COMMENTS RESPONSE SHEET

DOCUMENT REF.: ID-SMK-MS-2045-173003, Rev. A

Document/Pa
No Company Comments Contractor Response Initial Remarks
ge Ref.

To add pages for index, comment


1 Folio 1 of 6
sheet, and notes (if any).
Incorporated.

Suggestion: DP cell calculation Incorporated, these DP cell


should be re-checked after calculation will furnished after
installation to consider the elevation installation to consider the elevation
2 Folio 2 of 6 difference between tie-in on the difference between tie-in on the
vessel and the capillary tube low vessel and the capillary tube low
point. point. As mention in general notes
(typical comment) no.5 sheet 1.

To identify also the overflow


3 Folio 2 of 6
elevation in side-view.
Incorporated

To clarify: The corrosion inhibitor skid The corrosion inhibitor skid tank
4 Folio 2 of 6 tank level measurement not included level measurement will be provided
in this document. by Corrosion Package Vendor.
To provide the visible range of LG at
The visible range of LG will be
the referred point (next to the LG
5 Folio 2 of 6
drawing).
shown in the below table of each
sheet respectively.
(typical comment)
To clarify why the LG nozzle (N1A)
6 Folio 2 of 6 elevation height is less than LT Incorporated.
(N2A).

To confirmed the piping bottom- Confirmed, this configuration will be


7 Folio 2 of 6 connection configuration of LG- provided with straight nozzle from
280201 to piping discipline. nozzle.

Incorporated, LG-
To maintain the LG transparent type
280201/280204/280103 will be
8 Folio 2 of 6 as per specification.
change back to transparent type
(typical comment)
with suitable visible-length.

Incorporated, bottom nozzle (N1B)


To confirm that the nozzle elevation for LIT-360102 move to elevation
height of LIT-360102 is suitable to +100 so that the threshold alarm
9 Folio 3 of 6
perform the threshold alarm within (LAL & LAH) will be 11.54% ~
10% ~ 90% of signal. 69.23% which is within the
requirement.
To confirm that the nozzle elevation
Confirmed, those LIT have 48.61%
height of LIT-360107/360106/360105
10 Folio 3 of 6
is suitable to perform the threshold
~ 83.61% alarm signal which is
within the requirement.
alarm within 10% ~ 90% of signal

To define the zero elevation for


11 Folio 4 of 6
disposal tube level measurement.
Incorporated.

To confirm that the nozzle elevation


height of LIT-280104 is suitable to Confirmed, that LIT-280104 alarm
12 Folio 5 of 6
perform the threshold alarm within threshold is within 10% ~ 90%.
10% ~ 90% of signal
Confirmed, this LG-700109 can
observe liquid start from elevation
+296 from the tangent line which is
adequate from process side (liquid
will appear around +300 from
To clarify: LG-700109 to have lower
tangent line).
13 Folio 6 of 6 elevation height to indentify the liquid
appearance inside the vessel.
Also there are mechanical
requirement that should be space
on weld edge, therefore L1B at
+210 is considerable the lower
nozzle for this LG.