Contents
1 Scope ................................................................ 2
2 Applicable Documents ....................................... 2
3 Definitions .......................................................... 3
4 Instructions ........................................................ 4
5 Reviews and Project Non-Conformity
Resolution ................................................ 19
6 Responsibilities ................................................ 20
Revision Summary................................................. 22
1 Scope
1.1 This Saudi Aramco Engineering Procedure (SAEP) establishes the instructions
and responsibilities used by Saudi Aramco Reviewing Organizations (SAROs)
when conducting formal engineering reviews of project packages relating to
capital and non-capital projects.
SAROs provide only a general review of the project. Full responsibility of the
project is with PRO.
2 Applicable Documents
The requirements contained in the following documents apply to the extent specified in
this procedure:
3 Definitions
Design Basis Scoping Paper (DBSP): Refer to SAEP-1350. For projects using
the Capital Management System (CMS), DBSP refers to the portion of FEL 2
after the Gate Alternative Selection and prior to the G2 Gate.
System (CMS), Project Proposal refers to the portion of FEL 3 before the
Project Proposal Approval.
Detailed Design: A set of documents used for project construction and material
procurement. For projects using the Capital Management System (CMS),
Detailed Design refers to the Detailed Design portion of the Execution Phase.
Engineering reviews are generally organized based on one of the two following
methods:
4 Instructions
ABRs are conducted by SAROs once during Project Proposal on the last issue of
the Project Proposal review package before the Project Proposal Approval.
ABRs are conducted by SAROs once during Detailed Design, preferably at the
stage indicated in Section 4.5.1 for each discipline.
4.2.2 Include in the Project Proposal the proposed number, method, and type
of the engineering reviews for the Detailed Design phase of the project.
DSRs shall be carried out during the Detailed Design phase at the
percent completion stage agreed to by PRO and SAROs during the
Project Proposal meeting. Required percent completions are given for
each discipline in Section 4.5.1.
ABRs shall be carried out during the Detailed Design phase at the overall
project percent completion stage agreed to by PRO and SAROs during
the Project Proposal meeting.
4.3.1 General
PRO must include a document in each Index for all Detailed Design
review requests that indicates the cut-off dates for all MSAERs.
4.3.2 PRO must complete and attach the Engineering Design Review
Submittal Checklist per Appendix C to the initial package submittal.
Failure to do so will result in package rejection.
4.4.2 The review period to perform a DSR shall be established via the approval
mechanism in the Engineering Service Request system in SAP.
In these tables, the first column gives the documentation required for
Saudi Aramco: Company General Use
Page 5 of 35
Document Responsibility: Electrical Systems Designs and Automation Standards Committee SAEP-303
Issue Date: 21 November 2016
Next Planned Update: 21 November 2019 Engineering Reviews of Project Documentation
both ABRs and DSRs. The second column gives details of the required
documentation as well as the required percent completion for each
discipline for DSRs. All review requests, including Project Proposal
reviews, must contain all of the listed documents. PRO must include a
document in each Index showing the file name(s) of the review
documents corresponding to the required documents.
Review Requirements
Document Comments
Review Requirements
Document Comments
Review Requirements
Document Comments
Review Requirements
Document Comments
2 Drawings
3 Project Plan
4 Material List
5 Show all disciplines including: Outside
plant systems, structured cabling
system, Data Network System,
Wireless System, Telephone
Switching, Special circuits and
services, Video Conferencing, VSAT
Communications Towers, fiber optics
backbone network, microwave
systems, SCADA connectivity
solutions, and Communications
Facilities with required civil,
Mechanical, DC/AC power, and Plant
Demilitarized Zone (DMZ) Architecture
and all of its components.
Review Requirements
Document Comments
Review Requirements
Document Comments
5 One Line Diagrams (Substation) Showing all major equipment ratings (continuous
kVA/HP/current, short circuit, interrupting, transformer
impedance), basic protective relaying, circuit breaker
and/or normal switching positions, power system
automation block diagrams
6 Substation Drawings Plan views showing equipment layout inside and
outside the building, external elevations of building,
grounding layout
7 System studies which form the basis of Should include:
the equipment ratings shown on the - load flow
one line diagrams - short circuit
- motor starting
- arc flash
- grounding calculations (as per SAES-P-111)
8 Additional power system studies as As per SAES-P-100
applicable
9 Typical installation drawings, electrical At 90% Detailed Design only
cable schedule, underground cable
layout, grounding drawings and
Conduit/cable tray/ junction box cable
filling calculations
Environmental Engineering Typical % completion for DSRs = 60%
1 Scope of Work
2 Project Description
3 Material Specifications and Data
Sheets for wastewater treatment
equipment
4 Wastewater treatment systems studies
which for the basis of the equipment
design
5 Specifications of Ambient Air Quality
and Meteorology Monitoring Stations,
if required by the project scope
6 Design details/drawings for
groundwater monitoring wells,
as required by the project scope
7 Construction Contractor Work Scope
8 Plot Plans
9 PFDs
Review Requirements
Document Comments
10 P&IDs
11 Design Calculations For any equipment with an environmental emission
12 Environmental Impact Assessment All Reviews
13 Environmental/Social Health Impact All Reviews
Assessment (ESHIA)
14 Design details of radioactive storage
facilities.
15 Manufacturer’s specifications for any
sources of ionizing radiation
(equipment generating ionizing
radiation or radioactive sources) that
are part of the design or required to
carry out the project.
Geotechnical (off-shore) Typical % completion for DSRs = 30%
1 Design Concept Project Proposal only
2 Scope of Work Detailed Design only
3 Pile Design and Installation 30% Detailed Design
4 On-bottom Stability and Mudmats 30% Detailed Design
5 Flooding and Grouting System Design 90% Detailed Design
and Drivability
Geotechnical (on-shore) Typical % completion for DSRs = 30%
1 Scope of Geotechnical Investigation
2 Geotechnical Report
3 Foundation Types and Load Indications
4 Earth Work Plans and Specifications
5 Construction Procedures for Special i.e., evaporation ponds and quay walls
Projects
Heat Exchangers and Boilers Typical % completion for DSRs = 30%
1 P&IDs and PFDs
2 Equipment Data Sheets
3 Pressure vessels & storage tanks At 60% Completion
HVAC Typical % completion for DSRs = 60%
1 P&IDs
2 Specifications
Review Requirements
Document Comments
3 Calculations
4 System Diagrams
5 Scope of Work
6 Equipment Layout
7 Equipment Schedules
Instrumentation Typical % completion for DSRs = 30%
1 PFDs Samples (for DSR only)
2 P&IDs Samples
3 Instrument Installation Schedules Samples
4 Instrument Specification Sheets One sample for each different instrument
5 Console/Panel/Rack Drawings (C/P/R) Only General Layouts
6 Instrument Interconnection Wiring Samples for JBs, Marshaling cabinets, C/P/R drawings
Diagrams
7 Layouts Instrument Points and Lines Samples
8 ESD System Drawings Samples of Cause and Effect, Basic Logic Diagram
and ESD Logic Narrative
9 Equipment Protection System Samples of Basic Logic Diagram, and Logic Narrative
Drawings
10 Instrument Loop Diagrams Sample for each different Loop Template
11 System Block Diagram Full set, should be completed at the start of a project
12 Logic Diagrams and Logic Narrative for Samples
Batch or Sequential control
13 Typical installation drawings, electrical At 90% Detailed Design only
cable schedule, underground cable
layout, grounding drawings and
Conduit/cable tray/ junction box cable
filling calculations
Materials and Corrosion Control Typical % completion for DSRs = 30%
1 Scope of Work Submit for background information
2 Process Flow Diagrams (including Submit for background information
Process Description/Data)
3 P&IDs Submit before POs are issued
4 Material Specifications/Selection Submit before POs are issued
Review Requirements
Document Comments
5 Equipment and Lines with H2S Submit before PRs or POs are issued
(Appendix B)
6 Equipment Data Sheets Submit before POs are issued
7 Corrosion Management Program Submit and get approval before POs are issued
(see SAES-L-133, Section 8)
Paints and Coatings Typical % completion for DSRs = 60%
1 PFDs Specify temperature, pressure, and fluid composition
for internal coatings. Specify temperature for external
coatings. Specify insulation, if any.
2 Material Specifications and Equipment Identify which metallurgies are specified
Data Sheets
3 Coating “Map” Identify which coatings are specified for which
services.
Piping Typical % completion for DSRs = 60%
1 P&IDs and PFDs
2 Scope of Work
3 Piping Material Specifications Submit before PRs or POs are issued
4 Plot Plans
5 Piping Plans, Layouts, Sections, and
Details
6 Isometrics
7 Piping Support Details
8 Calculations
9 Safety Instruction Sheets At least 90% complete.
10 Hydrostatic Test Diagrams
Plant Management Systems Typical % completion for DSRs =60%
1 Installation and Commissioning Plan
2 Architecture Design
3 Application Design
4 Human Interface Design
5 Integration Design
6 Computer Room(s) Design
7 Structured Wiring Design
Review Requirements
Document Comments
8 Development Plan
9 Boundary Specification
10 Application Interpath Design
11 Communication Network Interconnect
Diagrams
12 Plant Management System Security
Diagrams
13 Flare Monitoring System
Plumbing and Utilities Typical % completion for DSRs = 60%
1 P&IDs
2 Material Specifications
3 Plot Plans
4 Hazardous Area Classifications
5 Calculations
6 Layout Drawings, Sections, and Details
Pressure Vessels and Storage Tanks Typical % completion for DSRs = 30%
1 Equipment Data Sheets
Process Typical % completion for DSRs = 30%
1 Design Data Requirements Project Proposal only
2 Process Simulation model
3 Process Simulation report
4 Process Flow Diagrams (PFDs)
5 Heat & Material Balance
6 Utility balances and Utility Flow
Diagrams (UFDs)
7 Technology Licensor selection report Project Proposal only
8 Process Equipment List
9 Piping & Instrumentation Diagrams
(P&IDs)
10 Process Equipment datasheets
11 Hydraulic design reports.
12 Catalysts and Chemicals Summary Project Proposal only
Review Requirements
Document Comments
Review Requirements
Document Comments
Review Requirements
Document Comments
4.5.2 All documents for review shall contain evidence of design agency
quality assurance and quality control through:
(a) Document revision control numbering, dating, and marking in
accordance with SAES-A-202,
(b) A general note citing the applicable engineering standards cut-off
date for project (see SAEP-125 Sec 3.1 and SAEP-14, Sec 3.2.8.1),
(c) “Designed by” designer initials,
(d) “Checked by” checker initials (i.e., design verified via intra-
discipline review) and
(e) “Approved by” responsible engineer initials (i.e., design is
validated via project-team inter-discipline design review and off-
project discipline engineering review).
PRO must include a document in each Index that contains a list of the
full names, initials, roles, and qualifications of the engineers who have
initialed documents in that index.
5.1 SARO Engineers shall perform the review of design documentation and make
appropriate comments in the eReview system.
5.2 SARO comments shall clearly reference the issue being discussed (e.g., state
equipment name, tag number, drawing number), clearly state the issue and
provide recommended resolution. All comments must be properly classified in
the eReview system.
5.3 PRO shall generate responses to all SARO comments and enter these responses
into the eReview Comments Management System such that the relevant SARO
Engineer is notified of the proposed resolution.
5.4 PRO shall update the status of all comments in the eReview Comments
Management System such that everyone involved in the project can access all
comments and their proposed resolutions.
5.5 After all Project Proposal Reviews are completed, PRO shall compile the
“Project Proposal Review Report”, per the CMS Manuals, RAPID Matrix, and
book of deliverables, detailing all comments and their resolutions, and distribute
to all SAROs.
5.6 Using the eReview Comments Management System, PRO shall request approval
to close a review comment from the SARO Engineer who entered a comment.
5.7 SARO Engineer shall respond in a timely manner to PRO requests to close items
and make every effort to work with SARO to come to an appropriate resolution.
5.8 All review comments must be closed in the eReview Comments Management
System before the commencement of the next review cycle.
5.9 Review comments cannot be marked as closed until they are approved in the
eReview Comments Management System by the SARO Engineer who entered
the comment.
5.11 Per the CMS Manuals, RAPID Matrix, and book of deliverables, certain SAROs
have to “Agree” to the DBSP and Project Proposal Packages. This means that
the Managers of these SARO shall approve these packages before the project
progresses past this point.
5.11.2 When all review comments are resolved, PRO shall route the approval
workflows for these packages, via the SAP application “e-Approval” to
these SAROs for approval.
5.12 When a SARO receives an approval workflow for DBSP or Project Proposal,
5.12.1 SARO shall verify that all comments have been closed via the eReview
Comments Management System.
6 Responsibilities
Clarification, etc.), for each comment only to have PRO not use this
unaltered metadata in the PRO reporting statistics.
6.3 PRO may elect to utilize a third party review at any design stage for CMS
Project Characterization C1 projects as defined in SAEP-360.
1. PRO remains accountable for the design and review of the design.
2. PRO shall cause third party to comply with all review responsibilities
highlighted under Section 6.2.
Revision Summary
13 December 2011 Major revision.
21 November 2016 Major revision is required in order to align SAEP-303 with the CMS system and to
incorporate many enhancements required to improve the review and implementation of
recommendations.
A.2 Purpose
A.3 Definitions
NCF: Non-Conformity Form (NCF) issued to the Saudi Aramco organizations and/or
Contractors responsible for Non-conforming actions.
The non-conformities Levels can be categorized into three levels: Major, Medium, and
Minor. The following table summarizes the non-conformities Levels and approval
levels.
Major O
Medium O
Minor O
O: Approval
4.1.3 Actions that violate the corporate values by submitting forged reports
and counterfeit materials.
Non-conformity Form (NCF) Level II, signed by the ES Division Head, shall be
addressed to the responsible Department Head of the Proponent (Projects and/or
Operations). Non-conformity Level II Form shall include the Non-Conformity
description, non-compliance reasons, and business impact.
6.1 The process outlined in Figures 1 and 2 of this section shall be used for all non-
conformity Escalation.
6.3 The status of “Non-Conformity and Escalation Actions Log” shall be updated
regularly by the ES Responsible Engineer.
Non-Conformity Level
Minor Medium Major
No No No
6.4 The “Non-Conformity and Escalation Actions Log” shall be reviewed monthly
in the Department Communication Meeting.
A.7 Responsibilities
7.2.3 Approve the Moderate NCF with the initial Agreed completion date.
7.3.2 Assign the required resources and backup to address the Non-
Conformity items.
7.3.3 Approve the NCF form for minor Non-conformity action with the initial
Agreed completion date.
Table 3 - Material Release Threshold for Tier I and Tier II Integrity Non-Conformity
Tier 1 Tier 2
(Categories below refer to (Categories below refer to
API/ANSI standard RP 754) API/ANSI standard RP 754)
Material Hazard Classification Outdoor Indoor Outdoor Indoor
(with example materials) release release release release
Flammable Gases – e.g.:
Methane, ethane, propane,
butane, 500 kg 250 kg 50 kg 25 kg
Natural gas
Ethyl mercaptan
Liquids with Boiling Point ≤ 35°C
(95°F) and Flash Point < 23°C
(73°F) – e.g.:
500 kg 250 kg 50 kg 25 kg
Liquefied petroleum (LPG)
Liquefied natural gas (LNG)
isopentane
Liquids with Boiling Point > 35°C
(95°F) and Flash Point < 23°C (73°F)
e.g.:
gasoline/petrol, toluene,
xylene, 1,000 kg 500 kg 100 kg 50 kg
or or or or
condensate
7 bbl 3.5 bbl 1 bbl 0.5bbl
methanol
˃15 API Gravity crude oils
(unless actual flashpoint
available)
Liquids with Flash Point ≥ 23°C
(73°F) and ≤ 60°C (140°F) – e.g.:
2,000 kg 1,000 kg 100kg 50 kg
Diesel, most kerosenes,
or or or or
˂15 API Gravity crude oils 14 bbl 7 bbl 1 bbl 0.5 bbl
(unless actual flashpoint
available)
Liquids with Flash Point > 60°C
(140°F) released at a temperature at
or
above its flash point – e.g.: 2,000 kg 1,000 kg 100 kg 50 kg
or or or or
Asphalts, molten Sulphur,
14 bbl 7 bbl 1 bbl 0.5 bbl
Ethylene glycol, propylene
glycol,
Lubricating oil
Tier 1 Tier 2
(Categories below refer to (Categories below refer to
API/ANSI standard RP 754) API/ANSI standard RP 754)
Material Hazard Classification Outdoor Indoor Outdoor Indoor
(with example materials) release release release release
Liquids with Flash Point < 60, °C
(140, °F) released at a temperature
at or
below its flash point – e.g.: 1,000 kg 500 kg
Not Not
or or
Asphalts, molten Sulphur, applicable applicable
10 bbl 5 bbl
Ethylene glycol, propylene
glycol,
Lubricating oil
TIH Zone A Materials – includes:
5 kg 2.5 kg 0.5 kg 0.25 kg
Acrolein (stabilized)
TIH Zone B Materials- includes:
Hydrogen sulphide (H2S). 25 kg 12.5 kg 2.5 kg 1.3 kg
Chlorine (CL2)
TIH Zone C Materials –includes:
Sulphur Dioxide (SO2). 100 kg 50 kg 10 kg 5 kg
Hydrogen Chloride (HCL)
TIH Zone D Materials –includes:
Ammonia (NH3). 200 kg 100 kg 20 kg 10 kg
Carbon monoxide (CO)
Other Packing Group I Materials –
includes:
Aluminum alkyls
Some liquid amines
500 kg 250 kg 50 kg 25 kg
Sodium cyanide
Sodium peroxide
Hydrofluoric acid (> 60%
solution)
Other Packing Group II Materials –
includes:
Aluminum chloride
phenol 1,000 kg 500 kg 100 kg 50 kg
calcium carbide or or or or
carbon tetrachloride 7 bbl 3.5 bbl 1 bbl 0.5bbl
some organic peroxides
Hydrofluoric acid (˂ 60%
solution)
Tier 1 Tier 2
(Categories below refer to (Categories below refer to
API/ANSI standard RP 754) API/ANSI standard RP 754)
Material Hazard Classification Outdoor Indoor Outdoor Indoor
(with example materials) release release release release
Other Packing Group III Materials –
includes:
Sulphur
Lean amine
Calcium oxide 2,000 kg 1,000 kg 100 kg 50 kg
or or or or
Activated carbon
14 bbl 7 bbl 1 bbl 0.5 bbl
Chloroform
Some organic peroxides
Sodium fluoride
Sodium nitrate
Strong Acids or Bases – includes:
Sulphuric acid, hydrochloric 2,000 kg 1,000 kg 100 kg 50 kg
acid or or or or
Sodium hydroxide (caustic) 14 bbl 7 bbl 1 bbl 0.5 bbl
Calcium hydroxide (lime)
Moderate Acids or Bases – includes: 1,000 kg 500 kg
Diethylamine (corrosion None None or or
inhibitor) 10 bbl 5 bbl
kg: Kilogram
bbl: barrels
Pipe circuit or Type of Wet H2S H2S partial Design/ Design/ HIC-resistant PR/PO
SAIR
No. equipment no. service concent. pressure operating operating steel specified Justification number (if
comments
exposed to H2S* carrying H2S (ppm) (psia) temp (ºC) pressure (psia) (Y/N)? developed)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
* This numbering shall be easily traced back to attached drawings.
Page 34 of 35
Document Responsibility: Electrical Systems Designs and Automation Standards Committee SAEP-303
Issue Date: 21 November 2016
Next Planned Update: 21 November 2019 Engineering Reviews of Project Documentation
BI # BI Title
☐ FEL-1 ☐ FEL-2
Project Stage: ☐ FEL-3
Skip next part