Project version Date: 14 Feb 2017

(To be used in project associated with the licenser) Time: 8:5:33


Licenser: SY Perunding; www.syp.com.my By : ONG
PILECAP REFERENCE:Bakau PIle Roof Slab Extend Page: 1
-------------------------------------------------------------------------------------

Column Vert Dim, Hyy = 225 mm Pile X Y


Column Horz Dim, Hxx = 125 mm 1 -150 450
Column Service Load, Tt = 49 KN 2 150 450
Average Load Factor,ULF = 1.43 3 -150 150
Column Ser. Moment, Mxx = 0 KN-M 4 150 150
Column Ser. Moment, Myy = 0 KN-M 5 -150 -150
Concrete Grade, Fcu = 25.00 N/mm^2 6 150 -150
Steel Type, Fy =460.00 N/mm^2 7 -150 -450
Concrete cover = 40 mm 8 150 -450
Pile size = 100 mm
Max Pile Working Load = 8 KN
Safe Pile Spacing = 250 mm
Edge Distance = 100 mm
Pile Penetration = 75 mm

No.of warning(pile spacing + pile load)= 0 + 0 = 0


Pile Cap last rotated angle = 0 deg. clock-wise

P1 P2

P3 Y1 P4

1
3
X1 X
0
P5 P6 0

P7 P8

600

3 6 n
o
n n s
o o
s s 1
0
1 1
2 2 3
0
0

Piles C.G. x = 0.00mm. y = 0.00mm REBAR along XX = 6 NO. of 12.00 mm dia, at 223.20mm c/c
P.CAP C.G. x = 0.00mm. y = 0.00mm REBAR along YY = 3 NO. of 12.00 mm dia, at 244.00mm c/c
Eccen. Ex1 = 0.00mm.Ey1= 0.00mm LOOP BAR = 1 NO. Y 10
(Coordinate wrt Col. Centre as origin) anchorage of pile rebar to pilecap to be provided for