You are on page 1of 1

AIRCONDITIONING MONITORING FORM

School Name Work Order No.


Block Name Type of Work  PPM  CCM
Floor Category  Quarterly  Annually
Location Name Start Date End Date

Unit Tag No. SWEE FM


Unit Type Split  Window  Ceiling  cassette  Floor Standing
Brand  York  Carrier  Panasonic  Mitsubishi  Trane  Others:-
Model No. Serial No. Capacity
Indoor Unit
Outdoor Unit
CHECKLIST RECOMMENDATION
 Inspect and Clean Indoor Condensate tray & drain.
 Inspect and Clean/Replace filters.
 Test PCB and Sensors for proper functions.
 Blower Motor - Volt:- V and Amp:- A
 Check for Proper installation of Indoor unit.
 Visual check alignment of pipes.
 Inspect and Clean Condenser Coil.
 Inspect and Clean Fan blade.
 Fan Motor – Volt: - V and Amp: - A.
 Proper Lubricants of Motor and make sure smooth operation.
 Inspect and test Capacitor.
 Inspect Magnetic Switch and PCB.
 Inspect Terminal Cable.
 Compressor – Starting Current:- A
 Check capillary tubes for damage.
 Check refrigerant leak and top up if needed.
 Check filter dryer.
 Check for proper insulation of the pipes.
 Check for proper installation of outdoor Unit.
 Proper housekeeping.
 Electrical Wiring- Test and tighten the connections.

Technician SWEE M &E Engineer SWEE Facility Manager JPPE

You might also like