Shell Eastern Petroleum - Pulau Bukom Oil Refinery – Refinery Management System
MNT_INTG-2009WI HYDROSTATIC TEST PROCEDURE July 2016
Revision: 6
Appendix 2
APPLICATION FOR WAIVER OF PRESSURE TEST
IONREGISTRAT
Part I. Registration (By Plant Engineer)
REPORT No: DATE: VESSEL / LINE NUMBER: DESCRIPTION: TAKENACTION
Part II. Action Taken (By Plant Engineer)
Reason for waiver Isolating valve passing Operational Constraints No Isolating valve available nearby Existing structural supports unable to take the full Part III. Comments : ON/VERIFICATI APPROVAL
Part IV. Action taken and comments: Update Equipment Record (Inspection Engineer)
Document Status APPROVED
Page 1 of 1 The controlled copy of this document is in electronic format on the Shell Singapore Web. Issued by: Dept QSC This hardcopy is uncontrolled and was printed on 18 September 2020 Approved by: DMA/122