Province Biliran
MUNICIPALITY OF NAVAL
One Bagger Concrete Mixer 2 Generator Set 1 Kva 1 Civil Engineer 1 Carpenter 6
Dump Truck (5 cu.m Capacity) 1 OxyAcetylene Cutting Outfit 1
Concrete Stick Vibrator 1 Portable Welding Machine 1 Foremen 1 Steelman 6
Excavator with breaker (0.28
1 Crawler Crane 46-50T 1 Mason 6
cu.m capacity)
Plate Compactor 2 Electric drill 2 Paintor 4
BIPSU MAIN NET COURTS ROOFING SYSTEM(REVISED JAN 13) .xlsx Page 1
BREAKDOWN OF ESTIMATE EXPENDITURES AMOUNT %
I. ESTIMATE COST :
A. DIRECT COST :
1. Mobilization / Demobilization ₱ 202,276.11 0.74%
2. Materials ₱ 18,436,242.46 67.04%
3. Labor ( Includes fringes benefits ) ₱ 2,068,966.88 7.52%
4. Equipment Expenses ₱ 1,122,343.64 4.08%
5. Permits, Clearances, Blue Prints, Professional Fee, etc. ₱ 50,700.00 0.18%
6. Prov. for Handling of Materials to Site ₱ 150,000.00 0.55%
7. Provision for Fabrication
B. INDIRECT COST:
1. Overhead, contingency, Miscellaneous ₱ 2,495,599.97 9.07%
( 7% to 15% of A1 To A 4 )
2. Profits ( 8% to 10% of A1 to A 4 ) ₱ 1,746,184.20 6.35%
3. Comprehensive all Risk Insurance
( 4.5 % of A1 to A 4 )
4. Vat (5% of DC + OCM + CP) ₱ 1,227,686.74 4.46%
5. Mobilization & Demobilization
Sub - Total ₱ 27,500,000.00 100.00%
II. CONTINGENCIES / RESERVES
5. Physical ( up to 5% of the estimated
contract cost )
6. Price Escalation ( up to 12 % of the
estimated contract cost )
Sub - Total
III. ESTIMATED GOVERNMENT EXPENDITURE
7. Engineering and Administrative Overhead
( 3 % of A1 to A 4 )
8. ROW / SITE Acquisition
9. Material to be Furnish by the Government
TOTAL ESTIMATED PROJECT COST ₱ 27,500,000.00 100.00%
SAY
Prepared by:
Checked: Noted:
Recommending Approval:
BIPSU MAIN NET COURTS ROOFING SYSTEM(REVISED JAN 13) .xlsx Page 2