WHAT IS SCHEDULED WASTE?

Is your premise HAS THE POTENTIAL to


produce scheduled waste?

WHAT ARE THE LEGISLATIONS ON SW?

What shall you do to ensure that your factory


handle SW properly according to the legal
requirement?
SCHEDULED WASTE MANAGEMENT
OBJECTIVES

• Protectpublic health and the environment ;


• Conservation of natural resources;
• Reduce waste;
• Environmental friendly management ;and
• Profitable in the long run
Vital components
Institutional
arrangements

LEGISLATION FACILITIES
)

SUPPORT
ENFORCEMENT
SERVICES

Stakeholders

Source: David C Wilson 1993


Hazardous waste management system

LEGISLATION FACILITIES

Hazardous SUPPORT SERVICES


ENFORCEMENT
waste
management
system
ENVIRONMENTAL CONTROLS INFRASTRUCTURE

ANCILLARY SERVICES
SERVICE SECTOR
Why definition is difficult

The hazard associated with a waste depends on:

COMPOSITION
PHYSICAL FORM

HAZARDOUS WASTE

CHEMICAL PROPERTIES PHYSICAL PROPERTIES

BIOLOGICAL PROPERTIES
Some types of waste associated with different
industries
Chemical Vehicle maintenance shops
manufacturers Paint wastes
Chemical process Used oils
wastes Spent solvents
Acids and alkalis Acids and alkalis
Spent solvents
Reactive wastes Furniture and wood
Discarded commercial manufacturing and
chemical products refinishing
Spent solvents
Construction industry Paint wastes
Paint wastes
Spent solvents
Strong acids and bases
JADUAL PERTAMA
PBT 2005
FIRST SCHEDULE
(Regulation 2)
HIRACHYOF WASTE MANAGEMENT
REDUCTION
Reassessment of process, raw materials, Technology

RECYCLE
Reuse/raw materials

WASTE TREATMENT
PCT/ Solidification/incinerator

DISPOSAL
Secure Landfill
• Peraturan 2, PBT 2005
Regulation 2, SWR 2005

– Kontraktor = mana-mana orang yang dilesen dibawah


Subseksyen 18 (1A) Akta
– Contractor = any person licenced under subsection
18 (1A) of the Act
IMPORTANT REGULATIONS
RESPONSIBILITY OF WASTE GENERATOR

Regulation 3 - Notification
( Second Schedule) –within 30 days
from generation.
Submit once only unless there is a
change in the category of waste
produced
o
o Pelupusan Buangan Terjadual (P4)
Disposal of Scheduled Wastes

 Di premis Yang Ditetapkan


(PYDT)
 At prescribed premises only
o Pengolahan Buangan Terjadual (P5)
Treatment of Scheduled Wastes

> Dalam tapak atau di PYDT