RISK ASSESSMENT

PROJECT PARTICULARS RA / JSA No: 001

Project Name: 2 BLKS OF 6 & 10 STY. RESIDENTIAL APARTMENT Name of Contractor: WOH HUP CONSTRUCTION

Project No: SQ 705850 Trade:

Task / Activity: To Erect &Dismantle Modify of scaffold Designation:


Prepared by:
Name & Signature
Date:

Location of Work: HANDY ROAD Designation:


Reviewed by:
Name & Signature
Date:

Work Commencement: Designation


Conducted by:
Name & Signature
Work Completion: Date:

Equipment/Tools Used: Approved By


Date of Next
Name/Designation &
Review:
Materials Used: Signature

Applicable Relevant Safety Legislation: Approved Code/s Of Practice (COP) Applicable to the Works:

WSH ( Scaffolding) Regulations 2011 CP 14 & SS 580

 HAZARD IDENTIFICATION  RISK EVALUATION  RISK CONTROL

5x5 Risk Matrix with a mix of Numeric and descriptive ratings 5x5 Risk Matrix with numeric ratings
Likelihood Rare Unlikely Possible Likely Almost Certain Likelihood Rare Unlikely Possible Likely Almost Certain
Severity (1) (2) (3) (4) (5) Severity (1) (2) (3) (4) (5)
Catastrophe(
M M H H H
A) Catastrophe(5) 5 10 15 20 25
Major (B) M M M H H Major (4) 4 8 12 16 20
Moderate (C) L M M M H Moderate (3) 3 6 9 12 15
Minor (D) L M M M M Minor (2) 2 4 6 8 10
Insignificant (E) L L L M M Insignificant (1) 1 2 3 4 5
RISK ASSESSMENT

S/N Work Activities / Job Potential Hazards Possible Accidents / Ill Existing Risk Residual Risk Action Officer /
Steps Health & Persons at Existing Risk Control / Severi- Likeli- Risk Additional Risk Control / Severi- Likeli- Risk Designation / Follow-
Risk Preventive Measures ty hood Level Preventive Measures ty hood Level up Date
01 Materials mobilised to Collision with Property damage Lorry driven by qualified 4 2 8(M) Speed limit to be 3 2 6(M) Supervisor /
site via lorry crane property driver regulated below Driver
15km/hr.

Struck by Personnel at site Escorted by Banks man 5 2 10(M) To ensure banks man 3 2 6(M) Banks man
moving vehicle are equip with whistle
and luminous vest.
02 Delivery of materials Person(s) hit by Ensure the ground 5 2 10(M) An escort must be 3 2 6(M) Driver
to site delivery truck condition is of a firm provided when Supervisor
base transporting any Banks man
oversize load or item
Banks man to ensure
safety of vehicle and
pedestrian during the
process of moving in
and out

Vehicle must not be left


unattended while engine
is running

03 Unload materials Struck by objects Personnel at site Barricade the work area 5 2 10(M) Ensure materials are not 3 2 6(M) rigger
and install signboard stack more than 1.5 m in Banksman
height.
Falling objects Materials rigged by 4 2 8(M) Ensure shackles and 3 2 6(M) rigger
qualified rigger webbing sling are in
good condition
Lifting gear to be in good rigger
condition and certificates
valid

Barricade work area with

5x5 Risk Matrix with a mix of Numeric and descriptive ratings 5x5 Risk Matrix with numeric ratings
Likelihood Rare Unlikely Possible Likely Almost Certain Likelihood Rare Unlikely Possible Likely Almost Certain
Severity (1) (2) (3) (4) (5) Severity (1) (2) (3) (4) (5)
Catastrophe(
M M H H H
A) Catastrophe(5) 5 10 15 20 25
Major (B) M M M H H Major (4) 4 8 12 16 20
Moderate (C) L M M M H Moderate (3) 3 6 9 12 15
Minor (D) L M M M M Minor (2) 2 4 6 8 10
Insignificant (E) L L L M M Insignificant (1) 1 2 3 4 5
RISK ASSESSMENT

signage.
Falling object Personnel at site Materials rigged properly 4 2 8(M) Ensure materials are 3 2 6(M) rigger
and balanced before rigged according to the
hoisting SWL of the lifting gear.
Struck by objects Tagline to be attached 4 2 8(M) Loose materials will be 3 2 6(M) rigger
and controlled carried using safety net
Signalman to guide rigger / Signalman
crane operator

Keep away from rigger


suspended load
Do not stand between
the materials and other
objects during lifting
operations.
Crushed by rigger Hands to be kept clear 3 2 6(M) Ensure hand gloves are 2 2 4(M) rigger
objects of load when placing worn at all times.
timber
Lorry overturning rigger Ground condition to be 3 2 6(M) Lorry crane outriggers to 3 2 6(M) Lifting Supervisor
good be extended fully and rigger
sole plate installed
Outriggers to be fully Driver
extended on steel plate

Hand injury Avoid standing at the 2 3 6(M)


edge of the lorry
04 Storage of materials Injury / damage Hit by sliding / Store on even ground 3 3 9(M) Do not place / store 2 2 4(M) Supervisor
to property site toppling materials with proper stacking materials on slopes and Scaffolders
facility within safe height limit of at edge of excavation General workers
1.5m and 300mm above Use safety helmet and
ground protective footwear at
storage areas
Use wedges whenever
required
Contact with sharp / Use protective gloves 2 3 6(M)
protruding parts

5x5 Risk Matrix with a mix of Numeric and descriptive ratings 5x5 Risk Matrix with numeric ratings
Likelihood Rare Unlikely Possible Likely Almost Certain Likelihood Rare Unlikely Possible Likely Almost Certain
Severity (1) (2) (3) (4) (5) Severity (1) (2) (3) (4) (5)
Catastrophe(
M M H H H
A) Catastrophe(5) 5 10 15 20 25
Major (B) M M M H H Major (4) 4 8 12 16 20
Moderate (C) L M M M H Moderate (3) 3 6 9 12 15
Minor (D) L M M M M Minor (2) 2 4 6 8 10
Insignificant (E) L L L M M Insignificant (1) 1 2 3 4 5
RISK ASSESSMENT

Improper storage & Arrange & stack neatly Supervisor


arrangement all materials i.e. proper Scaffolders
housekeeping General Workers

Materials not to be
stored at edge of pit &
slopes
Erection,
modification and
dismantling of
Cuplok
05 Erection of Legs and Struck by objects Scaffolders Hold standards until they 3 2 6(M) Ensure r person to hold 2 2 4(M) Scaffold Supervisor
Frame from ground. are secured the standard at all times. Scaffolders
Pinch point Scaffolders Keep fingers away when 3 3 9(M) Toolbox to be conducted 2 2 4(M) Supervisors
Hazard hooking up the leg by supervisors. Safety Supervisors.
pocket.
To check and ensure
Hand gloves to be worn that the gloves are in
at all times. good working condition.

Installed/Dismantle
platform to top of
frame
Falling from Scaffolders Harness to be worn 4 2 8(M) Harness to be anchored 3 2 6(M) Supervisor
height Do not leave any loose at all times Scaffolder
planks on the scaffold
Ensure harnesses are
Install single guard rails check by competent
to non working platforms person.
before continuing
erection of scaffold
Use proper access to
get to the work platform

Falling objects Scaffolders Do not throw materials 4 2 8(M) Barricade the work area 3 2 6(M) Supervisor
Injury / up or down. Pass below with a standby Scaffolders

5x5 Risk Matrix with a mix of Numeric and descriptive ratings 5x5 Risk Matrix with numeric ratings
Likelihood Rare Unlikely Possible Likely Almost Certain Likelihood Rare Unlikely Possible Likely Almost Certain
Severity (1) (2) (3) (4) (5) Severity (1) (2) (3) (4) (5)
Catastrophe(
M M H H H
A) Catastrophe(5) 5 10 15 20 25
Major (B) M M M H H Major (4) 4 8 12 16 20
Moderate (C) L M M M H Moderate (3) 3 6 9 12 15
Minor (D) L M M M M Minor (2) 2 4 6 8 10
Insignificant (E) L L L M M Insignificant (1) 1 2 3 4 5
RISK ASSESSMENT

Fatality materials by hand. man

When passing materials Do not leave materials


ensure that the other on the edge of the work
person has a good grip platform
before releasing the
materials
Those passing or
collecting materials from
Do not stack materials below should avoid
on the work platform standing below the
materials until they are
When passing standards ready to be collected or
during dismantling, move away immediately
avoid holding them by once the material has
the spigot as they may been passed on.
come loose and drop
below.

Struck by falling Scaffolders Have a good grip when 4 2 8(M) Ensure work area is 3 2 6(M) Supervisors
objects passing materials barricade with signage.

Persons at the bottom to Standby man to be at


move away after work area at all times.
passing materials
Do not store material
Ensure that the other near the edge of the
person has a good grip temporary work
before releasing the platform.
material
06 Installation/Dismantle
of Primary/Secondary
& Plywood Decking
Struck by falling Scaffolders Have a good grip when 5 2 10(M) Ensure work area is 4 2 8(M) Supervisors
objects passing materials barricade with signage.

Persons at the bottom to Standby man to be at


move away after work area at all times.

5x5 Risk Matrix with a mix of Numeric and descriptive ratings 5x5 Risk Matrix with numeric ratings
Likelihood Rare Unlikely Possible Likely Almost Certain Likelihood Rare Unlikely Possible Likely Almost Certain
Severity (1) (2) (3) (4) (5) Severity (1) (2) (3) (4) (5)
Catastrophe(
M M H H H
A) Catastrophe(5) 5 10 15 20 25
Major (B) M M M H H Major (4) 4 8 12 16 20
Moderate (C) L M M M H Moderate (3) 3 6 9 12 15
Minor (D) L M M M M Minor (2) 2 4 6 8 10
Insignificant (E) L L L M M Insignificant (1) 1 2 3 4 5
RISK ASSESSMENT

passing materials
Do not store material
Ensure that the other near the edge of the
person has a good grip temporary work
before releasing the platform.
material
Pinch point Scaffolders Keep fingers away when 3 3 9(M) Toolbox to be conducted 2 2 4(M) Supervisors
Hazard installing the plywood. by supervisors. Safety Supervisors.

Hand gloves to be worn To check and ensure


at all times. that the gloves are in
good working condition.

Falling from Scaffolders Harness to be worn 4 2 8(M) Harness to be anchored 3 2 6(M) Supervisor
height Do not leave any loose at all times Scaffolder
planks on the scaffold
Ensure harnesses are
Install single guard rails check by competent
to non working platforms person.
before continuing
erection of scaffold
Use proper access to
get to the work platform
07 Stacking materials on Tripping Scaffolders Materials to be stacked 2 3 6(M) Supervisors
ground neatly

Ensure materials are not


stack more than 1.5 m
height and 300mm
above ground.
Water stagnation Mosquito breeding Do not block access way 3 3 9(M) Ensure all stagnate 2 2 4(M) Supervisors
water are clear after
Will be stacked with a raining.
slope to prevent water
stagnating Fumigation are done
every weekly by client
08 Removal of materials Struck by Scaffolder Keep clear of moving 4 2 8(M) Ensure banks man is 3 2 6(M) Driver
from site moving vehicle vehicle present to direct traffic. Banks man

5x5 Risk Matrix with a mix of Numeric and descriptive ratings 5x5 Risk Matrix with numeric ratings
Likelihood Rare Unlikely Possible Likely Almost Certain Likelihood Rare Unlikely Possible Likely Almost Certain
Severity (1) (2) (3) (4) (5) Severity (1) (2) (3) (4) (5)
Catastrophe(
M M H H H
A) Catastrophe(5) 5 10 15 20 25
Major (B) M M M H H Major (4) 4 8 12 16 20
Moderate (C) L M M M H Moderate (3) 3 6 9 12 15
Minor (D) L M M M M Minor (2) 2 4 6 8 10
Insignificant (E) L L L M M Insignificant (1) 1 2 3 4 5
RISK ASSESSMENT

Do not stand behind


vehicle
Material toppling Scaffolders Materials to be bundled 4 2 8(M) Ensure materials are not 3 2 6(M) Supervisors
and secured properly stack more than 1.5 m. Drivers

Ensure no stacking of
materials at slope area.

Level Severity Description Score


5 Catastrophe Fatality, fatal diseases or multiple major injuries. 5
Serious injuries of life-threatening occupational disease
4 Major (includes amputations, major factures, multiple injuries, 4
occupational cancer, acute poisoning
Injury requiring medical treatment or ill-treatment leading to
3 Moderate disability (includes lacerations, burns, sprain, minor fractures, 3
dermatitis, deafness, and work-related upper limb disorders).
Injury or ill-health requiring first-aid only (includes minor cuts
r Minor r
and bruises, irritation, ill-health with temporary discomfort).
1 Negligible Not likely to cause injury or ill-health. 1
risk Level risk Acceptability
recommended Actions
- No additional risk control measures may be needed.
Severity Index - Frequent review and monitoring of hazards are
Low risk Acceptable
required to ensure that the risk level assigned is
accurate and does not increase over time
- A careful evaluation of the hazards should be carried
out to ensure that the risk level is reduced to as low
as reasonably practicable (ALArP) within a defined
period.
Medium risk Tolerable
- Interim risk control measures, such as administrative
controls or PPEs, may be implemented while longer
term measures are being established.
- Management attention is required.
- High risk Level must be reduced to at least Medium
risk before work commences.
- There should not be any interim risk control
5x5 Risk Matrix with a mix of Numeric and descriptive ratings 5x5 Risk Matrix with numeric ratings measures. risk control measures should not be
Likelihood Rare Unlikely Possible Likely Almost Certain Likelihood
High risk Rare Not acceptable
Unlikely Possible
overly dependentLikely Almost Certain
on PPE or appliances
Severity (1) (2) (3) (4) (5) Severity (1) (2) (3) (4) (5)
- If practicable, the hazards should be eliminated
Catastrophe(
15before work commences.
M M H H H
A) Catastrophe(5) 5 10 20 25
Major (B) M M M H H Major (4) 4 8 - 12Management review 16 is required before
20 work
Moderate (C) L M M M H Moderate (3) 3 6 9 commences. 12 15
Minor (D) L M M M M Minor (2) 2 4 6 8 10
Insignificant (E) L L L M M Insignificant (1) 1 2 3 4 5