You are on page 1of 1

Form

CONTRACTOR:
Rev
MANAGEMENT SYSTEM

PRE-TILING INSPECTION SHEET (WALLS) Page Number

CONTRACT : _______________________________________________________
DESCRIPTION :________________________________________________________
LOCATION :________________________________________________________
DRAWING REF :________________________________________________________

PRE - TILING CHECKLIST YES NO COMMENTS


1. CHECK ALL WALLS /FLOOR FOR:
PLUMB
SQUARE - WALL TO WALL
STRAITNESS
SQUARE - WALL & FLOOR
2. ARCHITECTS SETTING OUT POINTS:
CHALK LINE TO CENTERS DONE
CHALK LINE TO STARTING POINTS DONE
DATUM (CHALK LINE TO TOP OF TILE DONE)
3. GAUGE STICK USED TO CHECK FOR EQUAL CUTS
4. GAUGE STICK USED TO AVOID UNDER 50mm CUTS
5. WALLS / FLOORS PREPARED TO RECEIVE TILES

TILING CHECKLIST YES NO COMMENTS


1. CHECK TILES ARE TO CORRECT SPECIFICATION
2. ALL CUTS EVENLY CUT
3. ALL CUTS SQUARE IN CORNERS
4. ALL EDGE TILES SQUARE WITH WALL
5. ALL JOINTS STRAIGHT & MARGINAL
6. ALL CUTS AROUND PIPES NEAT & SQUARE
7. EXCESS ADHESIVE REMOVED FROM JOINTS / TILES
8. ALL TILED WALLS / FLOORS CHECKED FOR:
LEVEL
SQUARE
STRAIGHTNESS
MARGINS
SQUARE TO FLOOR
9. CHECK GROUTING FOR:
COLOUR
NEATNESS
10. AREA CLEAN

CHECKED FOR CONTRACTOR

Name Sign Date Box 3

CHECKED FOR TUT

Name Sign Date Box 4

You might also like