You are on page 1of 3

Curriculum Vitae of Mr.

Ranapratap Singh Rana Contract Package:

CURRICULUM VITAE (CV) FOR PROPOSED KEY PERSONNEL


1. General
PositionTitle Interface Co-Ordinator (Manager)
Name of Key Personnel Ranapratap Singh Rana
Current/last Designation Deputy Project Manager
Name of the member of JV proposing the Key Personnel (If any) NA
DateofBirth 05-10-1992
Nationality Indian
Country of Current Residence India

2. Educational Qualification: B. tech.(ECE), MBA (PO & M)

3. EmploymentRecord(PostQualification):

FROM: July-2011 To July-2013


EMPLOYER: M/s Uncease Automation Pvt. Ltd., Ghaziabad
POSITION HELD: Project Engineer
LOCATION: Chennai, Dharwad, Pant nagar, Gurugram etc.
FROM: Aug-2013 To Mar-2021
EMPLOYER: M/s Autometers Alliance Ltd., Noida
POSITION HELD: Interface Manager, Line Manager
LOCATION: DMRC New Delhi, Noida
FROM: Mar-21 To Till date
EMPLOYER: Brilliant Elevator India Co. Pvt. Ltd, Kolkata (Subsidiary of Yuanda Group, China)
POSITION HELD: Chief Interface co-ordinator, Deputy Project Manager
LOCATION: Mumbai- MML3 Project

4. Employment Record (Relevant Eligible Assignments for Key Personnel):

Sr. Period Position / Post Employing Country Name of the Summary of activities Performed relevant to the
No. Held organization project Assignment
and Contact
Information For
References
1 Dec 2013 to Interface M/s Autometers India DMRC Phase 3 Project (CE-04, Lot-  Interface Meetings,
Dec 2016 Engineer, Alliance Ltd, 02), Delhi & New Delhi  Drawings Corrections pertaining to our
Interface Noida Equipments,
Manager  Discussion with DDC & site interface,
Curriculum Vitae of Mr. Ranapratap Singh Rana Contract Package:

 Shaft measurements & handing over


 DMRC site Visits
2 Jan 2017 to Line Manager M/s Autometers India DMRC Phase 3 Project (CE-04, Lot-  Site Co-ordination with CJVs in all respect,
Mar 2021 (Corridor Wise) Alliance Ltd, 02), Delhi & New Delhi  Material Delivery planning,
Noida  Project Planning,
 with DMRC.
 SPOC to DMRC & AAL Management for
Line’s progress briefing. (Line 8 & 5)
3 Mar 2021 to Chief Interface Brilliant India Mumbai Metro Line 3 Project,  Integration with CJVs & SWCs (E&M)
Jul 2021 Co-ordinator Elevator India Mumbai (Colaba-Bandra-Seepz) Professionally.
Co. Pvt. Ltd,  Drawings sign off (SEMs & CSDs),
Kolkata Interface Matrix, CCFs closures in all stage
of our work (Design, Installation).
 Recording & clarification of all interfacing
requirements w.r.t contractual boundries.
 Monitoring of Degree-2 access pertaing to
readiness of Shafts for Delivery planning.

4 Aug 2021 to Deputy Project Brilliant India Mumbai Metro Line 3 Project,  Project planning delivery to Chief Interface
Till Date Manager Elevator India Mumbai (Colaba-Bandra-Seepz) co-ordinator.
Co. Pvt. Ltd,  Meeting with GC/IMT, MMRCL in all
Kolkata respect like Project Planning, Installation,
Testing & commissioning.
 Co-ordinatation with GC/MMRCL from
design stage to Installation phase.
 Ensure Integration with STPT contractor.
 Preparation of Deliverable documents
pertaining to Design, Installation &
commissioning & integration testing stage.
 Monitoring & controlling of Sub contractors

6. EnglishLanguageSkills:

Languages Read Write Speak Remarks


English Very Good Very Good Good
Hindi Very Good Very Good Very Good
Curriculum Vitae of Mr. Ranapratap Singh Rana Contract Package:

*under language skills give gradation as excellent, very good, good, average and poor for every subcategory.

7. Adequacy for the Assignment:

Detailed Tasks Assigned to Key Personnel:


 Integration with CJVs & SWCs (E&M) Professionally.
 Drawings sign off (SEMs & CSDs), Interface Matrix, CCFs closures in all stage of our work (Design, Installation).
 Recording & clarification of all interfacing requirements w.r.t contractual boundries.
 Monitoring of Degree-2 access pertaing to readiness of Shafts for Delivery planning.
 Meeting with GC/IMT, MMRCL in all respect like Project Planning, Installation, Testing & commissioning.
 Co-ordinatation with GC/MMRCL from design stage to Installation phase.
 Ensure Integration with STPT contractor.
 Preparation of Deliverable documents pertaining to Design, Installation & commissioning & integration testing stage.
Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the AssignedTasks
 Successful completion of 78 Units of Escalators in DMRC phase 3 projects & got rewards from DMRC.
 India’s Highest Rise Escalator installed & commissioned under my leadership. (Rise 15650mm).
 Interface for 189 Nos Units of MML3 Mumbai Project, 90 units already installed & commissioned during my tenure as CIC as well as Dy.PM.

8. Certification:

I, the undersigned, certify to the best of myknowledge and belief that:


(i) This CV correctly describes my qualifications and my experience;
(ii) I am, pursuant to conditions of contract clauses of this project, eligible for engagement.

I understand that anymiss statement described herein may lead to my disqualification or dismissal, if engaged.

Signatures of Key Personnel Signature of contractor’s Representative

Full name of contractor’s


Full name of Key Personnel: RANAPRATAP SINGH RANA Representative: