METHOD STATEMENT FOR HYDRAULIC
JACKING PILE INSTALLATION

1) MACHINERIES, EQUIPMENTS AND TOOLS FOR THE WORKS:

1.1) Hydraulic Jacking Grip-Box Machine (YZY SERIES)


Machine Model YZY-100 YZY-150B YZY-300B
Machine Own Weight: 44.3 t 50.8 t 104.7 t
Total Counterweights: 70 t 110 t 210 t
Machine Model YZY-400B YZY-500B YZY-600B
Machine Own Weight: 145.9 t 161.9 t 182 t

.
Total Counterweights: 270 t 350 t 430 t

D
1.2) Hydraulic Jacking Grip-Box Machine (ZYC SERIES)

H
Machine Model ZYC-120B-B ZYC-900B-B
Machine Own Weight: (Tonne) 48.5 t 220 t

.B
Total Counterweights: (Tonne) 90 t 680 t

1.3) Crawler or Hydraulic Crane (20 or 25 Tonne)

N
1.4) 275 or 100 KVA Generator Set
1.5) 300 Amp Welding Transformer
1.6)
1.7)
Oxy-Acetylene Gas c/w Cutting Torch
Engine/Electric Cutter with Diamond Disc or
Electric/Engine/Air Breaker (40 lbs) with mold point
SD
-IN

2) MATERIALS AND TRANSPORTATION: (BY MAIN CONTRACTOR)

2.1) The pile element material generally be comply in accordance with BS 8004, 1986- Foundation
and BS 8110, 1985-Structure Use of Concrete (British Standard Code of Practice).
CK

2.2) Pile elements shall be cautiously loaded and stacked levelly onto the trailer while transporting
to site. During unloading at site, unloading of Piles shall exercise the greatest care in the lifting
and handling of piles and no piles shall be lifted otherwise than slinging by the lifting holes.
The pile elements are to be stacked on a level site and supported at two (2) points 0.2L from
JA

their ends.

3) LABOURERS:
T

3.1) Machine Crew (Foreman, Operator & Rig Assistant/Welder) - 4 to 5 per machine
A

3.2) Mobile Crane Crew (Crane Operator & Rigger) - 1 to 2 per machine
RE

4) SETTING OUT OF PILE POINTS: (BY MAIN CONTRACTOR)

4.1) By Licence Surveyor based from the 4 building controlling corner pegs/points for each tower
block given and establishment of temporary bench mark (TBM) carried out by Client or Main
G

Contractor.

4.2) The Client or Main Contractor shall obtain all survey data as below and platform:-
a) Endorsed As-Built Precom Plan for level and footprint of building.
b) Architectural Drawings (Site Plan and Ground Floor Plan).
c) Structural Drawings (Piling Floor Plan for Ground Floor, Pile Cap Detail, Column
Schedule).
d) Cut-off Level of piles.
e) Working Pile Load Test and PDA (if require) Position.
f) Excavate or trim the earth slope to the required profile, firm and dry working platform with
proper drainage and access road to be handed over and accepted by us.
…../2
GREAT JACK-IN SDN. BHD. (576567-V)
(Hydraulic Jack-In Foundation Specialist Contractor)
G
RE
A
T
JA
CK
-IN
SD
N
.B
H
D
.
G
RE
A
T
JA
CK
-IN
SD
N
.B
H
D
.
-4- METHOD STATEMENT FOR HYDRAULIC
JACKING PILE INSTALLATION

6) METHOD OR PROCEDURES OF HYDRAULIC PILE JACKING:

6.1) The Procedures of Hydraulic Pile Jacking shall be as below :-

k) When the pile has achieved its bearing capacity or set/depth, the pile head shall be cut at
the existing ground level by means of engine/electric cutter with diamond disc. Cut-off pile
with length exceeding 6m may be re-use for pile setting by inverting and jointing of the pile
head.

.
D
l) Plumb tests in the hollow centre of the spun piles shall be carried out and recorded in the

H
piling record form, on every installed piles immediately after pile termination.

.B
7) SET CRITERIA:

7.1) Pressure Conversion : Refer to the Pressure Conversion Table for the Calculation of

N
Setting Pressure for the Hydraulic Cylinders shall be submit before
commencement of work

7.2)
SD
When the pile has achieved its bearing capacity, specified attention shall be kept on recording
the pile setting by holding the setting jacking pressure.
-IN

8) LOAD TESTING:
CK

8.1) Hydraulic Jacking Pile System also a piling system whereby every piling point is self tested
during installation. However, if required by the Superintendent Officer/Engineer, maintained
load test as accordance to BS 8004, 1986 – British Standard Code of Practice for Foundation
can be carried out at any of the pile installed
JA
T
A
RE
G

…../5

GREAT JACK-IN SDN. BHD. (576567-V)


(Hydraulic Jack-In Foundation Specialist Contractor)
-5- METHOD STATEMENT FOR HYDRAULIC
JACKING PILE INSTALLATION

9) SAFETY:

9.1) Thing to ponder at project site, Think it over !


a) Keep your promises.
b) No excuses, think how you can manage to do it.
c) Do it by all means, Never give up. Achieve your target.
d) Don’t wait for tomorrow for resolution. Correct your errors on the spot.
e) Think what you would do it you were the client.
f) Report in thinking “why” & “why” !!

.
g) Put yourself in the scene giving you the Problem.

D
h) Find your goldmines nowhere but at the site & in the drawings.

H
i) Use your knowledge & wisdom not your money.
j) Realize that Incapability is from lack of use of your brain, which comes from lack of

.B
worrying.
9.2) Statutory safety requirements (General Duties of Employees, Section 24, Occupational Safety
and Health Act, 1994)
9.3) Site-specific safety requirements, as set out in the contract; and the main contractor’s

N
Environmental, Safety, Health and Security Plan.
9.4) Worker shall be provided with safety glasses, safety shoes, hard hat, safety belt/harness,

9.5)
respirator, dust mask, ear muff/ear plugs and gloves.SD
Work site shall be provided with suitable barricade tape to prevent persons from falling into the
inject hole.
9.6) HSE Officer
-IN

HSE Officer will coordinating all safety-related activities at the work site and ensuring that all
safety requirements are complied.

9.7) Pile Installation


CK

Pile installation involves jacking and lifting. The potential hazards and the respective
precautions are as follows:
JA

Hazard Precautions
1. Overturning  Ensure ground is reasonably level.
 Ensure equipment is level.
 Use matting is ground is soft.
T

 Do not attempt to track across water ponded


area.
A

2. Pile falling during pitching  Use approved and tested wire ropes.
 Double loop of wire rope around the pile to
RE

avoid slipping (pile surface is smooth).


 Do not drag the pile more than 12m from the
piling leader.
G

 Stay away from pile during dragging and


pitching.
3. Others  Operator should always view at the worker
working at the grip clamp and only grip the pile
where operator is free from clamp.
 Ensure no worker is under the object when
being lifted.
 Regular checking of lifting cables, winch etc.

…../6

GREAT JACK-IN SDN. BHD. (576567-V)


(Hydraulic Jack-In Foundation Specialist Contractor)
-6- METHOD STATEMENT FOR HYDRAULIC
JACKING PILE INSTALLATION

9) SAFETY:

9.8) Cutting of Piles

The work involves cutting of piles with mechanical driven diamond cutter at high speed. The
risks and precautions are as follow:
Hazard Precautions
1. Struck by flying material  Stay at least 4m during cutting process.

.
D
2. Dust  Operator must wear dust mask.
3. Cut by cutter  Only experienced worker is allowed to work.

H
4. Failing of piles  If piles above cut off level are more than 4m
high, it should be supported by crane or

.B
clamped by the equipment.

N
10) OTHER CRITERIAS AND PERFORMANCE REQUIREMENTS OF THE NORMAL
SPECIFICATIONS ON INSTALLATION OF CONCRETE PILE AND THE RELEVANT
SD
CODE OF PRACTISE AND BRITISH STANDARDS SHALL BE FOLLOWED.