INSPECTION PLAN
POWER GENERATOR
2 Visual Inspection
- Verify nameplate of equipment - Application Procedure - Inspection Checklist - Manufacturer's Report P V
- Check equipment layout based on classification area - Application Procedure - Inspection Checklist - Drawing P V
- Check condition of generator & driver - Application Procedure - Inspection Checklist - Manufacturer's Report P W
- Check condition of support - Application Procedure - Inspection Checklist - Manufacturer's Report P W
- Check condition of cable wiring - Application Procedure - Inspection Checklist - Manufacturer's Report P W
- Check of grounding installation - Application Procedure - Inspection Checklist - Manufacturer's Report P W
- Check instrument and electrical parameter - Application Procedure - Inspection Checklist - Manufacturer's Report P W
- Check of control panel - Application Procedure - Inspection Checklist - Manufacturer's Report P W
- Check condition of safety device - Application Procedure - Inspection Checklist - Manufacturer's Report P W
- Check Personal Safety Sign and Warning Sign - Application Procedure - Inspection Checklist - Manufacturer's Report P W
3 Function test
- Vibration measurement - Application Procedure - Inspection Checklist - Complied to code/ Standard W P
- Temperature measurement - Application Procedure - Inspection Checklist - Complied to code/ Standard W P
- Noise level measurement - Application Procedure - Inspection Checklist - Complied to code/ Standard W P
- Rotation (RPM) measurement - Application Procedure - Inspection Checklist - Complied to code/ Standard W P
- Earthing Measurement - Application Procedure - Inspection Checklist - Complied to code/ Standard W P
4 Report
- Final inspection report AR P
- Certificate of inspection P