INSPECTION PLAN
POWER GENERATOR

Project : Certification 1 Unit Power Generator Remark Remark Remark


Owner : PT Bina Abadi Pratama R : Review P : Provide IC : Inspection Company
Insp. Comp. : PT Farrald Teknindo V : Verification AR : Approval Required O : Owner
Location : Malang - Jawa Timur H : Hold Point W : Witness U : User

Reference Verified Acceptance Scope Of Inspection


No. Activity
Document Document Criteria U/O IC Migas
1 Document Review
- Manufacturer Data Report - IEC/NEMA/BS Standard - Manufacturer's Report - Complied to code/ standard P R
- Data Sheet - IEC/NEMA/BS Standard - Data Sheet - Complied to code/ standard P R
- Single Line Diagram - User/owner spec. - Electrical One Line Diagram - Complied to user/owner spec. P R
- Drawing - User/owner spec. - As Built Drawing - Complied to user/owner spec. P R
- Layout Equipment - User/owner spec. - Layout Equipment - Complied to user/owner spec. P R
- O & M Manual - User/owner spec. - O&M - Complied to user/owner spec. P R
- Driver Data Book P R

2 Visual Inspection
- Verify nameplate of equipment - Application Procedure - Inspection Checklist - Manufacturer's Report P V
- Check equipment layout based on classification area - Application Procedure - Inspection Checklist - Drawing P V
- Check condition of generator & driver - Application Procedure - Inspection Checklist - Manufacturer's Report P W
- Check condition of support - Application Procedure - Inspection Checklist - Manufacturer's Report P W
- Check condition of cable wiring - Application Procedure - Inspection Checklist - Manufacturer's Report P W
- Check of grounding installation - Application Procedure - Inspection Checklist - Manufacturer's Report P W
- Check instrument and electrical parameter - Application Procedure - Inspection Checklist - Manufacturer's Report P W
- Check of control panel - Application Procedure - Inspection Checklist - Manufacturer's Report P W
- Check condition of safety device - Application Procedure - Inspection Checklist - Manufacturer's Report P W
- Check Personal Safety Sign and Warning Sign - Application Procedure - Inspection Checklist - Manufacturer's Report P W

3 Function test
- Vibration measurement - Application Procedure - Inspection Checklist - Complied to code/ Standard W P
- Temperature measurement - Application Procedure - Inspection Checklist - Complied to code/ Standard W P
- Noise level measurement - Application Procedure - Inspection Checklist - Complied to code/ Standard W P
- Rotation (RPM) measurement - Application Procedure - Inspection Checklist - Complied to code/ Standard W P
- Earthing Measurement - Application Procedure - Inspection Checklist - Complied to code/ Standard W P

4 Report
- Final inspection report AR P
- Certificate of inspection P

Contractor Inspection Company Migas


PT PT Farrald Teknindo



( )
Kepala Teknik
(Mulyadin)
Manager Teknik & Operasi
PT BINA ABADI PRATAMA