for
CITY GAS DISTRIBUTION
in
MECON LIMITED
Delhi – 110 092
GAIL GAS LIMITED
for
CITY GAS DISTRIBUTION
in
MECON LIMITED
Delhi – 110 092
05.15.23LW.DFR..TTZ
CONTENTS
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
CONTENTS
Chapter No. Description Total Pages
02.00 INTRODUCTION 06
H:\rajesh\Market Survey\TTZ\Final\Contents.doc Contents - 1/2 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Sl
Annexure / Drawing No. Description
No
H:\rajesh\Market Survey\TTZ\Final\Contents.doc Contents - 2/2 © 2010 MECON Limited. All Rights Reserved
CHAPTER – 1
EXECUTIVE SUMMARY
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
01.01 Introduction
01.01.01 General
In last few years, the Indian Oil & Gas industry has witnessed some significant
changes which have set it on a path of greater competitiveness and efficiency.
The biggest milestone has been the formation of Petroleum & Natural Gas
Regulatory Board (PNGRB) for regulating the down stream sector. Under
present guidelines issued by PNGRB, companies interested in natural gas
business serving consumers of various sectors namely, domestic, commercial,
industrial and automobile, are now required to bid for various cities and
successful bidders will be awarded the rights to serve various segments under
laid down terms and conditions. This calls for understanding the natural gas
market of cities of interest, assessment of demand of natural gas in all the
segments, planning for City Gas Distribution (CGD) network and to assess
overall financial viability for the project prior to bidding process.
As a part of this exercise, GAIL Gas Limited, Noida, a wholly owned subsidiary
of GAIL (India) Limited, has assigned MECON Limited, New Delhi for
development of Detailed Feasibility Report (DFR) for setting up City Gas
Distribution Network including CNG dispensing facilities in Taj Trapezium Zone.
Taj Trapezium Zone (TTZ) is a defined area of 10,400 sq km around the Taj
Mahal to protect the monument from pollution. The geographical limits of the Taj
Trapezium Zone have been defined in the shape of a trapezoid between
27030’N & 77030’E to 27045’N & 77015’E and 26045’N & 77015’E to 27000’N &
78030’E, was notified by the Government of India for intensifying efforts for
prevention and control of pollution.
The Supreme Court of India delivered a ruling on December 30, 1996 regarding
industries covered under the TTZ, in response to a PIL seeking to protect the
Taj Mahal from environmental pollution. It banned the use of coal/ coke in
industries located in the TTZ with a mandate for switching over from coal/ coke
to natural gas, and relocating them outside the TTZ or shutting down. The TTZ
comprises over 40 protected monuments including three World Heritage Sites
— the Taj Mahal, Agra Fort and Fatehpur Sikri etc. TTZ is so named since it is
located around the Taj Mahal and is shaped like a trapezoid
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-1/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
For the purpose of the present DFR, the demand projections for domestic,
commercial, automobile and industrial sectors for the TTZ area have been made
available by GAIL Gas. The projected demand for TTZ for the four consumer
segments namely, Domestic, Industrial, Commercial and Automobile has been
worked out for 25 years.
Following is the summary of total projected demand for various sectors for TTZ
under realistic scenario:
Table - 01.01
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-2/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The above demand figures are with 2010 as the first year and 2034 as the 25th
year, as considered in the market survey and demand projection report.
In case of the automobile segment the Market Survey report made available by
GAIL Gas indicates a very equitable picture. All the locations in the TTZ
irrespective of area and population profile have been projected to be having
same CNG demand. This may not be the real picture as every town or city,
depending on its population profile and level of economic and commercial
activity, will have varying vehicular profile and hence the CNG demand. In light
of the above, though total projected demand as indicated in the demand report
has been considered for distribution but the locational distribution of total CNG
load has been worked out based on the above indicated parameters.
The projection has been made considering annual growth rate of 4.0% for the
units located in Industrial Area and other areas lying outskirts of the city. This
growth rate includes increase in demand of individual units as well as new
upcoming units. In case of units located within the city areas, annual growth rate
of 1.5% has been considered. This growth rate mainly takes into account the
increase in demand of individual units. Due to congested areas, no new units in
these locations have been considered. In case of Bharatpur (CA-16), the
projected demand is 0.0129 MMSCMD. Based on interaction with few of the
local industrial units at Bharatpur, the demand potential for industries at
Bharatpur appears to be much more than the projected demand (0.003
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-3/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
MMSCMD in 1st year and 0.0129 MMSCMD in 25th year). In view of the above
findings during the field visit system design has been worked out keeping a
provision of a total gas load of 0.0262 MMSCMD.
Further, the industry loads indicated by GAIL Gas for Firozabad region,
presently being fed by GAIL’s existing pipeline infrastructure have also not been
considered.
Based on the above, following sector wise realisable demand have been
arrived at and considered for design of system.
Table: 01.02
Sector TOTAL REALISABLE DEMAND, in MMSCMD
nd
2 5th 10th 15th 20th 25th
DOMESTIC 0.0030 0.0309 0.0362 0.0426 0.0521 0.0586
COMMERCIAL 0.0004 0.0023 0.0027 0.0031 0.0034 0.0037
INDUSTRIAL 0.1989 0.8684 1.2780 1.4862 1.7342 2.0301
AUTOMOBILE 0.0070 0.0370 0.1870 0.2230 0.2670 0.3270
Total 0.2092 0.9386 1.5039 1.7549 2.0567 2.4194
The above indicated Realisable Demand (Table-01.02) is the sum total of the
realisable demand, considered for distribution, for various consumer segments
in TTZ Geographical Area taking 2010 as the first year and 2034 as the terminal
or 25th year
Based on the realisable demand of 25th year, following sector wise Peak loads
have been arrived at and considered for design of Steel Grid Network.
Table: 01.03
The total system collectively has been designed to cater the peak load
requirement of 3.4786 MMSCMD of 25th year. The pipeline sizing has been
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-4/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
done by simulating the total peak load of gas after distributing the requirements
in the network.
TTZ area is already having a couple of major trunk pipelines running right
across the GA and also feeding gas to some of the industrial and different bulk
consumers of gas. GREP Pipeline of GAIL runs through the western part of the
TTZ Geographical area in South - North direction. Another pipeline, a spurline of
GREP, runs between Bhajera tap-off to Agra and Firozabad. Gas to be supplied
in the TTZ area is envisaged to be taken from these two trunklines. Further, the
area of TTZ is large with targeted towns and cities to be supplied with gas,
located considerable distance apart with large tracts of uninhabited land in
between. For the purpose of optimisation of pipeline network and downstream
distribution following five distinct areas have been identified and are envisaged
to have five independent sources of gas from these two pipelines.
The Steel grid line network has been designed to cater to a pressure of up to 49
kg/cm2, however, the maximum working pressure is considered to be 24
kg/cm2(g) in most part of the network, barring a portion of the Firozabad grid
where the pressure is envisaged higher. As mentioned earlier, there shall be five
independent CGSs for supplying gas to the various areas in TTZ. These five
CGSs shall feed gas to the five pipeline systems which shall be for all practical
purposes independent of each other. All these pipeline systems put together,
shall traverse a total length of about 142.8 km from the various City Gate
Stations. The branches of 4”, 6” & 8” shall be taken from this main grid line up to
the CNG stations, industrial units and DRSs as needed. The scheme has been
elaborated in the Schematic Drawing attached.
The scheme has been developed by optimising the pipeline sizes using
engineering design software (refer software generated schematic diagram
enclosed at Annexure-Ia & Ib)
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-5/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
b) The laying of major portion of grid line of 10”dia (47.7 km), 8” dia (49
km), 6”dia (0.8 km) and 4” dia (45.3 km) is envisaged to be completed in
first two years with approximately 70% being laid in first year. Refer
implementation Schedule (Fig-7.01).
c) The total inch Km of pipeline proposed to be laid in first five years (i.e.
the period of exclusivity) is as given below:
Table: 01.04
Pipe Detail Period
st
1 Year 2nd Year 3rd Year
10" x 6.4mm- API 5L Gr X42
33,390 m 14,310 m
(Total- 47,700m)
(333.9 Inch-KM) (143.1 Inch-KM) -
Chhata-Vrindavan Crossing – 21 km
Firozabad CGS – Arya Nagar - Makhanpur - 26.7 km
8" x 6.4mm- API 5L Gr B
(Total- 49,000m) 34,300 m 14,700 m
-
Vrindavan Crossing – Raya – Hathras – 45 km (274.4 Inch-km) (117.6 Inch-km)
Inner By-pass Firozabad - 4 km
6" x 6.4mm- API 5L Gr B
(Total - 800m) 800 m
-
Inner By-pass Firozabad – Jalesar Rd - 0.2 km (4.8 Inch-km)
Karbala Rd – Suhag Nagar - 0.6 km
4" x 6.4mm- API 5L Gr B
(Total- 45,300m)
Chhata – Nandgaon/Barsana – 10 km
31,710 m 13,590 m
Achhnera – Kiraoli – Fatehpursikri - 13 km -
(126.84 Inch-KM) (54.36 Inch-KM)
Bhajer – Bharatpur - 10 km
GREP – Govardhan - 5 km
Misc. Firozabad - 7.3 km
The total Inch-KM of Steel pipeline envisaged to be laid in first five years
i.e. the period of exclusivity is 1065.
d). Two types of CNG Stations, namely mother stations and daughter
booster stations are envisaged, to cater to the CNG demand of
automobile sector. Following is the total number of various stations to be
installed in 25 years:
Table – 01.05
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-6/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
1200 SCMH 7 7 7
650 SCMH - 3 -
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-7/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Quantity (Nos.)
By 5th Year from 6th to 15th from 16th to 25th Year
Sl. Facility Year
No.
250 SCMH 20 6 -
2. Dispensers:
For Bus 12 7 4
For Cars/Auto 52 19 4
3. Cascades:
4500 WL cap. 5 9 5
3000 WL cap. 2 1 2
2200 WL cap. 20 6 -
PNG Network
It is planned to have common PRSs/DRSs (as the case may be) for all domestic
and commercial connections and for some of the industrial connections.
Considering the large area coverage of the TTZ and the requirement to feed to
gas to comparatively much smaller towns and cities, smaller capacity DRSs
have been envisaged at multiple locations. In this connection DRSs of 400
SCMH, 600 SCMH, 1250 SCMH and 2500 SCMH capacity have been
envisaged.
Table: 01.07
Period District Regulating Stations
400 SCMH 600 SCMH 1250 SCMH 2500 SCMH
st th
1 – 5 Year 3 nos. 7 nos. 3 nos. 2 nos.
6th – 10th Year - - - -
th th
11 – 25 Year - - - -
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-8/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The Network would begin from DRS and enter up to premises of industrial,
domestic and commercial units
In view of the large area coverage the gas distribution network in the TTZ area
has been conceived in a way that the entire network in effect comprises of
separate gas supply systems for areas of major gas demand potential. These
systems are for all practical purposes independent of each other and have
separate gas off-take points as well. In all five nos. of City Gate Stations have
been envisaged out of which three nos., the ones for Chhata, Govardhan and
Bharatpur are on the GREP pipeline and the other two, for Achhnera and
Firozabad lie on the Bhajera-Agra-Firozabad pipeline. So to summarise the
above arrangement,
CGS near Achnera - Gas for Achnera, Kiraoli, Fatehpur sikri area
(Bhajera-Agra-Firozabad P/L)
Odourising system shall be provided along with Metering Skids to detect any
accidental leakage of gas
The steel grid line has been designed to cater to pressure upto 49 Kg/cm2,
as per the recent guidelines of PNGRB.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-9/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The Steel Grid Pipeline shall be PE coated in order to ensure long life. The
entire pipeline shall be provided with Permanent Cathodic Protection
System. Temporary Cathodic Protection (TCP) shall be provided during
construction phase of the proposed line by suitable means.
For entire pipeline & CNG distribution network, dedicated OFC based SCADA
system has been recommended. The pipeline and the CNG network shall be
monitored and controlled from central SCADA System Control centre using
Remote Terminal Units (RTUs) located along the pipeline at suitable locations.
For voice and data communication between stations and Master Control Station,
dedicated Optical Fibre Cables (OFC)/ Satellite Link/ Leased Line/ GSM/ CDMA
Network can be used. This will be implemented based on the criticality and the
capacity of the end user. The locations where dedicated OFC network is not
considered with pipeline, to meet the voice and data communication
requirement of these locations Leased Line/ GSM of other service provider /
operators available at city can be used for the limited SCADA (dedicated time
polling not a real time polling).
Master Control station (MS) is proposed at Firozabad and RTU at each CGS will
be provided. All large consumers will be connected with respective RTU of CGS
through GSM. The RTU will be connected to MS with existing GAIL telecom
network / leased line of other service provider / operators available between
each CGS location and Firozabad. This will cater telecom requirements of the
pipelines network.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-10/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The City Gas Distribution (MDPE) network shall receive gas from District
Regulatory Station (DRS) at a pressure of 7 bar for onward distribution to
domestic, commercial and some of the Industrial consumers. The distribution
system shall comprise of –
It is planned to have DRS for some of the industrial consumers and all domestic
and commercial connections. DRS of capacities namely 400, 600, 1250 and
2500 SCMH will be installed in the first five years itself. These DRSs will bring
down the pressure from 19 kg/cm2(g) (max) to 7 kg/cm2(g).
For domestic connections, each service line shall include a main isolation
valve and a regulator, reducing the pressure to 21 mbar.
The overall project comprising the CNG & PNG facilities including laying of main
grid and MDPE Network in TTZ is envisaged to be implemented in 25 years in
different Phases taking into account year-wise planning of infrastructure
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-11/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
development in line with growth in demand for CNG and PNG in various
segments.
The 10”/8”/ 6” dia Steel Pipe Line of length 142.8 Km (1065 Inch-KM).
01.08 Manpower
Keeping in view the vast area covered by TTZ Geographical Area, the project
work has to be taken up in various locations simultaneously. This will require at
least three dedicated teams for Grid line as well as for CNG & City Gas. The
organisational set-up for project implementation for the Project shall be headed
by a Dy. General Manager (Projects) who shall be assisted by six Managers
dedicated for Grid line and CNG & City Gas. They inturn shall be assisted by
adequate number of Assistant Managers and staff members having the required
skills to look after the distinct functions assigned to them (Refer Figure 8.01),
namely,
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-12/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The total project shall be taken up as comprising following two distinct areas:
Hence, there shall be dedicated project implementation teams for these two
areas which shall report to Dy. General Manager (Projects).
The requirement of manpower has been worked out keeping in view the
proposed locations of CNG dispensing facilities (Mother Stations/ On-line
Stations) and Grid Pipeline at various cities inside TTZ. It is proposed that a
unified O & M mechanism headed by a Dy. General Manager and supported by
Managers, Assistant Managers for Operation and Maintenance, Safety, Stores
and Logistics, Administration & Finance. Further, adequate number of
supervisors, Assistants and Attendants would look after Operations &
Maintenance of following distinct areas, namely:
The officers upto managerial level shall be from GAIL Gas Ltd. and manpower
requirement from Supervisors and below ranks may be taken on contract basis.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-13/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Capital cost based on the facilities envisaged for steel gridline, online stations
and city gas distribution network including charges for domestic, commercial
and industrial connections are estimated as Rs. 465.34 crores.
Phasing of capital expenditure before interest during construction for the project
as Rs. 43756.3 Lakhs has been worked out on the basis of implementation
schedule. The same is shown year-wise and given below.
Table – 01.08
st nd rd th
Year 1 2 3 4 5th
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-14/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The annual operating costs for the project at 100% capacity is given below
The financial analysis of the project has been carried out based on the capital
cost and operating cost as elaborated in Chpaters-09 & 10 respectively and the
purchase price of the gas delivered at the tap-off and finally to consumers of the
gas for the project. Profit & Loss Statement, Cash flow Statement and Balance
Sheet have been projected for the project life of 25 years. Following are the
salient financial indices for the project:
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-15/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Table – 01.10
Sl. Description Unit Amount
No.
1. Compression Charges Rs/ Kg 4.07
2. Transportation Tariff Rs/ MMBTU 27.14
3. Post-tax IRR on Capital employed % 23.6
4. Pre-tax IRR on Capital employed % 27.8
5. Payback period Years 8.8
6. Debt-service coverage ratio Times 2.54
7. Break-even capacity % 26.4
8. Cash break-even capacity % 15.6
9. NPV (post-tax) @10% discount for the project Rs.lakhs 40990.4
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-16/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Sensitivity analysis for the project has been carried out for increase/decrease of
capital cost, operating cost, selling price, gas purchase price and gas volume by
5-10%. Sensitivity for these Variants are given below.
Table – 01.10
Compression Transportation
Sl. IRR on Capital
Description Charges, Tariff,
No Employed, (%) Rs./Kg Rs./MMBTU
With decrease in
5 23.9 3.78 26.78
Operating cost by 10%
With increase in Gas
6 25.6 3.70 24.67
volume by 10%
With decrease in Gas
7 volume by 10% 21.6 4.52 30.16
The summary of the DFR in form of “Project at a Glance” has been presented as
Exhibit-1
H:\rajesh\Market Survey\TTZ\Final\Chapter - 01 - Executive Summary.doc 01-17/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
GAIL GAS
City Gas Distribution Network
Taj Trapezium Zone
MECON
PROJECT AT A GLANCE
i
DETAILED FEASIBILITY REPORT
GAIL GAS
City Gas Distribution Network
Taj Trapezium Zone
MECON
6.0 Peak (Hour/Day) Projected Gas Demand sector wise in 25th year:
SCMH MMSCMD
Commercial : 20 0.0074
ii
DETAILED FEASIBILITY REPORT
GAIL GAS
City Gas Distribution Network
Taj Trapezium Zone
MECON
:
v) Break- even capacity 26.4%
:
vi) Cash Break- even capacity 15.6 %
:
vi) Compression charges at 10% Rs. 4.07 / Kg
discount rate
vii) Transportation tariff at 10% : Rs. 27.14 / MMBTU
discount rate
iii
CHAPTER – 2
INTRODUCTION
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
02 INTRODUCTION
02.01 General
Over the last century there has been a perceptible shift of focus from coal to oil
and now natural gas and this has resulted in Natural Gas becoming a vital
component of the world's supply of energy these days. It is one of the cleanest,
safest, and most useful of all fossil fuels. It is increasingly finding acceptance as
the preferred fuel for the industry, automobiles and households alike the world
over.
In line with the new Gas Pipeline policy of Govt. of India and the PNGRB Act
2006, PNGRB has formulated and got notified a number of regulations for
downstream oil & Gas sector. In line with the new regulatory requirements of
tariff based bidding for grant of authorisation, a number of entities have come
out with Expressions of Interest (EOI) to set up CGD (City Gas Distribution). For
some of the cities even formal bidding process has also commenced.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 02 - Introduction.doc 02-1/6 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
GAIL (India) Limited has formed joint ventures with some of the oil companies
for distribution of natural gas in selected cities in the state of Andhra Pradesh,
Maharastra, Madhya Pradesh, Uttar Pradesh, Delhi etc.
02.02 Background
The entry of private players like Adani, Reliance, GEECL (with Coal Bed
Methane) in natural gas business along with Public Sector Companies like
IOCL, BPCL, HPCL and joint venture companies like IGL, MGL, TNGCL, GGL,
BGL, AGL etc. fuelled with new discoveries of Natural Gas in India and
formation of Petroleum & Natural Gas Regulatory Board (PNGRB) by the
government is going to totally transform this Industry.
GAIL Gas Limited, Noida, a Wholly Owned Subsidiary of GAIL (India) Limited,
has assigned MECON Limited, New Delhi for development of Detailed
Feasibility Report (DFR) for setting up CNG dispensing and City Gas
Distribution Network in Taj Trapezium Zone (TTZ) covering certain districts of
Uttar Pradesh and Rajasthan.
Taj Trapezium Zone (TTZ) is a defined area of 10,400 sq km around the Taj
Mahal to protect the monument from pollution. The geographical limits of the Taj
Trapezium Zone have been defined in the shape of a trapezoid between
27030’N & 77030’E to 27045’N & 77015’E and 26045’N & 77015’E to 27000’N &
78030’E, was notified by the Government of India for intensifying efforts for
prevention and control of pollution.
The Supreme Court of India delivered a ruling on December 30, 1996 regarding
industries covered under the TTZ, in response to a PIL seeking to protect the
Taj Mahal from environmental pollution. It banned the use of coal/ coke in
H:\rajesh\Market Survey\TTZ\Final\Chapter - 02 - Introduction.doc 02-2/6 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
industries located in the TTZ with a mandate for switching over from coal/ coke
to natural gas, and relocating them outside the TTZ or shutting down. The TTZ
comprises over 40 protected monuments including three World Heritage Sites
— the Taj Mahal, Agra Fort and Fatehpur Sikri. TTZ is so named since it is
located around the Taj Mahal and is shaped like a trapezoid.
Under present study, the Geographical Area (GA) covers entire TTZ except
Agra and Mathura with total area of about 9513 Sq Km. The Geographical Area
covered under present study comprises of following 23 Charge Areas:
H:\rajesh\Market Survey\TTZ\Final\Chapter - 02 - Introduction.doc 02-3/6 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The aim of the present feasibility study is to develop CNG and City Gas
Distribution network covering various Charge Areas (CAs) to cater demand for
natural gas in Industrial, Commercial, Domestic and Automobile segments.
Presently the natural gas demand of Industrial Sector of Firozabad (CA-1) is
being catered by M/s GAIL. M/s GAIL have established a vast pipeline network
in Firozabad for this purpose. The existing Pipeline network in Firozabad, GREP
and Agra Bajera Pipe Lines of M/s GAIL shall be taken as the source of Natural
Gas supply to various Charge Areas covered under the Geographical Area.
2) System Design
H:\rajesh\Market Survey\TTZ\Final\Chapter - 02 - Introduction.doc 02-4/6 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
7) Financial analysis
The financial analysis would include working out the Profit & Loss
Account, Cash Flow Statement, Estimated Balance Sheet, Network Tariff
Calculation etc. as per various Formats provided by PNGRB.
The DFR contains information under following chapters to meet the requirement
of the work order.
Executive Summary
Introduction
Methodology of Study
Demand Projections
System Design
System Description
H:\rajesh\Market Survey\TTZ\Final\Chapter - 02 - Introduction.doc 02-5/6 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Implementation Schedule
Organisation Structure & Manpower Planning
Capital Cost Estimate
Operating Cost Estimate
Financial Analysis
Study of the Demand Assessment Report provided by M/s GAIL Gas Limited
was carried out to develop an understanding of the overall demand potential in
the Geographical Area. Apart from this study, MECON team visited various
prominent charge Areas and conducted Reccee survey for grid pipeline route
and to locate suitable sites for City Gate Station (CGS), DRS, CNG Dispensing
facilities etc.
02.07 Acknowledgement
H:\rajesh\Market Survey\TTZ\Final\Chapter - 02 - Introduction.doc 02-6/6 © 2010 MECON Limited. All Rights Reserved
CHAPTER – 3
METHODOLOGY OF STUDY
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
03.01 Introduction
The said facilities, as detailed in the Chapter on System Design and System
Description, have been planned based on projected natural gas demand for 25
years. The demand projections for various segments have been arrived at
through a dedicated market survey got conducted by M/s GAIL Gas Limited
through a market survey agency. The proposed network and route selection has
been based on demand assessment, field visits, inputs from M/s GAIL & M/s
GAIL Gas Ltd. and other secondary data.
The demand projections for next 25 years (from 2010-34) for domestic,
commercial, automobile and industrial sectors in the Geographical Area covered
under TTZ, have been made by a specialised market survey agency appointed
by M/s GAIL Gas Ltd. The project demand for various segments from 2010-34
has been taken as basis with some modifications based on feed back received
from M/s GAIL and M/s GAIL Gas particularly in case of industrial demand for
Firozabad (CA-1) and at other places wherever felt necessary. The Demand
Assessment Report submitted by the market survey agency shall be an integral
part of the present DFR.
03.03 Maps Used For Study & Important Source of Secondary Data
The following maps were studied for the optimum route selection:
a) City map including Gas Grid map of M/s GAIL for Firozabad
H:\rajesh\Market Survey\TTZ\Final\Chapter - 03 - Methodology.doc 03-1/3 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
For selecting the Gas Grid for different Charge Areas, route study was carried
out keeping the following factors into account:
The selection criteria for location of CNG stations in the city is based on the
following:
H:\rajesh\Market Survey\TTZ\Final\Chapter - 03 - Methodology.doc 03-2/3 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
ii) The distance between two successive stations in case of the Grid within
cities shall be about 3.0 km.
iii) Conservation of gas
iv) Time to blow down the isolated section
v) Continuity of gas service
vi) Operational flexibility
vii) Expected future expansion between two sectionalizing valves
viii) Ease & flexibility in operation and security of the line
ix) Availability of a plot of minimum size 3m x 5m
Depending on the local site conditions the spacing between SV stations may be
adjusted to permit installation of SV station in a more accessible location
depending upon the availability of land during project execution.
In the current scheme of things DRSs of various capacities like 400, 600, 1250
and 2500 SCMH capacity has been envisaged. The selection criteria for DRS
location is based on the following:
iii) Locations shall be such that there is possibility of forming closed loops of
the MDPE network.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 03 - Methodology.doc 03-3/3 © 2010 MECON Limited. All Rights Reserved
CHAPTER – 4
DEMAND PROJECTION
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
04.01 General
For the purpose of the present DFR, the demand projections for domestic,
commercial, automobile and industrial sectors in the Geographical Area covered
under TTZ have been made based on market survey conducted through a
specialised market survey agency appointed by M/s GAIL Gas Limited. The
demand assessment report provides demand projections up to 25th year
beginning from the year 2010. The 1st year has been taken as the year for
creating the infrastructure for the project. The projected demand has been
worked out in three scenarios namely, optimistic, pessimistic and realistic. The
realistic demand has been considered for further working out total realisable
demand which has formed the basis for development of infrastructure and
system design.
The projected demand for the Geographical Area for the four consumer
segments namely, Domestic, Industrial, Commercial and Automobile has been
projected for 25 years.
The demand for domestic segment has been worked out by market survey
agency for all Charge Areas. The demand projected under realistic scenario has
been considered for development of gas distribution infrastructure. Following is
the summary of projected demand for domestic sector pertaining to different
Charge Areas:
H:\rajesh\Market Survey\TTZ\Final\Chapter - 04 - Demand.doc 04-1/7 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Charge Year
Charge Area
Area (Demand in MMSCMD)
2011 2014 2019 2024 2029 2034
CA-01 FIROZABAD 0.0012 0.0124 0.0146 0.0173 0.0214 0.024
CA-02 FARHA 0 0.0003 0.0003 0.0004 0.0006 0.0007
CA-03 AWAGARG 0 0.0003 0.0003 0.0004 0.0005 0.0005
CA-04 JALESAR 0.0001 0.0008 0.0009 0.0011 0.0014 0.0016
CA-05 SAHPAU 0 0.0001 0.0001 0.0001 0.0002 0.0002
CA-06 SADABAD 0.0001 0.0007 0.0008 0.001 0.0013 0.0014
CA-07 HATHRAS 0.0005 0.0047 0.0055 0.0065 0.0078 0.0088
CA-08 BALDEO 0 0.0002 0.0003 0.0005 0.0007 0.0008
CA-09 RAYA 0 0.0004 0.0004 0.0005 0.0007 0.0008
CA-10 VRUNDAVAN 0.0002 0.0023 0.0027 0.0031 0.0037 0.0042
CA-11 BARSANA 0 0.0002 0.0002 0.0002 0.0003 0.0004
CA-12 NANDGAON 0.0001 0.0009 0.0011 0.0013 0.0017 0.0019
CA-13 GOWARDHAN 0.0001 0.0006 0.0007 0.0009 0.0011 0.0012
CA-14 KUMHER 0.0001 0.0015 0.0018 0.0021 0.0027 0.003
CA-15 ACHNERA 0.0001 0.0006 0.0007 0.0009 0.0012 0.0013
CA-16 BHARATPUR 0.0008 0.0081 0.0094 0.0108 0.0128 0.0144
CA-17 RUPBAS 0 0 0 0 0 0
CA-18 BAYANA 0.0001 0.0013 0.0015 0.0017 0.002 0.0023
CA-19 JAGNER 0 0.0001 0.0001 0.0002 0.0002 0.0003
H:\rajesh\Market Survey\TTZ\Final\Chapter - 04 - Demand.doc 04-2/7 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Charge Year
Charge Area
Area (Demand in MMSCMD)
2011 2014 2019 2024 2029 2034
CA-01 FIROZABAD 0.00005 0.0002 0.0002 0.0002 0.0003 0.0003
CA-02 FARHA 0 0.0001 0.0001 0.0001 0.0001 0.0001
CA-03 AWAGARG 0 0 0 0 0.0001 0.0001
CA-04 JALESAR 0 0 0 0 0 0
CA-05 SAHPAU 0 0 0 0 0 0
CA-06 SADABAD 0.00005 0.0002 0.0003 0.0003 0.0003 0.0004
CA-07 HATHRAS 0.00005 0.0002 0.0002 0.0002 0.0003 0.0003
CA-08 BALDEO 0 0 0 0 0 0
CA-09 RAYA 0 0.0001 0.0001 0.0001 0.0001 0.0001
CA-10 VRUNDAVAN 0.00006 0.0003 0.0004 0.0004 0.0005 0.0005
CA-11 BARSANA 0 0.0001 0.0001 0.0001 0.0001 0.0001
CA-12 NANDGAON 0 0.0001 0.0001 0.0001 0.0001 0.0001
CA-13 GOWARDHAN 0 0.0001 0.0001 0.0002 0.0002 0.0002
CA-14 KUMHER 0 0 0 0 0 0
CA-15 ACHNERA 0.00004 0.0001 0.0002 0.0002 0.0002 0.0002
CA-16 BHARATPUR 0.00014 0.0006 0.0007 0.0008 0.0008 0.0009
CA-17 RUPBAS 0 0.0001 0.0001 0.0001 0.0001 0.0001
CA-18 BAYANA 0 0.0001 0.0001 0.0001 0.0001 0.0001
CA-19 JAGNER 0 0.0001 0.0001 0.0001 0.0001 0.0001
CA-20 KHERAGARH 0 0.0001 0.0001 0.0001 0.0001 0.0001
FATEHPUR-
CA-21 SIKRI 0 0.0001 0.0001 0.0001 0.0001 0.0002
CA-22 KIRAOLI 0 0.0001 0.0001 0.0002 0.0002 0.0002
CA-23 SHAMSABAD 0 0.0001 0.0002 0.0002 0.0002 0.0002
TOTAL 0.00039 0.0028 0.0033 0.0036 0.004 0.0043
H:\rajesh\Market Survey\TTZ\Final\Chapter - 04 - Demand.doc 04-3/7 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Charge Year
Charge Area
Area (Demand in MMSCMD)
2011 2014 2019 2024 2029 2034
CA-01 FIROZABAD 0.4394 4.8043 5.5757 6.0097 6.4776 6.9818
CA-02 FARHA 0 0 0 0 0 0
CA-03 AWAGARG 0 0 0 0 0 0
CA-04 JALESAR 0 0 0 0 0 0
CA-05 SAHPAU 0 0 0 0 0 0
CA-06 SADABAD 0 0 0 0 0.0001 0.0001
CA-07 HATHRAS 0.0001 0.0006 0.0025 0.0027 0.0029 0.0031
CA-08 BALDEO 0 0 0 0 0 0
CA-09 RAYA 0 0 0 0 0 0
CA-10 VRUNDAVAN 0 0 0 0 0 0
CA-11 BARSANA 0 0 0 0 0 0
CA-12 NANDGAON 0 0 0 0 0 0
CA-13 GOWARDHAN 0 0 0 0 0 0
CA-14 KUMHER 0 0 0 0 0 0
CA-15 ACHNERA 0 0 0 0 0 0
CA-16 BHARATPUR 0.0003 0.0013 0.0103 0.0111 0.012 0.0129
CA-17 RUPBAS 0 0 0 0 0 0
CA-18 BAYANA 0 0 0.0002 0.0002 0.0002 0.0002
CA-19 JAGNER 0 0 0 0 0 0
CA-20 KHERAGARH 0 0 0.0001 0.0001 0.0001 0.0001
FATEHPUR-
CA-21 SIKRI 0 0 0 0 0 0
CA-22 KIRAOLI 0 0 0 0 0 0
CA-23 SHAMSABAD 0 0 0 0.0002 0.0002 0.0002
TOTAL 0.4398 4.8062 5.5888 6.024 6.4931 6.9984
H:\rajesh\Market Survey\TTZ\Final\Chapter - 04 - Demand.doc 04-4/7 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Year
(Demand in MMSCMD)
Charge
Charge Area
Area
2011 2014 2019 2024 2029 2034
H:\rajesh\Market Survey\TTZ\Final\Chapter - 04 - Demand.doc 04-5/7 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Year
(Demand in MMSCMD)
Charge
Charge Area
Area
2011 2014 2019 2024 2029 2034
Considering sizes of different Charge Areas and their population etc. this
even projection of CNG demand is certainly not realistic. The CNG
demand for Charge Areas like Firozabad, Bharatpur etc. can not be
same as those of places like Jalesar, Baldeo, Kumher etc. where even
commercial demand has been projected as nil. In absence of reliable
data in the Demand Assessment Report pertaining to CNG demand, the
data has been modified based on MECON’s assessment for deciding
number of CNG Stations. The CNG run vehicles coming from nearby
places like Delhi and other parts of NCR etc. particularly to tourist places
like Fatehpur Sikri, Vrindavan,Goverdhan, Bharatpur etc. has been taken
into account.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 04 - Demand.doc 04-6/7 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Year
(Demand in MMSCMD)
Charge
Charge Area
Area
2011 2014 2019 2024 2029 2034
FATEHPUR-
CA-21 SIKRI 0.0003 0.0022 0.00882 0.0105 0.0126 0.0154
H:\rajesh\Market Survey\TTZ\Final\Chapter - 04 - Demand.doc 04-7/7 © 2010 MECON Limited. All Rights Reserved
CHAPTER – 5
SYSTEM DESIGN
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
05.01 General
This chapter covers the design philosophy, input parameters, basic design and
standards for the total CNG & PNG distribution system envisaged for Taj
Trapezium Zone Geographical Area.
The demand projections are as per the market survey and demand assessment
study got conducted by GAIL Gas for the complete geographical area and the
demand report of the same made available to MECON for preparation of DFR.
The projections in the said demand report have been made for a period of 25
years taking 2010 as Zero year for four consumer segments namely, domestic,
commercial, automobile and industrial.
The total projected demand for various segments during 2nd, 5th, 10th, 15th, 20th
and 25th year has been indicated in Table - 05.01 (refer chapter-4.0 for details):
Table - 05.01
Sector PROJECTED DEMAND, in MMSCMD
10th 15th 20th 25th
2nd Year 5th Year
Year Year Year Year
DOMESTIC 0.0036 0.0385 0.0450 0.0532 0.0656 0.0737
The Projected gas demand as per the market survey may not be achievable in
totality due to several factors viz; implementation difficulties, socio-economic
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-1/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
factors etc. Thus the demand is reanalysed to obtain a demand which can
actually be realised on implementation of the proposed Grid Network.
The projected demand figures of 25th year are normally further analysed for
determining the Realisable Demand in some of the segments. As the entire
Realisable demand projection for 25 years is considered in designing the Grid,
no excess carrying capacity is further considered.
In case of the automobile segment the Market Survey report made available by
GAIL Gas indicates a very equitable picture. All the locations in the TTZ
irrespective of area and population profile have been projected to be having
same CNG demand. This may not be the real picture as every town or city,
depending its population profile and level of economic and commercial activity,
will have varying vehicular profile and hence the CNG demand. In light of the
above, though total projected demand as indicated in the demand report has
been considered for distribution but the locational distribution of total CNG load
has been worked out based on the above indicated parameters.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-2/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Kotla Road
Asfabad
The projection has been made considering annual growth rate of 4.0% for the
units located in Industrial Area and other areas lying outskirts of the city. This
growth rate includes increase in demand of individual units as well as new
upcoming units. In case of units located within the city areas, annual growth rate
of 1.5% has been considered. This growth rate mainly takes into account the
increase in demand of individual units. Due to congested areas, no new units in
these locations have been considered. In case of Bharatpur (CA-16), the
projected demand is 0.0129 MMSCMD. Based on interaction with few of the
local industrial units at Bharatpur, the demand potential for industries at
Bharatpur appears to be much more than the projected demand (0.003
MMSCMD in 1st year and 0.0129 MMSCMD in 25th year). In view of the above
findings during the field visit system design has been worked out keeping a
provision of a total gas load of 0.0262 MMSCMD.
Further, the industry loads indicated by GAIL Gas for Firozabad region,
presently being fed by GAIL’s existing pipeline infrastructure have also not been
considered.
Based on the above, following sector wise realisable demand have been arrived
at and considered for design of system.
Table: 05.02
Sector TOTAL REALISABLE DEMAND, in MMSCMD
nd
2 5th 10th 15th 20th 25th
DOMESTIC 0.0030 0.0309 0.0362 0.0426 0.0521 0.0586
COMMERCIAL 0.0004 0.0023 0.0027 0.0031 0.0034 0.0037
INDUSTRIAL 0.1989 0.8684 1.2780 1.4862 1.7342 2.0301
AUTOMOBILE 0.0070 0.0370 0.1870 0.2230 0.2670 0.3270
Total 0.2092 0.9386 1.5039 1.7549 2.0567 2.4194
The above indicated Realisable Demand (Table-05.02) is the sum total of the
realisable demand, considered for distribution, for various consumer segments
in TTZ Geographical Area taking 2010 as the first year and 2034 as the terminal
or 25th year.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-3/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The total philosophy for the system design has been worked out keeping in view
the availability of sufficient gas in the CGSs envisaged for the entire area
alongwith:
It has been envisaged that more emphasis shall be given to utilising the existing
Retail outlets for CNG dispensing as the demand has already been built up in
these stations. The domestic sector has also been given priority while designing
the system. The augmentation of infrastructure for CNG & PNG distribution has
been planned in a phased manner as the demand builds up in subsequent
years. This would ensure capital investment in phased manner resulting into
overall economy of the project. As the area to be covered is quite big with many
locations to be reached, the philosophy adopted for CNG system design is to
have centralised CNG compression facilities at few locations and the other
locations comparatively farther away from the steel network to be fed with
Daughter Booster Stations. The compression capacity requirements for these
locations shall be loaded onto the CNG Mother stations planned along the steel
network. The above is aimed at optimising the steel pipeline network yet have a
good geographical spread and area coverage of CNG availability
As per the new regulations of PNGRB, network tariff charges and compression
charges are to be worked out for economic life of the project i.e. 25 years.
Accordingly, following has been taken into account while carrying out overall
system design:
The network has been conceived to be able to cater to the peak load
realisable demand for 25th year. This shall avoid the trouble of laying
another line on the same route after the exclusivity period.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-4/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
As already stated earlier, TTZ area is already having a couple of major trunk
pipelines running right across the GA and also feeding gas to some of the
industrial and different bulk consumers of gas. It has also been mentioned
earlier that natural gas is already being supplied to industrial consumers in
Firozabad area.
GREP Pipeline of GAIL runs through the western part of the TTZ Geographical
area in South - North direction. Another pipeline, a spurline of GREP, runs
between Bhajera tap-off to Agra and Firozabad. Gas to be supplied in the TTZ
area is envisaged to be taken from these two trunklines. Further, the area of
TTZ is large with targeted towns and cities to be supplied with gas, located
considerable distance apart with large tracts of uninhabited land in between.
Considering the above, it may not be economically viable to conceive a network
in the complete area with a single or couple of sources and reaching all areas
from there. It would be prudent to have multiple sources of gas from points on
the source pipelines suitably located for major demand centres. Thus conceiving
the CGD network for TTZ GA in such a way that the total network in the GA
essentially comprises a few smaller gas distribution networks which may be, for
all practical purposes, independent of each other, for the reason that
interconnecting these independent networks would result in substantial increase
in the dead length of the steel pipeline.
For the area comprising Barsana, Nandgaon, Vrindavan, Raya and right upto
Hathras it is envisaged that gas shall be tapped from the SV 10 of GAIL’s GREP
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-5/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
pipeline near Chhata sugar mill lying just on the north-western fringes of the TTZ
Geographical area.
Source of gas for the consumers in Firozabad area would be the Bhajer-Agra-
Firozabad pipeline of GAIL with the gas being tapped from the existing city gate
station at Firozabad.
Source of gas for the consumers in the Govardhan area would again be GREP
pipeline of GAIL with the gas being tapped from the SV 9.
For meeting the gas requirement of the various consumers in and around
Bharatpur city, gas is envisaged to be tapped from the SV 8 of the GREP
pipeline of GAIL.
It is assumed that the required quantity of natural gas for the CGD network in
TTZ area shall be made available by the natural gas suppliers, from the above
mentioned sources.
All the five different sources of gas indicated above would individually require
city gate stations with all the associated facilities. It is assumed that these
CGSs, if need be with suitable modifications at a future date, shall be able to
meet the requirements up to the 25th year.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-6/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The Odourising Units with Ethyl Mercaptan as odourant shall be installed at the
City Gate Stations in line with the regulatory requirement.
This increased flow rate is termed as Peak Load. The system has to be designed
for a higher capacity based on the Peak Load requirements of all consumer
segments.
Based on the realisable demand of 25th year, following sector wise peak loads
have been arrived at and considered for design of system:
Table – 05.03
For Automobile Sector, the peak loads have been worked out
considering 60% of daily demand to be met in 8 hour and balance 40%
in remaining period.
For Industrial Sector, the peak loads have been worked out
considering 18 hour working in industrial units.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-7/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
For Commercial Sector, the peak loads have been worked out
considering 12 hour working in commercial units.
For Domestic Segment, the peak loads have been worked out
considering consumption in 8 hour per day.
The Steel grid line network has been designed to cater to a pressure of up to 49
kg/cm2, however, the maximum working pressure is considered to be 24
kg/cm2(g) in most part of the network, barring a portion of the Firozabad grid
where the pressure is envisaged higher. As mentioned earlier, there shall be five
independent CGSs for supplying gas to the various areas in TTZ. These five
CGSs shall feed gas to the five pipeline systems which shall be for all practical
purposes independent of each other. All these pipeline systems put together,
shall traverse a total length of about 142.8 km from the various City Gate
Stations. The branches of 4” and 6”/8” shall be taken from this main grid line up
to the CNG stations, industrial units and DRSs as needed. The scheme has
been elaborated in the Schematic Drawing attached.
The scheme has been developed by optimising the pipeline sizes using
engineering design software (refer software generated schematic diagram
enclosed at Annexure-Ia & Ib)
b) The laying of major portion of grid line of 10”dia. (47.7 km), 8” dia (49
km), 6”dia (0.8 km) and 4” dia (45.3 km) is envisaged to be completed in
first two years with approximately 70% being laid in first year. Refer
implementation Schedule (Fig-7.01 and 7.02).
c) The total inch Km of pipeline proposed to be laid in first five years (i.e.
the period of exclusivity) is as given below:
Table: 05.03
Pipe Detail Period
st
1 Year 2nd Year 3rd Year
10" x 6.4mm- API 5L Gr X42 33,390 m 14,310 m
(Total- 47,700 m) (333.9 Inch-KM) (143.1 Inch-KM) -
Chhata-Vrindavan Crossing – 21 km
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-8/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The total Inch-KM of Steel pipeline envisaged to be laid in first five years
i.e. the period of exclusivity is 1065.
Design Temperature
- Buried : 45°C
- Above Ground : 65°C
Joint Factor : 1
Temperature Factor : 1
Population Density Factor-Gridline : Class-IV
Design Life : 30 Yrs
Pipe Line Specification
- Pipeline Material :
For all size P/L : API 5L Gr.42 /API 5L Gr.B
6.4 mm WT.
- Corrosion Allowance : 0.5 mm
- Pipeline Efficiency : 0.9
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-9/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Based on the available projected demand, various facilities have been planned
in a phased manner and the same has been shown in the Implementation
Schedule (figure-07.01 and 07.02).
Commensurate with growth in demand for CNG, the facilities shall be added in a
staggered manner as detailed in Table 05.04 below:
Table: 05.04
STATIONS Cap. of compressor No. of installations Year of
in SCMH installation
Upto 5th Beyond 5th
year year
A ) Mother Stations – Green Field
Firozabad on NH 1200 1 1 1st & 7th
Near CGS 650 1 13th
Near Chhata on NH 1200 1 1 1st & 11th
Hathras
1200 1 1 1st & 9th
(on NH )
Bharatpur 1200 1 1 1st, 13th
On Agra Highway 650 1 10th
Raya 1200 1 1 5th & 14th
On Proposed Taj Expressway
Vrindavan X-ing 1200 - 2 8th & 16th
(on NH )
Achhnera 1200 - 2 10th & 18th
On Bhajera-Agra Highway 650 1 9th
Hathras 1200 - 2 21st & 22nd
(on NH)
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-10/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The daughter booster stations shall be chosen such that they provide a good
geographical spread for the CNG network.
CNG Cascades of 4500 water litre capacity are envisaged installed at all the
Green Field Mother Stations. At the Mother Stations on OMC ROs, 3000 water
litre capacity cascades are proposed. Adequate number of cascades along with
LCVs shall have to be deployed to ensure uninterrupted CNG supply to DBSs.
Adequate number of Bus, Car/ Auto dispensers have been envisaged to
maintain a healthy dispensing capacity to gas demand ratio.
The planned gas demand for the automobile sector in different years is as
mentioned in Table 05.05 below:
Table: 05.05
CNG DEMAND, in MMSCMD
2nd Year 5th Year 10th Year 15th Year 20th Year 25th Year
0.0070 0.0370 0.1870 0.2230 0.2670 0.3266
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-11/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The number of compressors have been added over the years to maintain a healthy
compression capacity to gas demand ratio, being 1.26 at the end of 25th.
Considering the fact that TTZ area comprises nearly 10,000 sq km and in view of
the larger spread of the area substantial number of DBSs have been envisaged to
cater to the CNG demand of the comparatively smaller towns and cities located
away from the steel network. For the reason that CNG Mother stations are
proposed only at major and strategic locations, additional number of DBSs have
been envisaged and as a result, the number of dispensers considered end up with
a very healthy Dispensing capacity to gas demand ratio over the 25 year period.
The design parameters for the above CNG facilities and number of CNG
cascades are as follows:
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-12/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Bus : 80 kg
Car : 8 kg
Auto : 3.5 kg
Bus : 8 minutes
Car : 4 minutes
Auto : 2 minutes
Table: 05.07
Quantity (Nos.)
By 5th Year from 6th to from 16th to 25th
Sl. Facility 15th Year Year
No.
1. Compressors:
1200 SCMH 7 7 7
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-13/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
650 SCMH - 3 -
250 SCMH 20 6 -
2. Dispensers:
For Bus 12 7 4
For Cars/Auto 52 19 4
3. Cascades:
4500 WL cap. 5 9 5
3000 WL cap. 2 1 2
2200 WL cap. 20 6 -
The pressure regimes that shall be followed for the system design are:
Out of the total area of TTZ industrial activity is substantial only at three major
locations, with the lions share being that of Firozabad and the other two being
Bharatpur and Hathras. The following major industrial areas have been targeted
for Industrial PNG distribution:
Firozabad
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-14/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Purani Mandi
Pameshwar Gate
Saraswati Nagar
Kotla Road
Hanuman Garh
Makhanpur
Bhartpur
Brij Industrial Area (RIICO)
Purana Industrial Area
Hathras
Industrial Area
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-15/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
It is planned to have common PRSs/DRSs (as the case may be) for all domestic
and commercial connections and for some of the industrial connections.
Considering the large area coverage of the TTZ and the requirement to feed to
gas to comparatively much smaller towns and cities, smaller capacity DRSs
have been envisaged and multiple locations. In this connection DRSs of 400
SCMH, 600 SCMH, 1250 SCMH and 2500 SCMH capacities have been
envisaged.
The Network would begin from MRS/DRS and enter upto premises of industrial,
domestic and commercial units.
Steel Pipes
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-16/17 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
CNG System
H:\rajesh\Market Survey\TTZ\Final\Chapter - 05 - System Design.doc 05-17/17 © 2010 MECON Limited. All Rights Reserved
CHAPTER – 6
SYSTEM DESCRIPTION
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
06.01 General
To meet the projected gas demand of the entire Taj Trapezium Zone
Geographical Area, it is envisaged to lay a Distribution Network of Natural Gas
pipelines in the cities and other areas. The steel main grid would be laid initially
and installation of equipments would be done in a phased manner as described
in Chapter-07.00 (Implementation Schedule).
As already stated in the previous chapter, in view of the large area coverage the
gas distribution network in the TTZ area has been conceived in a way that the
entire network in effect comprises of separate gas supply systems for areas of
major gas demand potential. These systems are for all practical purposes
independent of each other and have separate gas off-take points as well. In all
five nos of City Gate Stations have been envisaged out of which three nos., the
ones for Chhata, Govardhan and Bharatpur are on the GREP pipeline and the
other two, for Achnera and Firozabad lie on the bhajera-Agra-Firozabad
pipeline. So to summarise the above arrangement,
CGS near SV10 of GREP – Gas for Barsana, Nandgaon, Vrindavan, Raya,
Hathras area
CGS near Achnera - Gas for Achnera, Kiraoli, Fatehpur sikri area
(Bhajer-Agra-Firozabad P/L)
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-1/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The City Gate Stations envisaged are to be a skid type having filtration,
pressure reduction and flow measurement facilities with following major items:
i) Isolation valves
ii) Cartridge filters
iii) Pressure regulators
iv) Slam shut valves
v) Turbine/ultrasonic flow meters
vi) Cold venting facilities
vii) Pressure Safety valves
viii) Instrumentation
Odorising Facilities
Odourising system shall be provided at the city gate stations to detect any
accidental leakage of gas. It is envisaged to have 1 no. of Odourising unit
installed along with the Metering Skid. The odourisation injection rate shall be
based on the flow rate of the gas. The odourant proposed to be used is Ethyl
Mercaptan.
The odorant, ethyl mercaptan provides a good odour impact and is commonly
available in India. The odorant sulphur compounds do not harm the natural gas
transmission or steel pipeline system because highly elevated temperatures are
required to convert these compounds into acidic substances.
The steel grid line has been designed to cater to pressure upto 49 Kg/cm2, as
per the recent guidelines of PNGRB. The main grid line has been designed
based on the following design parameters:
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-2/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The layout of the steel grid line along with equipments is shown in Annexure-III -
B.
Sectionalising valve
Tap-Off on upstream (future provision)
Cold venting facility
SV station shall have full bore gas actuated ball valve with extended stem.
6” /4” dia. Tap-offs (for 10”/8”/6” grid lines) shall be provided for future use.
Provision shall be made for safe blow down of gas into the atmosphere through
Vent. A vent pipe of minimum 3m height above ground and located at a suitable
safe distance from the valve assembly shall be provided.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-3/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
For efficient and satisfactory functioning of the main grid line system, both from
safety and economic point of view, the steel pipeline must be protected against
corrosion.
Salient features of the CP system proposed for Grid Line are described as
follows:
iv) All the cased road/ rail crossings shall be provided with proper insulating
spacers, end seals, drain and vent pipes. The casing pipes shall be
independently protected by sacrificial anodes, wherever necessary.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-4/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
v) Minor crossings need not be isolated but extra care in their protection
shall be exercised.
iv) For monitoring purposes in normal cases test stations shall be installed
at intervals not exceeding 1 km but in congested area test station shall
be installed at intervals of 250 metre. In addition, test points shall be
provided at all crossings and near insulating joints.
vi) Insulating joints shall be provided on the proposed line at all necessary
locations where electrical isolation is desirable such as at CNG Stations
and DRS. The grounding cells/ spark gap arresters will also be installed
across insulating joints.
For voice and data communication between stations and Master Control Station,
dedicated Optical Fibre Cables (OFC)/ Satellite Link/ Leased Line/ GSM/ CDMA
Network can be used. This will be implemented based on the criticality and the
capacity of the end user. The locations where dedicated OFC network is not
considered with pipeline, to meet the voice and data communication
requirement of these locations Leased Line/ GSM of other service provider /
operators available at city can be used for the limited SCADA (dedicated time
polling not a real time polling).
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-5/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Master Control station (MS) is proposed at Firozabad and RTU at each CGS will
be provided. All large consumers will be connected with respective RTU of CGS
through GSM. The RTU will be connected to MS with existing GAIL telecom
network / leased line of other service provider / operators available between
each CGS location and Firozabad. This will cater telecom requirements of the
pipelines network.
Natural Gas shall be transported from CGS to Compressed Natural Gas (CNG)
Station through main grid pipeline described above.
The following types of CNG stations are planned in TTZ area for catering to the
demand of automobile sector:
A. Main Equipment
i) Office-cum-Control Room
ii) RCC forecourt, canopy over dispenser island and signages
iii) Stainless steel tube connecting compressor, dispenser &
cascades laid in U/G trenches
iv) U/G drainage and sewerage network
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-6/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The above facilities shall vary as per requirement for the Mothers Stations
located on OMC ROs.
Process flow diagram for CNG Mother Station and typical plan for proposed
CNG Mother Station are shown in Annexure-III - C.
The following units have been envisaged in each Daughter Booster station:
A. Main Equipment
B. Other Facilities
i) Office-cum-Control Room
ii) RCC forecourt, canopy over dispenser island and signages
iii) Stainless steel tube connecting compressor, dispenser &
cascades laid in U/G trenches
iv) U/G drainage and sewerage network
v) Approach/ exit road, boundary wall etc.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-7/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
gas load of about 50 sm3/hr for 1200 SCMH compressor and 30 sm3/hr
for 650SCMH compressor. The compressor will start automatically in
case cascade pressure falls less than 210 kg/cm2(g) and will unload at
pressure 255 kg/cm2(g).
B) Booster Compressor
To increase the dispensing speed & reduce waiting time for filling at
daughter station and better utilisation of cascade capacity, one
hydraulic/reciprocating type electric motor driven compressor with 22 kW
load and of capacity 250 sm3/hr at suction pressure of 30 kg/cm2(g) has
been envisaged at daughter station. This booster compressor shall
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-8/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
C) Dispensers
- Bus Dispenser
- Car Dispenser
The car dispenser shall have two arms and bus dispenser shall
have one arm for dispensing the gas.
`Coriolis’ true mass flow metering system or equivalent with
necessary sensor & electronics shall be provided with provision
of liquid crystal backlit display for night viewing which will show
unit price of CNG in Rs./ Kg, quantity of gas sold in Kg & total
sale in Rupees. A tamper proof totaliser shall be provided.
PLC based sequencing software and controller including
hardware alongwith ball valves associated with pneumatic
actuation for dispensing of gas shall be provided.
Two CNG flexible electrically conductive twin fill and vent hoses
with two NGV-1 Type-2, Class – A fill nozzle with captive vent
including 3-Way vent shall be provided.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-9/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
E) Stationary Cascades
Cascades are used to store the CNG at high pressure, to absorb the
surge of reciprocating compressor, frequent start and stop of compressor
and to supply additional gas when dispensing rate is more than
compressor capacity. Compressor will start if pressure in cascade falls
below 210 kg/cm2(g) and stop at pressure 255 kg/cm2(g). For a pressure
range of 220 kg/cm2(g) to 255 kg/cm2(g), in cascades of 4500 litre, 3000
litre and 2200 litre capacity, approx. 750 kg, 500 Kg & 350 Kg
respectively, of CNG can be stored. The cascade shall supply gas to bus
as well as car/ auto dispensers.
F) Mobile cascade
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-10/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
DG Set
UPS & Battery Back-up – a one-hour UPS and battery back-up system
shall be provided at each station.
H) SS Tubing
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-11/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
One bore well of suitable depth and size will be constructed. One
submersible pump of capacity 3,000-5,000 l/hr, head 50-60 meter,
approx. 2 H.P. shall be installed in the bore well.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-12/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The downstream gas distribution network shall receive gas from DRS at a
pressure of 7 bar for onward distribution to domestic, commercial & Industrial
consumers. The distribution system shall comprise of –
The DRS shall work as pressure reducing and gas metering facility. The DRS
shall comprise of pressure reduction, metering system, condensate removing
facility and cold venting facility. Filter Separator shall be provided at the inlet of
each run of the pressure reduction metering assembly. Filtration efficiency shall
be 99.9% for the removal of all particles from 3 micron size onwards. The flow
measurement meter shall be of Turbine type. The error limits shall be ± 2% in
the range between Qmin and 0.2Qmax and ± 1% in the range between 0.2Qmax
and Qmax. The regulating assembly shall be a dual run assembly with each run
designed for the full flow capacity required for the station and manual isolating
valves provided to facilitate servicing of each run without shutdown of the
station.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-13/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Distribution Mains
Distribution Service
A) Distribution Mains
All MDPE pipes shall have minimum cover of one meter and shall be
back filled with sand around it to protect the plastic material. Emphasis
shall be placed on utilizing modern construction techniques to install the
distribution system. This shall include, wherever possible, avoiding
disruption/ damage to road and footpaths, by boring and drilling. Large
crossings, such as canals, major roads, etc., shall be carried out using
Horizontal Directional Drilling (HDD).
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-14/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
B) Distribution Services
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-15/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Control Philosophy
Instrumentation and control system has been envisaged for smooth, efficient
and trouble free transportation of natural gas from CGSs to the distribution
networks. This will be achieved through measurement of inlet/outlet gas
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-16/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
pressure and temperature, metering and control of gas flow through pipeline at
CGS.
All the instruments shall be microprocessor based electronic type with 4-20mA
DC isolated output. Final control element shall be gas-actuated type. Instrument
power supply shall be based on 230V, 50Hz AC through UPS. For instruments
in the CGS, apart from local gauges all indications, control, recording and valve
status indications shall be provided in a control panel in the local control room at
the CGS. Gas flow metering and control shall be skid based. For SV stations,
the line pressure and temperature indications shall be local only.
06.08 Electrical
The electrical load shall comprise of mainly lighting load, instrumentation power
requirements, at all locations and air conditioning, UPS, Electric Compressors,
Submersible Pump and Dispensers at CGS, mother & daughter stations.
The design and selection of electrical equipment for power distribution, drive
motors, their controls and illumination system for buildings and other process
areas has been envisaged to ensure high reliability & safety in operation.
Equipment available indigenously and incorporating required features with
proven reference in similar fields of application shall be used.
Though all precautions shall be planned for safe operation of the unit,
possibilities of accidental situations arising cannot be ruled out. In view of this, it
is imperative to prepare a Disaster Management Plan to serve as a guideline at
the time of emergency to help all concerned to handle the same as quickly as
possible in order to prevent or reduce suffering of consumers as well as damage
to property & equipment of the Company. This shall also help in imparting
knowledge of potential hazards and facilities available for controlling the same in
a well co-ordinated manner to all the employees and also train them before
hand.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-17/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The main objectives of the plan are to take immediate actions to meet any
emergency situation by making maximum use of combined resources for the
most effective, speedy and efficient rescue and relief operations. These are
briefly enumerated below:
i) Cordon and isolate the affected area for smooth rescue operations.
ii) Ensure restoration of gas supply/ services at the earliest possible time.
iii) Rescue and treat causalities and safeguard the rest.
iv) Minimise damage to person, property and surroundings.
v) Contain and ultimately bring the situation under control.
vi) Secure and safe rehabilitation of the affected area.
vii) Provide necessary information to statutory agencies.
viii) Provide authoritative information to the news media.
ix) Ward off anti-social elements and prying onlookers.
x) Counter rumour mongering and panic by providing relevant accurate
information.
xi) Protect the Company from adverse publicity.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-18/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Alarm Level 1
The incident can be capably dealt with by local site resources without further
support. The incident has not resulted in personal injury and agencies outside
the company are not involved. No adverse publicity will be attracted by the
company.
This level of Alarm will be managed by the relevant Assistant Manager as within
normal operational duties.
Alarm Level 2
The incident may have environmental consequences, result in some local loss
of supply until repaired, may have some business continuity impact and may
attract some adverse publicity for the company.
Alarm Level 3
The incident has already caused injury, or there is a substantial risk of personal
injury or death occurring. There is a high potential for adverse publicity for the
company or significant environmental impact may occur. A significant loss of
supply may result with a serious impact on business continuity, telephone or
cable loss may impact on information transfer or other utilities or electrical
supply may be at risk.
An incident of this severity requires the Manager to declare a Level 3 Alert. The
concerned General Manager must be advised and the Management Response
and Site Emergency Response Teams mobilised.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-19/20 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
company to co-operate with all other bodies brought together by SES to achieve
the best collective outcome.
If such a Plan is already in place, the company shall take steps to have the
effects of a reticulated gas system on the planned response actions
incorporated so that the best possible response can be undertaken.
The company will co-operate with State Authorities to prepare, or contribute to,
a State Disaster Response Plan that will provide the maximum possible degree
of human safety and protect public and Company assets in view of the possible
threats.
A broad bill of materials for all piping, mechanical, instrumentation & electrical
items described earlier in this chapter is listed as Annexure - II
H:\rajesh\Market Survey\TTZ\Final\Chapter - 06 - System Description.doc 06-20/20 © 2010 MECON Limited. All Rights Reserved
CHAPTER – 7
IMPLEMENTATION SCHEDULE
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
07.01 General
The overall project comprising the CNG & PNG facilities including laying of main
grid and MDPE Network in Taj Trapezium Zone area is envisaged to be
implemented over a period of 25 years in a phased manner taking into account
year-wise planning of infrastructure development in line with growth in demand
for PNG and CNG in various segments. Following are the salient points of the
Implementation Schedule:
The Steel grid line of 10”/8”/ 6”/4” to connect CNG station along with
required number of DRSs, has been planned to be completed mostly in
first year itself.
Most of the industrial units in and around Firozabad area shall be fed
from steel pipeline however in some of the cases the same shall be done
with DRSs, thereafter with MDPE pipeline to individual industrial units.
Even the comparatively larger industrial units may also be connected
through MDPE. Consumers in the major industrial areas located in
Firozabad, Hathras, Bharatpur etc. shall be taken up for connection.
The 10”/8”/ 6” dia Steel Pipe Line of length 142.8 Km (1065 Inch-
KM).
H:\rajesh\Market Survey\TTZ\Final\Chapter - 07 -Implementation.doc 07-1/7 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The period beyond 10 years is too long for judging accurate scenario of natural
gas demand, as this period may witness presence of different modes of Public
transport and other technological developments. The period may also have
presence of other players with access to the developed infrastructure and as
competitors sharing the present natural gas market. Thus the period beyond 10
years involves a considerable degree of uncertainty and as such the
implementation schedule under this Period may need updating in future.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 07 -Implementation.doc 07-2/7 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Following are the set of activities involved in development of City Grid line, CNG
Stations and City Gas Distribution:
H:\rajesh\Market Survey\TTZ\Final\Chapter - 07 -Implementation.doc 07-3/7 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
07.02 Assumptions
b) It is assumed that the ROU for laying City grid pipeline route and land
acquisition for CNG station, DRS & SV Stations etc. shall be taken as
per given schedule.
07.03 Recommendations
The city grid line construction along with erection of free issue items, erection of
CNG stations and City Gas Distribution system shall be given to competent
contractors, preferably an EPC agency, who shall complete the works as per
project schedule. All major/ critical equipment and materials will be procured by
H:\rajesh\Market Survey\TTZ\Final\Chapter - 07 -Implementation.doc 07-4/7 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
the owners directly, as this shall ensure the quality of equipment / material as
well as their availability in time
H:\rajesh\Market Survey\TTZ\Final\Chapter - 07 -Implementation.doc 07-5/7 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
H:\rajesh\Market Survey\TTZ\Final\Chapter - 07 -Implementation.doc 07-6/7 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
H:\rajesh\Market Survey\TTZ\Final\Chapter - 07 -Implementation.doc 07-7/7 © 2009 MECON Limited. All Rights Reserved
CHAPTER – 8
8.01 Introduction
The organization’s primary objective shall be safe, profitable and reliable supply
of natural gas to consumers of different segments.
The proposed structure also caters for the work change requirements
anticipated as the organization grows.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 08 - Manpower.doc 08-1/5 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Keeping in view the vast area covered by TTZ Geographical Area, the project
work has to be taken up in various locations simultaneously. This will require at
least three dedicated teams for Grid line as well as for CNG & City Gas. The
organisational set-up for project implementation for the Project shall be headed
by a Dy. General Manager (Projects) who shall be assisted by six Managers
dedicated for Grid line and CNG & City Gas. They inturn shall be assisted by
adequate number of Assistant Managers and staff members having the required
skills to look after the distinct functions assigned to them (Refer Figure 8.01),
namely,
The total project shall be taken up as comprising following two distinct areas:
Hence, there shall be dedicated project implementation teams for these two
areas which shall report to Dy. General Manager (Projects).
H:\rajesh\Market Survey\TTZ\Final\Chapter - 08 - Manpower.doc 08-2/5 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The requirement of manpower has been worked out keeping in view the
proposed locations of CNG dispensing facilities (Mother Stations, On-line
Stations) and Grid Pipeline at various cities inside TTZ. It is proposed that a
unified O & M mechanism headed by a Dy. General Manager and supported by
Managers, Assistant Managers for Operation and Maintenance, Safety, Stores
and Logistics, Administration & Finance. Further, adequate number of
supervisors, Assistants and Attendants would look after Operations &
Maintenance of following distinct areas, namely:
The officers upto managerial level shall be from GAIL Gas Ltd. and manpower
requirement from Supervisors and below ranks may be taken on contract basis.
It is further proposed that the services be out-sourced where ever possible, i.e.
services be contracted as required rather than employed as permanent staff,
particularly in the field of O&M, meter reading and account remittance, etc.
However, there shall be a requirement for a small permanent core group with
expertise to carry out work, supervise and ensure quality control on work
performed by contractors.
The number of contract crews for CNG installation, mainline laying, services
laying and customer connections & conversions shall be proportional to the rate
of new connections.
8.04 Training
H:\rajesh\Market Survey\TTZ\Final\Chapter - 08 - Manpower.doc 08-3/5 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The resources required shall depend on the rate of natural gas connections and
the consequent number of gas conversion staff.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 08 - Manpower.doc 08-4/5 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
FIGURE - 08.01
Assistant-1 Assistant
Assistant-1 (Safety)-3
Assistant-3
Supervisor-3 Supervisor
(Stores, Inventory & (Steel Grid)-3
Logistics)
Note:
Attendant-3 Attendant-3
During Project Implementation, services of the following is
envisaged
1) Engineering & Project Management Consultant
• Third Party Inspection Agency
• Outsourcing of services for CNG Stations, PNG
Services & Stores
FIGURE - 08.02
Assistant
Assistant (Finance)-2
Asstt. (Admin)-1
(C&P)-2
Supervisor
(Stores,
Supervisor Supervisor
Inventory &
(Operation)-3 (Maintenance)-3
Supervisor Supervisor Logistics)-2
(DRS & PNG)-4 (Steel Grid)-3
Assistant Attendant-2
Assistant
(Operations)-3
(Maintenance)-3
Assistant Assistant
Note:
(Projects)-4 (Projects)-3
During Project Implementation, services of the following is
envisaged
1) Engineering & Project Management Consultant
• Third Party Inspection Agency
• Outsourcing of services for CNG Stations, PNG
Services & Stores
H:\rajesh\Market Survey\TTZ\Final\Chapter - 08 - Manpower.doc 08-5/5 © 2010 MECON Limited. All Rights Reserved
CHAPTER – 9
09.01 General
Capital cost based on the facilities envisaged for steel gridline, online stations
and city gas distribution network including charges for domestic, commercial
and industrial connections are estimated as Rs.465.34 crores. The total cost of
project is summarised in Table -09.01.
Major facilities included in the capital cost estimates are given below:
H:\rajesh\Market Survey\TTZ\Final\Chapter - 09-Capital Cost.doc 09-1/8 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
The break up of capital costs under major heads such as equipment, spares,
civil engineering works, erection, duties & taxes, transportation and engineering,
supervision, project management etc., for CGS, City Gas Distribution and CNG
Stations are furnished in Table - 09.02 to 09.04.
09.03 Assumptions
Following assumptions have been made for working out the capital costs.
The cost of land for citing SV stations has been considered at a rate of Rs.
10000 per sqm. The cost towards Right of Way (ROW) has been considered as
Rs. 3 lakhs per km for required width for the entire length of steel pipeline.
09.03.02 Equipment
The costs of equipment, in some areas, are based on LOA/ budgetary offers.
However, generally, in house information for equipment installed in other
projects has been used. The cost of equipment under this head is on ex-works
basis.
09.03.03 Spares
Provision for spares required for 2 years normal operation has been made
equivalent to 5% of equipment cost excluding steel grid pipeline.
Cost estimates for civil engineering works have been worked out based on
preliminary layout and design of grid line and route survey and rates generally
prevailing for similar work in the area.
09.03.05 Erection
Provision towards erection of equipment has been made on the basis of erection
rates as prevailing in the region.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 09-Capital Cost.doc 09-2/8 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
For equipment provision for excise duty @10.3%, Central sales tax @10%,
inland freight & transit insurance @2% has been made. Service tax @10.3%
has also been considered on cost of Engineering, Supervision etc.
Provision towards owner’s management expenses have been kept at the rate of
3%. This includes preliminary and pre-operative expenses.
09.03.09 Contingencies
The Time Schedule for construction of various facilities for the proposed project
would be as per implementation schedule given in earlier chapter.
09.03.11 Financing
It has been assumed that the project cost would be financed in the debt: equity
ratio of 60:40. Interest rate on long term loan has been considered 10.5% per
annum.
Provision for connection charges has been made in the Capex @ Rs 8000 per
connection for total 117200 domestic connections. In case of commercial and
industrial connections it has been assumed that full expenses towards
connection shall be realised from the consumers. Therefore, no provision for
H:\rajesh\Market Survey\TTZ\Final\Chapter - 09-Capital Cost.doc 09-3/8 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
these charges has been kept in the estimates. Interest free deposit of Rs. 5000
per connection for domestic connections has been considered as refundable
advance. This amount has to be refunded at the end of project life as shown in
the Cash Flow Statement.
Phasing of capital expenditure before interest during construction for the project
as Rs.43756.3 Lakhs has been worked out on the basis of implementation
schedule. The same is shown year-wise and given below.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 09-Capital Cost.doc 09-4/8 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
H:\rajesh\Market Survey\TTZ\Final\Chapter - 09-Capital Cost.doc 09-5/8 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
H:\rajesh\Market Survey\TTZ\Final\Chapter - 09-Capital Cost.doc 09-6/8 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
H:\rajesh\Market Survey\TTZ\Final\Chapter - 09-Capital Cost.doc 09-7/8 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
H:\rajesh\Market Survey\TTZ\Final\Chapter - 09-Capital Cost.doc 09-8/8 © 2010 MECON Limited. All Rights Reserved
CHAPTER – 10
OPERATING COST
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
10.01 General
The annual operating costs for the project at 100% capacity is given below
A. Variable Cost
1. Electric Power 0.00 217.25 0.00 217.25
2. Diesel 0.00 47.51 0.00 47.51
3. Gas for compressors 0.00 815.56 0.00 815.56
4. Consumables 99.35 0.00 0.00 99.35
Sub-Total (A) 99.35 1080.32 0.00 1179.67
B. Fixed Cost
1 Manpower 96.79 152.10 110.62 359.51
2 Overheads 16.00 128.00 128.10 272.00
3 Repair & 125.95 631.28 185.35 942.58
Maintenance
4 Insurance 15.11 15.15 22.24 52.50
5. Wet lease for LCV’ s 0.00 234.00 0.00 234.00
6. AMC for 0.00 366.00 0.00 366.00
compressors
Sub-Total (B) 253.85 1526.53 446.21 2226.59
Total (A+B) 353.19 2606.85 446.21 3406.26
The various parameters considered for computing the operating costs are
described in the following paragraphs.
Year wise operating cost have been furnished in table no. 10.01
H:\rajesh\Market Survey\TTZ\Final\Chapter - 10-Operating Cost.doc 10-1/5 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Electric energy has been considered for CNG Stations and for operation of
Electric Motor driven CNG Compressors. The energy cost @ Rs.5/KWH has
been considered. In case of Gas Engine driven CNG Compressors, the gas cost
has been taken @ Rs.12.25 per SCM. Further, Diesel for Gen. Sets has been
considered @ Rs 32.54/litre.
10.03 Water
Since the water requirement of the project would be negligible, no separate cost
towards same has been considered in the operating cost estimate.
10.04 Manpower
Total 52
Provision for repair and maintenance has been kept at the rate of 1% of the
capital cost for Steel Grid Line and City Gas Distribution and 5% for CNG
H:\rajesh\Market Survey\TTZ\Final\Chapter - 10-Operating Cost.doc 10-2/5 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
stations. Since the useful life for compressors and dispensers has been
considered as 15 years, AMC has also been taken in addition to 5% of capital
cost taken for repair & maintenance for compressors and dispensers.
10.06 Insurance
Insurance cost at the rate of 0.12% of the capital cost has been considered in
the operating cost estimates
H:\rajesh\Market Survey\TTZ\Final\Chapter - 10-Operating Cost.doc 10-3/5 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Item Unit Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr 10 Yr 11 Yr 12
Power Lakh Rs 87.6 87.6 87.6 87.6 162.1 162.1 162.1 170.8 170.8 212.9 212.9 212.9
Gas Lakh Rs 143.1 143.1 143.1 143.1 250.4 250.4 286.2 357.7 393.5 472.2 472.2 507.9
Fuel Requirement Diesel Lakh Rs 23.8 23.8 23.8 23.8 29.7 29.7 29.7 41.6 41.6 41.6 41.6 41.6
Consumables Lakh Rs 8.6 21.9 32.0 38.5 49.3 51.6 54.0 57.7 61.8 63.6 65.8 67.8
Manpower Lakh Rs 100.8 201.5 201.5 243.5 280.5 280.5 280.5 280.5 301.5 306.5 306.5 306.5
Manpower Overheads Lakh Rs 72 144 144 176 208 208 208 208 224 224 224 224
Repair & Maintenance & Lakh Rs 165.4 374.0 414.7 457.7 599.4 602.4 620.5 678.7 696.1 781.6 786.7 804.1
Insurance
AMC for compressors and wet Lakh Rs 84 168 168 168 324 324 336 360 372 480 480 492
lease for LCVs
Total Lakh Rs 685.2 1163.8 1214.6 1338.1 1903.3 1908.6 1977.0 2155.0 2261.3 2582.4 2589.5 2656.8
H:\rajesh\Market Survey\TTZ\Final\Chapter - 10-Operating Cost.doc 10-4/5 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Item Unit Yr 13 Yr 14 Yr 15 Yr 16 Yr 17 Yr 18 Yr 19 Yr 20 Yr 21 Yr 22 Yr 23 Yr 24
Power Lakh Rs 212.9 212.9 212.9 212.9 212.9 212.9 212.9 212.9 217.2 217.2 217.2 217.2
Gas Lakh Rs 529.4 565.2 565.2 600.9 600.9 636.7 636.7 744.0 779.8 815.6 815.6 815.6
Fuel Requirement Diesel Lakh Rs 41.6 41.6 41.6 41.6 41.6 41.6 41.6 41.6 47.5 47.5 47.5 47.5
Consumables Lakh Rs 69.9 72.1 74.3 76.7 79.2 81.8 84.5 87.2 90.1 93.1 96.0 99.3
Manpower Lakh Rs 306.5 322.5 322.5 322.5 341.0 341.0 341.0 341.0 359.5 359.5 359.5 359.5
Manpower Overheads Lakh Rs 224 240 240 240 256 256 256 256 272 272 272 272
Repair & Maintenance & Lakh Rs 816.4 835.2 839.9 859.1 864.8 886.3 895.4 936.1 968.4 984.6 988.6 995.1
Insurance
AMC for compressors and Lakh Rs 504 516 516 528 528 540 540 576 588 600 600 600
wet lease for LCVs
Total Lakh Rs 2704.6 2805.4 2812.4 2881.7 2924.3 2996.2 3008.0 3194.7 3322.5 3389.5 3396.5 3406.3
H:\rajesh\Market Survey\TTZ\Final\Chapter - 10-Operating Cost.doc 10-5/5 © 2010 MECON Limited. All Rights Reserved
CHAPTER – 11
FINANCIAL ANALYSIS
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
11.01 General
The financial analysis of the project has been carried out based on the capital
cost and operating cost as elaborated in Chpaters-09 & 10 respectively and the
purchase price of the gas delivered at the tap-off and finally to consumers of the
gas for the project. Compression charges and Transportation Tariff with post tax
IRR of 10% has been calculated and given in Tables 11.01 and 11.02. Profit &
Loss Statement, Cash flow Statement and Balance Sheet have been projected
for the project life of 25 years and given in Table-11.03 to Table-11.05. Payback
period, Debt-service coverage ratio and Break-even capacity have been
calculated and given in Tables 11.06 to 11.08.
Salient financial indices for the project are given below.
11.02 Assumptions
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-1/22 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
ii) Gas purchase cost as indicated by M/s GAIL Gas has been considered as Rs
12.50/SCM for automobile & domestic consumers and Rs.18.00/SCM for
industrial & commercial consumers.
iii) The following net selling prices have been considered for working out the profit
& loss and cash flow statements for the project:
Domestic consumers: Rs 18.00/SCM
Commercial consumers: Rs 23.00/SCM
Industrial consumers: Rs20.00/SCM
CNG consumers: Rs 23.00/SCM (Rs 28.61/Kg)
The above selling prices for different consumers have been arrived at on the basis of
equivalent selling prices of alternative fuels prevailing in the region.
iv) Working capital requirement for the project has been considered equivalent to 3
months’ operating expenses.
vi) Project life has been considered as 25 years from the date of authorisation for
the project.
vii) Salvage value equivalent to 5% of the project cost has been considered at the
end of the economic life of the project.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-2/22 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
ix) All estimates are based on the prices prevailing in 2nd quarter of 2010 and no
future escalation has been considered.
xi) It has been considered that an interest free deposit of Rs 5000 per connection
from domestic consumers shall be taken. This amount shall be refunded at the
end of the project life and same is shown in the Cash Flow Statement.
xii) Regulated tariffs i.e. Compression charges and Transportation tariff have been
calculated with post tax IRR of 10% on regulated investments.
Selling prices of CNG and PNG as worked out above have been compared with
alternative fuels as given below.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-3/22 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
To arrive at the equivalent CNG & PNG prices, following considerations have
been made.
v) Excise duty and VAT, for CNG; have been considered @ 10.3% and
13.5% respectively. In addition dealer’s commission including VAT has
also been added @ Rs 1.20 per kg of CNG.
Sensitivity analysis for the project has been carried out for increase/decrease of
capital cost, operating cost, selling price, gas purchase price and gas volume by
10%. Compression charges, Transportation tariff and IRR (post tax) for the
project have been worked out with changed parameters to assess sensitivity of
the project under different scenarios and presented in Table-11.09.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-4/22 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
COMPRESSION CHARGES
Table-11.01
Item \ Year Unit 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th
Annual quantity of gas sold TSCM 0 1259 5037 7556 13432 16790 23506 30642 48691 68167 72197 73876
Capital investment Rs lakh 997 0 0 0 639 0 196 620 196 435 0 196
Annual operating cost Rs lakh 0 303 445 445 514 694 694 752 888 983 1120 1120
Total outflow Rs lakh 997 379 480 445 1170 740 890 1386 1118 1442 1154 1315
Annual revenue inflow Rs lakh 0 40 160 240 427 533 746 973 1546 2165 2293 2346
Net inflow Rs lakh -997 -339 -320 -205 -743 -207 -143 -413 429 723 1139 1031
Year-wise Comp. Charges (Rs/Kg) 38.156 12.084 7.468 11.054 5.594 4.804 5.740 2.913 2.684 2.028 2.260
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-5/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Cont….. Table-11.01
Item Unit 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th
Item \ Year Unit 76395 78913 81431 84279 87308 90666 94024 97382 101160 105777 109975 114172 119209
Annual quantity of gas sold TSCM 120 196 0 196 0 196 0 587 303 196 0 0 -254
Annual gas cost Rs lakh 1177 1217 1275 1275 1333 1333 1390 1390 1564 1631 1689 1689 1689
Total outflow Rs lakh 2426 2506 2586 2676 2773 2879 2986 3093 3213 3359 3492 3626 3786
Annual revenue inflow Rs lakh 1115 1083 1296 1206 1426 1351 1581 1115 1302 1515 1789 1936 2350
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-6/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
TRANSPORTATION TARIFF
Table-11.02
Item Unit 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th
Capital investment Rs lakh 10050 3858 3628 3838 356 270 360 390 300 617 450 300
Annual operating cost Rs lakh 0 148 344 395 450 533 539 545 553 561 574 582
Annual working capital
Rs lakh 0 37 49 13 13 21 2 1 2 2 4 1
requirement
Total outflow Rs lakh 10050 4043 4021 4246 818 824 900 936 855 1180 1028 882
Annual revenue inflow Rs lakh 0 349 1777 2600 3134 4008 4195 4393 4699 5023 5194 5348
-
Net inflow Rs lakh -3694 -2245 -1646 2316 3184 3295 3457 3844 3843 4166 4466
10050
Internal Rate of Return
15.15%
(IRR) - Pre-tax
Year-wise Tariff (Rs/SCM) 10.595 2.072 1.495 0.239 0.188 0.196 0.195 0.167 0.215 0.181 0.151
Year-wise Tariff
0.357 0.070 0.050 0.008 0.006 0.007 0.007 0.006 0.007 0.006 0.005
(Rs/MMBTU)
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-7/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Cont…….
Table-11.02
Item Unit 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th
Annual quantity of
TSCM 602288 621117 640392 660646 681756 703743 726704 750446 774867 800777 827019 854042 882714
gas sold
Capital
Rs lakh 420 420 420 450 510 660 810 420 360 420 360 390 -1315
investment
Total outflow Rs lakh 1009 1014 1062 1091 1159 1359 1512 1134 1081 1190 1130 1167 -625
Annual revenue
Rs lakh 5513 5686 5862 6048 6241 6442 6652 6870 7093 7331 7571 7818 8081
inflow
Net inflow Rs lakh 4505 4671 4800 4956 5082 5083 5140 5736 6013 6141 6441 6651 8706
Internal Rate of
Return (IRR) - 15.15%
Pre-tax
Year-wise Tariff
0.167 0.163 0.166 0.165 0.170 0.193 0.208 0.151 0.139 0.149 0.137 0.137 -0.071
(Rs/SCM)
Year-wise Tariff
0.006 0.006 0.006 0.006 0.006 0.007 0.007 0.005 0.005 0.005 0.005 0.005 -0.002
(Rs/MMBTU)
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-8/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
2 TOTAL ANNUAL OPERATING COST 685.2 1163.8 1214.6 1338.1 1903.3 1908.6 1977.0 2155.0 2261.3 2582.4 2589.5 2656.8
3 TOTAL MANUFACTURING EXPENSES 7450.3 35687.9 51524.8 61549.0 79083.3 82356.6 85886.7 91011.0 96348.6 99771.1 102685.9 105840.7
4 EXPECTED SALES 7661.0 38937.8 56921.5 68678.9 87864.1 92141.5 96678.2 103889.5 111546.8 115389.8 118802.1 122485.2
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-9/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
YEAR OF OPERATION --> 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th
Sl.
ITEM
No
1 ANNUAL GAS COST- CNG 9666.8 9975.4 10324.1 10695.2 11106.6 11517.9 11929.3 12392.1 12957.7 13471.9 13986.1 14603.1
ANNUAL GAS COST- PNG 96732.0 99718.9 102822.8 106045.6 109363.2 112845.6 116458.1 120144.4 123952.0 127890.7 131974.0 136201.0
ANNUAL OPERATING COST
a Consumables & Chemicals 69.9 72.1 74.3 76.7 79.2 81.8 84.5 87.2 90.1 93.1 96.0 99.3
b Utilities -(Power & Fuel) 783.8 819.6 819.6 855.4 855.4 891.1 891.1 998.5 1044.5 1080.3 1080.3 1080.3
c Salaries 306.5 322.5 322.5 322.5 341.0 341.0 341.0 341.0 359.5 359.5 359.5 359.5
d Repair & Maintenance 816.4 835.2 839.9 859.1 864.8 886.3 895.4 936.1 968.4 984.6 988.6 995.1
e Gen. Administrative Expences 224.0 240.0 240.0 240.0 256.0 256.0 256.0 256.0 272.0 272.0 272.0 272.0
2 TOTAL ANNUAL OPERATING COST 2704.6 2805.4 2812.4 2881.7 2924.3 2996.2 3008.0 3194.7 3322.5 3389.5 3396.5 3406.3
3 TOTAL MANUFACTURING EXPENSES 109103.5 112499.6 115959.3 119622.5 123394.1 127359.8 131395.4 135731.2 140232.3 144752.0 149356.5 154210.4
4 EXPECTED SALES 126317.4 130238.9 134366.0 138668.9 143154.6 147832.7 152662.1 157650.4 162962.3 168327.5 173849.2 179725.2
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-10/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
YEAR OF OPERATION --> 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th
Sl.
ITEM
No
Revenue from Network Tariff (based on PIRR) 108167.4 111509.6 114982.0 118588.0 122301.4 126207.2 130264.3 134383.7 138633.6 143033.4 147589.6 152307.2
Domestic 2706.8 2798.8 2890.8 2989.4 3101.0 3245.6 3423.0 3515.0 3593.8 3685.8 3764.6 3850.0
Commercial 209.9 218.3 226.7 235.1 235.1 243.5 243.5 251.9 251.9 260.2 260.2 260.2
Industry 105250.7 108492.6 111864.5 115363.6 118965.3 122718.1 126597.8 130616.9 134788.0 139087.4 143564.8 148196.9
5 OTHER INCOME
6 GROSS PROFIT BEFORE INTT. 17213.9 17739.3 18406.7 19046.3 19760.5 20472.9 21266.8 21919.3 22730.0 23575.5 24492.7 25514.8
7 INTT. ON LONG TERM LOAN 237.9 207.6 195.9 172.0 177.7 176.7 211.0 229.7 225.2 201.2 178.9 152.6
8 INTERST ON BANK BORROWINGS 77.8 80.7 80.9 82.8 84.1 86.1 86.5 91.8 95.5 97.4 97.6 97.9
FOR WORKING CAPITAL
9 INTEREST ON OVER DRAFT 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10 TOTAL FINANCIAL EXPENSES 315.6 288.2 276.7 254.9 261.8 262.9 297.5 321.5 320.7 298.6 276.6 250.5
11 DEPRECIATION 2062.9 2086.5 2127.2 2155.9 2208.4 2253.9 2316.9 2368.2 2404.3 2424.5 2446.4 2457.0
12 OPERATING PROFIT 14835.3 15364.5 16002.8 16635.6 17290.3 17956.2 18652.4 19229.6 20005.0 20852.4 21769.7 22807.4
13 PRELIMINARY EXPENSES WRITTEN OFF 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
14 PROFIT/LOSS BEFORE TAX 14835.3 15364.5 16002.8 16635.6 17290.3 17956.2 18652.4 19229.6 20005.0 20852.4 21769.7 22807.4
15 PROVISION FOR TAXATION 5251.1 5475.2 5751.6 5998.8 6269.8 6514.5 6781.9 6986.5 7266.0 7578.6 7928.3 8308.9
16 PROFIT AFTER TAX 9584.2 9889.4 10251.1 10636.9 11020.5 11441.7 11870.5 12243.1 12739.0 13273.7 13841.3 14498.5
17 DIVIDEND ON EQUITY 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 2.0
17 RETAINED PROFIT:
(i) CURRENT 9584.2 9889.4 10251.1 10636.9 11020.5 11441.7 11870.5 12243.1 12739.0 13273.7 13840.3 14496.5
(ii) CUMULATIVE 71104.1 80993.5 91244.6 101881.5 112902.0 124343.7 136214.1 148457.2 161196.2 174470.0 188310.3 202806.8
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-11/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Table-11.04
CASHFLOW STATEMENT
Sl.No. CONSTN. PERIOD OF OPERATIONS
ITEM/YEAR 1st 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th
SOURCES OF
A.
FUNDS
EQUITY - FIXED
1. 6264.1 1521.2 1059.4 1120.7 1259.5 78.8 222.4 560.5 204.8 871.3 131.3 204.8 185.5
CAPITAL
- MARGIN
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
MONEY
PROFIT BEFORE
2. -848.7 1986.9 3918.1 5480.4 7116.0 8084.5 9010.2 11064.9 13263.7 13659.0 14124.3 14620.6
INTT.AND TAX
DEPRECIATION
3. AND 1059.3 1263.1 1478.6 1649.6 1664.8 1700.4 1781.3 1813.6 1934.4 1959.7 1992.0 2023.9
PRELIMINARY
EXPENSES
WRITTEN OFF
TERM LOAN -
4. 9396.2 2281.8 1589.1 1681.0 1889.3 118.2 333.5 840.7 307.3 1307.0 197.0 307.3 278.2
FIXED CAPITAL
- MARGIN
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
MONEY
Connection
deposits from 300.0 300.0 1210.0 1280.0 90.0 90.0 120.0 130.0 100.0 110.0 150.0 100.0 140.0
customers
INCRE. IN BANK
5.
BORROWINGS
FOR WORKING
171.3 119.7 12.7 30.9 141.3 1.3 17.1 44.5 26.6 80.3 1.8 16.8
CAPITAL
6. OVER DRAFT 422.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL CASH
15960.3 4907.1 7228.2 9491.1 10399.7 9209.0 10462.2 12339.8 13535.1 17513.0 16177.3 16730.2 17265.0
INFLOW (A)
DISPOSITION
B.
OF FUNDS
CAPITAL
1. 15960.3 4103.0 3858.5 4081.7 3238.8 287.0 675.9 1531.2 612.1 2288.3 478.3 612.1 603.6
EXPENDITURE
2. DECREASE IN 0.0 0.0 1658.4 1868.5 2104.7 2119.5 2161.1 2266.2 2304.6 2468.0 834.3 662.5
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-12/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-13/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Cont……..
Table-11.04
PERIOD OF OPERATIONS
Sl.No.
ITEM/YEAR 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th
SOURCES OF
A.
FUNDS
EQUITY - FIXED 239.9 122.6 248.6 148.8 309.9 236.4 421.6 340.5 217.9 105.1 113.8 79.9
1.
CAPITAL
- MARGIN 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
MONEY
PROFIT BEFORE 15151.0 15652.8 16279.5 16890.5 17552.1 18219.1 18949.9 19551.1 20325.7 21151.0 22046.2 23057.9
2.
INTT.AND TAX
DEPRECIATION 2062.9 2086.5 2127.2 2155.9 2208.4 2253.9 2316.9 2368.2 2404.3 2424.5 2446.4 2457.0
3. AND
PRELIMINARY
EXPENSES
WRITTEN OFF
TERM LOAN - 359.8 183.9 372.9 223.3 464.9 354.6 632.4 510.8 326.8 157.6 170.7 119.9
4.
FIXED CAPITAL
- MARGIN 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
MONEY
Connection 140.0 140.0 150.0 170.0 220.0 270.0 140.0 120.0 140.0 120.0 130.0 0.0
deposits from
customers
INCRE. IN BANK
5.
BORROWINGS
FOR WORKING 12.0 25.2 1.7 17.3 10.7 18.0 2.9 46.7 32.0 16.7 1.8 2.4
CAPITAL
6. OVER DRAFT 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL CASH
17965.5 18210.9 19180.0 19605.8 20765.9 21351.9 22463.7 22937.3
INFLOW (A) 23447 23975 24909 25717.1
DISPOSITION OF
B.
FUNDS
CAPITAL 739.7 446.4 771.6 542.1 994.8 861.0 1194.0 971.4 684.7 382.7 414.6 199.8
1.
EXPENDITURE
DECREASE IN 461.1 491.3 472.6 414.2 403.7 298.4 318.1 358.7 387.8 383.7 380.4 355.1
2.
LONG TERM LOAN
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-14/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
PERIOD OF OPERATIONS
Sl.No.
ITEM/YEAR 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th
INCREASE IN 12.0 25.2 1.7 17.3 10.7 18.0 2.9 46.7 32.0 16.7 1.8 2.4
3. WORKING
CAPITAL
TOTAL INTT.ON 237.9 207.6 195.9 172.0 177.7 176.7 211.0 229.7 225.2 201.2 178.9 152.6
4.
LONG TERM LOAN
INTT.ON BANK 77.8 80.7 80.9 82.8 84.1 86.1 86.5 91.8 95.5 97.4 97.6 97.9
5.
BORROWING
FOR WORKING
CAPITAL
REPAYMENT OF 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
6.
OVER DRAFT
INTEREST ON 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7.
OVER DRAFT
PROVISION FOR 5251.1 5475.2 5751.6 5998.8 6269.8 6514.5 6781.9 6986.5 7266.0 7578.6 7928.3 8308.9
8.
TAXATION
DIVIDEND ON 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 2.0
9.
EQUITY
TOTAL CASH
6779.5 6726.4 7274.3 7227.2 7940.7 7954.7 8594.4 8684.8
OUTFLOW (B) 8691.2 8660.3 9002.6 9118.8
NET CASH 11186.0 11484.5 11905.7 12378.6 12825.3 13397.1 13869.3 14252.5 14755.5 15314.6 15906.3 16598.3
ACCRUALS (A-B)
OPENING 63392.7 74578.7 86063.3 97969.0 110347.5 123172.8 136569.9 150439.2 164691.7 179447.2 194761.8 210668.1
BALANCE
CUMULATIVE 74578.7 86063.3 97969.0 110347.5 123172.8 136569.9 150439.2 164691.7 179447.2 194761.8 210668.1 227266.5
CASH SURPLUS
Post-tax IRR on
Capital Employed,
%
Pre-tax IRR on
Capital Employed,
%
NPV @10%
discount factor
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-15/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Table-11.05
ESTIMATED BALANCE SHEET
(In Rs Lakhs)
CONSTN. PERIOD OF OPERATIONS
ITEM/YEAR 1st 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th
ASSETS
Gross Fixed Assets 15960.3 20063.3 23921.8 28003.6 31242.4 31529.4 32205.3 33736.5 34348.6 36636.9 37115.3 37727.4
Less: Accumulated Depreciation 1059.3 2322.4 3801.0 5450.6 7115.4 8815.8 10597.1 12410.7 14345.1 16304.8 18296.8 20320.7
Net Fixed Assets 0.0 14901.0 17740.9 20120.8 22553.0 24127.0 22713.6 21608.2 21325.8 20003.5 20332.1 18818.5 17406.7
Net Current Assets 171.3 291.0 303.6 334.5 475.8 477.1 494.2 538.7 565.3 645.6 647.4 664.2
Cash & Bank 0.0 -422.2 1352.7 3408.1 6711.0 10675.6 15106.1 20150.2 26555.4 34438.6 42597.5 52748.1 63392.7
Investments 15960.3 4103.0 3858.5 4081.7 3238.8 287.0 675.9 1531.2 612.1 2288.3 478.3 612.1 603.6
Misc. Fixed Assets
Deferred Revenue Exp.
Others
TOTAL ASSETS 15960.3 18753.1 23243.1 27914.4 32837.3 35565.4 38972.7 43783.9 49032.1 57295.7 64053.5 72826.0 82067.3
LIABILITIES
Net Worth
Equity Capital 6264.1 7785.3 8844.7 9965.4 11225.0 11303.8 11526.1 12086.6 12291.5 13162.8 13294.1 13499.0 13684.4
Preference Share Capital
Reserves 0.0 -1481.5 -969.7 1265.5 4787.3 9191.8 14041.3 19465.3 26323.1 34576.5 43243.7 52236.6 61519.9
Net Worth 6264.1 6303.8 7875.1 11231.0 16012.3 20495.6 25567.5 31551.9 38614.6 47739.3 56537.8 65735.5 75204.3
Debt
Rupee Term Loan 9696.2 12278.0 15077.1 16379.8 16490.5 14594.0 12928.1 11737.7 9878.8 8991.1 6870.1 6443.1 6198.7
FC Term Loan
Bank Borrowings for Working Capital 171.3 291.0 303.6 334.5 475.8 477.1 494.2 538.7 565.3 645.6 647.4 664.2
Others
TOTAL LIABILITIES 15960.3 18753.1 23243.1 27914.4 32837.3 35565.4 38972.7 43783.9 49032.1 57295.7 64053.5 72826.0 82067.3
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-16/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Cont…….
Table-11.05
PERIOD OF OPERATIONS
ITEM/YEAR 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th
ASSETS
Gross Fixed Assets 38331.0 39070.7 39517.1 40288.7 40830.8 41825.6 42686.6 43880.5
44851.9 45536.6 45919.3 46333.8
Less: Accumulated Depreciation 22383.6 24470.1 26597.4 28753.2 30961.6 33215.5 35532.4 37900.5 40304.9 42729.4 45175.8 47632.8
Net Fixed Assets 15947.4 14600.6 12919.8 11535.5 9869.2 8610.1 7154.2 5980.0 4547.0 2807.2 743.4 -1299.0
Net Current Assets 676.2 701.3 703.1 720.4 731.1 749.0 752.0 798.7 830.6 847.4 849.1 851.6
Cash & Bank 74578.7 86063.3 97969.0 110347.5 123172.8 136569.9 150439.2 164691.7 179447.2 194761.8 210668.1 227266.5
Investments 739.7 446.4 771.6 542.1 994.8 861.0 1194.0 971.4 684.7 382.7 414.6 199.8
Misc. Fixed Assets
Deferred Revenue Exp.
Others
TOTAL ASSETS 91942.0 101811.6 112363.4 123145.5 134767.8 146790.0 159539.3 172441.7 185509.6 198799.0 212675.2 227018.8
LIABILITIES
Net Worth
Equity Capital 13924.3 14046.9 14295.5 14444.3 14754.2 14990.6 15412.2 15752.8 15970.6 16075.7 16189.5 16269.5
Preference Share Capital
Reserves 71104.1 80993.5 91244.6 101881.5 112902.0 124343.7 136214.1 148457.2 161196.2 174470.0 188310.3 202806.8
Net Worth 85028.4 95040.4 105540.1 116325.8 127656.2 139334.3 151626.4 164210.0 177166.9 190545.7 204499.8 219076.2
Debt
Rupee Term Loan 6237.4 6069.9 6120.2 6099.3 6380.5 6706.7 7161.0 7433.1 7512.1 7406.0 7326.3 7091.1
FC Term Loan
Bank Borrowings for Working Capital 676.2 701.3 703.1 720.4 731.1 749.0 752.0 798.7 830.6 847.4 849.1 851.6
Others
TOTAL LIABILITIES 91942.0 101811.6 112363.4 123145.5 134767.8 146790.0 159539.3 172441.7 185509.6 198799.0 212675.2 227018.8
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-17/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-19/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-20/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
Note: Interest and depreciation charges have been considered average during the
project life.
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-21/22 © 2009 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
SENSITIVITY ANALYSIS
Table-11.09
IRR on
Compres
Capital Transportati
Sl. sion
Description Employ on Tariff,
No Charges,
ed, Rs/MMBTU
Rs/Kg
(%)
1 Base Case 23.6 4.07 27.14
2 With increase in Capital cost by 10% 22.2 4.19 29.50
H:\rajesh\Market Survey\TTZ\Final\Chapter - 11-Financial Evaluation.doc 11-22/22 © 2009 MECON Limited. All Rights Reserved
ANNEXURES & DRAWINGS
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
A2 Lot 5 0 0
Odorising System
A3 Mechanical Erection Lot 5 0 0
A4 Plot Lot 5 0 0
B Chhata-Vrindavan-Raya-Hathras
2.2.1
i Steel Pipe ( 4" x 6.4mm- API 5L GrB, 3L PE Coated) M 0 0 0
B 2.3 Govardhan
Steel Pipe ( 4" x 6.4mm- API 5L GrB, 3L PE Coated) M 5000 0 0
Steel Pipe ( 6" x 6.4mm- API 5L GrB, 3L PE Coated) M 0 0 0
Steel Pipe ( 8" x 6.4mm- API 5L Gr B, 3L PE M 0 0 0
Coated)
H:\rajesh\Market Survey\TTZ\Final\BOM.doc Ann II-BOM - 1/5 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
B3 Supply of
B 3.1 Warning Grid : 1 mm thk M 142800 0 0
B 3.2 50mm dia HDPE M 142800 0 0
B 3.3 33 mm dia OFC M 142800 0 0
H:\rajesh\Market Survey\TTZ\Final\BOM.doc Ann II-BOM - 2/5 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
C Compressors
1.2
- 1200 SCM/ Hr, Pr. : 19 to 255 kg/cm2(g) (GAS) Nos. 1x5 1x6 1x5
- 650 SCM/ Hr, Pr. : 19 to 255 kg/cm2(g) (GAS) Nos. - 1x3
C Cascades
1.3
- Capacity : 4500 WL Nos. 1x5 1x9 1x5
C Dispenser*
1.4
a) Car/Auto Nos. 2x5 1x6 1x4
b) Bus Nos. 2x5 1x6 1x4
C Interconnecting Pipe (up to 2" dia.) & SS Tubes Lot 1x5 1x2 1x1
1.7
SS Fittings
C Civil Works: Foundations, Building, Control Room & Lot 1x5 1x2 1x1
1.8 Cascade Filling Area
C Compressor
3.1
-1200 SCM/ Hr, Pr. : 19 to 255 kg/cm2(g) Nos. 1x2 1x1 1x2
(Gas)
C Dispenser
3.2
a) Car Nos. 1x2 1x1
b) Bus Nos. 1x2 1x1
H:\rajesh\Market Survey\TTZ\Final\BOM.doc Ann II-BOM - 3/5 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
C Dispenser*
5.2
- Car / Auto Nos. 2 x 20 2x6
H:\rajesh\Market Survey\TTZ\Final\BOM.doc Ann II-BOM - 4/5 © 2010 MECON Limited. All Rights Reserved
DETAILED FEASIBILITY REPORT
City Gas Distribution Network
GAIL GAS Taj Trapezium Zone MECON
F SCADA
SCADA with RTU for Gas Actuator valves
open/close position, Flow data Inlet pressure, Lot 1 0 0
Temperature, Cathodic Protection parameters etc.
H:\rajesh\Market Survey\TTZ\Final\BOM.doc Ann II-BOM - 5/5 © 2010 MECON Limited. All Rights Reserved