You are on page 1of 5

Name of Work: Design and construction of Formation in Embankment/Cutting Including Blanketing, Viaducts, Rail Flyover, Bridges (Major, Minor

&
RUBs) Supply and Spreading of ballast and other related infrastructural works for double track electrified railway line on Design Build Lump Sum basis
from Howrah end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station towards Garhwa and at Dehri-
on-Sone Yard from Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of Bihar in India.

Client : Dedicated Freight Corridor Corporation of India Ltd.


Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.
1/MJB/524/001
BBS FOR PEDESTAL & SEISMIC RESTRAINER Drawing No.
5/0/D
Cutting
Dia.of Spacing No. of Total length Wt/m in Total wt in
S No Bar no. Profile of bar length Remarks
bar 'mm' 'mm' bars 'mm' 'Kg.' 'Kg.'
'mm'
PEDESTAL FOR ABUTMENT & PIER
868
1 a1 550 550 20 10 2408 24080 2.470 59.478
300 300
868
2 a2 530 530 20 8 2368 18944 2.470 46.792
300 300
320 900
3 a3 900 900 16 6 3760 22560 1.580 35.645
900
SEISMIC RESTRAINER FOR PIER
860
4 r1 1850 1850 32 10 4904 49040 6.321 309.982
300 300
810
4 r1a 1786 1786 20 10 4822 48220 2.470 119.103
300 300
1060
5 r2 1818 1818 32 9 5040 45360 6.321 286.721
300 300
400 900
5 r3 1100 1100 20 100 c/c 12 4200 50400 2.470 124.488
900
400 1766
2 row in
6 r4 300 300 20 10 4332 43320 2.470 107.000
5 layer
1766
SEISMIC RESTRAINER FOR ABUTMENT
410
6 r5 1650 1650 32 10 3854 38540 6.321 243.611
200 200
860
7 r6 1618 1618 32 5 1 5 6.321 0.032
300 300
746
7 r6a 1586 1586 20 5 3838 19190 2.470 47.399

400 900
8 r7 450 450 20 100 c/c 12 2900 34800 2.470 85.956
900
400 1554 1 ROW
8 r8 150 150 20 6 3488 20928 2.470 51.692 IN 6
1554 LAYER

900 8 2 9570 19140 0.395 7.560


9 mesh

900
Total 1525.459
Total for 8 mm 7.560
10 mm 0.000
12 mm 0.000
16 mm 35.645
20 mm 641.908
25 mm 0.000
32 mm 840.346
Grand total = 1525.459
Grand total in MT = 1.525 MT
Name of Work: Design and construction of Formation in Embankment/Cutting Including Blanketing, Viaducts, Rail Flyover, Bridges (Major, Minor & RUBs)
Supply and Spreading of ballast and other related infrastructural works for double track electrified railway line on Design Build Lump Sum basis from Howrah
end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station towards Garhwa and at Dehri-on-Sone Yard from
Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of Bihar in India.
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.
BBS FOR TROLLEY REFUGE, INSPECTION PLATFORM & OHE 1/MJB/524/001
Drawing No.
MAST 4/0/D
Cutting
Dia.of Spacing No. of Total length Wt/m in Total wt in
S No Bar no. Profile of bar length Remarks
bar 'mm' 'mm' bars 'mm' 'Kg.' 'Kg.'
'mm'
TROLLEY REFUGE COLUMN
150
1 COLUMN 4255 12 32 4657 149024 0.888 132.333 4X8 NOS
300
160 230
4X28
2 RING 230 230 8 150 C/C 112 1000 112000 0.395 44.240
NOS
230
3030
TOP
SLAB 30 30 12 150 C/C 18 3042 54756 0.888 48.623
3 TOP
MAIN
R/F

TOP 30 30
SLAB 1051 1051 12 150 C/C 18 3114 56052 0.888 49.774
4 MAINBO 1000
TTOM
R/F
TOP
1405
SLAB
TOP 80 80 12 150 C/C 14 1517 21238 0.888 18.859
5
DISTIB
UTION
TOP
R/F
SLAB 1405
TOP
6 30 30 12 150 C/C 16 1417 22672 0.888 20.133
DISTIB
UTION
TOP
R/F
SLAB 1405
BOTTOM
7 80 80 10 150 C/C 14 1525 21350 0.617 13.173
DISTIB
UTION
TOP
R/F
SLAB 1405
BOTTOM
8 30 30 10 150 C/C 16 1425 22800 0.617 14.068
DISTIB
UTION
R/F
TIE 1080
BEAM
9 120 120 12 8 1272 10176 0.888 9.036
TOP &
BOTTOM
TIE 1230
BEAM
10 120 120 12 8 1422 11376 0.888 10.102
TOP &
BOTTOM
160 130

11 RING 130 130 8 150 C/C 10 600 6000 0.395 2.370 2X5 NOS
130
160 130

12 RING 130 130 8 150 C/C 12 600 7200 0.395 2.844 2X6 NOS
130

CONTRACTOR REP Page 2 of 5 PMC REP


Cutting
Dia.of Spacing No. of Total length Wt/m in Total wt in
S No Bar no. Profile of bar length Remarks
bar 'mm' 'mm' bars 'mm' 'Kg.' 'Kg.'
'mm'
INSPECTION PLATEFORM
1615
TOP
13 MAIN 80 10 70 1675 117250 0.617 72.343
BAR

BOTTOM
14 MAIN 80 10 70 1675 117250 0.617 72.343
BAR 1615

TOP
DISTRIB
15 8 14 5110 71540 0.395 28.258
UTION
BAR 5130

BOTTOM
DISTRIB
16 8 14 5110 71540 0.395 28.258
UTION
BAR 5130

PEDESTAL FOR OHE MAST


240 550
17 RING 730 730 12 95 c/c 3 2680 8040 0.888 7.140
550
706
18 771 771 16 95 c/c 5 2620 13100 1.580 20.698
250 250
526
19 755 755 16 95 c/c 3 2408 7224 1.580 11.414
250 250

DRAWIN
mesh 375 8 8 4 32.568 0.395 0.013 G NOS 1
20
M1 MJB/524/
375 0006/0/D

Total 606.022
Total for 8 mm 105.983
10 mm 171.927
12 mm 296.000
16 mm 32.112
20 mm 0.000
25 mm 0.000
32 mm 0.000

Grand total = 606.022

Grand total in MT = 0.606 MT

CONTRACTOR REP Page 3 of 5 PMC REP


Name of Work: Design and construction of Formation in Embankment/Cutting Including Blanketing, Viaducts, Rail Flyover, Bridges (Major, Minor &
RUBs) Supply and Spreading of ballast and other related infrastructural works for double track electrified railway line on Design Build Lump Sum basis
from Howrah end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station towards Garhwa and at Dehri-
on-Sone Yard from Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of Bihar in India.
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.
1/RFO/G2/0008
BBS FOR RFO PEDESTAL Drawing No.
/0/D
Cutting
Dia.of Spacing No. of Total length Wt/m in Total wt in
S No Bar no. Profile of bar length Remarks
bar 'mm' 'mm' bars 'mm' 'Kg.' 'Kg.'
'mm'
PEDESTAL FOR LP1 & RP1
676
1 a1 684 684 16 8 2416 19328 1.580 30.538
250 250
676
2 a2 700 700 16 6 2448 14688 1.580 23.207
250 250
240 700
3 a3 700 700 12 7 2920 20440 0.888 18.151
700
7
0
mesh 0 8 2 16269 32538 0.395 12.853
4 (
m2
1
700(10X70) 0
X
1076 7
5 a4 798 0
798 16 22 3044 66968 1.580 105.809
250 250 )
1626
6 a5 814 814 16 15 3626 54390 1.580 85.936
250 250
240 1650
7 a6 1100 1100 12 4 5620 22480 0.888 19.962
1650
1050(14X75
)
8 2 51830 103660 0.395 40.946
mesh
8
m3
1650(22X75)
PEDESTAL FOR LP2 & RP2
1236
9 a7 798 798 16 26 3204 83304 1.580 131.620
250 250
1786
10 a8 814 814 16 18 3786 68148 1.580 107.674
250 250
240 1810
11 a9 1260 1260 12 4 6260 25040 0.888 22.236
1810
1
8
8 2 65985 131970 0.395 52.128
mesh 0
12
m4 0
(
1275(17X75) 2
1786 4
X
13 a10 1408 7
1408 16 26 4974 129324 1.580 204.332
5
250 250 )

CONTRACTOR REP Page 4 of 5 PMC REP


8
0
0
(
2
4
X
7 Cutting
Dia.of Spacing No. of Total length Wt/m in Total wt in
S No Bar no. Profile of bar 5 length Remarks
) bar 'mm' 'mm' bars
'mm'
'mm' 'Kg.' 'Kg.'
761

14 a11 1424 1424 16 12 3981 47772 1.580 75.480


250 250

240 1810

16 a12 785 785 12 9 5310 47790 0.888 42.438


1810
1
8
0 8 2 41955 83910 0.395 33.144
mesh 0
16
m5 (
2
825(11X75) 4
X
7
5
) Total 1006.454
Total for 8 mm 139.071
10 mm 0.000
12 mm 102.787
16 mm 764.596
20 mm 0.000
25 mm 0.000
32 mm 0.000

Grand total = 1006.454

Grand total in MT = 1.006 MT

CONTRACTOR REP Page 5 of 5 PMC REP