You are on page 1of 2

Galaxy Chemicals (Egypt) S.A.E.

Document No. APEX/GCE/GMP/MOGP/SOP-12.0


IMS – (MOGP) – SOP FOR Revision No 04
PERFORMANCE Issue Date 30.03.2023
EVALUATION OF Effective Date 05.04.2023
CONTRACTOR/EXTERNAL Date of next review 29.03.2026
PROVIDER
Page No. Page 1 of 2
Operating Process: Manual of General Procedures (MOGP)

SOP for performance evaluation of contractor/external provider


1. Purpose:
1.1 The purpose of contractor evaluation is to list down the scope for various activities to be carried out by contractor at
site during execution.
1.2 To understand extent to which contractor / external provider complies to organization requirement
1.3 This is helpful document to get all contractors evaluated for performance on various parameters going by his
performance in the organization
2. Scope:
2.1 Scope of this procedure is limited to projects handled by all processes.
2.2 These evaluation formats will be used for instrument purchase, servicing and periodic preventive maintenance of
instruments, civil constructions, electrical, plant equipment maintenance, canteen and security services etc.
3. Responsibility:
3.1 Responsibility for contractor / service provider evaluation lies with respective section head. Documentation and
records is with respective process owner.
4. Procedure for performance evaluation
4.1. Contractor must be aware of and follow all the safety, statutory and regulatory requirements
4.2. They must be aware of safety precautions
4.3. Service provider must provide competent technicians to carry out the job
4.4. Contractor shall be fully responsible for all the rights and the claims of its employees carrying out the service in
accordance with contract including without limitation, salaries, social insurance, taxes and any other claims or
entitlements from said employees. Employees shall have no rights to claim against the company
4.5. Service provider must be periodically evaluated for performance on following parameters.
- Safety
- Quality
- Customer satisfaction
- Consistency in response
- In time delivery
- Post procurement service
- Knowledge of statuary requirements
- Legal compliance
- Adequacy of technicians with service provider
- Past performance experience with other customers
- Behavioral
- Communication and accessibility
- Prompt and effective corrective actions
- Documentation process

GMP/MOGPMANUAL/30.03.2023 Rev04 Approver’s signature not required unless the document is printed
Copy No.:
Galaxy Chemicals (Egypt) S.A.E.

Document No. APEX/GCE/GMP/MOGP/SOP-12.0


IMS – (MOGP) – SOP FOR Revision No 04
PERFORMANCE Issue Date 30.03.2023
EVALUATION OF Effective Date 05.04.2023
CONTRACTOR/EXTERNAL Date of next review 29.03.2026
PROVIDER
Page No. Page 2 of 2
Operating Process: Manual of General Procedures (MOGP)

5. Related References:

No Description Reference No. Version

Format for performance evaluation of service


01 F/GCE/GEN/20 00
provider

Change Record:

Sr. Effective date of


Revision No. Reason for change
No. issue

1 0 01.08.2012 Original issue of Document

2 1 01.04.2015 All the documents revised in line with global change of


documentation system.

3 2 01.04.2018 Entire manual revised as per ISO 9001 :2015


requirements.

4 3 01.04.2020 Entire manual issued as per ISO 22716 :2007


requirements only.

5 4 30.03.2023
Entire manual issued as per EFfCI GMP requirements

Prepared by Reviewed and Approved by Issued By

Sr. Manager -Quality Manager Director Management


Process Representative
Shantaram Kadam Dhaneshwar Patil Shantaram Kadam

GMP/MOGPMANUAL/30.03.2023 Rev04 Approver’s signature not required unless the document is printed