INSPECTION REPORT OF DE(H) QC RAMANATHAPURAM FOR THE MONTH OF JUNE - 2017.

Name of Q.C division: Madurai

at site
No of tests conducted No. of test satisfied No.of test Not satisfied

Name of the Execution Division

No of CMP / Ready mix site

Rebound hammer test/ Slump


Compressive strength /

Compressive strength /

Compressive strength /
Rebound hammer test

Rebound hammer test


inspected

Thickness, Width

Thickness, Width
inspected

Binder content

Binder content

Binder content
Temperature

Temperature

Temperature
Thickness
Gradation

Gradation

Gradation
S

Viscosity

Viscosity

Viscosity
Density

Density

Density
Remarks

Total

Total

Total
No
No.of Works

6 Not satisfied
Madurai, C&M 6 4 9 4 34 16 3 3 0 69 7 4 34 13 2 3 63 2 0 0 3 1 0 0 6
then Rectified
1
Madurai, RR - - - - - - - - - - - - - - - - - - - - - - - - - - --
2 Not satisfied
Dindigul, C&M 3 1 3 1 27 7 1 1 0 40 2 1 27 6 1 1 0 38 1 0 0 1 0 0 0 2
then Rectified
2
2 Not satisfied
Dindigul, RR 1 1 0 1 2 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 2
then Rectified
1 Not satisfied
3 Palani, C&M 2 0 2 0 27 8 0 0 0 37 2 0 27 7 36 0 0 0 1 0 0 0 1
then Rectified
4 Not satisfied
Theni, C&M 7 3 5 3 18 6 3 3 1 39 4 3 18 6 0 3 1 35 1 0 0 0 3 0 0 4
then Rectified
4
Theni, RR - - - - - - - - - - - - - - - - - - - - - - - - - - --
4 Not satisfied
Sivagangai, C&M 8 1 2 1 34 9 1 1 48 0 1 34 8 1 44 2 0 0 1 1 0 0 4
then Rectified
5
Paramakudi, RR - - - - - - - - - - - - - - - - - - - - - - - - - - --
4 Not satisfied
Ramnad, C&M 5 2 4 2 22 7 2 2 0 39 2 2 22 6 1 2 0 35 2 0 0 1 1 0 4
then Rectified
6
1 Not satisfied
Paramakudi, RR 1 3 1 4 3 0 3 0 0 1 1
then Rectified
Total 33 11 29 11 162 53 10 10 3 278 20 11 162 46 4 10 1 254 9 0 0 7 6 0 2 24
FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
NAME OF THE QC SUB DIVISION:MADURAI

BM

Km 1/204 Thickness 50 mm 52 mm Satisfied


L/S 1.10m from
edge Width 3.75 m 3.75 m Satisfied

Field Density > 100 % 100.50% Satisfied

BM

Km. 1/030 Thickness 50 mm 51 mm Satisfied


R/S 0.80m from
edge Width 3.75m 3.76m Satisfied

Strengthening to Muruganeri road Field Density > 100 % 100.20% Satisfied


Madurai C&M/
1 19.06.2017 brg.from Km.3/0 of Subbulapuram-
Peraiyur C&M BC
Sengulam road Km 0/0-1/6
Km 1/204 Thickness 30 mm 31 mm Satisfied
L/S 1.10m from
edge Width 3.75 m 3.75 m Satisfied

Field Density > 100 % 100.10% Satisfied

BC

Km. 1/030 Thickness 30 mm 32 mm Satisfied


R/S 0.80m from
edge Width 3.75m 3.77m Satisfied

Field Density > 100 % 100.20% Satisfied


FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
BM

Km 0/643 Thickness 50 mm 52 mm Satisfied


L/S 0.8m from
edge Width 3.75 m 3.80 m Satisfied

Field Density > 100 % 100.30% Satisfied

BM
Km. 1/300 Thickness 50 mm 53 mm Satisfied
R/S 1.0m from
edge Width 3.75m 3.75m Satisfied

Madurai C&M/ Strengthening to Keeranoor road Field Density > 100 % 100.40% Satisfied
2 28.06.2017
Melur C&M Km 0/0-2/4 BC

Km 0/643 Thickness 30 mm 32 mm Satisfied


L/S 0.8m from
edge Width 3.75 m 3.75 m Satisfied

Field Density > 100 % 100.40% Satisfied

BC

Km. 1/300 Thickness 30 mm 31 mm Satisfied


R/S 1.0m from
edge Width 3.75m 3.75m Satisfied

Field Density > 100 % 100.40% Satisfied


FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
BM

Thickness 50 mm 52 mm Satisfied
Km 0/636
R/S 0.7m from Width 3.75 m 3.80 m Satisfied
edge
Not Satisfied and
Field Density > 100 % 98.70%
16.06.2017 then rectified

BM
Km. 1/647.50 Thickness 50 mm 53 mm Satisfied
L/S 0.90m from
edge Width 3.75m 3.75m Satisfied
Madurai C&M/ Strengthening of Buskkaranpatti-
3
Usilampatti C&M Kakkiveeranpatti road km 0/0-4/2 Field Density > 100 % 100.30% Satisfied

BC
Km 0/636 Thickness 30 mm 31 mm Satisfied
R/S 0.7m from
edge Width 3.75 m 3.75 m Satisfied

28.06.2017 Field Density > 100 % 100.40% Satisfied

BC
Km. 1/647.50
L/S 0.90m from Thickness 30 mm 32 mm Satisfied
edge
Width 3.75m 3.75m Satisfied
FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
WMM

Thickness 100mm 102mm Satisfied


Madurai C&M/ Strengthening to NH 7 km 34/10 of
Km 0/385 L/S Width 3.75m 3.75m Satisfied
4 19.06.2017 Thirumangalam Mythanpatti Road at km. 0/0 - 1/0
0.9m from edge
C&M (O4174) Not Satisfied and
Field Density > 100 % 97.60%
then rectified
Not Satisfied and
Gradation - -
then rectified
WMM

Thickness 250 mm 260 mm Satisfied


Km 0/107 R/S
Width 3.75m 3.75m Satisfied
10.9m from edge
Field Density > 100 % 100.20% Satisfied
Strengthening to Thirumangalam -
Madurai C&M/ Pallapatti road 13/0 of Gradation - - Satisfied
5 28.06.2017 Thirumangalam Kangeyanatham Road at km. 0/0 -
C&M 1/300 Including Providing Paver WMM
block at km. 1/3 - 1/6 (O1982)
Thickness 250 mm 250 mm Satisfied
Km 1/220 R/S
Width 3.75m 3.75m Satisfied
0.8m from edge
Field Density > 100 % 100.30% Satisfied

Gradation - - Satisfied
FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
WMM

Thickness 150 mm 150 mm Satisfied

Km 0/113.60
R/S 0.8m from Width 3.75m 3.75m Satisfied
edge
Field Density > 100 % 100.60% Satisfied

Gradation - - Satisfied
Madurai C&M/ Strengthening to Veeraperumal
6 28.06.2017 Thirumangalam puram - Krishnapuram road km 0/0
C&M - 3/6 (Using Plastic Waste) WMM

Thickness 100 mm 120 mm Satisfied

Km 2/120 R/S
Width 3.75m 3.75m Satisfied
1.00m from edge
Not Satisfied and
Field Density > 100 % 98.60%
then rectified

Gradation - - Satisfied
FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF

NAME OF THE QC SUB DIVISION: DINDIGUL (DINDIGUL (H) C&M)

GSB
Km 5/226.50 (R/S)
Thickness 155 mm 157 mm Satisfied
- 0.80m
Km 6/486.00 (R/S)
Thickness 155 mm 155 mm Satisfied
- 1.00m
WMM
Widening from Intermediate lane to Thickness 250 mm 251 mm Satisfied
Double lane and Strengthening of
Dindigul (H) C&M / Dindigul - Manakkattur Road at km Km 5/226.50 (R/S)
1 07.06.2017 Gradation As per JMF As per JMF Satisfied
Dindigul (H) C&M 5/0 - 7/0, Strengthening at km 4/0 - - 0.80m
5/0 including CD Works in km 4/0-
7/0 (MD 590) Width 1500 mm 1500 mm Satisfied

Thickness 250 mm 253 mm Satisfied


Km 6/486.00 (R/S)
- 1.00m Width 1500 mm 1550 mm Satisfied
Not Satisfied then
Field Density Min 98 % 94.80%
rectified
GSB
Km 0/151.50 (L/S)
Thickness 290 mm 291 mm Satisfied
- 1.40m
Widening Junction improvement at WMM
Dindigul (H) C&M /
km 0/2 of Kodai Ghat road
2 22.06.2017 Vathalagundu (H) Thickness 250 mm 252 mm Satisfied
Construction of Centre median at
C&M
km 0/2 (SH-156) Km 0/151.50 (L/S)
Gradation As per JMF As per JMF Satisfied
- 1.40m
Width 5000 mm 5000 mm Satisfied
FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
DBM
Km 0/382.00 (L/S)
Thickness 50 mm 50 mm Satisfied
- 1.00m
Km 1/256.50 (R/S)
Thickness 50 mm 52 mm Satisfied
- 0.95m
Km 2/581.00 (L/S)
Thickness 50 mm 51 mm Satisfied
- 1.10m
Km 3/721.00 (R/S)
Thickness 50 mm 52 mm Satisfied
- 1.00m
Km 4/315.50 (L/S)
Thickness 50 mm 51 mm Satisfied
- 0.95m
Km 5/621.00 (R/S)
Thickness 50 mm 50 mm Satisfied
- 0.90m
BC
Thickness 30 mm 31 mm Satisfied
Km 0/382.00 (L/S)
Width 3750 mm 3750 mm Satisfied
- 1.00m
Field Density Min 100 % 100.20% Satisfied

Thickness 30 mm 30 mm Satisfied
Strengthening of Puliyarajakkapatti Km 1/256.50 (R/S) Width 3750 mm 3800 mm Satisfied
Dindigul (H) C&M /
3 22.06.2017 -Pudupatti Road at km 0/0 - 5/880 - 0.95m
Dindigul (H) C&M
including CD Works Field Density Min 100 % 100.10% Satisfied

Thickness 30 mm 32 mm Satisfied
Km 2/581.00 (L/S)
Width 3750 mm 3750 mm Satisfied
- 1.10m
Field Density Min 100 % 100.30% Satisfied
FORM-1
Strengthening of Puliyarajakkapatti
FOR NON BITUMINOUS
Dindigul (H) C&M / / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
3 22.06.2017 -Pudupatti Road at km 0/0 - 5/880
Dindigul (H) C&M
Name of Q.C division: Madurai including CD Works

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
Thickness 30 mm 30 mm Satisfied
Km 3/721.00 (R/S)
Width 3750 mm 3800 mm Satisfied
- 1.00m
Field Density Min 100 % 100.10% Satisfied

Thickness 30 mm 31 mm Satisfied
Km 4/315.50 (L/S)
Width 3750 mm 3800 mm Satisfied
- 0.95m
Field Density Min 100 % 100.20% Satisfied

Thickness 30 mm 30 mm Satisfied
Km 5/621.00 (R/S)
Width 3750 mm 3750 mm Satisfied
- 0.90m
Field Density Min 100 % 100.10% Satisfied
NAME OF THE QC SUB DIVISION: DINDIGUL (PALANI (H) C&M)
GSB V

Km 6/258.00 (R/S)
Thickness 175 mm 177 mm Satisfied
Widening from Single lane to - 1.00m
Palani (H) C&M /
intermediate lane and
1 22.06.2017 Vedasandur (H) Km 8/326.50 (R/S)
strengthening of Ayyalore - Eriodu Thickness 175 mm 175 mm Satisfied
C&M - 1.10m
Road at Km 6/0-10/0
Km 9/172.00 (R/S) Thickness 175 mm 178 mm Satisfied
- 0.90m Gradation As per JMF As per JMF Satisfied
FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
WMM

Thickness 250 mm 251 mm Satisfied


Km 6/258.00 (R/S)
Width 1750 1750 Satisfied
- 1.00m
Field Density Min 98 % 98.50% Satisfied
Widening from Single lane to Thickness 250 mm 253 mm Satisfied
Palani (H) C&M /
intermediate lane and
1 22.06.2017 Vedasandur (H) Km 8/326.50 (R/S)
strengthening of Ayyalore - Eriodu Width 1750 1750 Satisfied
C&M - 1.10m
Road at Km 6/0-10/0
Not Satisfied then
Field Density Min 98 % 94.63%
rectified
Thickness 250 mm 252 mm Satisfied
Km 9/172.00 (R/S)
Width 1750 1800 Satisfied
- 0.90m
Gradation As per JMF As per JMF Satisfied

BM

Km 0/782.50 (R/S)
Thickness 50 mm 51 mm Satisfied
- 1.00m

Palani (H) C&M / Km 1/560.00 (L/S)


Strengthening of D.Gudalore - Thickness 50 mm 50 mm Satisfied
2 22.06.2017 Vedasandur (H) - 0.90m
Vellianai Road at Km 0/0-6/0
C&M
Km 2/512.00 (R/S)
Thickness 50 mm 50 mm Satisfied
- 1.10m

Km 3/476.50 (L/S)
Thickness 50 mm 52 mm Satisfied
- 1.15m
FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF

Km 4/312.50 (R/S)
Thickness 50 mm 50 mm Satisfied
- 0.80m

Km 5/363.00 (L/S)
Thickness 50 mm 51 mm Satisfied
- 0.90m

BC

Thickness 30 mm 30 mm Satisfied
Km 0/782.50 (R/S)
Width 3000 3000 Satisfied
- 1.00m
Field Density Min 100 % 100.10% Satisfied
Palani (H) C&M / Thickness 30 mm 31 mm Satisfied
Strengthening of D.Gudalore -
2 22.06.2017 Vedasandur (H)
Vellianai Road at Km 0/0-6/0 Km 1/560.00 (L/S)
C&M Width 3000 3050 Satisfied
- 0.90m
Field Density Min 100 % 100.30% Satisfied

Thickness 30 mm 30 mm Satisfied
Km 2/512.00 (R/S)
Width 3000 3000 Satisfied
- 1.10m
Field Density Min 100 % 100.10% Satisfied

Thickness 30 mm 30 mm Satisfied
Km 3/476.50 (L/S)
Width 3000 3000 Satisfied
- 1.15m
Field Density Min 100 % 100.40% Satisfied
FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
Thickness 30 mm 32 mm Satisfied
Km 4/312.50 (R/S)
Width 3000 3050 Satisfied
- 0.80m
Palani (H) C&M / Field Density Min 100 % 100.20% Satisfied
Strengthening of D.Gudalore -
2 22.06.2017 Vedasandur (H)
Vellianai Road at Km 0/0-6/0 Thickness 30 mm 30 mm Satisfied
C&M
Km 5/363.00 (L/S)
Width 3000 3000 Satisfied
- 0.90m
Field Density Min 100 % 100.10% Satisfied
Name of Q.C Subdivision: Theni
BM

Depth 51 50 Satisfied
Improvements of Devathanapatty -
Varusanadu road at Km. 42/0 - BC
44/325 L/s
1 09.06.2017 Aundipatty 45/0 including Construction of
1.20m Depth 30 30 Satisfied
Retaining wall at Km. 44/6 (SH
101)
Width 7.00m 7.00m Satisfied

FD using PQI 100.28% 98% Satisfied

BM

Depth 53 50 Satisfied
Improvements of Devathanapatty -
Varusanadu road at Km. 46/970 - BC
2 09.06.2017 Aundipatty 49/250 including Construction of 47/845 R/s 1.20m
Retaining wall at Km. 48/4 (SH Depth 30 30 Satisfied
101)
Width 7.00m 7.00m Satisfied

FD using PQI 100.09% 98% Satisfied


FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
DBM
Improvements of Koduvilarpatti - Depth 53 50 Satisfied
Seelayampatti road (Via) S.
Alagapuri at Km. 5/4 - 7/0 including BC
6/031.70 L/s
3 09.06.2017 Theni reconstruction of damaged culvert
1.10m Depth 32 30 Satisfied
at Km. 5/8 (i), (ii) and construction
of protective wall at Km.
9/4,10/2,15/8,16/8 (SH 228) Width 7.20m 7.00m Satisfied

FD using PQI 100.36% 98% Satisfied

BM
Improvements of at km 64/4 of Depth 51 50 Satisfied
Dindigul - Kumuly Road to Jallipatty
road at Km 0/0-2/2 (using plastic BC
4 27.06.2017 Periyakulam waste) including construction of 1/944.5 R/s 1.00m
drain and retaining wall at km 1/0- Depth 31 30 Satisfied
1/4.providing paver block at km
0/6-0/10 Width 3.76m 3.75m Satisfied

FD using PQI 100.30% 98% Satisfied

DBM
Widening from Intermediate Lane
to Double Lane and Strengthening Depth 32 30 Satisfied
of Kanniyappapillai patty -
Gandamanur road (Via) G. BC
Usilampatty at Km. 1/6 - 3/0
5 27.06.2017 Aundipatty including reconstruction of 1/980 R/s 1.20m Depth 52 50 Satisfied
Damaged culvert at Km. 2/8 and
Construction culvert at Km. 10/10 Width 7.05m 7.00m Satisfied
in lieu of existing hard bed,
construction of retaining wall. (M
1145)
FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
Widening from Intermediate Lane
Name of Q.C division: Madurai to Double Lane and Strengthening
of Kanniyappapillai patty -
Gandamanur road (Via) G. value Remarks
Name of Exe.Dn Usilampatty at Km. 1/6 - 3/0 Item of work with
S Date of As per
5 27.06.2017 Aundipatty
Exe.sub. including reconstruction
Name of workof 1/980
Test R/s 1.20m
location Name of
No inspection As per test Satisfied / Not
dn Damaged culvert at Km. 2/8 and Test (*) Estimate /
at site satisfied
Construction culvert at Km. 10/10 JMF
in lieu of existing hard bed,
construction of retaining wall. (M
1145) FD using PQI 100.40% 100% Satisfied
FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
BM
Improvements of Balasamuthiram - Depth 51 50 Satisfied
M.Subbulapuram road BC
1/443.50 R/s
6 27.06.2017 Aundipatty at Km. 0/0 - 1/820 (using plastic
0.65m Depth 31 30 Satisfied
waste) including construction of
retaining wall at Km. 0/4. Width 3.80m 3.75m Satisfied
FD using PQI 100.10% 98% Satisfied
NAME OF THE QC SUB DIVISION : SIVAGANGAI
BM
7/782 L (1.20) Depth 50 51 Satisfied
Sivagangai (H) BC
Strengthening of A.Thekur - Pudur
1 05.06.2017 C&M/Thiruppathur
road at km 7/120-8/0 and 10/8-11/4 Depth 30 30 Satisfied
(H) C&M
7/782 L (1.20) Width 5.50 5.70 Satisfied
FD 100% 100.40% Satisfied
BM
0/316 L (1.00) Depth 50 50 Satisfied
1/289 R (1.00) Depth 50 51 Satisfied
BC
widening from Single lane to
Sivagangai (H) Depth 30 30 Satisfied
Intermediate lane and
2 05.06.2017 C&M/Thiruppathur
Strengthening of Pattamangalam 0/316 L (1.00) Width 5.50 5.60 Satisfied
(H) C&M
Cross road at km 0/0-2/0
FD 100% 100.70% Satisfied
Depth 30 30 Satisfied
1/289 R (1.00) Width 5.50 5.60 Satisfied
FD 100% 100.30% Satisfied
FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
CGPC

Depth 20 25 Satisfied
Sivagangai (H) Improvements of Nerkuppai - 0/216 R(0.80)
3 05.06.2017 C&M/Thiruppathur Velangudi at km 0/0-1/0, 2/0-3/4 Width 3.75 3.75 Satisfied
(H) C&M amd 6/8-7/0
Depth 20 21 Satisfied
2/814 L(0.80)
Width 3.75 3.80 Satisfied

CGPC
Improvements of
Thiruvegampathur - Pavanakottai Depth 20 22 Satisfied
Sivagangai (H) 1/245.6 L(0.80)
road at km 0/0-3/0 using plastic
4 23.06.2017 C&M/Devakottai(H Width 3.75 3.80 Satisfied
wastes including Reconstruction of
) C&M
culverts and Construction of Depth 20 21 Satisfied
retaining wall 2/058.2 R(0.80)
Width 3.75 3.82 Satisfied

CGPC

Depth 20 21 Satisfied
Improvements of Salaigramam -
Sivagangai (H) 22/369 L (1.20)
Sarugani road at km 22/0-24/0
5 23.06.2017 C&M/Devakottai(H Width 3.75 3.79 Satisfied
using plastic wastes in cluding
) C&M
Reconstruction of culverts Depth 20 20 Satisfied
23/084 R (1.20)
Width 3.75 3.75 Satisfied
FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
CRM
Not Satisfied then
Gradation
Rectified
Improvements of Depth 150 185 Satisfied
Sivagangai (H)
Velayuthapattinam - Nedunkulam 2/992 R(1.20)
6 23.06.2017 C&M/Devakottai(H FD 100% 100.40% Satisfied
road at km 2/0-4/4 including
) C&M
Reconstruction of culverts
CGPC

Depth 20 22.7 Satisfied


4/250 R(1.10)
Width 3.75 3.76

WMM

Depth 150 150 Satisfied

0/550 L (0.80) Width 3.75 3.78 Satisfied

FD 100% 100.40% Satisfied

Sivagangai (H) Strengthening of O.Siruvayal - Depth 150 188 Satisfied


7 23.06.2017 C&M/Karaikudi Kunnakudi road at km 0/0-4/4
4/050 R (0.80) Width 3.75 3.75 Satisfied
(H) C&M including Reconstruction of culverts
Not Satisfied then
FD 100% 96.50%
Rectified
Depth 100 121 Satisfied

3/339 L (0.80) Width 3.75 3.75 Satisfied

FD 100% 100.40% Satisfied


FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
WMM
Depth 250 251 Satisfied

5/821 L(0.80) Width 3.75 3.76 Satisfied


Sivagangai (H) Strengthening of Kandanur -
8 23.06.2017 C&M/Karaikudi Aravayal road at km 5/0-7/420 FD 100% 100.40% Satisfied
(H) C&M using plastic waste (OSGO12)
Depth 250 250 Satisfied
6/584 L(0.80) Width 3.75 3.77 Satisfied

FD 100% 100.40% Satisfied


Name of Q.C Subdivision: Ramanathapuram
BM

Km 1/436.20 Thickness 50 51 Satisfied


LS 1.30m Width 3750 3750 Satisfied

Km 0/452.60 Thickness 50 50 Satisfied


Strengthening of Vilathur - RS 1.20m Width 3750 3750 Satisfied
Melayakudi (Via)
Ramnad C&M / BC
1 21.06.2017 Thirushanmuganathapuram road at
Paramakudi C&M
Km.0/0-2/0 including reconstruction
of pipe culvert at Km.1/6 & 1/8 Km 1/436.20 Thickness 30 30 Satisfied
LS 1.30m Width 3750 3750 Satisfied

Thickness 30 30 Satisfied
Km 0/452.60
Width 3750 3750 Satisfied
RS 1.20m
FD using PQI 100.00% 101.70% Satisfied
FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
WMM
02.06.2017
@ yard Gradation --- --- Not Satisfied

BM

Thickness 50 51 Satisfied
Km 2/885.80
Strengthening of Keelasemanur - LS 1.15 m
Ramnad C&M / Width 3750 3750 Satisfied
2 Veeraperumalkoil road (via)
Paramakudi C&M
S.Kodikulam road at Km.2/2-3/700
21.06.2017 BC

Thickness 30 32 Satisfied
Km 2/885.80
Width 3750 3750 Satisfied
LS 1.15 m
FD using PQI 100.00% 102.20% Satisfied

BOX CUTTING
Km 6/429.80
Widening from SL To IL and Fielddensitry 100.00% 96.102% Not Satisfied
Ramnad C&M / L/S 0.90 m
3 02.06.2017 strengthening of Anjukottai -
Tiruvadanai C&M GSB GRADE V
Neerkundram road at Km 6/0-7/8

@ yard Gradation --- --- Satisfied


FORM-1

FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
BC

Thickness 30 30 Satisfied
Km 4/569.60
Width 3750 3750 Satisfied
L/S 1.20
FD using PQI 100.00% 100.30% Satisfied
Special Repairs to Kamuthi -
Ramnad C&M /
4 21.06.2017 Veppankulam Road Km 1/0 - 1/750 Km 5/100.10 Thickness 30 30 Satisfied
Kamuthi C&M
& 4/0 - 7/0. R/S 1.20 Width 3750 3760 Satisfied

Thickness 30 32 Satisfied
Km 6/635.10
Width 3750 3750 Satisfied
L/S 1.05
FD using PQI 100.00% 100.20% Satisfied

BC

Thickness 30 32 Satisfied
22/312.20
Width 3750 3800 Satisfied
Special Repairs to Peraiyur - L/S 1.00 m
Ramnad C&M /
5 21.06.2017 Vilathikulam Road Km 21/600 - FD using PQI 100.00% 100.40% Satisfied
Kamuthi C&M
24/0.
Thickness 30 31 Satisfied
23/707.40
Width 3750 3750 Satisfied
R/S 1.10 m
FD using PQI 100.00% 100.20% Satisfied
FORM-2
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.

Name of Item of work value Remarks


S Date of Exe.Dn with
Name of work Test location As per As per test Satisfied / Not
No inspection Exe.sub. Name of Test
dn (*) Estimate /JMF at site satisfied

NAME OF THE QC SUB DIVISION:MADURAI


BC
Mix Grading - - Satisfied

Strengthening to Muruganeri road brg.from 9/2 of Binder content 5.38+0.3% 5.17% Satisfied
Madurai C&M/
1 19.06.2017 Km.3/0 of Subbulapuram-Sengulam road Km Thirumangalam
Peraiyur C&M
0/0-1/6 -Pallapatty road 150oC - 170 o C Not Satisfied and
Temperature 130 °c
± 10 oC then Rectified

Viscosity Min 350 cp Satisfied


BC
Mix Grading - - Satisfied
Madurai Binder content 5.341+0.3% 5.20% Satisfied
2 21.06.2017 C&M / Melur Strengthening to Keeranoor at Km 0/0-2/4 Melakottai
C&M 150 C - 170 C
o o
Temperature 155 °c Satisfied
± 10 oC
Viscosity Min 350 cp Satisfied
DBM
Not Satisfied and
Madurai 10/0 of Mix Grading - -
Strengthening to Madurai-Natham road Km then Rectified
3 19.06.2017 C&M /Madurai Thirumangalam -
0/0-1/0 (SH 72) .
C&M Pallapatty Road Binder content 4.47+0.3% 4.32% Satisfied

Viscosity Min 350 cp 488.13 Satisfied


BC
Mix Grading - - Satisfied
Madurai 10/0 of
Strengthening to Madurai-Natham road Km
4 28.06.2017 C&M /Madurai Thirumangalam - Binder content 5.38+0.3% 5.23% Satisfied
1/0-2/2 (SH 72)
C&M Pallapatty Road
150 C - 170 C ±
o o
Temperature 144 0C Satisfied
10 oC
Name of Item of work value Remarks
S Date of Exe.Dn with
Name of work Test location As per As per test Satisfied / Not
No inspection Exe.sub. Name of Test
dn (*) Estimate /JMF at site satisfied

NAME OF QC SUB DIVISION : DINDIGUL (DINDIGUL (H) C&M)


BC
Binder 5.4 % + 0.3 5.31% Satisfied
Dindigul (H) Widening from Single lane to Intermediate lane Not As per Not satisfied
C&M / and Strengthening of NH-45 to Dindigul - Plant at Gradation As per JMF
1 22.06.2017 JMF then Rectified
Dindigul (H) Siluvathur Road (via) Periyakottai, Kovilur at km Reddiyarchatram
C&M 0/0 - 1/500 including CD works Viscosity Min 350 cP 461.83 cP Satisfied
Temperature of 150 o C - 165 o C
145 o C Satisfied
Mix + 10 oC
NAME OF QC SUB DIVISION : DINDIGUL (PALANI (H) C&M)
-- NIL --
Name of Q.C Subdivision: Theni
BC

Improvements of at km 64/4 of Dindigul - Kumuly Mix Grading - - Not Satisfied


Road to Jallipatty road at Km 0/0-2/2 (using
1 09.06.2017 Periyakulam plastic waste) including construction of drain KMC Plant Binder Content 5.38% 5.13% Satisfied
and retaining wall at km 1/0-1/4.providing paver
Viscosity 350 411.90cp Satisfied
block at km 0/6-0/10
150 o C - 165 o C Not Satisfied
Temperature 131°c
+ 10 oC then Rectified
DBM
Widening from Intermediate Lane to Double
Mix Grading - - Satisfied
Lane and Strengthening of Kanniyappapillai
patty - Gandamanur road (Via) G. Usilampatty at Binder Content 4.40% 4.28% Satisfied
2 09.06.2017 Aundipatty Km. 1/6 - 3/0 including reconstruction of GBM Plant
Damaged culvert at Km. 2/8 and Construction Viscosity 350 436.30cp Satisfied
culvert at Km. 10/10 in lieu of existing hard bed,
construction of retaining wall. (M 1145) 150 o C - 165 o C Not Satisfied
Temperature 133°c
+ 10 oC then Rectified

BM
Mix Grading - - Satisfied
Improvements of Uthamapalayam - Surulipatty Km 21/6 Binder Content 3.40% 3.31% Satisfied
Uthamapalaya
3 27.06.2017 road at Km. 2/0 - 4/0 including construction of Devathanapatty -
m
Retaining wall. (SH 102) Varusanadu Viscosity 350 459.20cp Satisfied
150 o C - 165 o C Not Satisfied
Temperature 136°c
+ 10 oC then Rectified
Name of Item of work value Remarks
S Date of Exe.Dn with
Name of work Test location As per As per test Satisfied / Not
No inspection Exe.sub. Name of Test
dn (*) Estimate /JMF at site satisfied

NAME OF THE QC SUB DIVISION : SIVAGANGAI


BM
Not Satisfied
Gradation
Sivagangai Widening from Intermediate lane to Double lane then Rectified
(H) C&M/ and Strengthening of Madhagupatti - Binder content 3.4 + 0.3% 3.26% Satisfied
1 05.06.2017 road
Sivagangai Alagamanagari road at km 0/0-1/0,
(H) C&M Improvements at km 1/0-3/0 Not Satisfied
Temperature 150 - 165 C +10 C 136 o c
then Rectified
Viscocity 350 572.3 Satisfied

Name of Q.C Subdivision: Ramanathapuram


BM
Gradation --- --- Satisfied
Ramnad C&M
Widening from SL To IL and strengthening of Km 124/10 of NH Binder 3.50 3.422 Satisfied
1 21.06.2017 / Tiruvadanai
Anjukottai - Neerkundram road at Km 6/0-7/8 210 road.
C&M Not Satisfied
Temperature 140-150o c 129 o c
then Rectified
Viscosity >350 cp 523.7 Satisfied
BM
Not Satisfied
Gradation --- ---
then Rectified
Ramnad C&M
Widening from SL To IL and strengthening of Km 120/10 of NH
2 21.06.2017 / Tiruvadanai Binder 3.50 3.417 Satisfied
Anjukottai - Neerkundram road at Km 2/0-4/0. 210 road.
C&M
Temperature 140-150 o c 153 o c Satisfied

Viscosity >350 cp 517.3 Satisfied


FORM-3
FOR CONCRETE WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
Name of Q.C division: Madurai
Item of value Remarks
Name of
S Date of work with
Exe.Dn Name of work Name of Test (*) As per Codal As per test Satisfied / Not
No inspection Grade of
Exe.sub.dn Provision at site satisfied
concrete
NAME OF QC SUB DIVISION : Madurai
-- NIL --

NAME OF QC SUB DIVISION : DINDIGUL (DINDIGUL (H) C&M)


Deck beam for P11 - P12
Construction of ROB in Not Satisfied
Madurai (H) Slump 50-75 82.67mm
Hanumanthanagar at Dindigul Town then Rectified
N&RR /
9 22.06.2017 in lieu of existing LC No 309 in M30
Dindigul (H) Deck P11 - P12
between railway km 431/900 -
N&RR
432/000 in Dindigul Yard. Not As per Not satisfied
20 mm Gradation As per JMF
JMF then Rectified
NAME OF QC SUB DIVISION : DINDIGUL (PALANI (H) C&M)

-- NIL --

Name of Q.C Subdivision: Theni


M 15
Providing of flood protection work at Gradation 40mm - - Satisfied
km. 11/6 of Sittharpatti vilakku - Below sill
1 27.06.2017 Theni
Ambasamthiram road (via) Gradation Fine Aggregates - - Satisfied
Ganesapuram (MD 1144).
slump 25 23 Satisfied
NAME OF QC SUB DIVISION : Sivagangai
-- NIL --
Name of Q.C Subdivision: Ramanathapuram

Coarse Aggregates 20 mm -- -- satisfied


R.wall
N&RR
Construction of High Level Bridge at Stem Coarse Aggregates 12.5 mm -- -- satisfied
Paramakudi/
1 21.06.2017 Km 1/8 of Muthaneri - Melakodumalur concrete
N&RR
Road. Below sill Fine Aggregate - Sand -- -- satisfied
Paramakudi
level M30
Slump Test 40mm-50mm 78mm Not satisfied
FORM-4

FOR CONCRETE WORKS (AT READY MIX PLANT SITE ) FOR THE MONTH OF JUNE- 2017.

Name of Q.C division: Madurai

value Remarks
Ready Mix
Date of Name of Exe.Dn Grade of Name of Test
S No Name of work Plant As per As per test at
inspection Exe.sub.dn Concrete (*) Satisfied / Not
location codal Ready Mix
satisfied
Provision Plant site

Name of Q.C Subdivision: Madurai

- NIL -

Name of Q.C Subdivision: Dindigul (DINDIGUL (H) C&M)

- NIL -

Name of Q.C Subdivision: Dindigul (PALANI (H) C&M)

- NIL -

Name of Q.C Subdivision: Theni

- NIL -

Name of Q.C Subdivision: Sivagangai

- NIL -

Name of Q.C Subdivision: Ramanathapuram

- NIL -
ABSTRACT
INSPECTION REPORT FOR THE MONTH OF June 2015
Name of Q.C division: Madurai

Ready mix site


inspected at
No of tests conducted No. of test satisfied No.of test Not satisfied
Name of the

No of CMP /
Execution

No.of Works

inspected
Division

Gradation

Gradation

Gradation
Thickness

Thickness

Thickness
site
Remarks

Density

Density

Density
content

content

content
Binder

Binder

Binder
No

Madurai 2 Not satisfied


1 4 1 1 2 14 9 0 2 14 8 1 0 0 1
C &M then rectified-

Madurai RR

Dindigul C & 1 Not satisfied


2 5 2 4 2 8 3 3 2 8 3 1
M then rectified-

Dindigul RR

Theni 3 Not satisfied


3 C&M 3 2 4 2 1 1 1 2 1 1 3 then rectified-

Theni RR

4 Sivagangai 1 1 1 1 1 1 1
C&M
Paramakudi 1 Not satisfied
RR
1 1 1 then rectified-
Ramnad 1 Not satisfied
5 3 1 4 1 0 1 4 0 0 0 0 1 then rectified-
C& M

Total 17 5 10 8 28 15 4 8 28 13 6 0 0 2
ABSTRACT
DETAILS OF TESTS CONDUCTED BY THE DIVISIONAL ENGINEER (QUALITY CONTROL) AS ON 31.05.2017
NAME OF QC DIVISION: MADURAI (H) QC CIRCLE : MADURAI (H) C&M
NO OF WORKS TOTAL NO OF TESTS NO OF TESTS NOT

RECTIFIED UPTO THIS Month


CHECKED CHECKED SATISFIED

TOTAL ( UPTO JUNE-2017)


UPTO PREVIOUS MONTH

UPTO PREVIOUS MONTH

UPTO PREVIOUS MONTH

DURING THE MONTH OF


DURING THE MONTH OF

DURING THE MONTH OF

NOT RECTIFIED
NO OF
SL.

JUNE-2017)
JUNE 2017

JUNE 2017
NAME OF DIVISIONS TESTS REMARKS
NO

TOTAL

TOTAL
SATISFIED

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A CONSTRUCTION & MAINTENANCE DIVISION
1 Madurai 5 6 11 54 69 123 114 3 6 9 9 -
2 Dindigul 4 3 7 49 40 89 84 3 2 5 5 -

3 Palani 8 2 10 122 37 159 154 4 1 5 5 -

4 Theni 8 7 15 46 39 85 76 5 4 9 9 -

5 Sivagangai 22 8 30 164 48 212 204 4 4 8 8 -

6 Ramnad 25 5 30 159 39 198 180 14 4 18 18 -


B MADURAI (H) NABARD & RURAL ROADS DIVISION
1 Madurai 2 0 2 8 0 8 4 2 2 4 4 -

2 Paramakudi 0 0 0 0 4 4 3 0 1 1 1 -

TOTAL 74 31 105 602 276 878 819 35 24 59 59 -

Divisional Engineer (H)


Quality Control Division
Madurai
NOT SATISFIED TEST DETAILS FOR THE MONTH OF JUNE- 2017.

NAME OF QC DIVISION : MADURAI


Item of Tests
No. of test
Month of Mix Rectified/
S.No Name of work(Division Wise) Not Binder Box Field
Inspection Thickness Gradation Tempar Slump Total Not
Satisfied Content Cutting density
ature Rectified

Name of Division:Madurai(H) C&M

Strengthening of Buskkaranpatti-
1 Jun-17 1 1 1 Rectified
Kakkiveeranpatti road km 0/0-4/2

Strengthening to NH 7 km 34/10 of
2 Jun-17 2 1 1 2 Rectified
Mythanpatti Road at km. 0/0 - 1/0 (O4174)

Strengthening to Veeraperumal puram -


3 Krishnapuram road km 0/0 - 3/6 (Using Jun-17 1 1 1 Rectified
Plastic Waste)
Strengthening to Muruganeri road brg.from
4 Km.3/0 of Subbulapuram-Sengulam road Km Jun-17 1 1 1 Rectified
0/0-1/6

Strengthening to Madurai-Natham road Km


5 Jun-17 1 1 1 Rectified
0/0-1/0 (SH 72) .

Name of Q.C Subdivision: Dindigul (DINDIGUL (H) C&M)

Widening from Intermediate lane to Double


lane and Strengthening of Dindigul -
1 Manakkattur Road at km 5/0 - 7/0, Jun-17 1 1 1 Rectified
Strengthening at km 4/0 - 5/0 including CD
Works in km 4/0-7/0 (MD 590)

Widening from Single lane to Intermediate


lane and Strengthening of NH-45 to Dindigul
2 Jun-17 1 1 1 Rectified
- Siluvathur Road (via) Periyakottai, Kovilur at
km 0/0 - 1/500 including CD works
Item of Tests
No. of test
Month of Mix Rectified/
S.No Name of work(Division Wise) Not Binder Box Field
Inspection Thickness Gradation Tempar Slump Total Not
Satisfied Content Cutting density
ature Rectified
Name of Q.C Subdivision: Dindigul (PALANI (H) C&M)

Widening from Single lane to intermediate


1 lane and strengthening of Ayyalore - Eriodu Jun-17 1 1 1 Rectified
Road at Km 6/0-10/0

Name of Division: Theni (H)C &M

Improvements of at km 64/4 of Dindigul -


Kumuly Road to Jallipatty road at Km 0/0-2/2
1 (using plastic waste) including construction Jun-17 2 1 1 2 Rectified
of drain and retaining wall at km 1/0-
1/4.providing paver block at km 0/6-0/10

Widening from Intermediate Lane to Double


Lane and Strengthening of Kanniyappapillai
patty - Gandamanur road (Via) G.
Usilampatty at Km. 1/6 - 3/0 including
2 Jun-17 1 1 1 Rectified
reconstruction of Damaged culvert at Km. 2/8
and Construction culvert at Km. 10/10 in lieu
of existing hard bed, construction of retaining
wall. (M 1145)

Improvements of Uthamapalayam -
3 Surulipatty road at Km. 2/0 - 4/0 including Jun-17 1 1 1 Rectified
construction of Retaining wall. (SH 102)
Item of Tests
No. of test
Month of Mix Rectified/
S.No Name of work(Division Wise) Not Binder Box Field
Inspection Thickness Gradation Tempar Slump Total Not
Satisfied Content Cutting density
ature Rectified

Name of Q.C Subdivision: Sivagangai

Improvements of Velayuthapattinam -
1 Nedunkulam road at km 2/0-4/4 including Jun-17 1 1 1 Rectified
Reconstruction of culverts

Strengthening of O.Siruvayal - Kunnakudi


2 road at km 0/0-4/4 including Reconstruction Jun-17 1 1 1 Rectified
of culverts

Widening from Intermediate lane to Double


lane and Strengthening of Madhagupatti -
3 Jun-17 2 1 1 2 Rectified
Alagamanagari road at km 0/0-1/0,
Improvements at km 1/0-3/0

Name of Division: Ramanathapuram (H)C &M

Strengthening of Keelasemanur -
1 Veeraperumalkoil road (via) S.Kodikulam Jun-17 1 1 1 Rectified
road at Km.2/2-3/700

Widening from SL To IL and strengthening of


2 Jun-17 2 1 1 2 Rectified
Anjukottai - Neerkundram road at Km 6/0-7/8

Widening from SL To IL and strengthening of


3 Jun-17 1 1 1 Rectified
Anjukottai - Neerkundram road at Km 2/0-4/0.
Item of Tests
No. of test
Month of Mix Rectified/
S.No Name of work(Division Wise) Not Binder Box Field
Inspection Thickness Gradation Tempar Slump Total Not
Satisfied Content Cutting density
ature Rectified

(H) Nabard & Rural Road

Madurai (H) N & RR Division

Construction of ROB in Hanumanthanagar at


Dindigul Town in lieu of existing LC No 309 in
1 Jun-17 2 1 1 2 Rectified
between railway km 431/900 - 432/000 in
Dindigul Yard.

Paramakudi (H) N & RR Division

Construction of High Level Bridge at Km 1/8


1 Jun-17 1 1 1 Rectified
of Muthaneri - Melakodumalur Road.

Total 24 0 9 0 6 0 7 2 24
RU¡f«
nfh£l¥bgh¿ahs® (be) ju¡f£L¥ghL nfh£l« mt®fshš 30.06.2017
tiu nk‰bfhŸs¥g£l ju¡f£L¥ghL nrhjidfë‹ étu§fŸ

ju¡f£L¥ghL nfh£l« : kJiu (be) ju¡f£L¥ghL t£l« : kJiu (be) f(k)g

ãt®¤Â brŒa¥g£l nrhjidfë‹ v©â¡if

ãt®¤Â brŒa¥gl nt©oa nrhjidfë‹


MŒÎ brŒa¥g£l gâfë‹ v©â¡if nrhjidfë‹ bkh¤j v©â¡if ÂU¥Âfuk‰w nrhjidfë‹ v©â¡if

v©â¡if
ÂU¥Âfu

Kªija khj« tiu

Kªija khj« tiu

Kªija khj« tiu


t. v© ju¡f£L¥ghL c£nfh£l« F¿¥òiu

ãfG« khj«

ãfG« khj«
ãfG« khj«
nrhjidfë‹ v©â¡if

bkh¤j«

bkh¤j«

bkh¤j«
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
m (be) f£Lkhd« k‰W« guhkç¥ò nfh£l«

1 kJiu (be) f(k)g 5 6 11 54 69 123 114 3 6 9 9 -

2 ©L¡fš (be) f(k)g 4 3 7 49 40 89 84 3 2 5 5 -

3 gHå (be) f(k)g 8 2 10 122 37 159 154 4 1 5 5 -

4 njå (be) f(k)g 8 7 15 46 39 85 76 5 4 9 9 -

5 Átf§if (be) f(k)g 22 8 30 164 48 212 204 4 4 8 8 -

6 Ïuhkehjòu« (be) f(k)g 25 5 30 159 39 198 180 14 4 18 18 -

M (be) egh®L k‰W« »uhk¢rhiyfŸ nfh£l«

1 kJiu (be) e.».rh 2 0 2 8 0 8 4 2 2 4 4 -

2 guk¡Fo (be) e.».rh 0 0 0 0 4 4 3 0 1 1 1 -


bkh¤j« 74 31 105 602 276 878 819 35 24 59 59 -
ÂU¥Âfuk‰w nrhjidfë‹ étu§fŸ

ju¡f£L¥ghL c£nfh£l« : kJiu (be) ju¡f£L¥ghL t£l« : kJiu (be) f(k)g

ÂU¥Âfu« Ïšyhj MŒÎ tif


nrhjid FiwfŸ rç
gâæ‹ bga® ÂU¥Âfuk‰w
t. v© brŒa¥g£l brŒa¥g£lit /
(nfh£l« thçahf) nrhjidfë‹ v©â¡if juthç jh® bt¥g mfy¥gL¤J«
khj« jok‹ ml®¤Â rçÎ msÎ bkh¤j« rç brŒa¥glhjit
msÎ msÎ msÎ Fê

kJiu (be) f£Lkhd« k‰W« guhkç¥ò nfh£l«

g°fhu‹g£o- f¡»Åu‹g£o rhiy ».Û.0/0 -4/2 tiu


1 #&‹ 2017 1 1 1 rç brŒa¥g£lit
cWÂ¥gL¤Jjš gâ

ikjh‹g£o rhiy ».Û 0/0 - 1/0 (kh.be. ».Û 34/10 ) tiu


2 #&‹ 2017 2 1 1 2 rç brŒa¥g£lit
cWÂ¥gL¤Jjš gâ

Åu¥bgUkhŸòu«-»UZzhòu« ».Û 0/0 - 3/6 tiu


3 #&‹ 2017 1 1 1 rç brŒa¥g£lit
cWÂ¥gL¤Jjš gâ

KUfneç rhiy 3/0š ÃçÍ« R¥òyhòu« - br§Fs« rhiy


4 #&‹ 2017 1 1 1 rç brŒa¥g£lit
».Û 0/0-1/6 tiu mfy¥gL¤Jjš gâ

5 kJiu- e¤j« rhiy ».Û.0/0 -1/0 tiu cWÂ¥gL¤Jjš gâ #&‹ 2017 1 1 1 rç brŒa¥g£lit

©L¡fš, f£Lkhd« k‰W« guhkç¥ò c£nfh£l«

©L¡fš - kz¡fh£^® rhiy ».Û 5/0 - 7/0 rhiyia


Ïiltêjl¤ÂèUªJ ÏUtêjlkhf mfy¥gL¤Â cWÂ¥gL¤Jjš,
1 #&‹ 2017 1 1 1 rç brŒa¥g£lit
».Û 4/0-5/0 cWÂ¥gL¤Jjš k‰W« ».Û 4/0 - 7/0
ÁWghy« f£L« gâ cŸgl
ÂU¥Âfu« Ïšyhj MŒÎ tif
nrhjid FiwfŸ rç
gâæ‹ bga® ÂU¥Âfuk‰w
t. v© brŒa¥g£l brŒa¥g£lit /
(nfh£l« thçahf) nrhjidfë‹ v©â¡if juthç jh® bt¥g mfy¥gL¤J«
khj« jok‹ ml®¤Â rçÎ msÎ bkh¤j« rç brŒa¥glhjit
msÎ msÎ msÎ Fê

©L¡fš - ÁYt¤ö® rhiy (tê) bgçanfh£il, nfhéÿ®


».Û 0/0 - 1/500 tiu cŸs rhiyia xUtêjl¤ÂèUªJ
2 #&‹ 2017 1 1 1 rç brŒa¥g£lit
Ïiltêjlkhf mfy¥gL¤Â cWÂ¥gL¤Jjš k‰W«
ÁWghy« f£L« gâ cŸgl
ÂU¥Âfu« Ïšyhj MŒÎ tif
nrhjid FiwfŸ rç
gâæ‹ bga® ÂU¥Âfuk‰w
t. v© brŒa¥g£l brŒa¥g£lit /
(nfh£l« thçahf) nrhjidfë‹ v©â¡if juthç jh® bt¥g mfy¥gL¤J«
khj« jok‹ ml®¤Â rçÎ msÎ bkh¤j« rç brŒa¥glhjit
msÎ msÎ msÎ Fê

gHå, f£Lkhd« k‰W« guhkç¥ò c£nfh£l«

mŒaÿ® - vçnahL rhiy ».Û 6/0 - 10/0 tiu xUtê jl¤ij


1 #&‹ 2017 1 1 1 rç brŒa¥g£lit
Ïiltêjlkhf mfy¥gL¤Jjš

njå, f£Lkhd« k‰W« guhkç¥ò c£nfh£l«

©L¡fš - FKë rhiy ».Û.64/4š ÃçªJ #šè¥g£o bršY«


rhiy ».Û.0/0-2/2 I nk«ghL brŒjš (Ãsh°o¡ fêÎfis¥
1 ga‹gL¤Â gâ nk‰bfhŸSjš) ».Û.1/0-1/4-š tofhš k #]‹ - 2017 2 1 1 2 rçbrŒa¥g£lit
‰W« jL¥ò¢Rt® f£Ljš. ».Û.0/6-0/10-š ngt®
Ãsh¡ g¤jš.

f‹åa¥g¥ÃŸisg£o f©lk}® rhiy tê í.cÁy«g£o


».Û.1/6-3/0š Ïiltê¤jl¤ij ÏUtê¤jlkhf k‰W« nk«ghL
2 brŒjš ».Û.2/8-š gGjilªj fšbt®£ ÂU«g f£Ljš #]‹ - 2017 1 1 1 rçbrŒa¥g£lit
».Û.10/10-š jh«ngh»¡F¥ gÂyhf fšbt®£ f£Ljš k
‰W« jL¥ò¢Rt® f£Ljš (v«.1145)

c¤jkghisa« - RUë¥g£o rhiy ».Û.2/0-4/0-š nk«ghL


3 brŒjš k‰W« jL¥ò¢Rt® f£Ljš (kh.be.102)
#]‹ - 2017 1 1 1 rçbrŒa¥g£lit

Átf§if, f£Lkhd« k‰W« guhkç¥ò c£nfh£l«

ntyhÍjg£od« - beL§Fs« rhiy ».Û. 2/0-4/4 nk«gL¤J«


1 gâ.
#]‹ - 2017 1 1 1 rçbrŒa¥g£lit
ÂU¥Âfu« Ïšyhj MŒÎ tif
nrhjid FiwfŸ rç
gâæ‹ bga® ÂU¥Âfuk‰w
t. v© brŒa¥g£l brŒa¥g£lit /
(nfh£l« thçahf) nrhjidfë‹ v©â¡if juthç jh® bt¥g mfy¥gL¤J«
khj« jok‹ ml®¤Â rçÎ msÎ bkh¤j« rç brŒa¥glhjit
msÎ msÎ msÎ Fê

X. ÁWtaš - F‹d¡Fo rhiy ».Û.0/0-4/4 cWÂ¥gL¤J«


2 gâ
#]‹ - 2017 1 1 1 rçbrŒa¥g£lit
ÂU¥Âfu« Ïšyhj MŒÎ tif
nrhjid FiwfŸ rç
gâæ‹ bga® ÂU¥Âfuk‰w
t. v© brŒa¥g£l brŒa¥g£lit /
(nfh£l« thçahf) nrhjidfë‹ v©â¡if juthç jh® bt¥g mfy¥gL¤J«
khj« jok‹ ml®¤Â rçÎ msÎ bkh¤j« rç brŒa¥glhjit
msÎ msÎ msÎ Fê

kjF¥g£o - mHFkhefç rhiy Ïiltê¤jl¤ÂèUªJ ÏUtê¤jlkhf


3 mfy¥gL¤Â cWÂ¥gL¤J« gâ ».Û.0/0-3/0
#]‹ - 2017 2 1 1 2 rçbrŒa¥g£lit

Ïuhkdhjòu«, f£Lkhd« k‰W« guhkç¥ò c£nfh£l«

ÑH¢nrk}® - Åu¥bgUkhŸnfhéš rhiy (tê)


1 v°.bfho¡Fs« rhiy cWÂ¥gL¤J« gâ ».Û.2/2-3/700.
#]‹ - 2017 1 1 1 rçbrŒa¥g£lit

mŠRnfh£il - Ú®¡F‹w« rhiy xUtê¤jl¤ÂèUªJ


2 Ïiltê¤jlkhf kh‰¿ cWÂ¥gL¤J« gâ ».Û.2/0-4/0.
#]‹ - 2017 1 1 1 rçbrŒa¥g£lit

mŠRnfh£il - Ú®¡F‹w« rhiy xUtê¤jl¤ÂèUªJ


3 Ïiltê¤jlkhf kh‰¿ cWÂ¥gL¤J« gâ ».Û.6/0-7/8.
#]‹ - 2017 2 1 1 2 rçbrŒa¥g£lit

beLŠrhiy, egh®L k‰W« »uhk¢rhiyfŸ

kJiu (be) egh®L k‰W« »uhk¢rhiyfŸ

©L¡fš - Adkªjhefçš uæš nk«ghy« f£Ljš (flÎ v©


1 #]‹ - 2017 2 1 1 2 Rectified
309) ».Û.431/900 - 432/0

guk¡Fo (be) egh®L k‰W« »uhk¢rhiyfŸ

1 K¤jndç nkybfhLkYh® rhiy ».Û.1/8 š ghy« f£L« gâ #]‹ - 2017 1 1 1 Rectified

bkh¤j« 24 0 9 0 7 6 2 0 24
DE RECTIFICATION REPORT
Madurai (H) QC Division Period : JUNE- 2017.

Estimate Instruction for


Name of Name of
Sl. amount Nature Inspect Date of Defects rectificatio of Date of Date of
Execution Execution Name of work Item of work Remarks
No Rs. In of work ed by Inspection Noticed Defects rectification Compliance
circle Division
Lakhs Noticed

Name of Q.C Subdivision: Madurai

Roll further
to acheive Copy of QC
Unsatisfied
Madurai (H) Madurai (H) Strengthening of Buskkaranpatti- Strengt the required register
1 105.00 WMM 1 No DE 16.06.2017 Field 17.06.2017 17.06.2017
C&M C&M Kakkiveeranpatti road km 0/0-4/2 hening compaction page
density.
and field enclosed
density.

Roll further
to acheive Copy of QC
Unsatisfied
the required register
19.06.2017 Field 21.06.2017 21.06.2017
compaction page
density.
and field enclosed
Strengthening to NH 7 km 34/10 density.
Madurai (H) Madurai (H) Strengt 2
2 of Mythanpatti Road at km. 0/0 - 26.00 WMM DE
C&M C&M hening NoS
1/0 (O4174)
Remove and
Copy of QC
restack the
Unsatisfied register
19.06.2017 with proper 21.06.2017 21.06.2017
Gradation page
graded
enclosed
materials

Roll further
to acheive Copy of QC
Strengthening to Veeraperumal Unsatisfied
Madurai (H) Madurai (H) Strengt the required register
3 puram - Krishnapuram road km 123.00 WMM 1 No DE 28.06.2017 Field 29.06.2017 29.06.2017
C&M C&M hening compaction page
0/0 - 3/6 (Using Plastic Waste) density.
and field enclosed
density.

Strengthening to Muruganeri road Copy of QC


Madurai (H) Madurai (H) brg.from Km.3/0 of Strengt Unsatisfied Increase the register
4 50.00 BC 1 No DE 19.06.2017 19.06.2017 19.06.2017
C&M C&M Subbulapuram-Sengulam road hening Temperature Temperature page
Km 0/0-1/6 enclosed

Remove and
Copy of QC
Strengthening to Madurai- restack the
Madurai (H) Madurai (H) Strengt Unsatisfied register
5 Natham road Km 0/0-1/0 (SH 165.00 DBM 1 No DE 19.06.2017 with proper 19.06.2017 19.06.2017
C&M C&M hening Gradation page
72) . graded
enclosed
materials
Estimate Instruction for
Name of Name of
Sl. amount Nature Inspect Date of Defects rectificatio of Date of Date of
Execution Execution Name of work Item of work Remarks
No Rs. In of work ed by Inspection Noticed Defects rectification Compliance
circle Division
Lakhs Noticed

Name of Q.C Subdivision: Dindigul (DINDIGUL (H) C&M)

Widening from Intermediate lane


Roll further at
to Double lane and Strengthening Copy of QC
CRIDP OMC to
Madurai (H) Dindigul (H) of Dindigul - Manakkattur Road at Unsatisfied register
1 180.00 2016- WMM 1 DE 07.06.2017 achieve the 08.06.2017 08.06.2017
C&M C&M km 5/0 - 7/0, Strengthening at km Field Density page
17 required Field
4/0 - 5/0 including CD Works in enclosed
Density
km 4/0-7/0 (MD 590)

Widening from Single lane to Remove


Intermediate lane and upper limit Copy of QC
CRIDP
Madurai (H) Dindigul (H) Strengthening of NH-45 to Unsatisfied material and register
2 110.00 2016- BC 1 DE 22.06.2017 22.06.2017 22.06.2017
C&M C&M Dindigul - Siluvathur Road (via) gradation satisfy the page
17
Periyakottai, Kovilur at km 0/0 - proper enclosed
1/500 including CD works gradation.

Remove
upper limit Copy of QC
Deck
Unsatisfied material and register
beem for 1 DE 22.06.2017 22.06.2017 22.06.2017
gradation satisfy the page
P11 - P12
Construction of ROB in proper enclosed
Hanumanthanagar at Dindigul RWP gradation.
Trichy (H) Madurai (H)
3 Town in lieu of existing LC No 309 2640.00 2010-
N&RR N&RR
in between railway km 431/900 - 11 Reduce the
432/000 in Dindigul Yard. Water Copy of QC
Deck P11 - Unsatisfied contest to register
1 DE 22.06.2017 22.06.2017 22.06.2017
P12 slump achive the page
required enclosed
slump.

Name of Q.C Subdivision: Dindigul (PALANI (H) C&M)

Roll further at
Widening from Single lane to Copy of QC
CRIDP OMC to
Madurai (H) Palani (H) intermediate lane and Unsatisfied register
195.00 2016- WMM 1 DE 22.06.2017 achieve the 22.06.2017 22.06.2017
C&M C&M strengthening of Ayyalore - Eriodu Field Density page
17 required Field
Road at Km 6/0-10/0 enclosed
Density

Name of Q.C Subdivision: Theni


Estimate Instruction for
Name of Name of
Sl. amount Nature Inspect Date of Defects rectificatio of Date of Date of
Execution Execution Name of work Item of work Remarks
No Rs. In of work ed by Inspection Noticed Defects rectification Compliance
circle Division
Lakhs Noticed

Improvements of at km 64/4 of
Dindigul - Kumuly Road to
Theni(H) Unsatisfied Rectify the Copy of QC
Jallipatty road at Km 0/0-2/2
Madurai (H) C&M/ Gradation & Gradation & register
(using plastic waste) including 105.00 CRIDP BC 1 No DE 09.06.2017 09.06.2017 09.06.2017
C&M Theni(H) Unsatisfied Increase page
construction of drain and retaining
C&M Temperature tempreture enclosed
wall at km 1/0-1/4.providing paver
block at km 0/6-0/10

Widening from Intermediate Lane


to Double Lane and
Strengthening of Kanniyappapillai
patty - Gandamanur road (Via) G.
Theni(H) Copy of QC
Usilampatty at Km. 1/6 - 3/0
Madurai (H) C&M/ Unsatisfied Increase register
including reconstruction of 140.00 CRIDP DBM 1 No DE 09.06.2017 09.06.2017 09.06.2017
C&M Theni(H) Temperature tempreture page
Damaged culvert at Km. 2/8 and
C&M enclosed
Construction culvert at Km. 10/10
in lieu of existing hard bed,
construction of retaining wall. (M
1145)

Theni(H) Improvements of Uthamapalayam Copy of QC


Madurai (H) C&M/ - Surulipatty road at Km. 2/0 - 4/0 Unsatisfied Increase register
120.00 CRIDP BM 1 No DE 27.06.2017 27.06.2017 27.06.2017
C&M Theni(H) including construction of Temperature tempreture page
C&M Retaining wall. (SH 102) enclosed

Name of Q.C Subdivision: Sivagangai


Remove the
uper graded
Improvements of Copy of QC
CRIDP metal un
Madurai (H) Sivagangai( Velayuthapattinam - Nedunkulam Unsatisfied register
60.00 2016- CRM 1 DE 23.06.2017 restock with 23.06.2017 23.06.2017
C&M H) C&M road at km 2/0-4/4 including gradation page
17 the proper
Reconstruction of culverts enclosed
graded
material

Roll further at
Strengthening of O.Siruvayal - Copy of QC
CRIDP OMC to
Madurai (H) Sivagangai( Kunnakudi road at km 0/0-4/4 Unsatisfied register
160.00 2016- WMM 1 DE 23.06.2017 achieve the 23.06.2017 23.06.2017
C&M H) C&M including Reconstruction of Field Density page
17 required Field
culverts enclosed
Density
Estimate Instruction for
Name of Name of
Sl. amount Nature Inspect Date of Defects rectificatio of Date of Date of
Execution Execution Name of work Item of work Remarks
No Rs. In of work ed by Inspection Noticed Defects rectification Compliance
circle Division
Lakhs Noticed

Refix the
Copy of QC
ratio to
Unsatisfied register
1 DE 05.06.2017 achieve 05.06.2017 05.06.2017
gradation page
proper
Widening from Intermediate lane enclosed
to Double lane and Strengthening CRIDP gradation
Madurai (H) Sivagangai(
of Madhagupatti - Alagamanagari 126.00 2016- BM
C&M H) C&M
road at km 0/0-1/0, 17
Improvements at km 1/0-3/0 Copy of QC
Unsatisfied Increase the register
1 DE 05.06.2017 05.06.2017 05.06.2017
Tempreture Tempreture page
enclosed

Name of Q.C Subdivision: Ramanathapuram

Refix the
Strengthening of Keelasemanur - Copy of QC
gradation to
Madurai (H) Ramnad (H) Veeraperumalkoil road (via) Unsatisfied register
1 75.00 Strengt WMM 1.No DE 02.06.17 achieve the 03.06.17 03.06.17
C&M Division S.Kodikulam road at Km.2/2- gradation. page
hening required
3/700 enclosed
gradation.

Roll further
to acheive Copy of QC
Unsatisfied
the required register
Boxcutting 1.No DE 02.06.17 Field 03.06.17 03.06.17
compaction page
density.
and field enclosed
Widening from SL To IL and wdg&str density.
Madurai (H) Ramnad (H)
2 strengthening of Anjukottai - 145.00 engthen
C&M Division Reduce the
Neerkundram road at Km 6/0-7/8 ing
mix Copy of QC
Unsatisfied
temperature register
Gradation. 1.No DE 21.06.17 mix 21.06.2017 21.06.2017
to achieve page
temperature.
the required enclosed
temperature.

Refix the
Copy of QC
Widening from SL To IL and Wdg & gradation to
Madurai (H) Ramnad (H) Unsatisfied register
3 strengthening of Anjukottai - 140.00 strength Gradation. 1 N0 DE 21.06.17 achieve the 21.06.17 21.06.17
C&M Division gradation. page
Neerkundram road at Km 2/0-4/0. ening required
enclosed
gradation.
Estimate Instruction for
Name of Name of
Sl. amount Nature Inspect Date of Defects rectificatio of Date of Date of
Execution Execution Name of work Item of work Remarks
No Rs. In of work ed by Inspection Noticed Defects rectification Compliance
circle Division
Lakhs Noticed

Reduce the
Copy of QC
Construction of High Level Bridge water content
Tirunelveli Paramakudi Constru Unsatisfied register
4 at Km 1/8 of Muthaneri - 600.00 1 No DE 21.06.17 to achieve 09.05.17 09.05.17
(H) N & RR (H) N & RR ction Slump. page
Melakodumalur Road. the required
enclosed
Slump.