Professional Documents
Culture Documents
Highlights
Client Iron Ore Company of Canada
• 336 Spiral Order for Iron Ore
Country Canada • CEP2 Expansion of Carol Lake Concentrator
With this installation, IOC now has over 5,000 MD WW6E spirals installed in its
Carol Lake Concentrator.
The first installation of spirals took place in the Hem plant at Carol Lake in 1995
and replaced worn out Humphreys spirals. This was followed by replacement of all
existing spirals in the main plant over a 10-year period.