Delay and LOS Calculations for the Intersection of ______________________________________ Date: 25 June 2020
Name: Anis Syafiqah binti Amar
Approach EB WB NB SB Lane Group LT T/R LT T/R LT T/R LT T/R Analysis Flow Rate (v) 300 1200 250 1150 90 390 70 370 Saturation Flow Rate (s) 1750 3400 1750 3400 475 1800 450 1800 Flow Ratio (v/s) 0.171 0.324 0.143 0.338 0.189 0.217 0.156 0.206 Critical Lane Group Yc 0.726 Lost time/phase 4 Total Lost Time 12 Cycle Length, Cmin 65 Xc 0.891 Eff.green time (g) 12.5 24.7 12.5 4.7 15.8 15.8 15.8 15.8 g/C 0.192 0.380 0.192 0.380 0.243 0.243 0.243 0.243 Lane group capacity ( c) 337 1292 337 1292 115 438 109 438 v/c (X) 0.890 0.851 0.742 0.890 0.783 0.890 0.642 0.845 d1 25.6 18.5 24.7 18.9 30.0 23.8 22.1 23.4 PF 1.0 (assumed) k 0.5 (pretimed control) l 1.0 (assumed) T 0.25 d2 25.6 18.5 13.7 9.5 40.1 22.8 25.6 17.8 Lane Group delay (d) 53.4 25.7 38.4 28.4 70.1 46.6 47.5 41.2 Lane Group LOS D C D C E D D D Approach delay 31.6 30.2 51.0 42.2 Approach LOS C C D D Intersection delay 34.8 Intersection LOS C