814.50 39970 70m P147


P148
P149
P150
1. Below Block No.13 24 Nos 1165 P151
P152
P153

2. Dam Block No.12 59 Nos 1140 N = 56261.5392


E = 49330.8064

3. Dam Block No.11 60 Nos on slope


Out side +1140 LAYOUT PLAN OF 2000MM Ø RCC PILE FOUNDATION AT RIGHT BANK
-
Damfoundation ?
4. RD.20m U/S TO 55m U/S 09 NoS.
RD.50m D/S TO 110m D/S 23 NoS.

5. 07 No. +1220
At National Highway -
RD. 110m D/S TO
150m D/S
RIGHT BANK ?

LEFT BANK
?

?
?

?
ELEVATION (IN METERS)

(TOP OF DAM)

560.00

PHPA PUNATSANGCHHU-I H.E. PROJECT AUTHORITY (BHUTAN)


REDUCED DISTANCE (IN METERS) CONSULTANTS:
WAPCOS
WAPCOS LIMITED
TYPICAL LONGITUDINAL SECTION ALONG DAM AXIS PUNATSANGCHHU - I H.E. PROJECT
SHOWING RIGHT BANK STABILIZATION WORKS TYPICAL LONGITUDINAL SECTION ALONG DAM AXIS

You might also like