You are on page 1of 1

REPORT ON SIEVE ANALYSIS

Construction of Central Workshop Building at NRL Site N R L

ITP NO : DATE : REV : REPORT NO :

REFERENCE WMS NO: QAP NO :

DATE OF RECEIPT : Source : Wt of Sample Taken(gm)


B. COARSE AGGREGATE 20mm

WEIGHT
SL SIEVE PERCENTAGE CUMULATIVE % REQUIREMENT ( AS PER IS
RETAINED % PASSING REMARKS
NO SIZE RETAINED RETAINED 383)/MORTH/THECH SPEC
(gm)
1 40mm 100
2 20 mm 90-100
5 10 mm 25-55
6 4.75 mm 0-10
7 2.36 mm -
Reference : Mix-Design Stipulation,IS 2386 Part III,IS 383, Technical Specification/MORTH
Remarks :

RBEIPL (QC) CLIENT/PMC