You are on page 1of 1

CONTRACTOR OWNER

REQUEST FOR INFORMATION/CLARIFICATION

Project : COMPOSTELASTEEL INC. FOUNDATION WORKS PO/SO Number: : SIGNED LETTER OF AWARD
Location : P. CABATINGAN ST. BRGY POBLACION COMPOSTELA CEBU Date : 19-Mar-21
Owner : COMPOSTELASTEEL INC. Reference No. : CSI-EEI-RFI-031

Attention : Randy J. Fostanes


No. of Pages : 1 of 6 including this page
Thru : Geprey B. Amaleona

Nature :
Structural Earthworks
Architectural Site Infrastructure
Furnishing and Furniture Mechanical / Plumbing / Sanitary
Others Electrical
Additional Works
(Instruction Ref. No._______)

ITEM
QUERY CONSULTANT'S/DESIGNERS RESPONSE
NO.

SAMC CMT
1 For Information/Clarification:

For Charging Bed and Furnace foundation, it seems that there is a conflict with the
SAMC D & E

drawings, CSI-FA-RC-300001, CSI-MB-SS-30001 & CSI-CB-RC-30000. Clarification


Furnace Area and Main Building footing depth should govern.
on what to follow is needed. (See attached drawing)
(See attached drawings) -2.80m and -4.30m, respectively.

References:
SAMC PMT

Please refer to the attached


PROCUREMENT

Commercial:

No Cost Implication
OTHERS

With Cost Implication

For Further Study

Prepared by: RECEIVED RELEASED


RESP.
Date Signature Date Signature

Probo F. Canada
EEI Project Manager SAMC CMT

Issued By:

03/24/2021
03-24-21
SAMC D & E
Civil Engineer MEPF In Charge

SAMC PMT
Mechanical in Charge Electrical In Charge

Noted by: SAMC


PROCUREMENT

Randy J. Fostanes Darwin J. Montemayor


CSI Construction Manager Construction Management Head
OTHERS

You might also like