You are on page 1of 1

FPSO

North
M 12 M 31
M 62 M 03-B M 03-C Gas Compressors Production
Laboratory Piperack Piperack
M-70 BLOCK) M 03-E M 01
Accomodation Piperack Flare Tower

Offloading Hose

Fore Castle Deck


(below is FC Stores)

AFT FWD

Helideck
M-74 M 87/88/89
Turret
Engine Casing
(Engine Room)
M 03-A M 03-D M 03-F
Piperack Piperack Piperack
M 51
Local Electrical Room M 04 M-76
M 21 M 03-G
M 50 M 23 Crane M 49 KO Drum Piperack
Power Generation Utility H2S Removal M 13
M-03 Gas Turbine (Including Chemical M 06 Polishing
Poop Deck
Injection & Gas Laydown Area (Including Stabilizer)
(below Helideck)
Dehydration)

Provision Crane

2 FW Pump
Lamprell Skids–inJebel
Modules Container
Ali Note: * dry weight from weighing report

Pump Dry
Dubai Room - below
Dock Deck
Modules + Integration – Dubai FPSO FIRENZE
FPSO AQUILA
TBD

Rick van der


E.David Bliek
20/07/09
Scale NTS draft-1
RevA
2019.09.01
Contract award (CA): 29th May 2009
Estimated Sailaway date : Modules Arrangement