Total
crushing
analysis
MONTHLY ORE PRODUCTION/HR( THEORITICAL ACTUAL OEE
HANDLED(TONNAGE) CUMMULATIVE) PRODUCTIVITY(T/HR) PRODUCTIVITY
217480.0
Running hrs Production Breakdown Hours Maint. Hrs
S
D h
a No. Of
t
i
Breakdown
Shutdown Hrs Preventive/ Details of B/D or Maintenance
e f Per Shift Per Day tonnage/day Total tonnage SHIFT WISE Toatal Scheduled Total JAMMING/CLEA
t NING
(If any)
C 5.3 1200 2.3 BC-4 D/chte jammed ,CR-06 jam BC-3 weightometer fixing ,Surge bin full 1
15-Jan A 4.0 15.3 590 3040 2.9 6.5 0.3 0.6 Cleaning work, Big boulder jamming, BF-004, BF-001 tripping,Crusher gap checking 0.3
B 6.0 1250 1.3 0.3 Gernal checking done, VF-01 tripped ,Bc-04 D/chute cleaning BC-5 Magnet cleaning
work Big boulder jamming
REASON OF BREAKDOWN
0.3 1
0.3 2.3 ###
0.3 1 ###
Running hrs Production Breakdown Hours Maint. Hrs
S
D
a h No. Of Shutdown
t
i Breakdo
Hrs Details of B/D or Maintenance
f wn Scheduled
e t
Per Shift Per Day tonnage/day Total tonnage SHIFT WISE Total (If any) Total
B 6.0 260 1.3 0.3 VF-001 tripped ,BC-04 Discharge chute cleaning work ,Big boulder jamming
REASON OF BREAKDOWN
CRUSHER B/D & RECIPROCATING OTHER Coarse Ore Jamming due to Dozer
CLEANING CONVEYORS B/D Jamming Mechanical B.D ELECT PROBLEM FEEDER Jamming INSTR. B/D Mechanical shortage Oversized Ore/ Unavailiable / FOB FULL POWER TRIP OTHERS
/B.D Uncrushable B.D
0.3 0.3 1
4 ###
1 0.3 ###