BOILER ERECTION
• Column erection
• Pressure part erection
• Miscellaneous
COLUMN ERECTION
⊙ Concurrent construction of S/S and Boiler ⊙ Boiler installation after completion of S/S
installation
⊙ S/S Modulization on the ground
⊙ Core Frame, Subsidiary S/S and Boiler ⊙ Separate installation of S/S 1Tier ~ 5 Tier
installation at the same time with Bottom-Up method
⊙ Lifting after Moduliztion on the ground, Erection ⊙ Unit Lifting and installation
⊙ Using special Lifting device : ⊙ Using ordinary construction lifting device
Hydraulic jack - to be able to lift Module
[2,500Tons] ⊙ Site assembly of Boiler equipment
⊙ Site assembly of Boiler equipment ▶ - Ground assembly : 20%,
▶ - Ground assembly : 70%, - Assembly after installation : 80%
- Assembly after installation : 30%
⊙ Planning and scheduling for concurrent
construction sequence Planning
Compare to Main Erection Process
Core
Frame
Module
Work Stand 1Tier
?
Panel
Ass’y
?
?
Sub-S/S
Ass’y
2Tier
1Tier
Module
Work
Modulization/Concurrent Erection Method Stand
Typical Construction Method
▷ In the process of Modulization of Heavy Girder ▷ S/S Heavy Girder installation
Boiler Furnace & Back Pass on the ground (Using Crane)
▷ S/S Heavy Girder installation (Using Crane)
Lifting
※ 6 month after starting S/S
※ 2 month after Starting S/S
? Heavy Girder
Heavy Girder Installation
?
Installation
Module Ass’y
on the Ground
Lifting using
Hydraulic Jack
?
Drum
Drum
Pressure Parts
Module
assembly on the
ground
Coil Module ?
Lifting
Hydraulic Jack
Winch
Back pass
Module
Lifting 中
? ?
Install
Jack for
Drum
Sequence of Modulization / Concurrent Installation
DRUM
LIFTING
Sequence of Modulization / Concurrent Installation
Install
Downcomer
pipes (6ea)
Sequence of Modulization / Concurrent Installation
Sequence of Modulization / Concurrent Installation
1’st Lifting
of
Back Pass
Module
Sequence of Modulization / Concurrent Installation
Sequence of Modulization / Concurrent Installation
Assemble the
Back Pass
Wall Panel
Sequence of Modulization / Concurrent Installation
SH tube
bundle
lifting
Assemble Back
Pass LTRH
Arch lifting
Sequence of Modulization / Concurrent Installation
Sequence of Modulization / Concurrent Installation
Assemble Eco
Tube, Eco Header
Sequence of Modulization / Concurrent Installation
Back Pass
Module
Final Lifting
Sequence of Modulization / Concurrent Installation
Install the
Burner windbox,
Low water panel,
Hopper panel,
Water inlet header,
Suction inlet piping.