You are on page 1of 1

TRANSGREEN STRUCTURE SDN BHD

HAZARD IDENTIFICATION RISK ASSESSMENT AND DETERMINING CONTROL

Workplace : Rev No/Date


Activity : Ref. No.:
Activity carried out by :
Location :

SEQUENCE OF JOB HAZARD CONSEQUENCES Existing Control Measure RISK ANALYSIS RISK Level Control Measure/ PIC
(If Any) Likelihood Severity Risk(L X S) (H/M/L) Recommendation (If Any) (Due Date/Status)

Prepared by : Approved and Issued by: Received By:


1 Name Name
2 Date Date
3
4
5

TSSB-HSEF-001
Rev 0

You might also like