Professional Documents
Culture Documents
Test Result: Procurement and Construction of 1X300 MW Thermal Power Plant
Test Result: Procurement and Construction of 1X300 MW Thermal Power Plant
Report No.:
Date:
Source of Aggregate:
Date of Sampling:
Date of Testing:
Weight of Sample:
Test Result
Wt. Retained Cum. % Cum. % Limit as per
Sr. No. Sieve Size % Wt. Retained
(gm) Retained Passing IS:383
1 4.75 mm
2 2.36 mm
3 1.18 mm
4 600 mic.
5 300 mic.
6 150 mic.
7 Pan
8 Total
Remarks:
Signature
Name
Date