Professional Documents
Culture Documents
Building Specification: White Wash and Colour Wash
Building Specification: White Wash and Colour Wash
SUBMITTED BY:-
GAURI RAJ
SWATI GOEL
WHITE WASHING
Scaffolding
It shall be erected on double
supports tied together by
horizontal pieces over which
scaffolding shall be fixed.
Scaffolding shall rest on the
surface which is been white
washed.
Scaffolding should be sound
and strong.
For ceiling proper stage
scaffolding shall Be erected.
Preparation of surface
Then surface shall be thoroughly brushed
free from mortar droppings and foreign
material.
In case of old surface the surface should be
thoroughly scraped of and holes in plaster
shall be filled up with mortar.
The surface shall then be allowed to dry for
at least 48hrs before white washing is done.
PREPARATION OF LIME WASH