OCCUPATIONAL HEALTH AND SAFETY ACT

85 OF 1993

GENERAL SAFETY REGULATIONS 9(1)

APPOINTMENT – ARC WELDING EQUIPMENT INSPECTOR

Marc Forrester
I, ___________________________ Michael Kankam Boadu as
(Representing the employer), hereby appoint______________________
the ARC WELDING EQUIPMENT INSPECTOR for the Group Five
_________________________ at the
New Liberty Gold Project
_________________________ Plant Site
Contract, situated at ____________________________to ensure that gas cutting
/ welding equipment and appurtenances are inspected and recorded until further notice and as per the attached
Annexure.

_______________ 23/09/2014
______________ Asst. Site Manager
______________________
SIGNATURE DATE DESIGNATION:

ACCEPTANCE OF APPOINTMENT

I, MICHAEL
______________________
KANKAM BOADU hereby accept this appointment as a GAS CUTTING / WELDING INSPECTOR and
acknowledge that I understand the requirements of this appointment.

_______________ 23/09/2014
______________ Fabricator
______________________
SIGNATURE DATE DESIGNATION:
ANNEXURE

DUTIES AND RESPONSIBILITIES

1. To ensure that all gas cutting / welding equipment and appurtenances are numbered and placed on a
register.

2. Ensure that all gas cutting / welding equipment and appurtenances is inspected on a monthly basis
against the register and that the findings are recorded as such.

3. Ensure that any serious deviations are rectified immediately and that any other deviations are attended
to as soon as possible.

4. UNDER NO CIRCUMSTANCE MAY ANY UNSAFE GAS CUTTING, WELDING EQUIPMENT OR


APPURTENANCES BE LEFT IN USE.