You are on page 1of 8

HAZARD IDENTIFICATION, RISK ASSESSMENT AND CONTROL (HIRAC) WORKSHEET

Reference No: JCVA-NOWR-xxxx-2023-00 Date: 1-Aug-23


Revision Date:
Task / Activity: Excavation Works Project Site: NOW Residences

No. Hazard / Findings Risk Person(s) Affected Consequence / Frequency / Risk Rating Existing Control Risk Rating with Mitigating Plan (Additional Risk Rating after
Severety Likelihood Measure(s) existing controls Control Measures) Mitigating Plan

3
4

Full Name Designation Signature

Prepared by: Rodelio T. Fruta Safety Officer 4

Approved by: Mercedes S. Lacsamana Project Manager


Recommendation