You are on page 1of 1

Project Name : Design, Supply, Construction, Installation, Testing and commissioning of 2X25kV , 50Hz , AC Traction Electrification, E & M and

Electrification, E & M and Associated works of Double Track Railway lines on a Design Build Lump Sum Basis For Mughalsarai - New Bhaupur Section of Eastern
Dedicated Freight Corridor (CP:204)

Client: : M/S Dedicated Freight Corridor Corporation of India Limited CP-204


CONTRACT PACKAGE:
PMC : M/S SYSTRA-Mott MacDonald Pvt. Ltd.
Contractor : M/S L&T - Inabensa Consortium Date of RFI : 13.01.2021

Contractor's Responsible PMC's Responsible


Sl. From CH To CH Date of Time of
Description of Works Location name Person Person Remarks If any
No. Inspection Inspection
Name Name

PMC representative to be
1 LT-INB/CP 204/RFI/OHE/17168 Contact & catenary Wiring Rasulabad KM 373/05 to 372/01 1/13/2021 3.00 PM Devendra/Tanmoy/Yogender Ram Dayal present

2 LT-INB/CP 204/RFI/PSI/17169 FDD checking of Soil 4th layer Rasulabad TSS ch.379 1/13/2021 4.30 PM KOUSHIK Deepansh PMC representative to be
present