Crossflow Turbine
Specification
Highly efficient Turbine based on T15 Entec License.
The objective of this will be to increase the turbine rpm to meet the generator rpm.
We need a speed increaser and flywheel. The speed increaser – 233 rpm to 1500 rpm – with
pulley system – belt with safety guard.
Electrical Components
Electrical Specification
# Parameter Specification
1 Phase 3 Phase
2 Voltage 240/415V
3 Power 250KW/350KVA
4 Grid Off-grid
Including AVR.
Power House
Power to accommodate future expansion (up to 3-4 units) with space for load controls – and adjacent
transformer outside.