You are on page 1of 1

Shell Eastern Petroleum - Pulau Bukom Oil Refinery – Refinery Management System

MNT_INTG-2009WI HYDROSTATIC TEST PROCEDURE July 2016


Revision: 6

Appendix 2

APPLICATION FOR WAIVER OF PRESSURE TEST


IONREGISTRAT

Part I. Registration (By Plant Engineer)


REPORT No: DATE:
VESSEL / LINE NUMBER: DESCRIPTION:
TAKENACTION

Part II. Action Taken (By Plant Engineer)


Reason for waiver
Isolating valve passing Operational Constraints
No Isolating valve available nearby Existing structural supports unable to take the full
Part III. Comments :
ON/VERIFICATI APPROVAL

_______________________ _____________________ __________________


Part IV. Action taken and comments:
Update Equipment Record (Inspection Engineer)

Document Status APPROVED


Page 1 of 1 The controlled copy of this document is in electronic format on the Shell Singapore Web. Issued by: Dept QSC
This hardcopy is uncontrolled and was printed on 18 September 2020 Approved by: DMA/122

You might also like