Daily Progress Report (DPR) from Proejct Engineer of PHC

S.E. (Mumbai / TNK/ Pune/ AN/ NAG Regional Office)


Project
Contractor
Sr. No. Date Project Name PMC Name PMC Staff with Designation Contractor Staff with Designation Labour Strength Plant & Machinery Engineer's
Name
comments
Requirment as per contract Requirment as per contract
Staff Name Designation Staff Name Designation Labous Nos Machinery Nos
Agreement Agreement
1 2 3 4 5 6 7 8 9 10 11 12

Construction of Cyber Crime


M/s. Conspro Team Leader/ Project In Charge / Sr. M/s Bafna Realtors Pilling Work will halt
1 06.11.2019 office and 9 Type-1V Staff Mr. Umar Farooque C.E & Project Head Architect-G.D. Arch / B.Arch. Skilled 2 Poclai 200 1 nos
Management Services Civil Engineer Pvt. Ltd. for Material Shortage
Quarters for C.P. Mumbai

Structural Engineer-M.Tech/M.E. Pilling Rig 1 Machine Out of


2 Resident Engineer Mr. Girish Mishra Resident Enginner Unskilled 19 2 nos
(Structure0 M.S. or Equivalent 185Torque Order

Project Engineer - B.E Civil, B.Tech Mr. Abhishek


3 Mr. Firozkhan Pathan Resident Enginner Project Manager Taurus Dumper 4 nos
(Civil) Tyagi
As and When
4 Architect Site Engineer- B.E/DCE
Required
Site Engineer / Site Supervisor / Quantity Quality Assurance and Quality Control
5 Surveyor/ Quality Control Engineer
Mr. Vishal Pandit Quantity Surveyor
Engg.- B.E/ DCE
6 Mr. Sandeep Sahani Electrical Engineer Electrical Engineer- B.E/ DCE
As and When Water Supply and Drainage Engineer--
7 Structural Consultant
Required B.E
As and When Management Information System
8 Electrical Consultant
Required (MIS)/ Planning Engg. B.E
As and When Quantity Surveyor (QS) / Billing Engg.,
9 Water Supply and Drainage Consultant
Required B.E
Safety Engineer, Advance Diploma in
As and When
10 Geotechnical Consultant Induatrial Safety/ Certificate Course of
Required NICMAR
As and When Supervisors, Safety Steward as per
11 Consultant for MOEF/CRZ Mr. Mahesh T Bhave Supervisor
Required Requirement
As and When
12 Consultant for Lft, Fire Surveyor and Asst. Surveyor
Required
Quality Assurance (QA) / Quality
13 Control (QC) Lab In Charge