Professional Documents
Culture Documents
SIDRA INTERSECTION 6.1 | Copyright © 2000-2015 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TRAFFIX GROUP PTY LTD | Created: Wednesday, 16 March 2016 12:17:56 PM
Project: P:\Synergy\Projects\GRP1\GRP19582\07-Analysis\SIDRA\Future Layout - Wheeler.sip6
MOVEMENT SUMMARY
Site: Wheeler Street / New Dookie Road - AM Future
New Site
Signals - Fixed Time Isolated Cycle Time = 120 seconds (User-Given Phase Times)
All Vehicles 1736 10.1 0.601 16.3 LOS B 22.8 168.2 0.57 0.55 46.9
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)
Pedestrian movement LOS values are based on average delay per pedestrian movement.
Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
SIDRA INTERSECTION 6.1 | Copyright © 2000-2015 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TRAFFIX GROUP PTY LTD | Processed: Monday, 22 February 2016 11:12:28 AM
Project: P:\Synergy\Projects\GRP1\GRP19582\07-Analysis\SIDRA\Future Layout - Wheeler.sip6
PHASING SUMMARY
Site: Wheeler Street / New Dookie Road - AM Future
New Site
Signals - Fixed Time Isolated Cycle Time = 120 seconds (User-Given Phase Times)
SIDRA INTERSECTION 6.1 | Copyright © 2000-2015 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TRAFFIX GROUP PTY LTD | Processed: Monday, 22 February 2016 11:12:28 AM
Project: P:\Synergy\Projects\GRP1\GRP19582\07-Analysis\SIDRA\Future Layout - Wheeler.sip6
MOVEMENT SUMMARY
Site: Wheeler Street / New Dookie Road - PM Future
New Site
Signals - Fixed Time Isolated Cycle Time = 120 seconds (User-Given Phase Times)
All Vehicles 1927 4.7 0.735 20.2 LOS C 32.4 230.5 0.65 0.63 44.7
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)
Pedestrian movement LOS values are based on average delay per pedestrian movement.
Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
SIDRA INTERSECTION 6.1 | Copyright © 2000-2015 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TRAFFIX GROUP PTY LTD | Processed: Wednesday, 16 March 2016 12:18:55 PM
Project: P:\Synergy\Projects\GRP1\GRP19582\07-Analysis\SIDRA\Future Layout - Wheeler.sip6
PHASING SUMMARY
Site: Wheeler Street / New Dookie Road - PM Future
New Site
Signals - Fixed Time Isolated Cycle Time = 120 seconds (User-Given Phase Times)
SIDRA INTERSECTION 6.1 | Copyright © 2000-2015 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TRAFFIX GROUP PTY LTD | Processed: Wednesday, 16 March 2016 12:18:55 PM
Project: P:\Synergy\Projects\GRP1\GRP19582\07-Analysis\SIDRA\Future Layout - Wheeler.sip6