S.

No ITEM Nos Length Breadth Height Volume


i Sub structure

a Foundation
1 Excavation
Foundation Puckal 14 1.65 1.65 1.5 57.1725
FoundationTie Beam 1 9.324 0.38 1.05 3.720276
FoundationTie Beam 1 6.859 0.38 1.05 2.736741
FoundationTie Beam 1 6.91 0.38 1.05 2.75709
FoundationTie Beam 1 8.485 0.38 1.05 3.385515
FoundationTie Beam 1 8.561 0.38 1.05 3.415839
FoundationTie Beam 1 8.968 0.38 1.05 3.578232
FoundationTie Beam 1 8.968 0.38 1.05 3.578232
FoundationTie Beam 1 2.972 0.38 1.05 1.185828
Total 81.530253

2 Soling(3" flat Brick)


Foundation Puckal 14 1.65 1.65 0.075 2.858625
FoundationTie Beam 1 9.324 0.38 0.075 0.265734
FoundationTie Beam 1 6.859 0.38 0.075 0.1954815
FoundationTie Beam 1 6.91 0.38 0.075 0.196935
FoundationTie Beam 1 8.485 0.38 0.075 0.2418225
FoundationTie Beam 1 8.561 0.38 0.075 0.2439885
FoundationTie Beam 1 8.968 0.38 0.075 0.255588
FoundationTie Beam 1 8.968 0.38 0.075 0.255588
FoundationTie Beam 1 2.972 0.38 0.075 0.084702
Total 4.5984645

3 pcc(1:3:6)
Foundation Puckal 14 1.65 1.65 0.075 2.858625
FoundationTie Beam 1 9.324 0.38 0.075 0.265734
FoundationTie Beam 1 6.859 0.38 0.075 0.1954815
FoundationTie Beam 1 6.91 0.38 0.075 0.196935
FoundationTie Beam 1 8.485 0.38 0.075 0.2418225
FoundationTie Beam 1 8.561 0.38 0.075 0.2439885
FoundationTie Beam 1 8.968 0.38 0.075 0.255588
FoundationTie Beam 1 8.968 0.38 0.075 0.255588
FoundationTie Beam 1 2.972 0.38 0.075 0.084702
Total 4.5984645

4 Rcc(1:1.5:3)
Foundation Puckal 14 0.69375 9.7125
FoundationTie Beam 1 9.324 0.23 0.23 0.4932396
FoundationTie Beam 1 6.859 0.23 0.23 0.3628411
FoundationTie Beam 1 6.91 0.23 0.23 0.365539
FoundationTie Beam 1 8.485 0.23 0.23 0.4488565
FoundationTie Beam 1 8.561 0.23 0.23 0.4528769
FoundationTie Beam 1 8.968 0.23 0.23 0.4744072
FoundationTie Beam 1 8.968 0.23 0.23 0.4744072
FoundationTie Beam 1 2.972 0.23 0.23 0.1572188
Column Up to Plinth 14 0.3 0.3 2.64 3.3264
plinth Beam 1 9.324 0.23 0.23 0.4932396
plinth Beam 1 6.859 0.23 0.23 0.3628411
plinth Beam 1 6.91 0.23 0.23 0.365539
plinth Beam 1 8.485 0.23 0.23 0.4488565
plinth Beam 1 8.561 0.23 0.23 0.4528769
plinth Beam 1 8.968 0.23 0.23 0.4744072
plinth Beam 1 8.968 0.23 0.23 0.4744072
plinth Beam 1 2.972 0.23 0.23 0.1572188
Total 19.4976726

5 Formwork
Foundation Puckal 14 6 0.2 16.8
FoundationTie Beam 1 9.324 0.46 4.28904
FoundationTie Beam 1 6.859 0.46 3.15514
FoundationTie Beam 1 6.91 0.46 3.1786
FoundationTie Beam 1 8.485 0.46 3.9031
FoundationTie Beam 1 8.561 0.46 3.93806
FoundationTie Beam 1 8.968 0.46 4.12528
FoundationTie Beam 1 8.968 0.46 4.12528
FoundationTie Beam 1 2.972 0.46 1.36712
Column Up to Plinth 14 1.2 2.64 44.352
plinth Beam 1 9.324 0.46 4.28904
plinth Beam 1 6.859 0.46 3.15514
plinth Beam 1 6.91 0.46 3.1786
plinth Beam 1 8.485 0.46 3.9031
plinth Beam 1 8.561 0.46 3.93806
plinth Beam 1 8.968 0.46 4.12528
plinth Beam 1 8.968 0.46 4.12528
plinth Beam 1 2.972 0.46 1.36712
Total 117.31524

6 Backfill
Total Excavation 1 81.53025 81.530253
Deduction
Soling -1 4.598465 -4.5984645
Pcc -1 4.598465 -4.5984645
RCC -1 12.94189 -12.9418863
brick work -1 37.06774 -37.0677384
Above GL 67.390662 1.9 128.0422581
Total 150.3659574

7 Brick work(1:6)
below plinth Beam 1 9.324 0.23 2.64 5.6615328
below plinth Beam 1 6.859 0.23 2.64 4.1647848
below plinth Beam 1 6.91 0.23 2.64 4.195752
below plinth Beam 1 8.485 0.23 2.64 5.152092
below plinth Beam 1 8.561 0.23 2.64 5.1982392
below plinth Beam 1 8.968 0.23 2.64 5.4453696
below plinth Beam 1 8.968 0.23 2.64 5.4453696
below plinth Beam 1 2.972 0.23 2.64 1.8045984
Total 37.0677384

ii First Floor

a Brickwork (1:4)
below first floor Beam 1 9.324 2.645 24.661
below first floor Beam 1 6.859 2.645 18.142
below first floor Beam 1 6.91 2.645 18.276
below first floor Beam 1 8.485 2.645 22.442
below first floor Beam 1 8.561 2.645 22.643
below first floor Beam 1 8.968 2.645 23.72
below first floor Beam 1 5.945 2.645 15.724
below first floor Beam 1 2.972 2.645 7.86
deduction -5 1.5 1.2 -4.5
-3 0.9 2.1 -2.835
Total 146.133

b Plaster work(1:4)wall
below first floor Beam 2 9.324 2.645 49.323
below first floor Beam 2 6.859 2.645 36.284
below first floor Beam 2 6.91 2.645 36.553
below first floor Beam 2 8.485 2.645 44.885
below first floor Beam 2 8.561 2.645 45.287
below first floor Beam 2 8.968 2.645 47.44
below first floor Beam 2 5.945 2.645 31.449
below first floor Beam 2 2.972 2.645 15.721
deduction -5 1.5 1.2 -4.5
-3 0.9 2.1 -2.835
Total 299.607

b Plaster work(1:3)Ceiling
ceiling area 1 area 57.51785 57.517
beam sides
below first floor Beam 2 9.324 0.25 4.662
below first floor Beam 2 6.859 0.25 3.429
below first floor Beam 2 6.91 0.25 3.455
below first floor Beam 2 8.485 0.25 4.242
below first floor Beam 2 8.561 0.25 4.28
below first floor Beam 2 8.968 0.25 4.484
below first floor Beam 2 5.945 0.25 2.972
below first floor Beam 2 2.972 0.25 1.486
Total 86.527

c ipc flooring screed


ceiling area 1 area 57.51785 57.517
staircase 1 area 8.254015 8.254
Total 65.771

d ipc punning
ceiling area 1 area 57.51785 57.517
staircase 1 area 8.254015 8.254
riser 18 area 0.15 2.7
Total 68.471

e sill lintel band


below first floor Beam 2 9.324 0.11 0.075 0.153
below first floor Beam 2 6.859 0.11 0.075 0.113
below first floor Beam 2 6.91 0.11 0.075 0.114
below first floor Beam 2 8.485 0.11 0.075 0.14
below first floor Beam 2 8.561 0.11 0.075 0.141
below first floor Beam 2 8.968 0.11 0.075 0.147
below first floor Beam 2 5.945 0.11 0.075 0.098
below first floor Beam 2 2.972 0.11 0.075 0.049
Total 0.955

f door 5
window 5

g RCC
ceiling area 1 area 67.46356 0.125 8.432
beam sides
below first floor Beam 1 9.324 0.23 0.25 0.536
below first floor Beam 1 6.859 0.23 0.25 0.394
below first floor Beam 1 6.91 0.23 0.25 0.397
below first floor Beam 1 8.485 0.23 0.25 0.487
below first floor Beam 1 8.561 0.23 0.25 0.492
below first floor Beam 1 8.968 0.23 0.25 0.515
below first floor Beam 1 5.945 0.23 0.25 0.341
below first floor Beam 1 2.972 0.23 0.25 0.17
pillar 13 0.3 0.3 2.645 3.094
Total 14.858

h Bar Bending
salb
btm Along X direction(8mm) 35.00 7.99 Kg 110.48
btm Along X direction(8mm) 21.00 6.19 Kg 51.34
btm Along y direction(8mm) 50.00 5.86 Kg 115.82
btm Along y direction(8mm) 37.5854 3.48 Kg 51.6
top 4.00 7.86 Kg 12.43
top 4.00 6.19 Kg 9.78
top 12.18 10.00 Kg 48.11
top 4.00 6.65 Kg 10.51
top 13.1862 8.02 Kg 41.77
top 13.1862 8.02 Kg 41.77
top 14.7106 9.85 Kg 57.23
top 10.6545 2.29 Kg 9.63
top 11.1626 1.68 Kg 7.4
top 10.6545 2.29 Kg 9.63
top 11.1626 1.68 Kg 7.4
top 6.85976 2.29 Kg 6.2
top 6.85976 1.68 Kg 4.55
top 10.1463 0.8 Kg 3.21
top 10.6545 2.1 Kg 8.67
top 10.6545 0.8 Kg 3.37
top 9.63821 2.1 Kg 8.02
top 9.63821 0.8 Kg 3.05
Total 621.97

Beam
top-2-16mm dai
below first floor Beam 2 10.724 Kg 33.89
below first floor Beam 2 8.259 Kg 26.10
below first floor Beam 2 8.31 Kg 26.26
below first floor Beam 2 9.885 Kg 31.24
below first floor Beam 2 9.961 Kg 31.48
below first floor Beam 2 10.368 Kg 32.77
below first floor Beam 2 7.345 Kg 23.21
below first floor Beam 2 4.372 Kg 13.82
Bottom-3-12mm dai
below first floor Beam 3 10.724 Kg 28.60
below first floor Beam 3 8.259 Kg 22.02
below first floor Beam 3 8.31 Kg 22.16
below first floor Beam 3 9.885 Kg 26.36
below first floor Beam 3 9.961 Kg 26.56
below first floor Beam 3 10.368 Kg 27.65
below first floor Beam 3 7.345 Kg 19.59
below first floor Beam 3 4.372 Kg 11.66
top-2-16mm dai extra
below first floor Beam 6 2.13 Kg 20.23
below first floor Beam 6 1.77 Kg 16.75
below first floor Beam 4 2.29 Kg 14.45
below first floor Beam 9 1.77 Kg 25.13
stirrup
below first floor Beam 74.592 9.32 1.13 33.30
below first floor Beam 54.872 6.86 1.13 24.50
below first floor Beam 55.28 6.91 1.13 24.68
below first floor Beam 67.88 8.49 1.13 30.30
below first floor Beam 68.488 8.56 1.13 30.57
below first floor Beam 71.744 8.97 1.13 32.03
below first floor Beam 47.56 5.95 1.13 21.23
below first floor Beam 23.776 2.97 1.061 9.97
pillar 390 3 1.061 1241.37
0
2549.870246

a Brickwork (1:4)
perimeter length 1 35.97561 0.23 2.35 19.44481707
deduction -2 2.2865854 0.23 2.439024 -2.56543724
-2 1.2195122 0.23 1.829268 -1.0261749
-1 1.5243902 0.23 1.829268 -0.64135931
Total 15.21184563

b halfbrick(1:4) 1 14.82622 2.35 34.84161585

c Plaster work outside(1:4)


perimeter length 2 35.97561 2.35 169.0853659
deduction -2 2.2865854 2.439024 -11.154075
-2 1.2195122 1.829268 -4.46162998
-1 1.5243902 1.829268 -2.78851874
Total 150.6811422

d Plaster work inside(1:4)


perimeter length 2 14.82622 2.35 69.68323171
Total 69.68323171

e Plaster work(1:3)Ceiling
ceiling area 1 area 57.51785 57.517
beam sides
below first floor Beam 2 9.324 0.25 4.662
below first floor Beam 2 6.859 0.25 3.429
below first floor Beam 2 6.91 0.25 3.455
below first floor Beam 2 8.485 0.25 4.242
below first floor Beam 2 8.561 0.25 4.28
below first floor Beam 2 8.968 0.25 4.484
below first floor Beam 2 5.945 0.25 2.972
below first floor Beam 2 2.972 0.25 1.486
Total 86.527

f ipc flooring screed


ceiling area 1 area 57.51785 57.517
staircase 1 area 8.254015 8.254
Total 65.771

g ipc punning
ceiling area 1 area 57.51785 57.517
staircase 1 area 8.254015 8.254
riser 18 area 0.15 2.7
Total 68.471

h sill lintel band


below first floor Beam 2 9.324 0.11 0.075 0.153
below first floor Beam 2 6.859 0.11 0.075 0.113
below first floor Beam 2 6.91 0.11 0.075 0.114
below first floor Beam 2 8.485 0.11 0.075 0.14
below first floor Beam 2 8.561 0.11 0.075 0.141
below first floor Beam 2 8.968 0.11 0.075 0.147
below first floor Beam 2 5.945 0.11 0.075 0.098
below first floor Beam 2 2.972 0.11 0.075 0.049
Total 0.955

i door 5
window 5

j colour work(Destemper paint) 1 10.365854 2.35 24.359


1 11.585366 0.23 2.664
1 14.629686 2.35 34.379
1 14.629686 0.23 3.364
1 2.8963415 2.972561 8.609
1 2.8963415 4.420732 12.803
Total 86.178

New Estimate
1st Floor

a Brick work 4"(1:4) 1 2.57 2.49 6.4


1 3.5 2.49 8.72
1 2.72 2.49 6.77
1 3.48 2.49 8.67
1 3.48 2.49 8.67
1 2.92 2.49 7.27
1 3.48 2.49 8.67
1 3.1 2.74 8.49
1 2.86 2.74 7.84
Deduction
lintel band -1 28.11 0.075 -2.11

door' -2 0.7621951 2.133496 -3.25


-3 0.9146341 2.133496 -5.85
-2 0.9143554 2.133496 -3.9
Total 56.39

Brick work 9"(1:4)


1 3.15 0.23 2.74 1.99
1 2.8 0.23 2.49 1.6
1 3.08 0.23 2.74 1.94
1 2.8 0.23 2.49 1.6
1 2.88 0.23 2.49 1.65
1 1.6 0.23 2.49 0.92
1 4.42 0.23 2.49 2.53
Deduction
lintel band -2 20.73 0.23 0.075 -0.72

window -2 1.2191405 0.23 1.219141 -0.68


-2 1.2191405 0.23 1.523926 -0.85
-1 1.8287108 0.23 1.523926 -0.64
Total 9.34

b rcc lintel 1 28.11 0.11 0.075 0.23


2 20.73 0.23 0.075 0.72
Total 0.95

c Plasterwork
Internal plaster
wall plaster 1 6.707 2.49 16.7
1 6.707 2.49 16.7
1 6.859 2.49 17.08
1 8.384 2.49 20.88
1 5.945 2.49 14.8
1 5.609 2.74 15.37
1 3.734 2.49 9.3
1 9.448 2.74 25.89
1 4.19 1.117 4.68

beam plaster 1 57.583 0.736 42.38


1 4.19 0.736 3.08
Total 186.86
External plaster
1 5.945 2.81 16.71
1 9.448 2.81 26.55
Total 43.26
d ipc flooring screed
ceiling area 1 area 57.51785 57.517
staircase 1 area 8.254015 8.254
Total 65.771

e ipc punning
ceiling area 1 area 57.51785 57.517
staircase 1 area 8.254015 8.254
riser 18 area 0.15 2.7
Total 68.471

f Skirting Work
5" Ht 1 57.583 57.583

H Clour work
internal

wall putting
Ceiling Putting work 1 area 57.51785 57.51784652
wall putting 1 area 186.86 186.86
staircase putting 1 area 8.254015 8.254015467

Destemper
Ceiling Putting work 1 area 57.51785 57.51784652
wall putting 1 area 374.08 374.08
staircase putting 1 area 8.254015 8.254015467

External
wall putting 1 3.15 2.81 8.8515
1 3.8 2.81 10.678
1 2.8 2.81 7.868
1 5.945 2.81 16.70545
Weather Coat
1 3.15 2.81 8.8515
1 3.8 2.81 10.678
1 2.8 2.81 7.868
1 5.945 2.81 16.70545

Top Floor

Brick work 4"(1:4) 1 2.972 2.49 7.4


1 2.743 2.49 6.83
1 4.647 2.49 11.57
1 2.438 2.74 6.68
Deduction
lintel band -1 12.8 0.075 -0.96

door' 1 0.7621951 2.133496 1.63


-2 0.9143554 2.133496 -3.9
Total 29.25

Brick work 9"(1:4) 1 5.028 0.23 2.49 2.88


1 8.543 0.23 2.74 5.38
1 2.819 0.23 2.49 1.61

Deduction
lintel band -2 16.39 0.23 0.075 -0.57

window -1 1.2191405 0.23 1.219141 -0.34


-2 1.8287108 0.23 1.523926 -1.28
Total 7.68

Rcc Lintel Band


2 6.4513868 0.23 0.075 0.22
1 6.4513868 0.23 0.075 0.11
3 2.3620847 0.11 0.075 0.06
1 2.5906736 0.11 0.075 0.02
1 4.0396341 0.11 0.075 0.03
1 9.0673575 0.23 0.075 0.16
Total 0.6

Plaster work

internal wall plaster 1 12.267601 2.74 33.61


1 11.658031 2.74 31.94
2 2.5906736 2.74 14.2
1 15.467845 2.74 42.38
Total 122.13

External wall plaster 1 8.4577873 2.81 23.77


1 9.0673575 2.81 25.48
Total 49.25

Koramasino
ipc flooring screed
ceiling area 1 area 14.266 14.266
staircase 1 area 8.254015 8.254
top terrace 1 area 43.54 43.54
Total 66.06

ipc punning
ceiling area 1 area 14.266 14.266
staircase 1 area 8.254015 8.254
top terrace 1 area 43.54 43.54
Total 66.06

Clour work
internal

wall putting
Ceiling Putting work 1 area 37.36615 37.3661511
wall putting 1 area 122.13 122.13
staircase putting 1 area 8.254015 8.254015467

Destemper
Ceiling Putting work 1 area 37.36615 37.3661511
wall putting 1 area 122.13 122.13
staircase putting 1 area 8.254015 8.254015467

External
wall putting 1 0.6095703 9.067358 5.527191413
1 8.4577873 2.81 23.77
1 9.0673575 2.81 25.48

Weather Coat
1 3.15 2.81 8.8515
1 3.8 2.81 10.678
1 2.8 2.81 7.868
1 5.945 2.81 16.70545

Terrace Tile 1 3.2002438 8.838769 28.29

Chinese brick pattern Tile 1 0.8381591 3.733618 3.13


1 0.9651631 3.733618 3.6
1 0.533374 3.733618 1.99
1 0.9143554 3.733618 3.41
1 0.9143554 2.971655 2.72
Total 14.85

Gardient pattern tile 1 0.6095703 3.88601 2.37


1 0.6095703 2.819262 1.72
Total 4.09
parapet wall
Brick work
4" wall 1 21.030174 0.914355 19.23
1 3.6574215 0.253886 0.93
2 2.7430661 0.914355 5.02
Total 25.18

9" Wall 1 2.7174642 0.23 0.685767 0.43


1 0.3555826 0.23 2.717 0.22
2 0.4063802 0.23 2.743066 0.51
1 0.3047851 0.23 3.553795 0.25
1 3.7336178 0.23 0.914355 0.79
1 2.971655 0.23 0.914355 0.62
Total 2.82
Plaster
4" wall 1.5 21.030174 0.914355 28.84
2 3.6574215 0.253886 1.86
2 2.7430661 0.914355 5.02
Total 35.72

9" Wall 2 2.7174642 0.685767 3.73


2 0.3555826 2.717 1.93
4 0.4063802 2.743066 4.46
2 0.3047851 3.553795 2.17
2 3.7336178 0.914355 6.83
2 2.971655 0.914355 5.43
Total 24.55
Colour work
wall putting
4" wall 1.5 21.030174 0.914355 28.84
2 3.6574215 0.253886 1.86
2 2.7430661 0.914355 5.02

9" Wall 2 2.7174642 0.685767 3.73


2 0.3555826 2.717 1.93
4 0.4063802 2.743066 4.46
2 0.3047851 3.553795 2.17

Exterior WeatherCoat
4" wall 1.5 21.030174 0.914355 28.84
2 3.6574215 0.253886 1.86
2 2.7430661 0.914355 5.02

9" Wall 2 2.7174642 0.685767 3.73


2 0.3555826 2.717 1.93
4 0.4063802 2.743066 4.46
2 0.3047851 3.553795 2.17

Toilets
Floor Tile 3 3.1 Area 9.3
3 0.2539876 1.219141 0.93

wall tile 3 7.924 1.5 35.66

steel Pipe
2"x2" squarePipe 6 1.8287108
3 2.438281
2 2.8192624
3 2.2096922
3 2.2096922
16 0.0381098
Unit Rate Amount brick area total brick brick amount cement(Bag)

0.666666666667
0.083333333333
0.416666666667
0.833333333333
0.75

Cu.M

Cu.M

Cu.M

0.45
0.24375
0.69375
Cu.M

Sq.M

Cu.M
Cu.M

14.76

13.5
6.888

sq.M 81834.48 0.0144 10229.31 204586.2 27.082536624

sq.M 32.24
sq.M 13.520

21.375575
sq.M

sq.M 9.0724075

cu.M 9.55

30000 150000
25000 125000

sq.M 148.58

0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
Kg

1.580
1.580
1.580
1.580
1.580
1.580
1.580
1.580

0.889
0.889
0.889
0.889
0.889
0.889
0.889
0.889

1.580
1.580
1.580
1.580
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395

Cum 8518.63355 30.423691255

Sq.M 2438.91311 6.4571269829

Sq.M 24.32

Sq.M 11.25

sq.M 13.520
21.375575
sq.M

sq.M 9.0724075

cu.M 9.55

30000 150000
25000 125000

Sq.M
3947.3 10.45064592

5230.4 18.68

9.5

23.12
5.35

sq.M 21.375575

sq.M
9.0724075

RM
2047.5 5.420844

4300.8 15.36

15.11

6.09
sq.M 21.4695

sq.M 5.76905

Sq.M

Sq.M

Sq.M
1762.6 4.66655904

1579.2 5.64

4.42

3.04
sand(M3) aggregate Tile
69.4444444 0.11

3.76146342

4.37
1.407

1.48346491 2.96692981

0.19685413

0.4970775 0.994155

7.733589 15.467178
4.25931678

0.89682319

3.30

1.53

1.407
1.48346491 2.96692981

0.19685413

0.4970775 0.994155
1.4514786

2.6152

0.494475 0.98895

4.09
0.95

1.48346491 2.96692981

0.19685413
0.752895

2.1504

0.3123 0.6246

2.67

1.08
1.4899833 2.9799666

0.1251775
0.6481332

0.7896

0.78

0.54