Professional Documents
Culture Documents
3. EmploymentRecord(PostQualification):
Sr. Period Position / Post Employing Country Name of the Summary of activities Performed relevant to the
No. Held organization project Assignment
and Contact
Information For
References
1 Dec 2013 to Interface M/s Autometers India DMRC Phase 3 Project (CE-04, Lot- Interface Meetings,
Dec 2016 Engineer, Alliance Ltd, 02), Delhi & New Delhi Drawings Corrections pertaining to our
Interface Noida Equipments,
Manager Discussion with DDC & site interface,
Curriculum Vitae of Mr. Ranapratap Singh Rana Contract Package:
4 Aug 2021 to Deputy Project Brilliant India Mumbai Metro Line 3 Project, Project planning delivery to Chief Interface
Till Date Manager Elevator India Mumbai (Colaba-Bandra-Seepz) co-ordinator.
Co. Pvt. Ltd, Meeting with GC/IMT, MMRCL in all
Kolkata respect like Project Planning, Installation,
Testing & commissioning.
Co-ordinatation with GC/MMRCL from
design stage to Installation phase.
Ensure Integration with STPT contractor.
Preparation of Deliverable documents
pertaining to Design, Installation &
commissioning & integration testing stage.
Monitoring & controlling of Sub contractors
6. EnglishLanguageSkills:
*under language skills give gradation as excellent, very good, good, average and poor for every subcategory.
8. Certification:
I understand that anymiss statement described herein may lead to my disqualification or dismissal, if engaged.