Professional Documents
Culture Documents
North
M 12 M 31
M 62 M 03-B M 03-C Gas Compressors Production
Laboratory Piperack Piperack
M-70 BLOCK) M 03-E M 01
Accomodation Piperack Flare Tower
Offloading Hose
AFT FWD
Helideck
M-74 M 87/88/89
Turret
Engine Casing
(Engine Room)
M 03-A M 03-D M 03-F
Piperack Piperack Piperack
M 51
Local Electrical Room M 04 M-76
M 21 M 03-G
M 50 M 23 Crane M 49 KO Drum Piperack
Power Generation Utility H2S Removal M 13
M-03 Gas Turbine (Including Chemical M 06 Polishing
Poop Deck
Injection & Gas Laydown Area (Including Stabilizer)
(below Helideck)
Dehydration)
Provision Crane
2 FW Pump
Lamprell Skids–inJebel
Modules Container
Ali Note: * dry weight from weighing report
Pump Dry
Dubai Room - below
Dock Deck
Modules + Integration – Dubai FPSO FIRENZE
FPSO AQUILA
TBD