150KV GI MANINJAU
FUNCTIONAL & INTERLOCKING SCHEME LOGIC

PENGADAAN DAN PEMASANGAN BAY KOPEL GI MANINJAU


PT. PLN (PERSERO) UIP3BS KONTRAK NO : 0013.PJ/KON.02.04/UPTPDG/2018
UPT PADANG
A SIZE FSCM NO DWG NO REV A
PT.INDORAJA TOWER A4 MNJ/SCHEME/LOGIC/04062020

PT.ELEKTRIKAL GLOBAL ENJINIRING DRAW BY SANI PRIADI APROVED BY : SHEET 1 OF 9

8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1

H H
NO DESCRIPTION SHEETS PAGE

1 BUS COUPLER - CIRCUIT BREAKER CLOSED

2 BUS COUPLER CIRCUIT BREAKER OPEN/TRIP

G 3 BUS COUPLER DS BUS-A & DS BUS-B OPEN/CLOSE G

4 OHL FEEDER CB CLOSE

5 OHL FEEDER CB OPEN/TRIP

6 OHL DS-BUS A OPEN/CLOSE


F F

7 OHL DS-BUS B OPEN/CLOSE

E E

D D

C C

B B

TABLE OF CONTENT
A SIZE FSCM NO PENGADAAN DAN PEMASANGAN BAY KOPEL GI MANINJAU REV A
KONTRAK NO : 0013.PJ/KON.02.04/UPTPDG/2018
DRAWN Sani Priadi A4

ISSUED PT.ELEKTRIKAL GLOBAL ENJINIRING SCALE NTS MNJ/SCHEME/LOGIC/04062020 SHEET 2 OF 9

8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1

H BUS COUPLER - CIRCUIT BREAKER CLOSED H

CB CONTROL SWITCH
CLOSED
G G
L/R SWITCH
(ON REMOTE POSITION)
AND
DS BUS-A CLOSE

DS BUS-B CLOSE

F F
AND
Not
TCS FAILURE

Not
PROTECTION TRIP

SYNCHROCHECK OK
OR
E E

L/R SWITCH
(ON LOCAL POSITION)

CB CONTROL SWITCH AND CB


CLOSE CLOSED
D AND D
AND
DS BUS-A OPEN

DS BUS-B OPEN

C SF6 BLOCKED C

CB SRING DISCHARGED

B B

BUS COUPLER
CB CLOSE
A SIZE FSCM NO
PENGADAAN DAN PEMASANGAN BAY KOPEL GI MANINJAU
REV A
DRAWN Sani Priadi A4 KONTRAK NO : 0013.PJ/KON.02.04/UPTPDG/2018

ISSUED PT.ELEKTRIKAL GLOBAL ENJINIRING SCALE NTS MNJ/SCHEME/LOGIC/04062020 SHEET 3 OF 9

8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1

H BUS COUPLER - CIRCUIT BREAKER OPENED/TRIP H

CB CONTROL SWITCH
CLOSED
AND
L/R SWITCH
G (ON REMOTE POSITION) G
OR
L/R SWITCH
(ON LOCAL POSITION)
AND
CB CONTROL SWITCH
OPEN

F F

DS BUS-A OPENED OR
OR
ALL BAYS ON BUSBAR

DS BUS-B OPENED
LIVE TRANSFER

AND CB
OPEN/TRIP
DS BUS-A OPENED AND
E E
OR COIL-1
DS BUS-B OPENED

PROTECTION OPERATION TRIP

D D

SF6 OPERATION LOCKOUT

PROTECTION OPERATION TRIP CB


C OPEN/TRIP C
AND

SF6 OPERATION LOCKOUT COIL-2

B B

BUS COUPLER
CB OPEN / TRIP
A SIZE FSCM NO REV A
PENGADAAN DAN PEMASANGAN BAY KOPEL GI MANINJAU
DRAWN Sani Priadi A4 KONTRAK NO : 0013.PJ/KON.02.04/UPTPDG/2018

ISSUED PT.ELEKTRIKAL GLOBAL ENJINIRING SCALE NTS MNJ/SCHEME/LOGIC/04062020 SHEET 4 OF 9

8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1

H BUS COUPLER - DS-BUS A OPEN/CLOSE H

DS CONTROL SWITCH
OPEN/CLOSED
AND
L/R SWITCH
G (ON REMOTE POSITION) G
OR DS BUS-A
OPEN/CLOSED
L/R SWITCH
(ON LOCAL POSITION) OR
AND
DS CONTROL SWITCH
OPEN/CLOSE

F F
CB OPENED

E E

BUS COUPLER - DS-BUS B OPEN/CLOSE

D D
DS CONTROL SWITCH
OPEN/CLOSED
AND
L/R SWITCH
(ON REMOTE POSITION)
OR DS BUS-B
OPEN/CLOSED
L/R SWITCH
(ON LOCAL POSITION) OR
C C
AND
DS CONTROL SWITCH
OPEN/CLOSE

CB OPENED

B B

DS BUS-A & DS BUS-B


CB OPEN / TRIP
A SIZE FSCM NO REV A
PENGADAAN DAN PEMASANGAN BAY KOPEL GI MANINJAU
DRAWN Sani Priadi A4 KONTRAK NO : 0013.PJ/KON.02.04/UPTPDG/2018

ISSUED PT.ELEKTRIKAL GLOBAL ENJINIRING SCALE NTS MNJ/SCHEME/LOGIC/04062020 SHEET 5 OF 9

8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1

H OHL - CIRCUIT BREAKER CLOSED H

Bay Line

CB CONTROL SWITCH
CLOSED
G G
L/R SWITCH
(ON REMOTE POSITION)
AND
DS BUS-A CLOSE

OR
DS BUS-B CLOSE

F F

DS LINE CLOSE
AND

TCS FAILURE
E E

PROTECTION TRIP

SYNCHROCHECK OK OR

CB
CLOSED
D D
MAINTENANCE
L/R SWITCH
(ON LOCAL POSITION)

CB CONTROL SWITCH AND


CLOSE AND

DS BUS-A OPEN
AND
C C
DS BUS-B OPEN

DS LINE OPEN

B B
SF6 BLOCKED

CB SRING DISCHARGED

OHL FEEDER
CB CLOSE
A SIZE FSCM NO
PENGADAAN DAN PEMASANGAN BAY KOPEL GI MANINJAU
REV A
DRAWN Sani Priadi A4 KONTRAK NO : 0013.PJ/KON.02.04/UPTPDG/2018

ISSUED PT.ELEKTRIKAL GLOBAL ENJINIRING SCALE NTS MNJ/SCHEME/LOGIC/04062020 SHEET 6 OF 9

8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1

H OHL - CIRCUIT BREAKER OPENED/TRIP H

Bay Line / Bay Trafo / Bay PLTA

CB CONTROL SWITCH
OPEN
AND
L/R SWITCH
G (ON REMOTE POSITION) G

L/R SWITCH
(ON LOCAL POSITION)
AND
CB CONTROL SWITCH OR
CB
OPEN
OPEN/TRIP

F AND F
COIL-1
PROTECTION OPERATION TRIP

POLE DISCREPANCY

SF6 OPERATION LOCKOUT


E E

D D
PROTECTION OPERATION TRIP CB
OPEN/TRIP
AND

SF6 OPERATION LOCKOUT COIL-2

C C

B B

BUS COUPLER
CB OPEN / TRIP
A SIZE FSCM NO
PENGADAAN DAN PEMASANGAN BAY KOPEL GI MANINJAU
REV A
DRAWN Sani Priadi A4 KONTRAK NO : 0013.PJ/KON.02.04/UPTPDG/2018

ISSUED PT.ELEKTRIKAL GLOBAL ENJINIRING SCALE NTS MNJ/SCHEME/LOGIC/04062020 SHEET 7 OF 9

8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1

H H
OHL - DS-BUS A OPEN/CLOSE

Bay Line / Bay Trafo / Bay PLTA

DS CONTROL SWITCH
OPEN/CLOSED
AND
G L/R SWITCH G
(ON REMOTE POSITION)
OR
L/R SWITCH
(ON LOCAL POSITION)
AND
DS CONTROL SWITCH
OPEN/CLOSE

F F
CB OPENED
DS BUS-A
AND
OPEN/CLOSED
DS BUS-B OPEN

AND

E E
CB CLOSED

OR
DS BUS-B CLOSED

AND
D BUS COUPLER CB CLOSE D
LIVE TRANSFER
CONDITION

BUS COUPLER DS BUS-A CLOSE

BUS COUPLER DS BUS-B CLOSE

C C

B B

OHL FEEDER
DS BUS-A OPEN/CLOSE
A SIZE FSCM NO
PENGADAAN DAN PEMASANGAN BAY KOPEL GI MANINJAU
REV A
DRAWN Sani Priadi A4 KONTRAK NO : 0013.PJ/KON.02.04/UPTPDG/2018

ISSUED PT.ELEKTRIKAL GLOBAL ENJINIRING SCALE NTS MNJ/SCHEME/LOGIC/04062020 SHEET 8 OF 9

8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1

H H
OHL - DS-BUS B OPEN/CLOSE

DS CONTROL SWITCH
OPEN/CLOSED
AND
G L/R SWITCH G
(ON REMOTE POSITION)
OR
L/R SWITCH
(ON LOCAL POSITION)
AND
DS CONTROL SWITCH
OPEN/CLOSE

F F
CB OPENED
DS BUS-B
AND
OPEN/CLOSED
DS BUS-A OPEN

AND

E E
CB CLOSED

OR
DS BUS-A CLOSED

AND
D BUS COUPLER CB CLOSE D
LIVE TRANSFER
CONDITION

BUS COUPLER DS BUS-A CLOSE

BUS COUPLER DS BUS-B CLOSE

C C

B B

OHL FEEDER
DS BUS-B OPEN/CLOSE
A SIZE FSCM NO
PENGADAAN DAN PEMASANGAN BAY KOPEL GI MANINJAU
REV A
DRAWN Sani Priadi A4 KONTRAK NO : 0013.PJ/KON.02.04/UPTPDG/2018

ISSUED PT.ELEKTRIKAL GLOBAL ENJINIRING SCALE NTS MNJ/SCHEME/LOGIC/04062020 SHEET 9 OF 9