You are on page 1of 21

NATIONAL CAPITAL REGION TRANSPORT CORPORATION LIMITED

(A Joint Venture Govt. of India and participating State Govts.)


7/6, Siri Fort Institutional Area, August Kranti Marg, New Delhi-110049
PHONE: +91-11-41066943; FAX: +91-11-41066953

ADDENDUM & CORRIGENDUM NO. 1

Name of Work: - DM/CN/COR-OF/111 Package 9A: Construction of Multistoried Staff Quarters [Including Site
Development, Architectural Finishes, E&M, HVAC, Plumbing, Firefighting, External Development and related
facilities] and connectivity from Mathura Road to Jangpura Stabling Yard Complex for Delhi – Ghaziabad –
Meerut RRTS Corridor of NCRTC.

Page 1 of 21
Package 9A: Addendum & Corrigendum No. 1
S.No. Bidding Document Existing Clause Modified Clause
Part / Section/Clause
No.
1. IFB, 1.2 (b) , Bid (i) Amount of Bid Security: - INR 4.37 Cr/- (i) Amount of Bid Security: - INR 4.37 Cr/-
Security
(ii) Validity of Bid Security in case of Bank (ii) Validity of Bid Security in case of Bank
Guarantee (BG): 05.02.2021 Guarantee (BG): 05.02.2021

Bid Security (BG, Demand Draft, Banker’s Cheque and Bid Security (BG, Demand Draft, Banker’s Cheque and
FDR) in original as per clause 19 of ITB shall be FDR) in original as per clause 19 of ITB shall be
accepted only up to 1500 hrs on 11.06.2020 in the accepted only up to 1500 hrs on 25.06.2020 in the
office of the Employer at the address mentioned office of the Employer at the address mentioned
hereinafter. The bidder must submit the bid security hereinafter. The bidder must submit the bid security in
in physical form and shall upload the scanned copies physical form and shall upload the scanned copies of
of bid security in their online bid. bid security in their online bid.
2. IFB, 1.2 (d) , From 30.04.2020 to 11.06.2020 (Up to 1500 Hrs) on From 30.04.2020 to 25.06.2020 (Up to 1500 Hrs) on
Availability of Bid e-bidding portal as mentioned in clause 1.2 (l) of IFB e-bidding portal as mentioned in clause 1.2 (l) of IFB
Document (Bid Schedule). (Bid Schedule).
3. IFB, 1.2 (i) , Date and Bid submission start date: 04.06.2020 from 1500 Hrs Bid submission start date: 18.06.2020 from 1500 Hrs
time of submission of Bid submission end date: 11.06.2020 up to 1500 Hrs Bid submission end date: 25.06.2020 up to 1500 Hrs
Online Bid
4. IFB, 1.2 (j) , Date & 12.06.2020 at 1500 Hrs. 26.06.2020 at 1500 Hrs.
Time of opening of Bid
(Technical Bid only)
5. Part-I, Section 2: BDS , - Joint Venture is not permitted in the bid.
Clause ITB 4.1

6. Part-I, Section 2: BDS , - Sub Clause 4.1 (b) is Deleted .


Clause ITB 4.1 (b)
Joint Venture is not permitted in the bid.

“Joint Venture” or “JV” means a joint venture,


association, consortium or other unincorporated
grouping of two or more persons, whether in the form
of a partnership or otherwise.

Page 2 of 21
Package 9A: Addendum & Corrigendum No. 1
7. Part-I, Section 2: BDS , Add following in ITB 4.1 (b): Deleted
Clause ITB 4.1 vi) “Joint Venture” or “JV” means a joint venture,
association, consortium or other unincorporated
grouping of two or more persons, whether in the form
of a partnership or otherwise.
8. Part-I, Section 2: BDS , - Deleted
Clause ITB 4.1 (d)

9. Part-I, Section 2: BDS , - Deleted


Clause ITB 4.1 (e)

Page 3 of 21
Package 9A: Addendum & Corrigendum No. 1
10. Part-I, Section 2: BDS , Replace ITB 14.7 with the following: Replace ITB 14.7 with the following:
Clause ITB 14.7
All duties, taxes (except Custom Duty), Goods and All duties, taxes (except Custom Duty), Goods and
Services Tax (GST), royalties, cess and other levies Services Tax (GST), royalties, cess and other levies
payable by the Bidder under the Contract, or for any payable by the Bidder under the Contract, or for any
other cause, as on the date 28 days prior to the other cause, as on the date 28 days prior to the
deadline for submission of bids, shall be included in deadline for submission of bids, shall be included in
the rates and prices and the total Bid Price submitted the rates and prices and the total Bid Price submitted
by the Bidder. by the Bidder.

Contractor is required to submit GST invoice showing Contractor is required to submit GST invoice showing
GST component separately as per statutory GST component separately as per statutory
requirements. The GST component as applicable for requirements. The GST component as applicable for
first Interim payment certificate (IPC) shall be first Interim payment certificate (IPC) shall be
released upon submission of GST invoice. The released upon submission of GST invoice. The
subsequent Interim payment certificate shall be raised subsequent Interim payment certificate shall be raised
for payment upon submission of documentary for payment upon submission of documentary
evidence towards payment of GST collected on the evidence towards payment of GST collected on the
previous bill to the GST Authorities. However, if previous bill to the GST Authorities. However, if
subsequent bills are raised before return submission subsequent bills are raised before return submission
date of previous bill period, then the documentary date of previous bill period, then the documentary
evidence towards payment of GST shall be provided evidence towards payment of GST shall be provided
within 7 days from the due date of such return filing. within 7 days from the due date of such return filing.
The Final bill/single bill payment shall be released on The Final bill/single bill payment shall be released on
the undertaking by the contractor/supplier for the undertaking by the contractor/supplier for
providing evidence within 7 days from the date of such providing evidence within 7 days from the due date of
return filing for final bill based on GST provision for such return filing for final bill based on GST provision
due dates. for due dates.

Payment shall be made electronically in the


bank account of the Contractor as per the
details provided by the Contractor. All
payments, will be subject to deduction of tax at
source in accordance with the provisions of the
Indian Income tax Act and any other applicable
law, including any Withholding Taxes etc.
BOCW Cess shall be applicable on Contract
Price.

Page 4 of 21
Package 9A: Addendum & Corrigendum No. 1
11. Part-I, Section 2: BDS , The currency that shall be used for bid evaluation and The currency that shall be used for bid evaluation and
Clause ITB 33.1 comparison purposes to convert all bid prices comparison purposes to convert all bid prices
expressed in various currencies into a single currency expressed in various currencies into a single currency
is: Indian Rupees (INR). is: Indian Rupees (INR).

Foreign currency part shall be converted to Equivalent Foreign currency part shall be converted to Equivalent
INR by adopting Exchange rate between the foreign INR by adopting Exchange rate between the foreign
currency and INR as prevailing 28 days before the currency and INR as prevailing 28 days before the
latest deadline for submission of bids, as per the latest deadline for submission of bids, as per the
website of Financial Benchmark India Private Limited website of Financial Benchmark India Private Limited
(FBIL) as recommended by RBI. (FBIL) as recommended by RBI.

In case the exchange rate of the particular currency is In case the exchange rate of the particular currency is
not available on the above date in the website, then the not available on the above date in the website, then the
exchange rate as per the website of the Central Bank of exchange rate as per the website of the Central Bank of
that country to which this currency belongs will be that country to which this currency belongs will be
adopted. In case the exchange rate of that currency is adopted. In case the exchange rate of that currency is
not directly available in INR on that website then the not directly available in INR on that website then the
currency will be first converted to USD as per the currency will be first converted to USD as per the
exchange rate between that foreign currency and US exchange rate between that foreign currency and US
Dollar on that web site and then converted from USD Dollar on that web site and then converted from USD
to INR as per FBIL exchange rate between US Dollar to INR as per FBIL exchange rate between US Dollar
and INR, as prevailing on 28 days before the deadline and INR, as prevailing on 28 days before the deadline
for submission of bids. for submission of bids.

Bidder should indicate the source used with


documentary evidence for conversion and
conversion rates used for converting foreign
currency into INR.

Page 5 of 21
Package 9A: Addendum & Corrigendum No. 1
12. Part-I, Section 2: BDS , II. The Employer’s evaluation of a Bid will exclude and II. The Employer’s evaluation of a Bid will
Clause ITB 35.2 , II. not take into account, exclude and not take into account,
(a) in the case of Goods (as defined under (a) in the case of Goods(as defined under
Conditions of Contract, Sub-Clause 1.1.6.5) offered General Conditions of Contract, Sub-Clause
from abroad, Custom Duty, applicable in the 1.1.6.4)/Plant(as defined under General
Employer’s country and payable on the Goods if the Conditions of Contract, Sub-Clause 1.1.6.5)
Contract is awarded to the Bidder; and and Services(as defined under Particular
Conditions of Contract, Part-B, Sub-Clause
(b) in the case of Goods offered from within the 1.1.6.17)/Works(as defined under General
Employer’s country, Custom Duty, applicable in the Conditions of Contract, Sub-Clause 1.1.6.12)
Employer’s country and payable on the Goods if the offered from abroad, Custom Duty, applicable
Contract is awarded to the Bidder. in the Employer’s country and payable on the
Goods if the Contract is awarded to the Bidder;
and

(b) in the case of Goods(as defined under


General Conditions of Contract, Sub-Clause
1.1.6.4)/Plant(as defined under General
Conditions of Contract, Sub-Clause 1.1.6.5)
and Services(as defined under Particular
Conditions of Contract, Part-B, Sub-Clause
1.1.6.17)/Works(as defined under General
Conditions of Contract, Sub-Clause 1.1.6.12)
offered from within the Employer’s country,
Custom Duty, applicable in the Employer’s
country and payable on the Goods if the
Contract is awarded to the Bidder.
13. Part-I, Section 2: BDS , - Sub Clause ITB 40.3
Clause ITB 40.3

Deleted
14. Part-I, Section 3: EQC
The existing Section-03-EQC has been revised and replaced with the revised Section-03-EQC/R1 attached
herewith as Attachment No. 1 in Addendum & Corrigendum No 1. Bidders may kindly note the same.
15. Part-I, Section
The existing Form CL-2 has been revised and replaced with the revised Form CL-2/R1 attached herewith as
4:Bidding Forms,
Attachment No. 2 in Addendum & Corrigendum No 1. Bidders may kindly note the same.
Form CL-2

Page 6 of 21
Package 9A: Addendum & Corrigendum No. 1
16. Part I, Section 6(a),
The existing Key Dates (Table-1) has been revised and replaced with the revised Key Dates , Table -1 /R1 attached
Appendix to Bids ,
herewith as Attachment No. 3 in Addendum & Corrigendum No 1. Bidders may kindly note the same.
Table 1
17. Part I, Section 6(a),
Add the following Clause as 1.1.6.17:
Particular Conditions
PC, Clause 1.1.6.17
“Services” means all acts of every kind to be
performed by the Contractor for the execution and
completion of Contract and the remedying of any
defects.

18. Part I, Section 6(a), Completion of outstanding works and Completion of outstanding works and
Particular Conditions remedying defects remedying defects
PC, Clause 10.1
The Defect Liability Period (DLP) shall be 18 months The Defect Liability Period (DLP) shall be 18 months
after the date of issue of the latest Taking Over from the date of issue of Taking Over Certificate
Certificate for the whole of the works. for the whole of the works.

19. Part I, Section 6(a), Replace the clause 11.1.1A (i) with the following: Replace the clause 11.1.1A (i) with the following:
Particular Conditions
PC, Clause 11.1.1(A) All duties, taxes (except Custom Duty), Goods and All duties, taxes (except Custom Duty), Goods and
Services Tax (GST), royalties, cess and other levies Services Tax (GST), royalties, cess and other levies
payable by the Bidder under the Contract, or for any payable by the Bidder under the Contract, or for any
other cause, as on the date 28 days prior to the other cause, as on the date 28 days prior to the deadline
deadline for submission of bids, shall be included in for submission of bids, shall be included in the rates
the rates and prices and the total Bid Price submitted and prices and the total Bid Price submitted by the
by the Bidder. Bidder.

Notwithstanding the provisions of sub-paragraph Notwithstanding the provisions of sub-paragraph


11.1.1A (i), In case, any reduction in Taxes, Custom 11.1.1A (i), In case, any reduction in Taxes, Custom
Duty or any benefit like Deemed Export Benefit results Duty or any benefit like Deemed Export Benefit results
due to any change in Laws or interpretation of the due to any change in Laws or interpretation of the
existing laws, the Contractor shall pass on the existing laws, the Contractor shall pass on the Financial
Financial benefit to the Employer. benefit to the Employer.

Contractor is required to submit GST invoice showing Contractor is required to submit GST invoice showing
GST component separately as per statutory GST component separately as per statutory

Page 7 of 21
Package 9A: Addendum & Corrigendum No. 1
requirements. The GST component as applicable for requirements. The GST component as applicable for
first Interim payment certificate (IPC) shall be first Interim payment certificate (IPC) shall be
released upon submission of GST invoice. The released upon submission of GST invoice. The
subsequent Interim payment certificate shall be raised subsequent Interim payment certificate shall be raised
for payment upon submission of documentary for payment upon submission of documentary
evidence towards payment of GST collected on the evidence towards payment of GST collected on the
previous bill to the GST Authorities. However, if previous bill to the GST Authorities. However, if
subsequent bills are raised before return submission subsequent bills are raised before return submission
date of previous bill period, then the documentary date of previous bill period, then the documentary
evidence towards payment of GST shall be provided evidence towards payment of GST shall be provided
within 7 days from the due date of such return filing. within 7 days from the due date of such return filing.
The Final bill/single bill payment shall be released on The Final bill/single bill payment shall be released on
the undertaking by the contractor/supplier for the undertaking by the contractor/supplier for
providing evidence within 7 days from the date of such providing evidence within 7 days from the due date of
return filing for final bill based on GST provision for such return filing for final bill based on GST provision
due dates. for due dates.

Payment shall be made electronically in the


bank account of the Contractor as per the
details provided by the Contractor. All
payments, will be subject to deduction of tax at
source in accordance with the provisions of the
Indian Income tax Act and any other applicable
law, including any Withholding Taxes etc.
BOCW Cess shall be applicable on Contract
Price.
20. Part I, Section 6(b), Sub clause GCC 11.21
Appendix to Bid, Payment of retention Money
Clause GCC 11.21
Deleted

21. Part II Section 8, - (51) Swimming pool and clubhouse along with related
Employer’s facilities.
Requirement, Clause
4.2.1
22. Part II Section 8, b) Fully Automatic and Computerized Batching b) Fully Automatic and Computerized Batching
Employer’s Plant - 3 Nos. (1 of 60 Cum/h and other of 30 Cum/h) Plant - 2 Nos. (1 of 60 Cum/h and other of 30 Cum/h)
Requirement, minimum or equivalent capacity in different minimum or equivalent capacity in different

Page 8 of 21
Package 9A: Addendum & Corrigendum No. 1
Appendix 9 (Table configuration at casting yard with an RO of suitable configuration at casting yard with an RO of suitable
clause b) capacity for proper quality of water. capacity for proper quality of water.
23. Part II Section 8, c) Concrete Pumps with boom placers: 3 c) Concrete Pumps with boom placers: 3 no.'s
Employer’s pump and 2 boom placer
Requirement,
Appendix 9 (Table
clause c)
24. Part II Section 8, e) Cranes in casting yard/site of suitable capacity e) Cranes in casting yard/site of suitable capacity
Employer’s 2 1
Requirement,
Appendix 9 (Table
clause e)
25. Part II Section 9(a),
MAKE : SHAKTIMET / GODREJ MAKE – GODREJ, SEHGAL, SHAKTI
Technical
HORMANN, SIGNUM
Specifications -
Architecture
Section 13 Fire Door
26. Part II Section 9(a), 22.0 METAL DOOR
-
Technical Door shutter shall be in GI with Zinc coating of 120
Specifications - gsm. Frame sheet thickness: 1.8 mm, Door leaf sheet
Architecture thickness: 1.6 mm and door leaf fully flushed.
Door shutter thickness: 46mm (min). All four edges of
door leaf shall be sealed and ground smooth

Measurements
Length and height shall be measured correct to a .The
area shall be calculated in square meter, correct to two
places of decimal.
Rates
The rate shall include the cost of all material and labour
involved in all the operations described above. The cost
should include all tools, tackles and working at all
heights and depths.

23.0 TENSILE STRUCTURE

Page 9 of 21
Package 9A: Addendum & Corrigendum No. 1
Material

White colour Polyester coated with polyvinyl chloride


(PVC) fabric having weight of 900-950 gsm, UV rays
resistant as per manufacturer specification, MS
structural with hollow member of size 150mm 100mm,
75mm 50 mm OD, MS base plate, anchor fastener
necessary hardware, bolt etc.

Installation
MS structural hollow member of size 150mm 100mm,
& 75mm OD , rafter of size 50 mm OD , purlin 50 mm.
Contractor has to consider wind load and design
accordingly. Soap drawing to be get approved from
Engineer in Charge before execution. Top surface shed
with white colour Polyester coated with polyvinyl
chloride (PVC) fabric having weight of 900-950 gsm
fixed.

Finish
MS structural hollow member shall be finished with
one coat of epoxy primer & two coats of epoxy paint or
Duco paint as approved by Engineer in charge.

Measurement
Surface area of Tensile Structure shall be measured for
payment purpose upto to two decimal of cm

Rate
The rate shall include the cost of all material and labour
involved in all the operations described above. The cost
should include all tools, tackles and working at all
heights and depths.

15 year warranty shall be provided by the contractor.

24.0 uPVC DOORS, WINDOWS, SLIDING


DOORS

Page 10 of 21
Package 9A: Addendum & Corrigendum No. 1
All external glazings -frames, glass thickness, fixing
details and hardware to be certified by IIT for wind
loads (all year) for each floor and each tower (Frame
+Glazing).

All sliding doors and windows to follow “Lift and


sliding Mechanism”.

Rate
The rate shall include the cost of all material and labour
involved in all the operations described above. The cost
should include all tools, tackles and working at all
heights and depths.
The rate includes cost of all hardware necessary for
proper functional. Cost of getting certificate from IIT
and any subsequent changes in uPVC frame, sash and
mullion extruded profiles and wall thickness is
included in the rate.
27. Part II Section 9(a),
The existing LIST OF APPROVED BRANDS FOR ARCHITECTURE has been revised and replaced and attached
Technical
as Revised LIST OF APPROVED BRANDS FOR ARCHITECTURE herewith as Attachment No. 4 in Addendum
Specifications - & Corrigendum No 1. Bidders may kindly note the same.
Architecture
28. Part II Section 9(a), The Exhaust/Supply air blower shall be Direct Driven
Technical The Exhaust/Supply air blower shall be Direct Driven Areo-foil shaped Vane/Tube Axial Flow fans connected
Specifications – HVAC Areo-foil shaped Vane/Tube Axial Flow fans to the duct & shall be of floor / ceiling / wall mounted
3.5 Axial Flow connected to the duct & shall be of floor / ceiling type as specified in the Bill of Quantities. The capacity
(Vane/Tube Axial) / wall mounted type as specified in the Bill of of Vane/tube axial flow fans, diameter, maximum
Fans Quantities. The capacity of Vane/tube axial flow motor H.P & static pressure etc. shall be according to
fans, diameter, maximum motor H.P & static schedule of equipment & Bill of Quantities. The noise
pressure etc. shall be according to schedule of level of axial fan shall be less than 78 dba at a distance
equipment & Bill of Quantities. The noise level of of 3.0 meter from the fan Under Room Condition.
axial fan shall be less than 78 dba at a distance of
3.0 meter from the fan.
29. Part II Section 9(a),
Technical The existing LIST OF MAKE FOR HVAC has been revised and replaced and attached as Revised LIST OF MAKE
Specifications – HVAC FOR HVAC herewith as Attachment No. 5 in Addendum & Corrigendum No 1. Bidders may kindly note the same.

Page 11 of 21
Package 9A: Addendum & Corrigendum No. 1
12.0 Vendor Approval
& List Of Make
30. Part IIA Section 9 (a), Add
Technical - • In case of any conflict/ ambiguity among/within the
Specifications For contract specifications/ clauses, more stringent shall
Electrical Works, prevail. In case of contradiction between various
standards mentioned in the contract, the latest and
Technical most stringent shall prevail. All codes and standards
Specifications For means their latest version, if nothing is specified then
HVAC Works requirements (of design, installation, testing,
Technical commissioning etc.) shall be governed by the relevant
Specifications For British or equivalent International or Indian
PHE & FF Works Standards. In case of any conflict/ ambiguity among
the mentioned documents, the Contractor shall
Technical always seek advice from the Employer/ Employer's
Specifications for Lift representative, the instructions/decision of the
Works Employer/ Employer's representative shall be final
and binding to the Contractor.
• DSR Items to be executed as per relevant latest
CPWD Specifications with up to date ( amendments /
correction slip.

31. Part II Section 9(a), The neutral bus bar shall be rated at not less than 100%
Technical The neutral bus bar shall be rated at not less than 50% of the phase bus bars. The design should allow for
Specifications – of the phase bus bars. The design should allow neutral cable sockets to be fitted directly to the bus
Electrical for neutral cable sockets to be fitted directly to bars. An aluminium earth bar of size 25x6mm together
S) STREET the bus bars. An aluminium earth bar of size with two cable eyes shall be provided for connections
LIGHTING, 25x6mm together with two cable eyes shall be to earth pits. All the cables shall be terminated at
OUTDOOR TYPE provided for connections to earth pits. All the ELMEX terminal block and there from wiring shall be
DISTRIBUTION cables shall be terminated at ELMEX terminal done with PVC insulated copper conductor cables to
FEEDER PILLARS block and there from wiring shall be done with MCCBs.
PVC insulated copper conductor cables to
MCCBs.
32. Part II Section 9(a), The acoustic enclosure suitable for DG set shall be
Technical The acoustic enclosure suitable for DG set shall be made of cold rolled sheet steel, completely
Specifications – made of cold rolled sheet steel, completely weatherproof and suitable for outdoor installation. The
Electrical weatherproof and suitable for outdoor outer wall and roof panels made of 14 SWG/16 SWG
E) DIESEL installation. The outer wall and roof panels made CRC plain press bent sheet comprises at least 100 mm
GENERATING SET, of 14 SWG/16 SWG CRC plain press bent sheet thick steel fabricated double wall. The inner sheet

Page 12 of 21
Package 9A: Addendum & Corrigendum No. 1
DETAILED comprises at least 100 mm thick steel fabricated made of 1.2 mm thick perforated CRC/MS sheet. Two
SPECIFICATION OF double wall. The inner sheet made of 1.2 mm slabs each of 50 mm thick having a density of 96kg/m³
D.G.SET, 12. thick perforated CRC/MS sheet. Two slabs each mineral wool mattresses are sandwiched through
Specification for of 50 mm thick having a density of 96kg/m³ suitable framing and channels. The panels are
Acoustic Enclosure: mineral wool mattresses are sandwiched mounted on the structure through suitable clamps and
through suitable framing and channels. The fasteners. Proper care ensured for heat rejection by
panels are mounted on the structure through providing suitable nos. and capacity axial/exhausts
suitable clamps and fasteners. Proper care fans to ensure its efficient functioning. Visual display
ensured for heat rejection by providing suitable of engine parameters provided on the enclosure.
nos. and capacity axial/exhausts fans to ensure Proper acoustic louvers are provided to take care of
its efficient functioning. Visual display of engine fresh air requirement and to control noise level as per
parameters provided on the enclosure. Proper CPCB latest norms/guidelines.
acoustic louvers are provided to take care of
fresh air requirement and to control noise level
up to 75db at a distance of three meter outside
the enclosure.
33. Part II Section 9(a), The detectors in the vicinity will be looped by 2x 1.5 The detectors in the vicinity will be looped by 2x1.5 sq
Technical sq.mm. Twisted pair FRLS PVC insulated 650/1100 V mm fire survival armoured cable, 600/1000V rated
Specifications – grade copper conductor cables in MS conduits as with annealed copper conductor having glass mica fire
Electrical specified in Bill of Quantities. Each loop will be barrier tape covered by an extruded layer of Cross
1) Fire Alarm Control connected directly to the Fire Alarm Control Panel. Linkable Ethylene Propylene Rubber (EPR) insulation
Panel, 6. Wiring and LSZH inner bedding, steel wire armouring & LSZH
outer sheath complete as required.
34. Part II Section 9(a), All Medium voltage or Low voltage supply cables shall
Technical All Medium voltage or Low voltage supply cables shall be XLPE insulated, extruded PVC inner sheathed,
Specifications – be PVC insulated, PVC sheathed and steel wire armoured, FRLS outer sheathed 1100 Volts grade
Electrical armoured or steel tape armoured working. The cables complete in all respects as per IS-7098 (part-1).
F) MEDIUM conductors of cable from 16 mm2 to 35 mm2 size The conductors of cable from 16 mm2 to 35 mm2 size
VOLTAGE CABLES, 1. shall be stranded. Sector shaped stranded shall be stranded. Sector shaped stranded conductors
TYPE conductors shall be used for cables of 50 mm2 shall be used for cables of 50 mm2 size and above
size and above. The cables shall conform to IS:
1554 part-1 (2010) in all respects.
35. Part II Section 9(a), SAFEX/ MINIMAX / SAGEGUARD / KANEX /
Technical Safex LIFEGUARD
Specifications –
Electrical
List of Makes
59. Fire Extinguishers

Page 13 of 21
Package 9A: Addendum & Corrigendum No. 1
36. Part II Section 9(a), Kirloskar, Voltamp, Raychem, Crompton, ABB, Kirloskar, Voltamp, Raychem, Crompton, ABB
Technical Elettromeccanical
Specifications –
Electrical
List of Makes
66. Power
Transformer
37. Part II Section 9(a), Apex Securities, Maac Infra, Tricon System Deleted
Technical
Specifications –
Electrical
List of Makes
73. LV Service
Providers
38. Part II Section 9(a), Schindler, OTIS, ThyssenKrupp, Kone, Mitsubishi
Technical Schindler, OTIS, ThyssenKrupp, Kone, Mitsubishi, Elevators India Pvt. Ltd., Toshiba Johnson Elevators
Specifications – Lifts Toshiba, Hitachi India Pvt. Ltd.
List of Makes
39. Part IIA Section 9(a), The monitor module shall provide address setting by The monitor module shall provide address setting by
Technical the use of DIP/Rotary switches. An LED shall be the use of electronic addressing/DIP/Rotary switches.
Specifications – provided which shall flash under normal conditions, An LED shall be provided which shall flash under
Electrical- 2. Detectors indicating that the monitor module is operational and normal conditions, indicating that the monitor module
and Addressable in regular communication with the control panel. is operational and in regular communication with the
Devices – 2.10 control panel.
Addressable monitor
modules

40. Part IIA Section 9(a), The control module shall provide address setting by The control module shall provide address setting by the
Technical the use of DIP/Rotary switches. An LED shall be use of electronic addressing/ DIP/Rotary switches. An
Specifications – provided which shall flash under normal conditions, LED shall be provided which shall flash under normal
Electrical-2 Detectors indicating that the control module is operational and conditions, indicating that the control module is
and Addressable in regular communication with the control panel. operational and in regular communication with the
Devices – 2.11 control panel.
Addressable control
modules

41. Part IIA Section 9(a), The software at the core computer shall be The software at the core computer shall be based
Technical based around the industry standard multi- around the industry standard multi-tasking, multi-
Specifications – tasking, multi-user operating system, user operating system, shall enough capable to work

Page 14 of 21
Package 9A: Addendum & Corrigendum No. 1
Electrical-3.0 system Microsoft Windows NT 4.0. Single user on all the latest platforms e.g. Microsoft Windows,
software operating systems such as those based on MS- Android or IOS etc.
DOS and Microsoft Windows 3.11 will not be Standard services supported by the core system
acceptable. operating system will include the following:

Standard services supported by the core system • Multi-tasking Multi-user support


operating system will include the following: • TCP/IP Network Support
• Graphic Display Building Editor with
• Multi-tasking Multi-user support functionality
• TCP/IP Network Support • Application software with
• Graphic Display Building Editor with functionality
functionality detailed in Section 5
• Application software with Software at the Operator Station shall comprise
functionality detailed in Section 5 of:

Software at the Operator Station shall • Windows, Android or IOS


comprise of: • Graphic Display Building Editor with
functionality detailed in Section 5
• Windows 95 or Windows NT • Application software with
• Graphic Display Building Editor with functionality
functionality detailed in Section 5 • TCP/IP Networking
• Application software with
functionality detailed in Section 5 If any other software is proposed, then
• TCP/IP Networking suppliers must be able to demonstrate

If other software is proposed, then suppliers The networking software shall use the industry
must be able to demonstrate full compliance standard TCP/IP LAN protocol.
with Section 5.
The core computer or an alternative network
The networking software shall use the industry connected computer shall be capable of acting
standard TCP/IP LAN protocol. as a File Server for displays and photo images.
All LAN connected Operator Stations shall be
The core computer or an alternative network able to view custom displays and photo images
connected computer shall be capable of acting from the core computer.
as a File Server for displays and photo images.
All LAN connected Operator Stations shall be All system peripherals including security and
able to view custom displays and photo images access panels and printers shall be capable of
from the core computer. being connected to the core computer via the
LAN.

Page 15 of 21
Package 9A: Addendum & Corrigendum No. 1
All system peripherals including security and
access panels and printers shall be capable of
being connected to the core computer via the
LAN.

42. Part IIA Section 9(a), 1. (5) Combo-box for activating 1. (5) Combo-box for activating
Technical hooters/sounders manually by the authorized hooters/sounders manually by the authorized
Specifications – operator. operator.
Electrical-4 Fire
Control System- 4.2 The software shall reconfirm before activating The software shall reconfirm before activating
Graphical Display hooters/sounders from the operator by way of hooters/sounders from the operator by way of user
user configured popup message. configured popup message.

The minimum proposed configuration of the The minimum proposed configuration of the Operator
Operator workstation will be as under: workstation will be as under:
GraphiGraphical Workstation
1. a) Intel Pentium IV 1. The Graphical workstation shall utilize a
2. b) Processor 1.5 GHz or better Microsoft® operating system. Each workstation shall
3. c) Serial ports (RS232) and USB ports. be capable of graphically annunciating and controlling
4. d) 256 Megabytes of RAM memory all network activity. Network display devices that are
5. e) 40 Gigabytes of hard disk space. only capable of displaying a subset of network points
shall not be suitable substitutes.
6.f) CD ROM Drive 52x or higher. 2. The Graphical workstation shall be an IBM (or
compatible) personal computer with the following
7) g) 1.4 MB FDD minimum requirements: Intel Pentium II(tm)-
processor, operating at a minimum of 400 Mhz,
128Mbytes of RAM, 8 Mbytes Video RAM, 1.44 Mbyte
H)19” Colour Monitor SVGA with a minimum
floppy drive, 3.2 Gbyte hard disk, mouse, 32X CD-
resolution of 1024 pixels Horizontal, 768 lines vertical
ROM, 3PCI / 1 ISA expansion slots, internal 3.2 Gbyte
minimum.
tape drive, sound card, 200 watt power supply, and
SVGA graphics with a screen resolution of 1024 x 768.
i)16 base colours. The Graphical workstation shall include a 19-inch
monitor.
j) Mouse with 2 Mouse Pads. Standard k) Keyboard.
3. The Graphical workstation shall be capable of
l)Windows Operating System. storing over 100,000 network events in a history file.
Events shall be stored on hard disk and shall be capable
of back-up storage to a tape drive. The history buffer
allows the operator to view events in a chronological

Page 16 of 21
Package 9A: Addendum & Corrigendum No. 1
order. A filter shall be available for displaying
chronological events by operator, date, time, fire
alarms, troubles (including security, supervisory and
system/device), disabled points/zones, system
programming, operator response and operator log
in/log out. The ability to print history files shall also be
available.
4. The Graphical workstation shall use a
Windows® dialog box technology to address,
interrogate, control, and/or modify intelligent points
on each fire alarm node. This shall include, and not be
limited to: Activating outputs, enabling or disabling
points, adding or removing intelligent points, viewing
intelligent detector sensitivity levels and modifying
point information (custom messages, detector type,
verification, day/night selection etc).
5. The Graphical workstation shall include the
ability to display system information in a graphical
(floor plan) format. Each view, created using standard
Windows® bitmap files, shall include icons created for
intelligent devices. These icons shall blink and change
to the appropriate programmed icon when an event
occurs. When the device has been acknowledged, the
icon shall become steady. Once the point has returned
to normal, the normal icon is displayed. In addition to
the graphical representation of the device, the user
shall be able to link pictures, documents, and sound
files to the device. The Graphical workstation shall also
provide the ability to auto-vector to the floor plan
(screen) of the device that is active. By selecting a
device in the graphic presentation, the operator of the
NCS shall have the ability to log onto the corresponding
node and interrogate the associated intelligent point.
6. The Graphical workstation shall have the ability
to provide the following information through a
Windows® pull down menu: An Event Counter that
contains the number of new and total events on the
network. The information that is displayed shall
consist of Fire Alarms, Pre-Alarms, Security Alarms,

Page 17 of 21
Package 9A: Addendum & Corrigendum No. 1
Supervisory Alarms, and Troubles. Detailed Event
window that contains all Off-Normal events, both
unacknowledged and acknowledged that are present in
the system.
7. The Graphical workstation shall have the option,
from a Windows® pull down menu, to connect to a
third party paging service that allows the Graphical
workstation to automatically send text-based messages
regarding system status to a typical text pager.
8. The Graphical workstation shall be UL-Listed for
fire protection (UL864) and burglary (UL1076).
9. The Graphical workstation shall meet FCC
regulations (Part 15, subpart J) regardless of its
connection means to the network.
11. The Graphical workstation shall have a flexible
way of assigning operator passwords. There shall be an
unlimited number of possible operators, each with
specific levels of control. Each operator shall have
his/her own password. Operator password and control
selection shall be available to a high level
"administrator" who shall have complete control over
levels of control.
12. The Graphical workstation shall include an
industry-standard EIA-232 port for a UL864 listed
printer

43. Part II Section 9(a), 1.0 General 1.0 General


Technical This work shall be got executed by approved This work shall be got executed by approved specialised
Specifications - specialised agencies who have expertise of the said agencies who have expertise of the said work, as
Structural for work, as provided by MIVAN and the like. provided by MIVAN and approved equivalent.
Residential Units
Appendix A
Clause 1.0
44. Part II Section 9(a), 4.5 The contractors should take extra care for 4.5 The contractors should take extra care for
Technical maintenance at site in order to achieve maximum maintenance at site in order to achieve maximum
Specifications - repetition. The Contractor should use proper releasing repetition. The Contractor should use proper releasing
agent like— FOSROC - REEBOL or equivalent.

Page 18 of 21
Package 9A: Addendum & Corrigendum No. 1
Structural for agent like— FOSROC - REEBOL or approved
Residential Units equivalent.
Appendix A
Clause 4
45. Part II Section 9(a), ……The panels of aluminium formwork are made from ……The panels of aluminium formwork are made from
Technical high strength Aluminium alloy of grade - 6061/T6 high strength Aluminium alloy of grade - 6061/T6
Specifications - (Source from GALCO & HINDALCO), with the face or (Source from GALCO/HINDALCO or approved
contact surface of the panel, made up of 4mm thick equivalent) to form a robust component………
Structural for
plate, which is welded to a formwork of specially
Residential Units designed extruded sections, to form a robust
Appendix A component……
Clause 5
46. Part II Section 9(a), …..The Welding Wire Alloy shall be 4043 (Source from …..The Welding Wire Alloy shall be 4043 (Source from
Technical INDALCO - CANADA)…… INDALCO – CANADA or approved equivalent)……
Specifications -
Structural for
Residential Units
Appendix A
Clause 5
47. Part II Section 9(a), …..The panels should be manufactured in MIVAN'S …..The panels should be manufactured in MIVAN'S or
Technical dedicated factories in Europe and South East Asia or approved equivalent’s dedicated factories.……
Specifications - equivalent .……
Structural for
Residential Units
Appendix A
Clause 6
48. Part II Section 9(a), Only approved shell drawings supplied by Mivan Only approved shell drawings shall be used for setting
Technical Formwork Design should be used for setting out. out.
Specifications -
Structural for
Residential Units
Appendix A
Clause 14.1
49. Part II Section 9(a),
Technical The existing Technical Specifications - Mathura Road Connectivity and Items 19 to 26 of Schedule B has been
Specifications - revised and replaced and attached as Revised Technical Specifications - Mathura Road Connectivity and Items

Page 19 of 21
Package 9A: Addendum & Corrigendum No. 1
Mathura Road 19 to 26 of Schedule B herewith as Attachment No. 6 in Addendum & Corrigendum No 1. Bidders may kindly
Connectivity and Items note the same.
19 to 26 of Schedule B
50. Part II , Section 9 (c) Revised Bid Drawings pertains to Architectural and Structural (Structural Residential Towers and Mathura Road
Connectivity) are attached herewith in Addendum & Corrigendum No- 1 as Attachment 7 (True PDF & Signed
form) in replacement to the earlier uploaded bid drawings Architectural and Structural (Structural Residential
Towers and Mathura Road Connectivity) in Section 9C. In case of any discrepancy between true PDF and Signed
Drawings, the bid drawings in signed form shall prevail. Bidders may kindly note the same.
51. Geotechnical Report The Geotechnical Report has been added in Employer Requirement (Part II) as Attachment 8 to the A&C No. 1
and making part of the bidding document. Bidders are requested to note the same.
52. 9B, SHE Document The key requirement on 'Precautionary Measures for Pandemic/Epidemic Disease Outbreak' has been included
in Employer Requirement on Safety, Health & Environment as Appendix – XV (as attachment 9 to the A&C No.
1). Bidders are requested to note the same.
53. Part IIA Section 9(a), Revised Technical specifications for PHE & Fire Fighting works is attached herewith in Addendum &
Technical Corrigendum No- 1 as Attachment 10 in replacement to the earlier uploaded Technical Specifications for PHE &
Specifications for PHE Fire Fighting Works. Bidders may kindly note the same.
& Fire Fighting Works
54. Part IIA Section 9(a), Revised Technical specifications for Lift Works is attached herewith in Addendum & Corrigendum No- 1 as
Technical Attachment 11 in replacement to the earlier uploaded Technical Specifications for Lift Works. Bidders may kindly
Specifications for Lift note the same.
Works
55. Part III, Section 10, Revised Financial Bid/R1 is enclosed herewith ‘Addendum and Corrigendum No 1’. Bidders are requested to
Financial Bid quote their percentage in Financial bid (R1 revision) issued vide Addendum and Corrigendum No 1. Financial
bid submitted in EXCEL file other than R1 revision will not be considered.

Page 20 of 21
Package 9A: Addendum & Corrigendum No. 1
Attachments:
1. Attachment No. 1- Revised Section-03-EQC/R1
2. Attachment No. 2- Revised Form CL-2/R1
3. Attachment No. 3- Revised Table -1, Key Dates /R1.
4. Attachment No. 4- Revised List of Make for Architecture.
5. Attachment No. 5- Revised List of Make for HVAC.
6. Attachment No. 6- Revised “Technical Specifications - Mathura Road Connectivity and Items 19 to 26 of Schedule B”.
7. Attachment No. 7- Revised Bid Drawings (in True PDF form and Signed form)
8. Attachment No. 8- Geotechnical Report.
9. Attachment No. 9 – Appendix XV of SHE Document.
10. Attachment No. 10 – Revised Technical Specifications for PHE & Firefighting works.
11. Attachment No. 11 – Revised Technical Specifications for Lift works.
12. Revised Financial bid/R1

Page 21 of 21
Package 9A: Addendum & Corrigendum No. 1

You might also like