Pedestal, Seismic, Trolley Refuge
Pedestal, Seismic, Trolley Refuge
&
RUBs) Supply and Spreading of ballast and other related infrastructural works for double track electrified railway line on Design Build Lump Sum basis
from Howrah end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station towards Garhwa and at Dehri-
on-Sone Yard from Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of Bihar in India.
400 900
8 r7 450 450 20 100 c/c 12 2900 34800 2.470 85.956
900
400 1554 1 ROW
8 r8 150 150 20 6 3488 20928 2.470 51.692 IN 6
1554 LAYER
900
Total 1525.459
Total for 8 mm 7.560
10 mm 0.000
12 mm 0.000
16 mm 35.645
20 mm 641.908
25 mm 0.000
32 mm 840.346
Grand total = 1525.459
Grand total in MT = 1.525 MT
Name of Work: Design and construction of Formation in Embankment/Cutting Including Blanketing, Viaducts, Rail Flyover, Bridges (Major, Minor & RUBs)
Supply and Spreading of ballast and other related infrastructural works for double track electrified railway line on Design Build Lump Sum basis from Howrah
end approach of DFCC Sone bridge to Chirapathu station of IR towards Howrah & to New Sonenagar station towards Garhwa and at Dehri-on-Sone Yard from
Km. 3.16 to Km. 5.38 in connection with Eastern Dedicated Freight Corridor in the state of Bihar in India.
Client : Dedicated Freight Corridor Corporation of India Ltd.
Contractor : M/S ATEPL & MGCPL (JV)
PMC : RODIC Consultant Pvt Ltd.
BBS FOR TROLLEY REFUGE, INSPECTION PLATFORM & OHE 1/MJB/524/001
Drawing No.
MAST 4/0/D
Cutting
Dia.of Spacing No. of Total length Wt/m in Total wt in
S No Bar no. Profile of bar length Remarks
bar 'mm' 'mm' bars 'mm' 'Kg.' 'Kg.'
'mm'
TROLLEY REFUGE COLUMN
150
1 COLUMN 4255 12 32 4657 149024 0.888 132.333 4X8 NOS
300
160 230
4X28
2 RING 230 230 8 150 C/C 112 1000 112000 0.395 44.240
NOS
230
3030
TOP
SLAB 30 30 12 150 C/C 18 3042 54756 0.888 48.623
3 TOP
MAIN
R/F
TOP 30 30
SLAB 1051 1051 12 150 C/C 18 3114 56052 0.888 49.774
4 MAINBO 1000
TTOM
R/F
TOP
1405
SLAB
TOP 80 80 12 150 C/C 14 1517 21238 0.888 18.859
5
DISTIB
UTION
TOP
R/F
SLAB 1405
TOP
6 30 30 12 150 C/C 16 1417 22672 0.888 20.133
DISTIB
UTION
TOP
R/F
SLAB 1405
BOTTOM
7 80 80 10 150 C/C 14 1525 21350 0.617 13.173
DISTIB
UTION
TOP
R/F
SLAB 1405
BOTTOM
8 30 30 10 150 C/C 16 1425 22800 0.617 14.068
DISTIB
UTION
R/F
TIE 1080
BEAM
9 120 120 12 8 1272 10176 0.888 9.036
TOP &
BOTTOM
TIE 1230
BEAM
10 120 120 12 8 1422 11376 0.888 10.102
TOP &
BOTTOM
160 130
11 RING 130 130 8 150 C/C 10 600 6000 0.395 2.370 2X5 NOS
130
160 130
12 RING 130 130 8 150 C/C 12 600 7200 0.395 2.844 2X6 NOS
130
BOTTOM
14 MAIN 80 10 70 1675 117250 0.617 72.343
BAR 1615
TOP
DISTRIB
15 8 14 5110 71540 0.395 28.258
UTION
BAR 5130
BOTTOM
DISTRIB
16 8 14 5110 71540 0.395 28.258
UTION
BAR 5130
DRAWIN
mesh 375 8 8 4 32.568 0.395 0.013 G NOS 1
20
M1 MJB/524/
375 0006/0/D
Total 606.022
Total for 8 mm 105.983
10 mm 171.927
12 mm 296.000
16 mm 32.112
20 mm 0.000
25 mm 0.000
32 mm 0.000
240 1810