Professional Documents
Culture Documents
2
ABSTRACT
INSPECTION REPORT OF DE(H) QC RAMANATHAPURAM FOR THE MONTH OF JUNE - 2017.
at site
No of tests conducted No. of test satisfied No.of test Not satisfied
Compressive strength /
Compressive strength /
Rebound hammer test
Thickness, Width
Thickness, Width
inspected
Binder content
Binder content
Binder content
Temperature
Temperature
Temperature
Thickness
Gradation
Gradation
Gradation
S
Viscosity
Viscosity
Viscosity
Density
Density
Density
Remarks
Total
Total
Total
No
No.of Works
6 Not satisfied
Madurai, C&M 6 4 9 4 34 16 3 3 0 69 7 4 34 13 2 3 63 2 0 0 3 1 0 0 6
then Rectified
1
Madurai, RR - - - - - - - - - - - - - - - - - - - - - - - - - - --
2 Not satisfied
Dindigul, C&M 3 1 3 1 27 7 1 1 0 40 2 1 27 6 1 1 0 38 1 0 0 1 0 0 0 2
then Rectified
2
2 Not satisfied
Dindigul, RR 1 1 0 1 2 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 2
then Rectified
1 Not satisfied
3 Palani, C&M 2 0 2 0 27 8 0 0 0 37 2 0 27 7 36 0 0 0 1 0 0 0 1
then Rectified
4 Not satisfied
Theni, C&M 7 3 5 3 18 6 3 3 1 39 4 3 18 6 0 3 1 35 1 0 0 0 3 0 0 4
then Rectified
4
Theni, RR - - - - - - - - - - - - - - - - - - - - - - - - - - --
4 Not satisfied
Sivagangai, C&M 8 1 2 1 34 9 1 1 48 0 1 34 8 1 44 2 0 0 1 1 0 0 4
then Rectified
5
Paramakudi, RR - - - - - - - - - - - - - - - - - - - - - - - - - - --
4 Not satisfied
Ramnad, C&M 5 2 4 2 22 7 2 2 0 39 2 2 22 6 1 2 0 35 2 0 0 1 1 0 4
then Rectified
6
1 Not satisfied
Paramakudi, RR 1 3 1 4 3 0 3 0 0 1 1
then Rectified
Total 33 11 29 11 162 53 10 10 3 278 20 11 162 46 4 10 1 254 9 0 0 7 6 0 2 24
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
NAME OF THE QC SUB DIVISION:MADURAI
BM
BM
BC
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
BM
BM
Km. 1/300 Thickness 50 mm 53 mm Satisfied
R/S 1.0m from
edge Width 3.75m 3.75m Satisfied
Madurai C&M/ Strengthening to Keeranoor road Field Density > 100 % 100.40% Satisfied
2 28.06.2017
Melur C&M Km 0/0-2/4 BC
BC
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
BM
Thickness 50 mm 52 mm Satisfied
Km 0/636
R/S 0.7m from Width 3.75 m 3.80 m Satisfied
edge
Not Satisfied and
Field Density > 100 % 98.70%
16.06.2017 then rectified
BM
Km. 1/647.50 Thickness 50 mm 53 mm Satisfied
L/S 0.90m from
edge Width 3.75m 3.75m Satisfied
Madurai C&M/ Strengthening of Buskkaranpatti-
3
Usilampatti C&M Kakkiveeranpatti road km 0/0-4/2 Field Density > 100 % 100.30% Satisfied
BC
Km 0/636 Thickness 30 mm 31 mm Satisfied
R/S 0.7m from
edge Width 3.75 m 3.75 m Satisfied
BC
Km. 1/647.50
L/S 0.90m from Thickness 30 mm 32 mm Satisfied
edge
Width 3.75m 3.75m Satisfied
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
WMM
Gradation - - Satisfied
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
WMM
Km 0/113.60
R/S 0.8m from Width 3.75m 3.75m Satisfied
edge
Field Density > 100 % 100.60% Satisfied
Gradation - - Satisfied
Madurai C&M/ Strengthening to Veeraperumal
6 28.06.2017 Thirumangalam puram - Krishnapuram road km 0/0
C&M - 3/6 (Using Plastic Waste) WMM
Km 2/120 R/S
Width 3.75m 3.75m Satisfied
1.00m from edge
Not Satisfied and
Field Density > 100 % 98.60%
then rectified
Gradation - - Satisfied
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
GSB
Km 5/226.50 (R/S)
Thickness 155 mm 157 mm Satisfied
- 0.80m
Km 6/486.00 (R/S)
Thickness 155 mm 155 mm Satisfied
- 1.00m
WMM
Widening from Intermediate lane to Thickness 250 mm 251 mm Satisfied
Double lane and Strengthening of
Dindigul (H) C&M / Dindigul - Manakkattur Road at km Km 5/226.50 (R/S)
1 07.06.2017 Gradation As per JMF As per JMF Satisfied
Dindigul (H) C&M 5/0 - 7/0, Strengthening at km 4/0 - - 0.80m
5/0 including CD Works in km 4/0-
7/0 (MD 590) Width 1500 mm 1500 mm Satisfied
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
DBM
Km 0/382.00 (L/S)
Thickness 50 mm 50 mm Satisfied
- 1.00m
Km 1/256.50 (R/S)
Thickness 50 mm 52 mm Satisfied
- 0.95m
Km 2/581.00 (L/S)
Thickness 50 mm 51 mm Satisfied
- 1.10m
Km 3/721.00 (R/S)
Thickness 50 mm 52 mm Satisfied
- 1.00m
Km 4/315.50 (L/S)
Thickness 50 mm 51 mm Satisfied
- 0.95m
Km 5/621.00 (R/S)
Thickness 50 mm 50 mm Satisfied
- 0.90m
BC
Thickness 30 mm 31 mm Satisfied
Km 0/382.00 (L/S)
Width 3750 mm 3750 mm Satisfied
- 1.00m
Field Density Min 100 % 100.20% Satisfied
Thickness 30 mm 30 mm Satisfied
Strengthening of Puliyarajakkapatti Km 1/256.50 (R/S) Width 3750 mm 3800 mm Satisfied
Dindigul (H) C&M /
3 22.06.2017 -Pudupatti Road at km 0/0 - 5/880 - 0.95m
Dindigul (H) C&M
including CD Works Field Density Min 100 % 100.10% Satisfied
Thickness 30 mm 32 mm Satisfied
Km 2/581.00 (L/S)
Width 3750 mm 3750 mm Satisfied
- 1.10m
Field Density Min 100 % 100.30% Satisfied
FORM-1
Strengthening of Puliyarajakkapatti
FOR NON BITUMINOUS
Dindigul (H) C&M / / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
3 22.06.2017 -Pudupatti Road at km 0/0 - 5/880
Dindigul (H) C&M
Name of Q.C division: Madurai including CD Works
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
Thickness 30 mm 30 mm Satisfied
Km 3/721.00 (R/S)
Width 3750 mm 3800 mm Satisfied
- 1.00m
Field Density Min 100 % 100.10% Satisfied
Thickness 30 mm 31 mm Satisfied
Km 4/315.50 (L/S)
Width 3750 mm 3800 mm Satisfied
- 0.95m
Field Density Min 100 % 100.20% Satisfied
Thickness 30 mm 30 mm Satisfied
Km 5/621.00 (R/S)
Width 3750 mm 3750 mm Satisfied
- 0.90m
Field Density Min 100 % 100.10% Satisfied
NAME OF THE QC SUB DIVISION: DINDIGUL (PALANI (H) C&M)
GSB V
Km 6/258.00 (R/S)
Thickness 175 mm 177 mm Satisfied
Widening from Single lane to - 1.00m
Palani (H) C&M /
intermediate lane and
1 22.06.2017 Vedasandur (H) Km 8/326.50 (R/S)
strengthening of Ayyalore - Eriodu Thickness 175 mm 175 mm Satisfied
C&M - 1.10m
Road at Km 6/0-10/0
Km 9/172.00 (R/S) Thickness 175 mm 178 mm Satisfied
- 0.90m Gradation As per JMF As per JMF Satisfied
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
WMM
BM
Km 0/782.50 (R/S)
Thickness 50 mm 51 mm Satisfied
- 1.00m
Km 3/476.50 (L/S)
Thickness 50 mm 52 mm Satisfied
- 1.15m
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
Km 4/312.50 (R/S)
Thickness 50 mm 50 mm Satisfied
- 0.80m
Km 5/363.00 (L/S)
Thickness 50 mm 51 mm Satisfied
- 0.90m
BC
Thickness 30 mm 30 mm Satisfied
Km 0/782.50 (R/S)
Width 3000 3000 Satisfied
- 1.00m
Field Density Min 100 % 100.10% Satisfied
Palani (H) C&M / Thickness 30 mm 31 mm Satisfied
Strengthening of D.Gudalore -
2 22.06.2017 Vedasandur (H)
Vellianai Road at Km 0/0-6/0 Km 1/560.00 (L/S)
C&M Width 3000 3050 Satisfied
- 0.90m
Field Density Min 100 % 100.30% Satisfied
Thickness 30 mm 30 mm Satisfied
Km 2/512.00 (R/S)
Width 3000 3000 Satisfied
- 1.10m
Field Density Min 100 % 100.10% Satisfied
Thickness 30 mm 30 mm Satisfied
Km 3/476.50 (L/S)
Width 3000 3000 Satisfied
- 1.15m
Field Density Min 100 % 100.40% Satisfied
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
Thickness 30 mm 32 mm Satisfied
Km 4/312.50 (R/S)
Width 3000 3050 Satisfied
- 0.80m
Palani (H) C&M / Field Density Min 100 % 100.20% Satisfied
Strengthening of D.Gudalore -
2 22.06.2017 Vedasandur (H)
Vellianai Road at Km 0/0-6/0 Thickness 30 mm 30 mm Satisfied
C&M
Km 5/363.00 (L/S)
Width 3000 3000 Satisfied
- 0.90m
Field Density Min 100 % 100.10% Satisfied
Name of Q.C Subdivision: Theni
BM
Depth 51 50 Satisfied
Improvements of Devathanapatty -
Varusanadu road at Km. 42/0 - BC
44/325 L/s
1 09.06.2017 Aundipatty 45/0 including Construction of
1.20m Depth 30 30 Satisfied
Retaining wall at Km. 44/6 (SH
101)
Width 7.00m 7.00m Satisfied
BM
Depth 53 50 Satisfied
Improvements of Devathanapatty -
Varusanadu road at Km. 46/970 - BC
2 09.06.2017 Aundipatty 49/250 including Construction of 47/845 R/s 1.20m
Retaining wall at Km. 48/4 (SH Depth 30 30 Satisfied
101)
Width 7.00m 7.00m Satisfied
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
DBM
Improvements of Koduvilarpatti - Depth 53 50 Satisfied
Seelayampatti road (Via) S.
Alagapuri at Km. 5/4 - 7/0 including BC
6/031.70 L/s
3 09.06.2017 Theni reconstruction of damaged culvert
1.10m Depth 32 30 Satisfied
at Km. 5/8 (i), (ii) and construction
of protective wall at Km.
9/4,10/2,15/8,16/8 (SH 228) Width 7.20m 7.00m Satisfied
BM
Improvements of at km 64/4 of Depth 51 50 Satisfied
Dindigul - Kumuly Road to Jallipatty
road at Km 0/0-2/2 (using plastic BC
4 27.06.2017 Periyakulam waste) including construction of 1/944.5 R/s 1.00m
drain and retaining wall at km 1/0- Depth 31 30 Satisfied
1/4.providing paver block at km
0/6-0/10 Width 3.76m 3.75m Satisfied
DBM
Widening from Intermediate Lane
to Double Lane and Strengthening Depth 32 30 Satisfied
of Kanniyappapillai patty -
Gandamanur road (Via) G. BC
Usilampatty at Km. 1/6 - 3/0
5 27.06.2017 Aundipatty including reconstruction of 1/980 R/s 1.20m Depth 52 50 Satisfied
Damaged culvert at Km. 2/8 and
Construction culvert at Km. 10/10 Width 7.05m 7.00m Satisfied
in lieu of existing hard bed,
construction of retaining wall. (M
1145)
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
Widening from Intermediate Lane
Name of Q.C division: Madurai to Double Lane and Strengthening
of Kanniyappapillai patty -
Gandamanur road (Via) G. value Remarks
Name of Exe.Dn Usilampatty at Km. 1/6 - 3/0 Item of work with
S Date of As per
5 27.06.2017 Aundipatty
Exe.sub. including reconstruction
Name of workof 1/980
Test R/s 1.20m
location Name of
No inspection As per test Satisfied / Not
dn Damaged culvert at Km. 2/8 and Test (*) Estimate /
at site satisfied
Construction culvert at Km. 10/10 JMF
in lieu of existing hard bed,
construction of retaining wall. (M
1145) FD using PQI 100.40% 100% Satisfied
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
BM
Improvements of Balasamuthiram - Depth 51 50 Satisfied
M.Subbulapuram road BC
1/443.50 R/s
6 27.06.2017 Aundipatty at Km. 0/0 - 1/820 (using plastic
0.65m Depth 31 30 Satisfied
waste) including construction of
retaining wall at Km. 0/4. Width 3.80m 3.75m Satisfied
FD using PQI 100.10% 98% Satisfied
NAME OF THE QC SUB DIVISION : SIVAGANGAI
BM
7/782 L (1.20) Depth 50 51 Satisfied
Sivagangai (H) BC
Strengthening of A.Thekur - Pudur
1 05.06.2017 C&M/Thiruppathur
road at km 7/120-8/0 and 10/8-11/4 Depth 30 30 Satisfied
(H) C&M
7/782 L (1.20) Width 5.50 5.70 Satisfied
FD 100% 100.40% Satisfied
BM
0/316 L (1.00) Depth 50 50 Satisfied
1/289 R (1.00) Depth 50 51 Satisfied
BC
widening from Single lane to
Sivagangai (H) Depth 30 30 Satisfied
Intermediate lane and
2 05.06.2017 C&M/Thiruppathur
Strengthening of Pattamangalam 0/316 L (1.00) Width 5.50 5.60 Satisfied
(H) C&M
Cross road at km 0/0-2/0
FD 100% 100.70% Satisfied
Depth 30 30 Satisfied
1/289 R (1.00) Width 5.50 5.60 Satisfied
FD 100% 100.30% Satisfied
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
CGPC
Depth 20 25 Satisfied
Sivagangai (H) Improvements of Nerkuppai - 0/216 R(0.80)
3 05.06.2017 C&M/Thiruppathur Velangudi at km 0/0-1/0, 2/0-3/4 Width 3.75 3.75 Satisfied
(H) C&M amd 6/8-7/0
Depth 20 21 Satisfied
2/814 L(0.80)
Width 3.75 3.80 Satisfied
CGPC
Improvements of
Thiruvegampathur - Pavanakottai Depth 20 22 Satisfied
Sivagangai (H) 1/245.6 L(0.80)
road at km 0/0-3/0 using plastic
4 23.06.2017 C&M/Devakottai(H Width 3.75 3.80 Satisfied
wastes including Reconstruction of
) C&M
culverts and Construction of Depth 20 21 Satisfied
retaining wall 2/058.2 R(0.80)
Width 3.75 3.82 Satisfied
CGPC
Depth 20 21 Satisfied
Improvements of Salaigramam -
Sivagangai (H) 22/369 L (1.20)
Sarugani road at km 22/0-24/0
5 23.06.2017 C&M/Devakottai(H Width 3.75 3.79 Satisfied
using plastic wastes in cluding
) C&M
Reconstruction of culverts Depth 20 20 Satisfied
23/084 R (1.20)
Width 3.75 3.75 Satisfied
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
CRM
Not Satisfied then
Gradation
Rectified
Improvements of Depth 150 185 Satisfied
Sivagangai (H)
Velayuthapattinam - Nedunkulam 2/992 R(1.20)
6 23.06.2017 C&M/Devakottai(H FD 100% 100.40% Satisfied
road at km 2/0-4/4 including
) C&M
Reconstruction of culverts
CGPC
WMM
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
WMM
Depth 250 251 Satisfied
Thickness 30 30 Satisfied
Km 0/452.60
Width 3750 3750 Satisfied
RS 1.20m
FD using PQI 100.00% 101.70% Satisfied
FORM-1
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
WMM
02.06.2017
@ yard Gradation --- --- Not Satisfied
BM
Thickness 50 51 Satisfied
Km 2/885.80
Strengthening of Keelasemanur - LS 1.15 m
Ramnad C&M / Width 3750 3750 Satisfied
2 Veeraperumalkoil road (via)
Paramakudi C&M
S.Kodikulam road at Km.2/2-3/700
21.06.2017 BC
Thickness 30 32 Satisfied
Km 2/885.80
Width 3750 3750 Satisfied
LS 1.15 m
FD using PQI 100.00% 102.20% Satisfied
BOX CUTTING
Km 6/429.80
Widening from SL To IL and Fielddensitry 100.00% 96.102% Not Satisfied
Ramnad C&M / L/S 0.90 m
3 02.06.2017 strengthening of Anjukottai -
Tiruvadanai C&M GSB GRADE V
Neerkundram road at Km 6/0-7/8
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
value Remarks
Name of Exe.Dn Item of work with
S Date of As per
Exe.sub. Name of work Test location Name of As per test Satisfied / Not
No inspection Estimate /
dn Test (*) at site satisfied
JMF
BC
Thickness 30 30 Satisfied
Km 4/569.60
Width 3750 3750 Satisfied
L/S 1.20
FD using PQI 100.00% 100.30% Satisfied
Special Repairs to Kamuthi -
Ramnad C&M /
4 21.06.2017 Veppankulam Road Km 1/0 - 1/750 Km 5/100.10 Thickness 30 30 Satisfied
Kamuthi C&M
& 4/0 - 7/0. R/S 1.20 Width 3750 3760 Satisfied
Thickness 30 32 Satisfied
Km 6/635.10
Width 3750 3750 Satisfied
L/S 1.05
FD using PQI 100.00% 100.20% Satisfied
BC
Thickness 30 32 Satisfied
22/312.20
Width 3750 3800 Satisfied
Special Repairs to Peraiyur - L/S 1.00 m
Ramnad C&M /
5 21.06.2017 Vilathikulam Road Km 21/600 - FD using PQI 100.00% 100.40% Satisfied
Kamuthi C&M
24/0.
Thickness 30 31 Satisfied
23/707.40
Width 3750 3750 Satisfied
R/S 1.10 m
FD using PQI 100.00% 100.20% Satisfied
FORM-2
FOR NON BITUMINOUS / BITUMINOUS WORKS (FIELD INSPECTION REPORT OF DE) FOR THE MONTH OF JUNE- 2017.
Strengthening to Muruganeri road brg.from 9/2 of Binder content 5.38+0.3% 5.17% Satisfied
Madurai C&M/
1 19.06.2017 Km.3/0 of Subbulapuram-Sengulam road Km Thirumangalam
Peraiyur C&M
0/0-1/6 -Pallapatty road 150oC - 170 o C Not Satisfied and
Temperature 130 °c
± 10 oC then Rectified
BM
Mix Grading - - Satisfied
Improvements of Uthamapalayam - Surulipatty Km 21/6 Binder Content 3.40% 3.31% Satisfied
Uthamapalaya
3 27.06.2017 road at Km. 2/0 - 4/0 including construction of Devathanapatty -
m
Retaining wall. (SH 102) Varusanadu Viscosity 350 459.20cp Satisfied
150 o C - 165 o C Not Satisfied
Temperature 136°c
+ 10 oC then Rectified
Name of Item of work value Remarks
S Date of Exe.Dn with
Name of work Test location As per As per test Satisfied / Not
No inspection Exe.sub. Name of Test
dn (*) Estimate /JMF at site satisfied
-- NIL --
FOR CONCRETE WORKS (AT READY MIX PLANT SITE ) FOR THE MONTH OF JUNE- 2017.
value Remarks
Ready Mix
Date of Name of Exe.Dn Grade of Name of Test
S No Name of work Plant As per As per test at
inspection Exe.sub.dn Concrete (*) Satisfied / Not
location codal Ready Mix
satisfied
Provision Plant site
- NIL -
- NIL -
- NIL -
- NIL -
- NIL -
- NIL -
ABSTRACT
INSPECTION REPORT FOR THE MONTH OF June 2015
Name of Q.C division: Madurai
No of CMP /
Execution
No.of Works
inspected
Division
Gradation
Gradation
Gradation
Thickness
Thickness
Thickness
site
Remarks
Density
Density
Density
content
content
content
Binder
Binder
Binder
No
Madurai RR
Dindigul RR
Theni RR
4 Sivagangai 1 1 1 1 1 1 1
C&M
Paramakudi 1 Not satisfied
RR
1 1 1 then rectified-
Ramnad 1 Not satisfied
5 3 1 4 1 0 1 4 0 0 0 0 1 then rectified-
C& M
Total 17 5 10 8 28 15 4 8 28 13 6 0 0 2
ABSTRACT
DETAILS OF TESTS CONDUCTED BY THE DIVISIONAL ENGINEER (QUALITY CONTROL) AS ON 31.05.2017
NAME OF QC DIVISION: MADURAI (H) QC CIRCLE : MADURAI (H) C&M
NO OF WORKS TOTAL NO OF TESTS NO OF TESTS NOT
NOT RECTIFIED
NO OF
SL.
JUNE-2017)
JUNE 2017
JUNE 2017
NAME OF DIVISIONS TESTS REMARKS
NO
TOTAL
TOTAL
SATISFIED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
A CONSTRUCTION & MAINTENANCE DIVISION
1 Madurai 5 6 11 54 69 123 114 3 6 9 9 -
2 Dindigul 4 3 7 49 40 89 84 3 2 5 5 -
4 Theni 8 7 15 46 39 85 76 5 4 9 9 -
2 Paramakudi 0 0 0 0 4 4 3 0 1 1 1 -
Strengthening of Buskkaranpatti-
1 Jun-17 1 1 1 Rectified
Kakkiveeranpatti road km 0/0-4/2
Strengthening to NH 7 km 34/10 of
2 Jun-17 2 1 1 2 Rectified
Mythanpatti Road at km. 0/0 - 1/0 (O4174)
Improvements of Uthamapalayam -
3 Surulipatty road at Km. 2/0 - 4/0 including Jun-17 1 1 1 Rectified
construction of Retaining wall. (SH 102)
Item of Tests
No. of test
Month of Mix Rectified/
S.No Name of work(Division Wise) Not Binder Box Field
Inspection Thickness Gradation Tempar Slump Total Not
Satisfied Content Cutting density
ature Rectified
Improvements of Velayuthapattinam -
1 Nedunkulam road at km 2/0-4/4 including Jun-17 1 1 1 Rectified
Reconstruction of culverts
Strengthening of Keelasemanur -
1 Veeraperumalkoil road (via) S.Kodikulam Jun-17 1 1 1 Rectified
road at Km.2/2-3/700
Total 24 0 9 0 6 0 7 2 24
RU¡f«
nfh£l¥bgh¿ahs® (be) ju¡f£L¥ghL nfh£l« mt®fshš 30.06.2017
tiu nk‰bfhŸs¥g£l ju¡f£L¥ghL nrhjidfë‹ étu§fŸ
v©â¡if
ÂU¥Âfu
ãfG« khj«
ãfG« khj«
ãfG« khj«
nrhjidfë‹ v©â¡if
bkh¤j«
bkh¤j«
bkh¤j«
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
m (be) f£Lkhd« k‰W« guhkç¥ò nfh£l«
5 kJiu- e¤j« rhiy ».Û.0/0 -1/0 tiu cWÂ¥gL¤Jjš gâ #&‹ 2017 1 1 1 rç brŒa¥g£lit
bkh¤j« 24 0 9 0 7 6 2 0 24
DE RECTIFICATION REPORT
Madurai (H) QC Division Period : JUNE- 2017.
Roll further
to acheive Copy of QC
Unsatisfied
Madurai (H) Madurai (H) Strengthening of Buskkaranpatti- Strengt the required register
1 105.00 WMM 1 No DE 16.06.2017 Field 17.06.2017 17.06.2017
C&M C&M Kakkiveeranpatti road km 0/0-4/2 hening compaction page
density.
and field enclosed
density.
Roll further
to acheive Copy of QC
Unsatisfied
the required register
19.06.2017 Field 21.06.2017 21.06.2017
compaction page
density.
and field enclosed
Strengthening to NH 7 km 34/10 density.
Madurai (H) Madurai (H) Strengt 2
2 of Mythanpatti Road at km. 0/0 - 26.00 WMM DE
C&M C&M hening NoS
1/0 (O4174)
Remove and
Copy of QC
restack the
Unsatisfied register
19.06.2017 with proper 21.06.2017 21.06.2017
Gradation page
graded
enclosed
materials
Roll further
to acheive Copy of QC
Strengthening to Veeraperumal Unsatisfied
Madurai (H) Madurai (H) Strengt the required register
3 puram - Krishnapuram road km 123.00 WMM 1 No DE 28.06.2017 Field 29.06.2017 29.06.2017
C&M C&M hening compaction page
0/0 - 3/6 (Using Plastic Waste) density.
and field enclosed
density.
Remove and
Copy of QC
Strengthening to Madurai- restack the
Madurai (H) Madurai (H) Strengt Unsatisfied register
5 Natham road Km 0/0-1/0 (SH 165.00 DBM 1 No DE 19.06.2017 with proper 19.06.2017 19.06.2017
C&M C&M hening Gradation page
72) . graded
enclosed
materials
Estimate Instruction for
Name of Name of
Sl. amount Nature Inspect Date of Defects rectificatio of Date of Date of
Execution Execution Name of work Item of work Remarks
No Rs. In of work ed by Inspection Noticed Defects rectification Compliance
circle Division
Lakhs Noticed
Remove
upper limit Copy of QC
Deck
Unsatisfied material and register
beem for 1 DE 22.06.2017 22.06.2017 22.06.2017
gradation satisfy the page
P11 - P12
Construction of ROB in proper enclosed
Hanumanthanagar at Dindigul RWP gradation.
Trichy (H) Madurai (H)
3 Town in lieu of existing LC No 309 2640.00 2010-
N&RR N&RR
in between railway km 431/900 - 11 Reduce the
432/000 in Dindigul Yard. Water Copy of QC
Deck P11 - Unsatisfied contest to register
1 DE 22.06.2017 22.06.2017 22.06.2017
P12 slump achive the page
required enclosed
slump.
Roll further at
Widening from Single lane to Copy of QC
CRIDP OMC to
Madurai (H) Palani (H) intermediate lane and Unsatisfied register
195.00 2016- WMM 1 DE 22.06.2017 achieve the 22.06.2017 22.06.2017
C&M C&M strengthening of Ayyalore - Eriodu Field Density page
17 required Field
Road at Km 6/0-10/0 enclosed
Density
Improvements of at km 64/4 of
Dindigul - Kumuly Road to
Theni(H) Unsatisfied Rectify the Copy of QC
Jallipatty road at Km 0/0-2/2
Madurai (H) C&M/ Gradation & Gradation & register
(using plastic waste) including 105.00 CRIDP BC 1 No DE 09.06.2017 09.06.2017 09.06.2017
C&M Theni(H) Unsatisfied Increase page
construction of drain and retaining
C&M Temperature tempreture enclosed
wall at km 1/0-1/4.providing paver
block at km 0/6-0/10
Roll further at
Strengthening of O.Siruvayal - Copy of QC
CRIDP OMC to
Madurai (H) Sivagangai( Kunnakudi road at km 0/0-4/4 Unsatisfied register
160.00 2016- WMM 1 DE 23.06.2017 achieve the 23.06.2017 23.06.2017
C&M H) C&M including Reconstruction of Field Density page
17 required Field
culverts enclosed
Density
Estimate Instruction for
Name of Name of
Sl. amount Nature Inspect Date of Defects rectificatio of Date of Date of
Execution Execution Name of work Item of work Remarks
No Rs. In of work ed by Inspection Noticed Defects rectification Compliance
circle Division
Lakhs Noticed
Refix the
Copy of QC
ratio to
Unsatisfied register
1 DE 05.06.2017 achieve 05.06.2017 05.06.2017
gradation page
proper
Widening from Intermediate lane enclosed
to Double lane and Strengthening CRIDP gradation
Madurai (H) Sivagangai(
of Madhagupatti - Alagamanagari 126.00 2016- BM
C&M H) C&M
road at km 0/0-1/0, 17
Improvements at km 1/0-3/0 Copy of QC
Unsatisfied Increase the register
1 DE 05.06.2017 05.06.2017 05.06.2017
Tempreture Tempreture page
enclosed
Refix the
Strengthening of Keelasemanur - Copy of QC
gradation to
Madurai (H) Ramnad (H) Veeraperumalkoil road (via) Unsatisfied register
1 75.00 Strengt WMM 1.No DE 02.06.17 achieve the 03.06.17 03.06.17
C&M Division S.Kodikulam road at Km.2/2- gradation. page
hening required
3/700 enclosed
gradation.
Roll further
to acheive Copy of QC
Unsatisfied
the required register
Boxcutting 1.No DE 02.06.17 Field 03.06.17 03.06.17
compaction page
density.
and field enclosed
Widening from SL To IL and wdg&str density.
Madurai (H) Ramnad (H)
2 strengthening of Anjukottai - 145.00 engthen
C&M Division Reduce the
Neerkundram road at Km 6/0-7/8 ing
mix Copy of QC
Unsatisfied
temperature register
Gradation. 1.No DE 21.06.17 mix 21.06.2017 21.06.2017
to achieve page
temperature.
the required enclosed
temperature.
Refix the
Copy of QC
Widening from SL To IL and Wdg & gradation to
Madurai (H) Ramnad (H) Unsatisfied register
3 strengthening of Anjukottai - 140.00 strength Gradation. 1 N0 DE 21.06.17 achieve the 21.06.17 21.06.17
C&M Division gradation. page
Neerkundram road at Km 2/0-4/0. ening required
enclosed
gradation.
Estimate Instruction for
Name of Name of
Sl. amount Nature Inspect Date of Defects rectificatio of Date of Date of
Execution Execution Name of work Item of work Remarks
No Rs. In of work ed by Inspection Noticed Defects rectification Compliance
circle Division
Lakhs Noticed
Reduce the
Copy of QC
Construction of High Level Bridge water content
Tirunelveli Paramakudi Constru Unsatisfied register
4 at Km 1/8 of Muthaneri - 600.00 1 No DE 21.06.17 to achieve 09.05.17 09.05.17
(H) N & RR (H) N & RR ction Slump. page
Melakodumalur Road. the required
enclosed
Slump.