You are on page 1of 2

REVISION 3

APPROVED BY: QM /GM


ISSUE DATE: 10-04-15
REVISION DATE: 09-03-17

Laboratory System Form


LSF 02-001-A In-House Training Plan and Record

Scope of training: Determination of Electrical Conductivity of water and waste water as per
APHA 2510B, Determination of Alkalinity, Phenolphthalein alkalinity , Carbonate,& Bicarbonate
as per APHA 2320B, and Determination of p H as per APHA 4500H+B
Dates of training: 5/8/2020
CTLGroup-Qatar Laboratory System Documents (line through table if “NA”)
Document # Document Title Rev # Sections Covered

Training Objectives (condition, task, standard)


1) To understand the procedure of Determination Electrical Conductivity of water and waste water
as per APHA 2510B, Determination of Alkalinity, Carbonate,& Bicarbonate as per APHA 2320B,
and Determination of p H as per APHA 4500H+B

Supplemental Materials required for this training


1) Work sheets CLF 055, CLF-054, CLF-053
2) Standards
3) Apparatus

Training Attendance (Trainee signs form for each day completed)


Printed Name Sign Date

Andrea 5/8/2020

Method of evaluation: Demonstration of test and verbal explanation

Page 1 of 2
This document is uncontrolled if printed.
It is the responsibility of the user to follow the current version of all Laboratory System Documents.
Revision histories and approval signatures are kept electronically.
REVISION 3
APPROVED BY: QM /GM
ISSUE DATE: 10-04-15
REVISION DATE: 09-03-17

Laboratory System Form


LSF 02-001-A In-House Training Plan and Record

Training Evaluation
Description of Expected Results Actual Results
understand the procedure of Determination Understood Well
Electrical Conductivity of water and waste
water as per APHA 2510B, Determination of
Alkalinity, Phenolphthalein alkalinity,
Carbonate,& Bicarbonate as per APHA 2320B,
and Determination of p H as per APHA
4500H+B

Training Acceptance (After Evaluation)


Printed Name Signed Name Date
Andrea 5/8/2020

Comments:

Approvals
Jerin Sam Kurian 5/8/2020
Trainer Date

5/8/2020
Quality Manager Date

5/8/2020
Projects Manager/Direct Supervisor Date

Page 2 of 2
This document is uncontrolled if printed.
It is the responsibility of the user to follow the current version of all Laboratory System Documents.
Revision histories and approval signatures are kept electronically.

You might also like