You are on page 1of 1

KEY PLAN:

1 6 14 25 34
MECCA
U
N

43

TUBE IS CLASHING WITH


THE CONNECTION.

LEGENDS & PARTICULAR NOTES:

UP

UP

LEVEL +9.40 M (QNHD) = +0.00 M (ARCHITECTURAL)

GENERAL NOTES:

UP

UP

TUBE IS CLASHING WITH


THE CONNECTION.

20.06.2018 00 G.M. APPROVED ISSUE


05.09.2018 01 G.M. AS CLOUDED (REVISED FRAMING PLAN)

TUBE IS CLASHING WITH


THE CONNECTION.

NORMAL WEIGHT REINFORCED CONCRETE


f 'c =400 Kg/m 2
fy =RENFORCEMENT=4200kg/cm 2
SHEET THICKNESS = 1.5mm ( TYPE 2 2VLI16) PROJECT
(SHEAR STUDS OMITTED FOR CLARITY )

GALVANIZED STEEL FORMED DECK KATARA TOWERS AT LUSAIL


SCALE 1/10 Lusail District, Doha
PROVIDE SHEAR STUDS FO ALL BEAMS AT TOP FLNAGE
2x3/4"x3" TO BE PROVIDED AT 250mm. MAXIMUM SPACING FLANGE WIDTH >200 mm. CLIENT
1x3/4"x3" TO BE PROVIDED AT 250mm. MAXIMUM SPACING FLANGE WIDTH <200 mm.

Katara Hospitality
Katara Hospitality Building, Marina District,
Lusail City, PO Box 2977 Doha, Qatar
LEAD
CONSULTANT

SUB -
CONSULTANTS

SUBMISSION
STAMP ISSUED FOR CONSTRUCTION
JUNE 2018 PACKAGE PK3
PACKAGE TITLE
GENERAL ARRANGEMENT PLANS
PK3 KATARA SUITE
STRUCTURAL LAYOUT
FORMAT FIRST ISSUE DATE DESIGNED BY CHECKED BY SCALE PLOT NO. / AREA
(ISSUE OF REV00)

TUBE IS CLASHING WITH Marina-hotel 001 /


LUSAIL
THE CONNECTION.
PROJECT NO. PHASE BLDG. NO. DISCIPLINE SERIAL NO. PART REV. NO.

Q17017-0100D FC T2 SS 142 1 OF 1 01