Professional Documents
Culture Documents
Subject- TO UNDER TAKE THE JOB OF COMPLETE INDUSTRIAL ENGINEERING FOR OUR PLANTS.
With reference to above subject, it is to inform you that , Maharashtra State Road Transport Corporation
has considered your tender to conduct time and motion study as per tender condition, scope of work and rate
offered by you. Accordingly, audited work order is issued vide ref4.above.
At present, MSRTC is not producing new bus body building at Central Workshops Pune, Nagpur
Aurangabad due to administrative reasons. However , other activities except bus body building are available for
time and motion study.
As per the note approved by Competent Authority vide ref-3 above , you are kindly requested to carry out time &
motion study at CWs Pune for engine, FIP & Tyre retreading along with turbo charger repairing activity at CWs
Aurangabad.
The variant activities for engine & FIP for CWs Aurangabad and Nagpur may be conducted provided its
billing will be processed by concerned WMs after variant study of Bus body building as the offer is combination of
three activities.
Considering above, you are requested to carry out time & motion study and comply.
For further information, if any, please feel free to contact at 022 23023964 to 66 or email at
msrtc.memeq@gmail.com
Thanking you,
Enclosed- original copy of work order.
Yours faithfully,
To,
The Principal,
Shri Ramdeobaba College of Engineering and Management,
Katol Road, Nagpur- 440013
Ph.: +91-712-2580011 (O) Ext. 2255
www.rknec.edu, principal@rknec.edu
WORK ORDER
Subject- TO UNDER TAKE THE JOB OF COMPLETE INDUSTRIAL ENGINEERING FOR OUR PLANTS.
Ref.- 1 EoI published vide our letter no. ST ME STF/ 5221 DT 18/12/2015
2 Tender ID 2016_MSRTC_117622_1 Opened on 26/04/2016.
3 Your E-MAIL Dt 23/9/2016 for Extension of tender validity upto 31.3.2017.
4 CR no 2016.08.13 dt 09/08/2016.
With reference to above subject and references you are hereby informed with great pleasure that,
the tender submitted by you is accepted by the Corporation. As per tender terms & conditions, scope of
work and rates offered by you, the work order is issued to conduct the time and motion study at Central
Workshops and TRPs for man HRs required to complete the task.
All terms and conditions of tender are applicable to this work order which are accepted by you
while submitting the tender. However, some of the broad terms, scope of work and approved rates are
specified in following schedules:
Schedule-A
2. To undertake an in-depth study and prepare process sheet, conduct time & motion study, prepare
standard time sheet, suggest lay outs, latest machines and man hours required to complete the
production activities of cited plants. The report in all respect should be submitted to this office
within 120 days.
3. The contractor shall examine the conditions of tender, general conditions of the contract and the
Scope of Work and approved rates to satisfy himself as to all the terms and conditions and
circumstances affecting the contract.
7. The work of time and motion study for which this work order is issued. Contractors shall complete
the activity and submit the report to Corporation in time.
8. Time and motion study is conducted in MSRTC’s factory premises during its operation.
9. The contractor/ consultant should take necessary precautions during study. In case of any
incident, liability of consultant will be with contractor. MSRTC will not be responsible.
10. Contractor should make necessary med-claim, life insurance, and insurance policies of the
persons and equipments involved in time and motion study.
11. The study is conducted in MSRTC work shop premises during working HRs, routine work of
operator should not be disturbed. Industrial peace should be maintained during study.
12. The General Manager (ME) reserves right to alter / delete scope of work as he may deem fit due
to various reasons from time to time during the course of contract period/study.
13. The report shall be free from strikeouts, over–writing, erasures or other modifications or any
clerical, computational or other errors, failing which such reports shall be liable for rejection.
Incomplete or erroneous reports are liable for rejection.
14. EMD will be refunded after satisfactory completion of work study scheduled at CW Dapodi .
15. The schedule of study will be decided by mutual consent. It will be the responsibility of contractor
to conduct the study as per schedule agreed mutually.
18. On the receipt of activity wise Report at concern WMs (representative of MSRTC ) office, it will be
jointly verified by the representative of the contractor and Work Manager for completeness and
satisfactory conditions of all requirements. Defects and deficiencies if any, shall be noted and
contractor shall initiate immediate corrective action for suitability and acceptability of activity report
to MSRTC. Final report should be consolidated report of all activities. Penal charges @ Rs 500
per day would be levied towards delay in final study report beyond 120 days from issue of Work
order and same will be recovered from the respective bill/pending bills of the contractor.
19. The firm shall handover the study report for each production activity to the authorized
representative of MSRTC (concerned Works Manager).
Payment Term:- The payment term applicable for the contract shall be 80% payment after 30 th
day on receipt and acceptance of shopwise report with the invoice / challan at concern WMs
Office or receipt of the delivery challan or receipt of invoice / bills whichever is later.
20. Any dispute regarding, payment or any litigation arising out of or in connection with the terms of
this contract made there under, including any suit to enforce the right or either party under / or in
respect of this contract, shall be instituted and exclusively tribal by the Courts of Competent
Authority Jurisdiction within Greater Mumbai. Notwithstanding that part of the clause of action may
have arisen outside jurisdiction of such courts and the suppliers expressly agree to the jurisdiction
of such courts.
21. Inviting/ promoting Corrupt or fraudulent practices will be liable to disqualify the contractor and all
pending payments will be forfeited.
22. In the event of any disputes arising under this contract shall be referred to Vice Chairman &
Managing Director, MSRT Corporation, Mumbai whose decisions shall be final and binding on
both the parties.
23. The tender shall understand contents of work order and Annexures :-
24. Failure or breach of the clauses shall render the contractor liable for penalties.
Schedule - B
(Scope of work , Approved rate and payable rate )
Landed Rate in Payable Rate
SR
ACTIVITY Rs (Inclusive of (80% of landed
NO
all taxes.) rate) in Rs
B1 To work out Man Hours on existing lay out and facilities available at DAPODI Unit.
Manufacturing of components for alu.bus body building.
1 ( ordinary and variant to semi luxury)
Assembly of components for alu.bus body structure ( ordinary and variant
2 to semi luxury)
604560 483648
3 Complete Bus body building Of Ordinery (Parivartan) bus 10.5 mt long.
Complete Bus body building of Semi luxury bus 10.5 mt long with
readymade Push back seats.
4 (Variant for Semi Luxury on 12 mtr long chassis)
5 Reconditioning of 10.5/12.00 mt long bus body in % with new bus body.
In case of any clarifications, contractors may contact Chief Engineer (OPN) and may notify to
MSRTC in writing to General Manager (ME), Mechanical Engineering Department, Dr. Anandrao Nair
Marg, Mumbai Central, Mumbai 400 008 by post or email. The contact details are 022 2302 3964 to 66 ,
email- msrtc.memeq@gmail.com
You are kindly requested to confirm your acceptance to this work order in writing to this office.
Thanking you,
Yours faithfully,
CONTACT DETAILS