1. DRAWNGS
2. DOCUMENTS
3.CALCULATIONS
4. BILL OF QUANTITES
DRAWNGS
3. EARTHING LAYOUT
6. LIGHTING LAYOUT
7. SITE PLAN
III. INDICATE THE WHAT TYPE OF ACSR/TUBULAR BUS USED FOR BUS AND
EQUIPMENT TO EQUIPMENT CONNECTION.
III. INDICATE THE WHAT TYPE OF ACSR/TUBULAR BUS USED FOR BUS AND
EQUIPMENT TO EQUIPMENT CONNECTION.
VI. INIDCATE THE LIGHTNING SPIKE OR SHEID WIRE FOR LTN. PROTN.
1. EARTHING LAYOUT
6. LIGHTING LAYOUT
7. SITE PLAN
1. CABLE SCHEDULE
2. INTERCONNECTION CHART
3.CALCULATIONS
1. EARTH MAT DESIGN CALCULATION
5. SAG CALCULATION
4. BILL OF QUANTITES
1. MAIN EQUIPMENT
2. ACSR/TUBULAR QTY
3. EARTHING MATERIAL QTY
4. CLAMPS AND CONNECTORS
5. CABLE QTY.
6. CABLE TRAY AND SUPPORT QTY
7. INSULATOR QTY
SLD
FOLLOWING DATAS REQUIRED FOR THE PREPARATION OF SLD
LAYOUT
• INDICATE WHAT IS THE TYPE OF ACSR/TUBULAR BUS USED FOR BUS AND
EQUIPMENT TO EQUIPMENT CONNECTION
• INDICATE THE EQUIPMENT SYMBOL( ie. Iso. – Single break or Double break)
FOLLOWING DATAS REQUIRED FOR THE PREPARATION OF LAYOUT SECTION
• INDICATE WHAT IS THE TYPE OF ACSR/TUBULAR BUS USED FOR BUS AND
EQUIPMENT TO EQUIPMENT CONNECTION
• INDICATE THE EQUIPMENT SYMBOL( ie. Iso. – Single break or Double break)
• INDICATE THE BUS LEVEL( ie. Tubular Bus height, Jag Bus height, I/C & O/G line height)
EARTHING
LIGHTNING
• REFER STANDARD
CABLE TRENCH
• FIRST FIX No. OF CABLE TRAY USED IN CABLE TRENCH( THIS IS BASED ON CABLE
QTY)
LIGHTING LAYOUT
SITE PLAN
AC SYSTEM
DC SYSTEM
• CHECK DC SOURCE( ONE OR TWO )