Comparison of Various Steel Deck Sheet Profiles

Concrete Steel Grade Span Capacity


Manufacturer Product Thickness Depth Price Failure Mode
Consumption (N/mm2) (mm)
Construction Stage Final Stage
mm mm kN/m2 230 240 250 340 350 450 550 Construction Stage Final Stage
(Deck as form) (Composite Slab)

Tata SmartDek-51 0.70 51 3.13 2030 2430 Web Crippling Combined Bending/Shear

1.00 51 3.13 2760 2480 Deflection Combined Bending/Shear

1.20 51 3.13 2920 2490 Deflection Combined Bending/Shear

JSW TR60 0.90 60 2.84 2480 2280 Web Crippling Combined Bending/Shear

1.00 60 2.84 2970 2290 Web Crippling Combined Bending/Shear

1.20 60 2.84 3590 2300 Deflection Combined Bending/Shear

LCP Formdek 75 0.80 75 2.73 1000 1880 Web Crippling Combined Bending/Shear

1.00 75 2.73 2000 1890 Web Crippling Combined Bending/Shear

1.25 75 2.73 2940 1890 Web Crippling Combined Bending/Shear

0.80 75 2.73 1890 1880 Web Crippling Combined Bending/Shear

1.00 75 2.73 2830 1890 Web Crippling Combined Bending/Shear

1.25 75 2.73 3890 1900 Deflection Combined Bending/Shear

0.80 75 2.73 3120 1880 Web Crippling Combined Bending/Shear

1.00 75 2.73 3690 1890 Deflection Combined Bending/Shear

1.25 75 2.73 3890 1900 Deflection Combined Bending/Shear

JSW TR80 0.90 80 2.60 2680 1660 Web Crippling Combined Bending/Shear

1.00 80 2.60 3210 1670 Web Crippling Combined Bending/Shear

1.20 80 2.60 4300 1670 Deflection combined Bending/Shear

0.90 80 2.60 3450 1660 Web Crippling Combined Bending/Shear

1.00 80 2.60 4110 1670 Deflection Combined Bending/Shear

1.20 80 2.60 4300 1670 Deflection Combined Bending/Shear

Note:

1) 150 mm slab is used for calculation of span capacities


2) Failure in deck as composite slab in final stage is mainly governed by interaction failure. This is primarily due to high demand-capacity ration under negative bending moment.
3) As depth of deck increases, flexural strength under hogging at support decreases due to reduction in depth of concrete.
4) To increase the overall span capacity in final stage for deck as composite slab, overall depth of slab should be increased above 150 mm.